CN106338327B - A kind of weighing system and method suitable for more marshalling tramcars - Google Patents
A kind of weighing system and method suitable for more marshalling tramcars Download PDFInfo
- Publication number
- CN106338327B CN106338327B CN201610731522.8A CN201610731522A CN106338327B CN 106338327 B CN106338327 B CN 106338327B CN 201610731522 A CN201610731522 A CN 201610731522A CN 106338327 B CN106338327 B CN 106338327B
- Authority
- CN
- China
- Prior art keywords
- vehicle
- railway line
- traverse table
- weighing
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01G—WEIGHING
- G01G19/00—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
- G01G19/02—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for weighing wheeled or rolling bodies, e.g. vehicles
- G01G19/04—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for weighing wheeled or rolling bodies, e.g. vehicles for weighing railway vehicles
Abstract
The invention discloses a kind of weighing systems and method suitable for more marshalling tramcars, including traverse table, traverse table track, the first railway line, the second railway line, third railway line, the first motor-car, the second motor-car, the first levitation vehicle, the second levitation vehicle, trailer, vehicle modules and vehicle solution volume to turn sequence device body.The present invention's can directly be sent multimode to weighing unit by traverse table, it is not necessary that bogie is first hung to weighing unit, car body is hung on bogie again, reduce and falls vehicle even extension step on weighing unit, and eliminate the loss of fastener between bogie and car body, reduce workload simultaneously, improves work efficiency;Entire weighing process, it is only necessary to three railway lines(Containing weighing-appliance)It can be completed, the route for moving back vehicle in this way was not only clear, but also can reduce railway line occupancy;The weighing method can weigh on the existing weighing-appliance of tramcar industry, and measure complete vehicle weight, cost-effective without buying special weighing-appliance again.
Description
Technical field
It is the present invention relates to a kind of weighing system and method, more particularly to a kind of to be suitable for weighing for more marshalling tramcars
System and method.
Background technology
Modern tram project is five marshallings, and there are three bogie, two dynamic one to drag for the installation of permutation vehicle;Pass through between vehicle
Articulated connection.Vehicle marshalling number is QKZ17, and organizational systems are:=the first the+the first levitation vehicle of motor-car+the+the second levitation vehicle+the of trailer
Two motor-cars=, vehicle model QK66, QK67, QK68, QK69, QK70.
QK66:To install the motor-car of motor car bogie and drivers' cab(First motor-car);
QK67:For levitation vehicle, lower part is not provided with bogie(First levitation vehicle);
QK68;To install the trailer of pantograph and trailer bogie(Trailer);
QK69:For levitation vehicle, lower part is not provided with bogie(Second levitation vehicle);
QK70:To install the motor-car of motor car bogie and drivers' cab(Second motor-car);
Weighing-appliance maximum capacity train length used in current track transportation industry is 24 meters(Distance between bogie),
Rated load is 120t, and weighing-appliance is made of 3 platform positions, 12 weighting platforms, 1 computer, an instrument display, each platform position
It can claim a bogie, each weighting platform that 1 wheel, the data obtained of weighing is claimed to be shown on instrument display, by operating computer
Required weighing data can be exported.The weighing-appliance can meet subway A, Type B vehicle, 3 and following marshalling tramcar
It weighs, but it is 25.6 meters that 5 marshalling tramcars of current track transportation industry are most short, so the weighing-appliance can not be suitable for 5
Marshalling tramcar.
In order to solve the problems, such as weighing for 5 marshalling tramcars, train examination is passed through, ensures the safety of train driving
Performance, so it is imperative that invention one kind 5, which organizes into groups tramcar weighing system and method,.
Utility model content
The present invention proposes a kind of weighing system and method suitable for more marshalling tramcars, solves the prior art
In the problem of weighing of 5 marshalling tramcars, it is easy to use, conveniently weigh.
In order to solve the above technical problem, the present invention provides the following technical solutions:
A kind of weighing system being suitable for five marshalling tramcars of the present invention, wherein turn sequence device including vehicle solution volume,
Further include five marshalling tramcars, traverse table, traverse table track, the first railway line, the second railway line and third railway line;Institute
It includes the first motor-car, the second motor-car, the first levitation vehicle, the second levitation vehicle and trailer to state five marshalling tramcars(41);It is described
Traverse table track is fixedly installed a plurality of, and the traverse table can be vertically moved along the traverse table track;
The side of the traverse table track is fixed with first railway line, second railway line and the third rail
Diatom;
First railway line, second railway line and the third railway line are arranged in parallel in the plane;Solve editorial afterword
First levitation vehicle side and the vehicle solution volume turn sequence device and be connected.
