CN106338216A - Operation specification for cleaning and disinfecting air-conditioner cooling tower - Google Patents
Operation specification for cleaning and disinfecting air-conditioner cooling tower Download PDFInfo
- Publication number
- CN106338216A CN106338216A CN201610943769.6A CN201610943769A CN106338216A CN 106338216 A CN106338216 A CN 106338216A CN 201610943769 A CN201610943769 A CN 201610943769A CN 106338216 A CN106338216 A CN 106338216A
- Authority
- CN
- China
- Prior art keywords
- water
- cooling tower
- cleaning
- tower
- add
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28G—CLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
- F28G9/00—Cleaning by flushing or washing, e.g. with chemical solvents
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28G—CLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
- F28G15/00—Details
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Agricultural Chemicals And Associated Chemicals (AREA)
Abstract
The invention relates to an operation specification for cleaning and disinfecting an air-conditioner cooling tower. The operation specification is characterized by including the following steps that 1, field investigation and preparation are performed, specifically, field investigation of normal running states of the cooling tower is performed, the actual situation is analyzed, and then an individualized operation scheme is worked out; an investigator needs to prepare personal protection very well, like wearing a mask and a pair of goggles; and key points of field investigation lie in that (1) dirt, algae and corrosion degrees of a water distributor, a filler, a tower tray (water collecting tray) and a backwater filtering net are investigated, (2) the investigator needs to know the situation of water replenishment of the cooling tower, (3) whether a water replenishing valve and a sewage discharge valve are intact or leak water or not is checked, (4) the investigator needs to know the corrosion degree of a support of the cooling tower, (5) whether an exhaust outlet is aligned to the cooling tower or not is checked, for oily fume increases the cleaning difficulty, and (6) an investigation report or advices are written, a plan is worked out, and suitable cleaning and disinfection agents, tools and equipment are prepared.
Description
Technical field
A kind of rule of operation of air conditioner cooling tower cleaning and sterilizing, is that Cooling Tower for Air conditioning System and cooling tower water are carried out
Sterilization technical specification to be observed, belongs to air conditioner cooling tower cleaning and sterilizing technical field.
Background technology
It build outdoor more cooling tower in, have sunlight and the sunshine of abundance, communicate with air and allow cooling water to adsorb air
In various pollutant, continual make-up water can bring new nutrient, continually with the nutrient in multiple sources so that
In cooling tower, algae and microorganism particularly pathogenic microorganism (as legionella) amount reproduction, become the potential pollution source of disease;
The ws 394-2012 " public place centralized air ventilation system hygienic practice " that Ministry of Public Health is promulgated requires open to central air conditioning
No less than once, the cooling tower water after cleaning must not detect legionella pneumophilia to the annual cleaning of cooling tower, and promulgates matched
Ws 396-2012 " public place centralized air ventilation system cleaning code " instructs the cleaning of air conditioning system;This cleaning code makes
Used time suffers from the drawback thatBecause lacking detailed, feasible rule of operation, the current Chinese society wiper mechanism good and the bad is not
Together, operation is lack of standardization, and particularly present wiper mechanism does not need the cleaning qualification obtaining correlation can obtain employment, and leads to clean
Journey becomes a mere formality;Effective percentage concentration when specification does not have strict restriction to sterilize and continuous disinfection time are so that Disinfection Effect
Often it is extremely difficult to expect, in real work, find that the air conditioner cooling tower after part cleaning remains to detect legionella pneumophilia;(3) advise
Model failed call is carried out the pre-filming treatment after sterilizing, and the pre- film in surface can stop and disperses various incrustation ion foulings, reaches
To anti-corrosion, antiscale with prevent the purpose that microorganism (particularly legionella) grows.