As a preferred technical solution of the present invention, it includes braced frame and support that the vehicle solution volume, which turns sequence device,
The top of plate, the support plate is fixed with flange connecting plate, and the both sides of the flange connecting plate pass through gusset and the branch
Fagging is fixedly connected, and the bottom end of the support plate is fixed with reinforcing plate, and the both sides of the reinforcing plate are fixed with the branch
Support frame frame is fixed with connecting rod, the top of the braced frame between the corresponding braced frame in the reinforcing plate both ends
It is fixed with supporting pad, wheel is fixed in the braced frame, the side of the braced frame is welded with hanging ring, the vehicle
It is fixed with shaft pressuring plate in the shaft of wheel.
A kind of weighing method for the weighing system being suitable for five marshalling tramcars, including following steps:
S 1:Before weighing, five marshalling tramcars are first subjected to solution volume on second railway line, described
One motor-car and first levitation vehicle and the trailer carry out even hanging the first module of composition;First module is pushed into the shifting vehicle
Platform is sent to the third railway line by traverse table track longitudinal movement by the traverse table and weigh and remember for the first time
Record data 1;At this point, one end of second levitation vehicle is even hung with the second motor-car, other end is supported using car cushion wood is fallen.
S2:First module is moved it to by traverse table on second railway line after the completion of weighing, and to described
First levitation vehicle and the trailer carry out solution volume, after the completion of solution is compiled, vehicle solution volume are turned sequence device and is connected with first levitation vehicle
It connects, turn sequence device using vehicle solution volume forms moveable second mould by first motor-car and first levitation vehicle
Block, the second module are sent to first railway line by traverse table and are temporarily placed;Then the trailer is individually pushed into the shifting
Ride is sent to the third railway line by traverse table track longitudinal movement by the traverse table and is weighed and record number
According to 2.
S3:The trailer is individually pushed into second railway line after the completion of weighing, and by the trailer and described second
Levitation vehicle carries out even extension, the trailer and the second levitation vehicle vehicle and second motor-car and even hangs composition third module:It will
The third module is vertically moved by the traverse table track using the traverse table send third module to described the again
Three railway lines complete third time and weigh and record data 3.
S4:The third module is pushed away it by the traverse table after the completion of weighing by traverse table track longitudinal movement
To second railway line, then the second module of first railway line is sent using the traverse table to second track
Vehicle solution volume is turned after sequence device removes, even to hang with third module, complete vehicle and even hangs and terminate all weighing stages, most by line
After pass through calculation formula:Data 1+ data 3- data 2 are obtained a result, which is the weight of permutation vehicle.
The advantageous effect that is reached of the present invention is:
1, this method can directly be sent the first module and third module that 3 vehicles form to weighing unit by traverse table,
It is not necessary that bogie is first hung to weighing unit, then car body is hung on bogie, reduces and fall vehicle on weighing unit and even hang step, and disappear
Except the loss of fastener between bogie and car body, avoids reusing the work such as travelling overhead crane, while reducing workload, carry
High working efficiency.
2, entire weighing process, it is only necessary to three railway lines(Containing weighing-appliance)It can be completed, move back the road of vehicle in this way
Line was not only clear, but also can reduce railway line occupancy.
3, the weighing method can weigh on the existing weighing-appliance of tramcar industry, and measure complete vehicle weight, nothing
Special weighing-appliance need to be bought again, and weighing-appliance is at least 500,000 yuan and often covers on the market at present, and institute in this way can be direct
500,000 yuan or more cashes are saved for company.
4, by by vehicle solution volume turn sequence device be affixed to tramcar vehicle solution compile after cannot independently support and
The module of walking makes these modules have the independent function of supporting and walk, to complete to turn sequence or shipping accordingly.