Content of the invention
The purpose of the invention is to provide a kind of science, effective, feasible air conditioner cooling tower cleaning and sterilizing rule of operation,
Make up the uncertainty of ws 396-2012 " public place centralized air ventilation system cleaning code " it is ensured that air conditioning system is cleaned
The science of work and specification;
Air conditioner cooling tower cleaning and sterilizing rule of operation, including the inspection of the scene of a crime with prepare, two steps of cleaning and sterilizing operation, specifically such as
Under:
The first step: the inspection of the scene of a crime and preparation
Cooling tower normal operation carries out the inspection of the scene of a crime, and analysis practical situation makes the operation scheme of personalization;Prospecting personnel
Personal protection need to be carried out, wear mask and protective eye lens;
Inspection of the scene of a crime emphasis: (1) check water-locator, filler, tower tray (water accumulating disc) and backwater drainage screen dirt, algae and corruption
Degree of corrosion;(2) understand the situation of cooling tower moisturizing;(3) check whether water compensating valve, sewage draining valve intact or seepy question;(4)
Solution cooling tower support extent of corrosion;(5) check whether exhaust outlet is directed at the problem (oil smoke can increase cleaning difficulty) of cooling tower;
(6) write exploration report or suggestion, make a plan, prepare cleaning and sterilizing medicament, instrument and the equipment being suitable for.
Second step: cleaning and sterilizing operation
Using correct shutdown programm, close cooling tower and be set to Non-follow control;Close the fresh air inlet of air conditioner ventilating system,
Close window in 30 meters of cooling tower periphery as far as possible, terminating to cleaning and sterilizing, to prevent the gas producing in operating process
Colloidal sol gets in;Operator need to carry out personal protection, wears total length protective garment, waterproof boots, impermeable glove, protective eye lens, entirely
Portion or half face mask are (with high efficiency filter or chemisorbed function, to prevent from sucking pathogenic microorganism and the high concentration of in the air
Chlorine);
1 chemical disinfections
(1) add chlorine-containing disinfectant in cooling tower, in view of the characteristic of disinfectant oxidative degradation, calculating according to tower inner volume makes just
Beginning free chlorine residual reaches 50mg/l;Chlorine-containing disinfectant, should be granule or the liquid form of quick release;If there are serious deposition
Thing can suitably increase chemical feeding quantity;Also dependent on practical situation, add other chemicals for example Biocidal algae-killing agent, mud remover,
Greasy dirt detergent and defoamer etc.;(2) all chemosterilant species of record interpolation, dosing time started, measure and note down
Free residual chlorine and ph value;(3) add in disinfectant 15min and add dispersion activating agent, to prevent biomembranous formation;Dispersion is lived
Property agent should be added on the rapid position of current first with adding after water dissolution again, is conducive to quickly spreading, concentration is maintained at
1.2-3.0g/l;(4), after having added chlorine-containing disinfectant and dispersion activating agent, make cooling water circulation;In 2 hours starting, monitoring
Once, chlorination makes free residual chlorine amount be maintained at more than 10mg/l for free residual chlorine and the every 15min of ph value, keeps ph value to exist simultaneously
7.5-8.0;Because too high ph value can reduce the biological efficiency of chlorine residue, when ph value is too high, can with interpolation its
His chemical and physical phase compatible acid regulation, example hydrochloric acid or sulphuric acid;(5) after about 2 hours or free residual chlorine amount stable after 10mg/l,
Continuous disinfection 24h, every 2 hours of period monitored a free residual chlorine amount and keeps it in more than 10mg/l;>=10mg/l dissociates
Property residual chlorine amount it is ensured that after Disinfection Effect (6) the continuous disinfection 24h of continuous and effective, empty cooling tower;
2 mechanical chippings
The portions such as mechanical chipping cools down inner wall of tower, air outlet, fan and water flow through water-locator, filler, tower tray, drainage screen, tank
Part, using top-down principle;(1) water-locator is cleaned out using shovel, punching depending on concrete situation;(2) air outlet, fan, mistake
Filter screen, filler (inside and outside) take high-pressure spray to rinse;(3) tower tray, tank regard mud degree, rinse after the existing silt dredging of severity level,