Description of the drawings
Attached drawing is used to provide further understanding of the present invention, and a part for constitution instruction, the reality with the present invention
It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is present invention walking structure schematic diagram when vehicle solution editorial afterword uses;
Fig. 2 is that the vehicle solution volume of the present invention turns sequence device front view;
Fig. 3 is that the vehicle solution volume of the present invention turns sequence device side view;
Fig. 4 is that the vehicle solution volume of the present invention turns sequence device vertical view;
Fig. 5 is the weighing method first step structural schematic diagram of the present invention;
Fig. 6 is the weighing method second step structural schematic diagram of the present invention;
Fig. 7 is the weighing method third step structural schematic diagram of the present invention;
Fig. 8 is the weighing method four steps structural schematic diagram of the present invention;
In figure:1, vehicle solution volume turns sequence device;1-1, connecting rod;2, braced frame;3, gusset;4, flange connecting plate;5、
Support plate;6, reinforcing plate;7, wheel;8, shaft pressuring plate;9, hanging ring;10, supporting pad;11, traverse table;12, traverse table track;13、
First railway line;14, the second railway line;15, third railway line;20, five marshalling tramcars;21, the first motor-car;22,
Two motor-cars;31, the first levitation vehicle;32, the second levitation vehicle;41, trailer.
Specific implementation mode
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein
Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
Embodiment 1
For most of tramcar, vehicle solution compiles 32 module of the first levitation vehicle 31 or the second levitation vehicle having later
Due to no independent bogie, independently it cannot support and walk, so needing to turn the progress of sequence device 1 using vehicle solution volume
The solution volume of these modules turns sequence work.
As shown in Figs 1-4, a kind of vehicle solution volume of present invention offer turns sequence device, wherein the vehicle solution volume turns sequence device 1
Including braced frame 2 and support plate 5, the top of the support plate 5 is fixed with flange connecting plate 4, the flange connecting plate 4
Both sides are fixedly connected by gusset 3 with the support plate 5, and the bottom end of the support plate 5 is fixed with reinforcing plate 6, described to add
The both sides of strong plate 6 are fixed with the braced frame 2, fixed between the corresponding braced frame 2 in 6 both ends of the reinforcing plate
Equipped with connecting rod 1-1, the top of the braced frame 2 is fixed with supporting pad 10, and wheel is fixed in the braced frame 2
7, the wheel 7 is set as 4, and the side of the braced frame 2 is welded with hanging ring 9, is easy to lift the mobile vehicle solution and compiles
Turn sequence device 1, shaft pressuring plate 8 is fixed in the shaft of the wheel 7, is affixed to by the way that vehicle solution volume is turned sequence device 1
On the first levitation vehicle 31 or the second levitation vehicle 32 after tramcar vehicle solution volume, make the first levitation vehicle 31 or the second levitation vehicle
32 modules have the independent function of supporting and walk, to complete the processes such as to turn sequence or shipping and weigh accordingly.
Specifically, vehicle solution volume turns sequence device 1 in use, car body of the device directly with the first levitation vehicle 31 is hingedly installed
Hole connects, and connection type is to be penetrated from car body "A" end of car to an extreme direction using the hexagon socket head cap screw of six M20X20, and one
Position extreme direction is fastened using nut and flat spring washer, carries out height adjusting after the completion of bolt fastening, while by supporting pad 10, directly
To simultaneously forced position is contacted with vehicle body bottom frame, stress can not only be shared to six bolts in this way, can also car body be effectively prevent to collapse,
Ensure vehicle body transportation, transport process safety.A kind of optional technical solution, device lower part setting can be in-orbit there are four wheel 7
It is arbitrarily pushed on road, facilitates work.
It is affixed to after tramcar vehicle solution is compiled and cannot independently support and go by the way that vehicle solution volume is turned sequence device 1
The module walked makes these modules have the independent function of supporting and walk, to complete to turn sequence or shipping accordingly.
Embodiment 2
As viewed in figures 5-8, a kind of weighing system being suitable for five marshalling tramcars turns sequence including vehicle solution volume
Device 1 includes braced frame 2 and support plate 5, and the top of the support plate 5 is fixed with flange connecting plate 4, the flanged joint
The both sides of plate 4 are fixedly connected by gusset 3 with the support plate 5, and the bottom end of the support plate 5 is fixed with reinforcing plate 6, institute
The both sides for stating reinforcing plate 6 are fixed with the braced frame 2, between the corresponding braced frame in 6 both ends of the reinforcing plate 2
It is fixed with connecting rod 1-1, the top of the braced frame 2 is fixed with supporting pad 10, is fixed in the braced frame 2
The side of wheel 7, the braced frame 2 is welded with hanging ring 9, and shaft pressuring plate 8 is fixed in the shaft of the wheel 7, further includes
Five marshalling tramcars 20, traverse table 11, traverse table track 12, the first railway line 13, the second railway line 14 and third track
Line 15;Five marshalling tramcars 20 include the first motor-car 21, the second motor-car 22, the first levitation vehicle 31, the second levitation vehicle
32 and trailer 41;
The traverse table track 12 is provided with a plurality of, and the traverse table 11 can be vertically moved along the traverse table track 12;
Traverse table 11 can in 12 range of traverse table track transit vehicle.