As long as otherwise rinsing well;(4) after mechanical chipping finishes, sewage treatment;
3 two chemical disinfections
Close blowoff valve, fill cooling water, press step " 1 " chemical disinfection again, sterilization heel row sky cooling tower water simultaneously fills again;
4 cooling water circulation displacement blowdowns
After cleaning and sterilizing, with the cooling water circulation pump circulation of system 4 ~ 6 hours, blowdown, should a large amount of as much as possible drainings and moisturizing enter
Row system is replaced, and stops blowdown when turbidity drops to 10/below l (when draining is limpid), fills new water, prepares next step pre-
Film;
The pre- film of 5 dosings operational maintenance
(1) after pre- film can make cleaning, the equipment especially after Chemical cleaning and pipeline are in the fresh gold under the state of activation
On metal surface, previously generate one layer of complete and corrosion resistant protecting film before normal operation input;Add ph value first to adjust
Agent, the ph value of system water is adjusted to 6.5~9.0;After water quality adjustment is good, add passivation film agent, start water pump circulation, according to
Situation circulates 48~72 hours;Add anti-incrustation corrosion inhibitor, composite water stabilizer, the ph value of system circulation water is adjusted to 7.0
~9.0 entrance day-to-day operations, and sample and carry out water quality detection;(2) configure Full-automatic agent-feeding device, make up what artificial dosing existed
Not enough;(3) formulate regular visit scheme;
Effective meaning of the present invention: this air conditioner cooling tower cleaning and sterilizing rule of operation is the specification to the sector behavior, in principle
Air conditioner cooling tower cleaning is required to accomplish " reconnaissance at criminal scene-once sterilizing-cleaning-secondary sterilization-displacement blowdown-pre- film-daily guarantor
Support ", to guarantee to obtain good treatment effect, it is widely used in the cleaning and sterilizing of public place central air conditioning cooling tower;Cleaning
Mechanism can design targetedly operation scheme on this basis.
Specific embodiment
A kind of rule of operation of air conditioner cooling tower cleaning and sterilizing is it is characterised in that comprise the following steps:
Step 1: the inspection of the scene of a crime and preparation, cooling tower normal operation carries out the inspection of the scene of a crime, and analysis practical situation makes individual character
The operation scheme changed;Prospecting personnel need to carry out personal protection, wears mask and protective eye lens;Inspection of the scene of a crime emphasis: (1) checks water distribution
Device, filler, tower tray (water accumulating disc) and backwater drainage screen dirt, algae and extent of corrosion;(2) feelings of cooling tower moisturizing are understood
Condition;(3) check whether water compensating valve, sewage draining valve intact or seepy question;(4) understand cooling tower support extent of corrosion;(5) look into
See whether exhaust outlet is directed at the problem (oil smoke can increase cleaning difficulty) of cooling tower;(6) write exploration report or suggestion, formulate meter
Draw, prepare cleaning and sterilizing medicament, instrument and the equipment being suitable for;
Step 2: cleaning and sterilizing operation, using correct shutdown programm, close cooling tower and be set to Non-follow control;Close air-conditioning to lead to
The fresh air inlet of wind system, closes window in 30 meters of cooling tower periphery as far as possible, terminating to cleaning and sterilizing, to prevent from grasping
The aerosol producing during work gets in;Operator need to carry out personal protection, wears total length protective garment, waterproof boots, antiseepage
Glove thoroughly, protective eye lens, the half face mask all or with high efficiency filter or chemisorbed function;
Step 3: a chemical disinfection,
(1) add chlorine-containing disinfectant in cooling tower, in view of the characteristic of disinfectant oxidative degradation, calculating according to tower inner volume makes just
Beginning free chlorine residual reaches 50mg/l;Chlorine-containing disinfectant, should be granule or the liquid form of quick release;If there are serious deposition
Thing can suitably increase chemical feeding quantity;Also dependent on practical situation, add other chemicals for example Biocidal algae-killing agent, mud remover,
Greasy dirt detergent and defoamer etc.;
(2) all chemosterilant species of record interpolation, dosing time started, measure and note down free residual chlorine and ph value;