The side of the traverse table track 12 is fixed with first railway line 13, second railway line 14 and described
Third railway line 15;
First railway line 13, second railway line 14 and the third railway line 15 are arranged in parallel in the plane;
Space can be effectively saved in this way;
31 side of the first levitation vehicle of solution editorial afterword and vehicle solution volume turn sequence device 1 and are connected, and can will be unable to list
It solely supports and the first mobile levitation vehicle 31 after even being hung with the first motor-car 21 by moving together, realize in entirely weighing link
Transhipment.
A kind of weighing method for the weighing system being suitable for five marshalling tramcars, wherein include the following steps:
As shown in figure 5, S 1:State before weighing is state shown in Fig. 8, first will be described on second railway line 14
Five marshalling tramcars 20 carry out solution volume, and first motor-car, 21 and first levitation vehicle 31 and the trailer 41 carry out even extension
Form the first module;First module is pushed into the traverse table 11, is indulged by the traverse table track 12 by the traverse table 11
It is sent to movement to the third railway line 15 and weigh for the first time and record data 1;At this point, second levitation vehicle, 32 vehicle one
End is even hung with the second motor-car 22, and other end, which utilizes, falls the support of car cushion wood;
As shown in fig. 6, S2:First module by traverse table 11 moves it to second railway line after the completion of weighing
On 14, and solution volume is carried out to first levitation vehicle 31 and the trailer 41, after the completion of solution is compiled, vehicle solution volume is turned into sequence device 1
It is connect with first levitation vehicle 31, turns sequence device 1 by first motor-car 21 and first levitation vehicle using vehicle solution volume
31 one moveable second module of composition, the second module are sent to first railway line 13 by traverse table 11 and are temporarily placed;
Then the trailer 41 is individually pushed into the traverse table 11, is moved by the traverse table 11 by the way that the traverse table track 12 is longitudinal
Dynamic send to the third railway line 15 is weighed and records data 2;
As shown in fig. 7, S3:The trailer 41 is individually pushed into second railway line 14 after the completion of weighing, and will be described
Trailer 41 is moved with second levitation vehicle, 32 company's of progress extension, the trailer 41 and 32 vehicle of the second levitation vehicle and described second
Vehicle 22 even hangs composition third module:The third module is indulged using the traverse table 11 by the traverse table track 12 again
Third module is sent to the third railway line 15 to mobile, third time is completed and weighs and record data 3;
As shown in figure 8, S4:It is passed through the traverse table rail by the third module after the completion of weighing by the traverse table 11
The longitudinal movement of road 12 is pushed into second railway line 14, then the second module of first railway line 13 is utilized the traverse table
11 send to second railway line 14, and vehicle solution volume is turned after sequence device 1 removes, even to hang with third module, complete vehicle and even hang
And terminate all weighing stages.Finally by calculation formula:Data 1+ data 3- data 2 are obtained a result, which is permutation
The weight of vehicle
The present invention's can directly be sent the first module and third module to weighing unit by traverse table, that is, be made full use of existing
Equipment is effectively weighed, and it is not necessary that bogie is first hung to weighing unit, then car body is hung on bogie, is reduced weighing unit
On fall vehicle and even hang step, and eliminate the loss of fastener between bogie and car body, avoid reusing the work such as travelling overhead crane,
Reduce workload simultaneously, improves work efficiency;Entire weighing process, it is only necessary to three railway lines(Containing weighing-appliance)
It completes, the route for moving back vehicle in this way was not only clear, but also can reduce railway line occupancy;The weighing method can be in tramcar row
It weighs on the existing weighing-appliance of industry, and measures complete vehicle weight, without buying special weighing-appliance again, at present on the market
Weighing-appliance is at least 500,000 yuan and often covers, and institute can directly be that company saves 500,000 yuan or more cashes in this way.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features.
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's
Within protection domain.