(3) add in disinfectant 15min and add dispersion activating agent, to prevent biomembranous formation;Dispersion activating agent should first be used
Add again after water dissolution, be added on the rapid position of current, be conducive to quickly spreading, concentration is maintained in 1.2-3.0g/l;
(4), after having added chlorine-containing disinfectant and dispersion activating agent, make cooling water circulation;In 2 hours starting, more than monitoring free property
Once, chlorination makes free residual chlorine amount be maintained at more than 10mg/l for chlorine and the every 15min of ph value, keeps ph value in 7.5-8.0 simultaneously;
Because too high ph value can reduce the biological efficiency of chlorine residue, when ph value is too high, can be with other chemicals with interpolation
Mutually compatible acid regulation, example hydrochloric acid or sulphuric acid;
(5) after about 2 hours or free residual chlorine amount stable after 10mg/l, continuous disinfection 24h, every 2 hours of period monitored once
Free residual chlorine amount keeps it in more than 10mg/l;>=10mg/l free residual chlorine amount is it is ensured that the sterilization of continuous and effective
Effect;
(6), after continuous disinfection 24h, empty cooling tower;
Step 4, mechanical chipping, mechanical chipping cools down inner wall of tower, air outlet, fan and water flow through water-locator, filler, tower tray,
The parts such as drainage screen, tank, using top-down principle;
(1) water-locator is cleaned out using shovel, punching depending on concrete situation;
(2) air outlet, fan, drainage screen, filler (inside and outside) take high-pressure spray to rinse;(3) tower tray, tank regard mud degree,
Rinse, as long as otherwise rinsing well after the existing silt dredging of severity level;
(4) after mechanical chipping finishes, sewage treatment;
Step 5, secondary chemical disinfection, close blowoff valve, fill cooling water, press step " step 1 " chemical disinfection again, after sterilization
Emptying cooling tower water simultaneously fills again;
Step 6, cooling water circulation displacement blowdown, after cleaning and sterilizing, with the cooling water circulation pump circulation of system 4 ~ 6 hours, blowdown, should
A large amount of as much as possible drainings and moisturizing carry out system displacement, when turbidity drops to 10/below l, when that is, draining is limpid, stop row
Dirt, fills new water, prepares the pre- film of next step;
Step 7, the pre- film of dosing operational maintenance,
(1) after pre- film can make cleaning, the equipment especially after Chemical cleaning and pipeline are in the fresh gold under the state of activation
On metal surface, previously generate one layer of complete and corrosion resistant protecting film before normal operation input;Add ph value first to adjust
Agent, the ph value of system water is adjusted to 6.5~9.0;After water quality adjustment is good, add passivation film agent, start water pump circulation, according to
Situation circulates 48~72 hours;Add anti-incrustation corrosion inhibitor, composite water stabilizer, the ph value of system circulation water is adjusted to 7.0
~9.0 entrance day-to-day operations, and sample and carry out water quality detection;
(2) configure Full-automatic agent-feeding device, make up the deficiency that artificial dosing exists;
(3) formulate regular visit scheme.
Claims (1)
1. a kind of rule of operation of air conditioner cooling tower cleaning and sterilizing is it is characterised in that comprise the following steps:
Step 1: the inspection of the scene of a crime and preparation, cooling tower normal operation carries out the inspection of the scene of a crime, and analysis practical situation makes individual character
The operation scheme changed;Prospecting personnel need to carry out personal protection, wears mask and protective eye lens;Inspection of the scene of a crime emphasis: (1) checks water distribution
Device, filler, tower tray (water accumulating disc) and backwater drainage screen dirt, algae and extent of corrosion;(2) feelings of cooling tower moisturizing are understood
Condition;(3) check whether water compensating valve, sewage draining valve intact or seepy question;(4) understand cooling tower support extent of corrosion;(5) look into
See whether exhaust outlet is directed at the problem (oil smoke can increase cleaning difficulty) of cooling tower;(6) write exploration report or suggestion, formulate meter
Draw, prepare cleaning and sterilizing medicament, instrument and the equipment being suitable for;
Step 2: cleaning and sterilizing operation, using correct shutdown programm, close cooling tower and be set to Non-follow control;Close air-conditioning to lead to
The fresh air inlet of wind system, closes window in 30 meters of cooling tower periphery as far as possible, terminating to cleaning and sterilizing, to prevent from grasping
The aerosol producing during work gets in;Operator need to carry out personal protection, wears total length protective garment, waterproof boots, antiseepage
Glove thoroughly, protective eye lens, the half face mask all or with high efficiency filter or chemisorbed function;
Step 3: a chemical disinfection,
(1) add chlorine-containing disinfectant in cooling tower, in view of the characteristic of disinfectant oxidative degradation, calculating according to tower inner volume makes just
Beginning free chlorine residual reaches 50mg/l;Chlorine-containing disinfectant, should be granule or the liquid form of quick release;If there are serious deposition
Thing can suitably increase chemical feeding quantity;Also dependent on practical situation, add other chemicals for example Biocidal algae-killing agent, mud remover,
Greasy dirt detergent and defoamer etc.;
(2) all chemosterilant species of record interpolation, dosing time started, measure and note down free residual chlorine and ph value;
(3) add in disinfectant 15min and add dispersion activating agent, to prevent biomembranous formation;Dispersion activating agent should first be used
Add again after water dissolution, be added on the rapid position of current, be conducive to quickly spreading, concentration is maintained in 1.2-3.0g/l;
(4), after having added chlorine-containing disinfectant and dispersion activating agent, make cooling water circulation;In 2 hours starting, more than monitoring free property
Once, chlorination makes free residual chlorine amount be maintained at more than 10mg/l for chlorine and the every 15min of ph value, keeps ph value in 7.5-8.0 simultaneously;
Because too high ph value can reduce the biological efficiency of chlorine residue, when ph value is too high, can be with other chemicals with interpolation
Mutually compatible acid regulation, example hydrochloric acid or sulphuric acid;
(5) after about 2 hours or free residual chlorine amount stable after 10mg/l, continuous disinfection 24h, every 2 hours of period monitored once
Free residual chlorine amount keeps it in more than 10mg/l;>=10mg/l free residual chlorine amount is it is ensured that the sterilization of continuous and effective
Effect;
(6), after continuous disinfection 24h, empty cooling tower;
Step 4, mechanical chipping, mechanical chipping cools down inner wall of tower, air outlet, fan and water flow through water-locator, filler, tower tray,
The parts such as drainage screen, tank, using top-down principle;
(1) water-locator is cleaned out using shovel, punching depending on concrete situation;
(2) air outlet, fan, drainage screen, filler (inside and outside) take high-pressure spray to rinse;(3) tower tray, tank regard mud degree,
Rinse, as long as otherwise rinsing well after the existing silt dredging of severity level;
(4) after mechanical chipping finishes, sewage treatment;
Step 5, secondary chemical disinfection, close blowoff valve, fill cooling water, press step " step 1 " chemical disinfection again, after sterilization
Emptying cooling tower water simultaneously fills again;
Step 6, cooling water circulation displacement blowdown, after cleaning and sterilizing, with the cooling water circulation pump circulation of system 4 ~ 6 hours, blowdown, should
A large amount of as much as possible drainings and moisturizing carry out system displacement, when turbidity drops to 10/below l, when that is, draining is limpid, stop row
Dirt, fills new water, prepares the pre- film of next step;
Step 7, the pre- film of dosing operational maintenance,
(1) after pre- film can make cleaning, the equipment especially after Chemical cleaning and pipeline are in the fresh gold under the state of activation
On metal surface, previously generate one layer of complete and corrosion resistant protecting film before normal operation input;Add ph value first to adjust
Agent, the ph value of system water is adjusted to 6.5~9.0;After water quality adjustment is good, add passivation film agent, start water pump circulation, according to
Situation circulates 48~72 hours;Add anti-incrustation corrosion inhibitor, composite water stabilizer, the ph value of system circulation water is adjusted to 7.0
~9.0 entrance day-to-day operations, and sample and carry out water quality detection;
(2) configure Full-automatic agent-feeding device, make up the deficiency that artificial dosing exists;
(3) formulate regular visit scheme.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610943769.6A CN106338216A (en) | 2016-11-02 | 2016-11-02 | Operation specification for cleaning and disinfecting air-conditioner cooling tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610943769.6A CN106338216A (en) | 2016-11-02 | 2016-11-02 | Operation specification for cleaning and disinfecting air-conditioner cooling tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106338216A true CN106338216A (en) | 2017-01-18 |
Family
ID=57840646
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610943769.6A Pending CN106338216A (en) | 2016-11-02 | 2016-11-02 | Operation specification for cleaning and disinfecting air-conditioner cooling tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106338216A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1086496A (en) * | 1992-11-03 | 1994-05-11 | 吕胜一 | Water disinfecting system and working method thereof |
US5774298A (en) * | 1993-11-23 | 1998-06-30 | International Business Machines Corporation | Asynchronous digital PES demodulation disk drive servo control system |
CN101929588A (en) * | 2010-08-09 | 2010-12-29 | 中建五局第三建设有限公司 | Anti-corrosion, scale-inhibiting and recycling treatment construction method for central air-conditioning water system |
CN103613226A (en) * | 2013-12-13 | 2014-03-05 | 海南汉地阳光石油化工有限公司 | Industrial circulating water treatment technology |
-
2016
- 2016-11-02 CN CN201610943769.6A patent/CN106338216A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1086496A (en) * | 1992-11-03 | 1994-05-11 | 吕胜一 | Water disinfecting system and working method thereof |
US5774298A (en) * | 1993-11-23 | 1998-06-30 | International Business Machines Corporation | Asynchronous digital PES demodulation disk drive servo control system |
CN101929588A (en) * | 2010-08-09 | 2010-12-29 | 中建五局第三建设有限公司 | Anti-corrosion, scale-inhibiting and recycling treatment construction method for central air-conditioning water system |
CN103613226A (en) * | 2013-12-13 | 2014-03-05 | 海南汉地阳光石油化工有限公司 | Industrial circulating water treatment technology |
Non-Patent Citations (2)
Title |
---|
中华人民共和国卫生部: "WS/T 396—2012 公共场所集中空调通风系统清洗消毒规范", 《WS/T 396—2012 公共场所集中空调通风系统清洗消毒规范》 * |
周明浩: "《社区消毒与病媒生物防制实用手册》", 31 January 2016 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kumpel et al. | Mechanisms affecting water quality in an intermittent piped water supply | |
Palmore et al. | A cluster of cases of nosocomial legionnaires disease linked to a contaminated hospital decorative water fountain | |
US20130319464A1 (en) | Heat Exchanger Pipework Cleaning Apparatus and Method | |
RU2671348C2 (en) | Water treatment plant (versions) and method for functional control of chlorine sensor (versions) | |
Craun | The importance of waterborne disease outbreak surveillance in the United States | |
JP2015016402A (en) | Purifying apparatus for system for utilizing recycling water | |
Jahne et al. | Enteric pathogen reduction targets for onsite non-potable water systems: A critical evaluation | |
Razmju et al. | Risk assessment of water supply system safety based on WHOs water safety plan: case study Semnan, Iran | |
CN106338216A (en) | Operation specification for cleaning and disinfecting air-conditioner cooling tower | |
Shelton et al. | Review of Legionnaires' disease | |
Mains | Biofilm control in distribution systems | |
Lee et al. | Outbreak investigations and identification of Legionella in contaminated water | |
Kanno et al. | Sanitary Survey and drinking water quality performance of treat-ment plant: the case of Dilla Town, Ethiopia | |
Girolamini et al. | Cooling towers influence in an urban environment: A predictive model to control and prevent Legionella risk and Legionellosis events | |
Abdalla et al. | Comparative assessment of Legionella pneumophila prevalence among hospitals and hotels water systems | |
GB2599906A (en) | Method of sanitizing a wetted system and devices for use in such | |
Luttrell | Mitigating waterborne illness risks in facilities | |
GB2478532A (en) | Closed loop heat exchanger pipe cleaning apparatus and method | |
Ganiyu et al. | Assessment of quality status of raw and treated water from Erelu waterworks using data of routine monitoring parameters (2018–2020) | |
Sandle | Utilities Design and Testing | |
Clark et al. | Modeling the propagation of waterborne disease in water distribution systems: results from a case study | |
Cantor | Diagnosing corrosion problems through differentiation of metal fractions | |
CN106168046A (en) | A kind of automatization safety water supply system of water factory | |
Mackie | The Prevention of Legionellosis in New Zealand | |
Sulliaman et al. | The Potential of Waste Water Produced From Split Type Air Conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170118 |
|
RJ01 | Rejection of invention patent application after publication |