Claims (3)
1. a kind of vehicle solution volume turns sequence device, which is characterized in that the vehicle solution volume turns sequence device(1)Including braced frame(2)
And support plate(5), the support plate(5)Top be fixed with flange connecting plate(4), the flange connecting plate(4)Both sides
Pass through gusset(3)With the support plate(5)It is fixedly connected, the support plate(5)Bottom end be fixed with reinforcing plate(6), institute
State reinforcing plate(6)Both sides be fixed with the braced frame(2), the reinforcing plate(6)The corresponding support frame in both ends
Frame(2)Between be fixed with connecting rod(1-1), the braced frame(2)Top be fixed with supporting pad(10), the support
Frame(2)On be fixed with wheel(7), the braced frame(2)Side be welded with hanging ring(9), the wheel(7)Shaft
On be fixed with shaft pressuring plate(8).
2. a kind of weighing system being suitable for five marshalling tramcars, which is characterized in that including vehicle as described in claim 1
Solution compile turn sequence device, further include five marshalling tramcars(20), traverse table(11), traverse table track(12), the first track
Line(13), the second railway line(14)With third railway line(15);Five marshalling tramcars(20)Including the first motor-car
(21), the second motor-car(22), the first levitation vehicle(31), the second levitation vehicle(32)And trailer(41);
The traverse table track(12)It is fixedly installed a plurality of, the traverse table(11)It can be along the traverse table track(12)It is longitudinal
Sliding;
The traverse table track(12)Side be fixed with first railway line(13), second railway line(14)And institute
State third railway line(15);
First railway line(13), second railway line(14)With the third railway line(15)It is parallel in the plane to set
It sets;
Solve first levitation vehicle of editorial afterword(31)Side turns sequence device with vehicle solution volume(1)It is connected.
3. a kind of weighing method for the weighing system being suitable for five marshalling tramcars as claimed in claim 2, feature
It is, includes the following steps:
S 1:Before weighing, in second railway line(14)It is upper first by five marshalling tramcars(20)Carry out solution volume, institute
State the first motor-car(21)With the first levitation vehicle(31)And the trailer(41)The first module of composition is hung by the company of progress;By the first module
It is pushed into the traverse table(11), by the traverse table(11)Pass through the traverse table track(12)Longitudinal movement is sent to the third
Railway line(15)Weigh for the first time and record data 1;At this point, second levitation vehicle(32)Vehicle one end and the second motor-car
(22)It even hangs, other end is supported using car cushion wood is fallen;
S2:First module passes through traverse table after the completion of weighing(11)Move it to second railway line(14)On, and it is right
First levitation vehicle(31)With the trailer(41)Solution volume is carried out, after the completion of solution is compiled, vehicle solution volume is turned into sequence device(1)With institute
State the first levitation vehicle(31)Connection turns sequence device using vehicle solution volume(1)By first motor-car(21)It suspends with described first
Vehicle(31)Moveable second module is formed, the second module passes through traverse table(11)It send to first railway line(13)Temporarily
When place;Then by the trailer(41)Individually it is pushed into the traverse table(11), by the traverse table(11)Pass through the shifting vehicle
Platform track(12)Longitudinal movement is sent to the third railway line(15)It is weighed and records data 2;
S3:The trailer(41)It is individually pushed into second railway line after the completion of weighing(14), and by the trailer(41)With
Second levitation vehicle(32)The company's of progress extension, the trailer(41)With second levitation vehicle(32)Vehicle and second motor-car
(22)Even hang composition third module:The third module is utilized into the traverse table again(11)Pass through the traverse table track
(12)Longitudinal movement send the third module to the third railway line(15), complete third time and weigh and record data 3;
S4:The third module weigh after the completion of by it by the traverse table(11)Pass through the traverse table track(12)It is longitudinal to move
It is dynamic to be pushed into second railway line(14), then by first railway line(13)The second module utilize the traverse table(11)It send
To second railway line(14), vehicle solution volume is turned into sequence device(1)After removing, is even hung with third module, complete vehicle and even hang
And terminate all weighing stages,
Finally by calculation formula:The weight of permutation vehicle=" data 1 "+" data 3 "-" data 2 " are obtained a result, which is
The weight of permutation vehicle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610731522.8A CN106338327B (en) | 2016-08-26 | 2016-08-26 | A kind of weighing system and method suitable for more marshalling tramcars |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610731522.8A CN106338327B (en) | 2016-08-26 | 2016-08-26 | A kind of weighing system and method suitable for more marshalling tramcars |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106338327A CN106338327A (en) | 2017-01-18 |
CN106338327B true CN106338327B (en) | 2018-10-19 |
Family
ID=57822980
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610731522.8A Active CN106338327B (en) | 2016-08-26 | 2016-08-26 | A kind of weighing system and method suitable for more marshalling tramcars |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106338327B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109204379B (en) * | 2018-10-10 | 2020-06-09 | 成都市新筑路桥机械股份有限公司 | 100% modern city tramcar module connecting method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1510404A (en) * | 2002-12-25 | 2004-07-07 | 北京东方瑞威科技发展有限公司 | Electronic railway scale with double table tops and data processing method thereof |
CN102582653A (en) * | 2012-04-09 | 2012-07-18 | 铁道第三勘察设计院集团有限公司 | Special equipment for bullet train transfer table with turntable |
CN202413844U (en) * | 2011-11-25 | 2012-09-05 | 株洲南车特种装备科技有限公司 | Vehicle moving platform |
CN104386066A (en) * | 2014-09-29 | 2015-03-04 | 周新华 | Parallel connection type descending operation track train and transporting method thereof |
CN104649131A (en) * | 2014-12-30 | 2015-05-27 | 唐山轨道客车有限责任公司 | Low-floor vehicle transportation method and system thereof |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002274361A (en) * | 2001-03-15 | 2002-09-25 | Kawasaki Heavy Ind Ltd | Method and device for eliminating step in electric car station and electric car station without step |
-
2016
- 2016-08-26 CN CN201610731522.8A patent/CN106338327B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1510404A (en) * | 2002-12-25 | 2004-07-07 | 北京东方瑞威科技发展有限公司 | Electronic railway scale with double table tops and data processing method thereof |
CN202413844U (en) * | 2011-11-25 | 2012-09-05 | 株洲南车特种装备科技有限公司 | Vehicle moving platform |
CN102582653A (en) * | 2012-04-09 | 2012-07-18 | 铁道第三勘察设计院集团有限公司 | Special equipment for bullet train transfer table with turntable |
CN104386066A (en) * | 2014-09-29 | 2015-03-04 | 周新华 | Parallel connection type descending operation track train and transporting method thereof |
CN104649131A (en) * | 2014-12-30 | 2015-05-27 | 唐山轨道客车有限责任公司 | Low-floor vehicle transportation method and system thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106338327A (en) | 2017-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204978684U (en) | Single track train power truck of a formula is striden to diaxon | |
CN105151069B (en) | A kind of subway engineering vehicle electric drive bogie | |
CN203372251U (en) | Railway vehicle steering frame central dragging device | |
CN103523037A (en) | Track vehicle steering frame | |
CN103241258B (en) | A kind of bogie frame | |
CN104325991A (en) | Rail vehicle and hinged bogie for same | |
CN107476146B (en) | The long heavy parts replacement sling cart of high-speed railway track switch and its replacing options | |
CN108725495B (en) | Light rail vehicle bogie | |
CN204341077U (en) | Heavy-duty freight car bogie truck and vehicle | |
CN109747676A (en) | Rail vehicle truck and rail vehicle with eddy current braking device | |
CN106965828A (en) | A kind of hanging type aerial track train bogie frame | |
CN103640587A (en) | Co bogie for electric shunting locomotive | |
CN204548113U (en) | Containing the Multi-cylinder supporting leg compound type low level beam transportation vehicle supported of setting a roof beam in place | |
CN107933597B (en) | Combined type unwheeling auxiliary mould and Che Fangfa is fallen based on the tooling | |
CN215436426U (en) | High-temperature superconducting magnetic suspension bogie and sightseeing vehicle | |
CN106338327B (en) | A kind of weighing system and method suitable for more marshalling tramcars | |
CN104695338A (en) | Multi-oil-cylinder-supporting-leg combination type low-position girder transporting vehicle with girder erection supports | |
CN104649131B (en) | Low-floor vehicle transportation method and system thereof | |
CN205044756U (en) | Subway engineering car electric drive bogie | |
CN202547922U (en) | Lifting device for test bench of traction transmission system of high-speed train frame suspension type bogie | |
CN205012236U (en) | Single double track railway bridge is torn open and is changed planes | |
CN204978655U (en) | Articulated EMUs bogie drive of low -floor and arresting gear | |
CN101935978B (en) | Overhead cable track and special track traveling crane thereof | |
CN103612644A (en) | Bo steering frame used for electric shunting locomotive | |
CN102849613A (en) | Special hoisting tool special for high-speed rail motor train unit carriage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Ou Yangwei Inventor after: Zhao Xuanwu Inventor after: Jia Liyang Inventor before: Ou Yangwei Inventor before: Zhao Xuanwu Inventor before: Jia Liyang |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |