CN106332302A - Method for establishing X2 connection and connection device - Google Patents

Method for establishing X2 connection and connection device Download PDF

Info

Publication number
CN106332302A
CN106332302A CN201510369003.7A CN201510369003A CN106332302A CN 106332302 A CN106332302 A CN 106332302A CN 201510369003 A CN201510369003 A CN 201510369003A CN 106332302 A CN106332302 A CN 106332302A
Authority
CN
China
Prior art keywords
x2gw
base station
target
source base
supported
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201510369003.7A
Other languages
Chinese (zh)
Inventor
刘磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201510369003.7A priority Critical patent/CN106332302A/en
Priority to PCT/CN2015/094598 priority patent/WO2017000472A1/en
Publication of CN106332302A publication Critical patent/CN106332302A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a method for establishing an X2 connection and a connection device and relates to the technical field of wireless communications. The method comprises steps that: in a transmission layer address acquiring process, when a target base station perceives that the target base station is different from an X2 gateway GW supported by a source station, the target base station and the source base station negotiate to determine the jointly supported X2GW; and the X2 connection is established between the target base station and the source base station through the jointly supported X2GW. The invention also discloses a base station device. According to the invention, the HeNB and the eNB are allowed to support the same X2GW, so it is ensured that indirect the HeNB/eNB can successfully initiate the indirect X2 establishment.

Description

A kind of method of X2 connection establishment and base station equipment
Technical field
The present invention relates to wireless communication technology field, between particularly relating to initiate between a kind of HeNB and eNB Meet method and HeNB, eNB that X2 sets up.
Background technology
Home eNodeB (HeNB) is a kind of small base station, mainly assists macro base station (eNB) to carry out heat Point covers.It is the ingredient of isomery networking, can be effectively improved indoor voice and high-speed data service covers Lid, Home eNodeB can be installed in such as family, office, coffee-house, supermarket etc. place.Family Base station advantage is as follows: low cost, low-power, volume are little, deployment is convenient.
But when Home eNodeB networking together with macro base station, there are outstanding problem, i.e. HeNB and eNB Between link may be the most because around an eNB may dispose thousands of HeNB, If there is an X2 link between eNB and each HeNB, the biggest link can be brought to eNB Load.
Third generation partnership project (Third Generation Partnership Projects, referred to as 3GPP) LTE (Long Term Evolution, the Long Term Evolution) R11 of normal structure definition introduces New network element X2 gateway (X2GW).Can be built by X2GW between HeNB and eNB Vertical indirectly X2 interface, thus solve the problem that between above-mentioned eNB and HeNB, X2 link is too many. Group-network construction is as it can be seen, be in E-UTRAN the logical architecture disposing X2GW shown in Fig. 1.Figure 2 show the E-UTRAN configuration diagram that existing X2GW disposes.
Although proposing X2GW, but whether source base station and target side base station can support same X2GW Also it is a problem.
In sum, current problem demanding prompt solution: if HeNB Yu eNB or HeNB with When not sharing X2GW between HeNB, the most how fast-negotiation goes out shared X2GW, thus Make HeNB (or eNB) that indirect X2 link establishment can be initiated smoothly.
Summary of the invention
The technical problem to be solved is to provide a kind of method of X2 connection establishment and base station sets Standby, X2 during to solve not share X2GW between HeNB and eNB or HeNB and HeNB The problem of link establishment.
In order to solve above-mentioned technical problem, a kind of method that the invention discloses X2 connection establishment, the party Method includes:
In transport layer address acquisition procedure, its X2 gateway GW supported with source base station of target BS perception Time different, described target BS and source base station consult to determine the X2GW of common support;
Set up X2 by the X2GW of described common support between described target BS and source base station to be connected.
Alternatively, in said method, described target BS is macro base station or Home eNodeB.
Alternatively, in said method, when described target BS is macro base station, described target BS and source base Stand and consult to determine that the process of the X2GW of common support includes:
Described target BS increases X2GW so that the X2GW increased is consistent with what source base station was supported, And the X2GW increased is fed back to described source base station;
When described target BS is Home eNodeB, described target BS and source base station are consulted to determine common support The process of X2GW include:
Described target BS updates X2GW so that the X2GW of renewal is consistent with what source base station was supported, And the X2GW of renewal is fed back to described source base station.
Alternatively, in said method, described source base station is macro base station or Home eNodeB.
Alternatively, in said method, when described source base station is macro base station, described target BS and source base station Consult to determine that the process of the X2GW of common support includes:
The X2GW that self supports is fed back to described source base station by described target BS, and described source base station is from institute State and the X2GW of target BS support selects increase X2GW so that the X2GW increased and target base Stand support consistent;
When described source base station is Home eNodeB, described target BS and source base station are consulted to determine common support The process of X2GW includes:
The X2GW that self supports is fed back to described source base station by described target BS, and described source base station is from institute State and the X2GW that target BS is supported selects update X2GW so that the X2GW of renewal and target base Stand support consistent.
Alternatively, in said method, described source base station selects from the X2GW that described target BS is supported Update X2GW so that process consistent with target BS support for the X2GW of renewal includes:
Before described source base station updates X2GW, the X2 application protocol AP layer link that there is currently is released Bleed off, and after release completes, current X2GW is gone registration, after going registration to complete, Xiang Xuan The X2GW selecting renewal sends registration message.
The invention also discloses a kind of base station equipment, this equipment includes:
First negotiation element, in transport layer address acquisition procedure, the X2 net that perception is supported with source base station When closing GW difference, consult to determine the X2GW of common support with source base station;
Link setup unit, by the X2GW of described common support, is connected with setting up X2 between source base station.
Alternatively, in the said equipment, described base station equipment is macro base station or Home eNodeB.
Alternatively, when above-mentioned base station equipment is macro base station, described first negotiation element, consult with source base station Determine that the X2GW of common support refers to:
Described first negotiation element, increases X2GW so that the X2GW increased supports with source base station Unanimously, and by the X2GW increased described source base station is fed back to;
When described base station equipment is Home eNodeB, described first negotiation element, consult to determine altogether with source base station Refer to the X2GW supported:
Described first negotiation element, updates X2GW so that the X2GW of renewal supports with source base station Unanimously, and by the X2GW of renewal described source base station is fed back to.
Alternatively, above-mentioned base station equipment also includes:
Second negotiation element, in transport layer address acquisition procedure, consults to determine common with target BS The X2GW held;
Now, described link setup unit, by the X2GW of described common support, and build between target BS Vertical X2 connects.
Alternatively, when above-mentioned base station equipment is macro base station, described second negotiation element, assist with target BS Business determines that the X2GW of common support refers to:
Receive the X2GW himself supported of described target BS feedback, support from described target BS X2GW selects increase X2GW so that the X2GW increased is consistent with what target BS was supported;
When described base station equipment is Home eNodeB, described second negotiation element, consult to determine with target BS The common X2GW supported refers to:
Receive the X2GW himself supported of described target BS feedback, support from described target BS X2GW selects update X2GW so that the X2GW of renewal is consistent with what target BS was supported.
Alternatively, in the said equipment, the X2GW that described second negotiation element is supported from described target BS Middle selection updates X2GW so that the consistent finger that the X2GW of renewal supports with target BS:
Described second negotiation element, before updating X2GW, the X2 application protocol AP that will exist before Layer link discharges, and after release completes, current X2GW goes registration, goes registration to complete it After, send registration message to selecting the X2GW updated.
Technical scheme makes HeNB with eNB support identical X2GW, thus ensures HeNB/eNB can initiate indirect X2 smoothly and set up.
Accompanying drawing explanation
Fig. 1 is the logical architecture disposing X2GW in existing E-UTRAN;
Fig. 2 is the E-UTRAN configuration diagram that existing X2GW disposes;
Fig. 3 is the flow chart of the X2 connection establishment that the present invention applies;
Fig. 4 is the schematic flow sheet that in the embodiment of the present invention, eNB consults to update X2GW;
Fig. 5 is the schematic flow sheet that in the embodiment of the present invention, eNB consults to update X2GW;
Fig. 6 is the schematic flow sheet that in the embodiment of the present invention, HeNB consults to update X2GW;
Fig. 7 is the schematic flow sheet that in the embodiment of the present invention, HeNB consults to update X2GW;
Fig. 8 is the schematic flow sheet that in the embodiment of the present invention, HeNB consults to update X2GW;
Fig. 9 is the structured flowchart of the HeNB that the embodiment of the present invention provides;
Figure 10 is the structured flowchart of the eNB that the embodiment of the present invention provides.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing pair Technical solution of the present invention is described in further detail.It should be noted that in the case of not conflicting, this Feature in the embodiment of application and embodiment can arbitrarily be mutually combined.
Embodiment 1
The present embodiment provides a kind of method of X2 connection establishment, as it is shown on figure 3, mainly include grasping as follows Make:
Step 301, in transport layer address acquisition procedure, target BS perception its support with source base station During X2 gateway GW difference, target BS and source base station consult to determine the X2GW of common support;
Step 302, sets up X2 by the common X2GW supported between target BS with source base station and is connected.
Wherein, its X2GW supported with source base station of target BS (such as, eNB or HeNB) perception Time different, can increase or update X2GW so that the X2GW after increasing or updating and source base Stand support consistent.Such as, when target BS is eNB, target BS increases X2GW so that increase X2GW consistent with what source base station was supported, and the X2GW increased is fed back to source base station.Mesh When mark base station is HeNB, target BS updates X2GW so that the X2GW of renewal props up with source base station That holds is consistent, and the X2GW of renewal is fed back to source base station.
It addition, in transport layer address acquisition procedure, or target BS judges unnecessary renewal During X2GW, the X2GW (or X2GW list) that oneself is supported can be fed back to source base station, By source base station judge whether oneself perform increase or update X2GW, so it is also ensured that source base station and The X2GW that target BS is supported is consistent.Wherein, when source base station is eNB, source base station is from target BS The X2GW supported selects increase X2GW so that the X2GW increased and the one of target BS support Cause.If source base station is HeNB, source base station selects to update from the X2GW that target BS is supported X2GW so that the X2GW of renewal is consistent with what target BS was supported.
It is noted that the register update process of HeNB needs on the basis of existing LTE R12 agreement Amendment, current LTE R12 agreement is only supported registration, is not supported to go registration, so needing amendment at present Register flow path, increases and removes registering functional.I.e. source base station selects to update from the X2GW that target BS is supported Before X2GW, first the X2 application protocol AP layer link that there is currently is discharged, and releasing Cheng Hou, goes registration to current X2GW, after going registration to complete, to the X2GW selecting renewal Transmission registration message.
Below in conjunction with accompanying drawing and the detailed implementation of concrete application note said method.
Below using eNB as source base station, as a example by HeNB is as target BS, illustrate that eNB consults more The process of new X2GW, this process is as shown in Figure 4.
ENB is as source base station, and target BS is HeNB, in transport layer address acquisition response message, HeNB returns its X2GW, this X2GW supported and is not comprised in the X2GW row that eNB supports In table, now eNB and HeNB does not support identical X2GW, the X2GW that eNB supports from HeNB Middle one X2GW of interpolation that selects, i.e. performs one and registers this X2GW process, thus the two supports Identical X2GW, source base station eNB can be initiated indirect X2 smoothly and set up.
Again using eNB as target side base station, as a example by HeNB is as source base station, illustrate that eNB consults to update The process of X2GW, this process is as shown in Figure 5.
ENB is as target side base station, and source base station is HeNB, in transport layer address acquisition request message, The X2GW that HeNB supports is not in the X2GW list that eNB supports, eNB selects to add HeNB The X2GW, i.e. eNB supported performs a process registering this X2GW, and rings in transport layer address Answer and message is carried this X2GW, after source base station HeNB perception, indirect X2 can be initiated smoothly and set up.
HeNB is as source base station, and when eNB is as target BS, HeNB consults to update X2GW's Process is as shown in Figure 6:
HeNB is source base station, and eNB is target BS.Carry in transport layer address response message is The X2GW list that eNB supports, wherein, the X2GW that HeNB does not supports.The most now HeNB Judge that setting up X2 link with this eNB is worth bigger, the X2GW list that HeNB supports from eNB One X2GW of middle selection, the i.e. X2GW that HeNB newly supports.
After selection, HeNB to first carry out and old X2GW gone registration process.
Before carrying out registration process, the X2AP layer link existed before to be discharged by HeNB, I.e. send X2 REMOVAL REQUEST message to all of X2 linking objective, and collect target After the X2 REMOVAL RSPONSE message returned or waiting timer time-out, it is right that HeNB performs Old X2GW goes registration process.
LTE R12 agreement only supports (H) eNB registration process to X2GW at present, then we need X2AP MESSAGE TRANSFER message increases a field be shown to be registration still go registration, Now HeNB sends to old X2GW and removes registration message.
After going registration, HeNB sends registration message to the above-mentioned new X2GW chosen.
In sum, HeNB achieves the renewal process of X2GW.
Now source base station HeNB and target BS eNB supports identical X2GW, and HeNB can be suitable Profit is initiated indirect X2 and is set up.
HeNB is as target side base station, and when eNB is as source base station, HeNB consults to update X2GW Process as shown in Figure 7.
HeNB is target side base station, and eNB is source base station.Transport layer address request is carried The X2GW, HeNB that in the X2GW list that eNB supports, HeNB does not supports judges and is somebody's turn to do ENB sets up X2 link and is worth bigger, and HeNB decision-making is supported from eNB for updating X2GW, HeNB X2GW list in select an X2GW, the i.e. X2GW that HeNB newly supports.
The X2GW renewal process of HeNB is with described in above-mentioned Fig. 6, i.e. HeNB selects new X2GW Afterwards, HeNB to first carry out and old X2GW gone registration process.
Before carrying out registration process, the X2AP layer link existed before to be discharged by HeNB, I.e. send X2 REMOVAL REQUEST message to all of X2 linking objective, and collect target After the X2 REMOVAL RSPONSE message returned or waiting timer time-out, it is right that HeNB performs Old X2GW goes registration process.
LTE R12 agreement only supports (H) eNB registration process to X2GW at present, then we need X2AP MESSAGE TRANSFER message increases a field be shown to be registration still go registration, Now HeNB sends to old X2GW and removes registration message.
After going registration, HeNB sends registration message to the above-mentioned new X2GW chosen.
In sum, HeNB achieves the renewal process of X2GW.
The X2GW that HeNB newly supports, source base station eNB is carried in transport layer address response message Indirect X2 can be initiated after perception smoothly set up.
HeNB2 is as target side base station, and when HeNB1 is as source base station, HeNB2 consults to update The process of X2GW is as shown in Figure 8.
HeNB2 is target BS, and HeNB1 is source base station.Transport layer address request is carried HeNB1 support X2GW be not HeNB2 support X2GW, HeNB2 judge with should HeNB1 sets up X2 link and is worth bigger, and HeNB2 decision-making is to be updated to the X2GW that HeNB1 supports.
The X2GW renewal process of HeNB2 is with described in above-mentioned Fig. 6, i.e. HeNB2 selects new X2GW Afterwards, HeNB2 to first carry out and old X2GW gone registration process.
Before carrying out registration process, the X2AP layer link existed before to be discharged by HeNB2, I.e. send X2 REMOVAL REQUEST message to all of X2 linking objective, and collect target After the X2 REMOVAL RSPONSE message returned or waiting timer time-out, HeNB2 performs Old X2GW gone registration process.
LTE R12 agreement only supports (H) eNB registration process to X2GW at present, then we need X2AP MESSAGE TRANSFER message increases a field be shown to be registration still go registration, Now HeNB2 sends to old X2GW and removes registration message.
After going registration, HeNB2 sends registration message to the above-mentioned new X2GW chosen.
In sum, HeNB2 achieves the renewal process of X2GW.
The X2GW that HeNB2 newly supports, source base station HeNB1 is carried in transport layer address response message Indirect X2 can be initiated after perception smoothly set up.
Embodiment 2
The present embodiment provides a kind of base station equipment, and this equipment at least includes such as lower unit.
First negotiation element, in transport layer address acquisition procedure, the X2 net that perception is supported with source base station When closing GW difference, consult to determine the X2GW of common support with source base station;
Link setup unit, by the common X2GW supported, is connected with setting up X2 between source base station.
Wherein, in transport layer address acquisition procedure, above-mentioned base station is eNB, and as target side base station Time: the first negotiation element judges that it is the most consistent with the X2GW that source base station (such as HeNB) is supported, If consistent, in transport layer address acquisition response message, directly carry the transport layer address of this X2GW; If inconsistent, the first negotiation element can select to register this X2GW, then at transport layer address acquisition Response message carries the transport layer address of this X2GW, or the first negotiation element decision-making is without this X2GW, then carries its X2GW transport layer address supported in transport layer address acquisition response message List.
When above-mentioned base station is HeNB, and during as target side base station: receiving transport layer address acquisition please Ask X2GW or the X2GW list in message, if HeNB support X2GW consistent with it or Person is present in list, then show that source base station supports identical X2GW with this HeNB;The most not Unanimously, the first negotiation element can choose whether to update X2GW, if the first negotiation element determines to update, Then first carry out old X2GW goes registration process, then selects new X2GW to perform registration process, Finally make it consistent with the X2GW that source base station is supported;If HeNB determines still to keep original X2GW, HeNB do not update, and leave the power to make decision of negotiation for source base station.
It addition, above-mentioned base station equipment can also include: the second negotiation element, in transport layer address acquisition mistake Cheng Zhong, consults to determine the X2GW of common support with target BS;Now, link setup unit, by jointly The X2GW supported, is connected with setting up X2 between target BS.
Wherein, when above-mentioned base station is eNB, and during as source base station: respond at transport layer address acquisition In message, receive the X2GW that target HeNB is supported, if eNB has supported this X2GW at present, Avoid the need for updating its X2GW list;Otherwise, the second negotiation element, whether can register this with decision-making X2GW, it is ensured that its X2GW identical with the support of target HeNB after registration.
When above-mentioned base station equipment is HeNB, and during as source base station: receive the biography that target BS returns In defeated layer address response message, if the X2GW carried is consistent with what oneself was supported, HeNB is the clearest Its X2GW identical with target BS;If X2GW or the X2GW list carried and oneself That supports is inconsistent, and the second negotiation element can choose whether to update X2GW, if second consults list Unit determines to update, then first carry out old X2GW goes registration process, then selects new X2GW to hold Row registration process, finally makes it consistent with the X2GW that target BS is supported.
It is embodied as being described further to above-mentioned base station equipment below in conjunction with the accompanying drawings.
Such as, when above-mentioned base station equipment is specially HeNB, its structure is as it is shown in figure 9, include following each Part, wherein omits link setup unit.
Receiving transport layer address response message module, the message that this module receives passes to negotiation module and enters Row processes.
Negotiation module, comprise as target BS hold consultation process the first negotiation element and as source base Station hold consultation process the second negotiation element, i.e. in transport layer address acquisition procedure, HeNB conduct When source base station and target side base station, it is handled through consultation is different.When HeNB is as source base station, Receive and receive the response message that transport layer address response message module sends, hold consultation.
When HeNB is as target side base station, after negotiation, hand over sending transport layer address response message module Mutually, its new X2GW is notified.
Send transport layer address response message module, mutual with negotiation module, obtain the new X2GW of HeNB And carry in transport layer address response message.
For another example, when above-mentioned base station equipment is specially eNB, its structure as shown in Figure 10, including following each Part, wherein omits link setup unit.
Receiving transport layer address response message module, the message that this module receives passes to negotiation module and enters Row processes.
Negotiation module, comprises the first negotiation element handled through consultation as target side and as source negotiation Second negotiation element, i.e. in transport layer address acquisition procedure, eNB is as source base station and target side base When standing, it is handled through consultation is different.When eNB is as source base station, receives reception transport layer address and ring Answer the response message that message module sends, hold consultation.
It is when eNB is as target side base station, after negotiation, mutual with sending transport layer address response message module, Notify its new X2GW list.
Send transport layer address response message module, mutual with negotiation module, obtain the new X2GW of eNB List, and in transport layer address response message, carry the X2GW or whole that source HeNB supports X2GW list.
One of ordinary skill in the art will appreciate that all or part of step in said method can pass through program Instructing related hardware to complete, described program can be stored in computer-readable recording medium, as read-only Memorizer, disk or CD etc..Alternatively, all or part of step of above-described embodiment can also use One or more integrated circuits realize.Correspondingly, each module/unit in above-described embodiment can use The form of hardware realizes, it would however also be possible to employ the form of software function module realizes.The application is not restricted to appoint The combination of the hardware and software of what particular form.
The above, the only preferred embodiments of the present invention, it is not intended to limit the protection model of the present invention Enclose.All within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. done, Should be included within the scope of the present invention.

Claims (12)

1. the method for an X2 connection establishment, it is characterised in that the method includes:
In transport layer address acquisition procedure, its X2 gateway GW supported with source base station of target BS perception Time different, described target BS and source base station consult to determine the X2GW of common support;
Set up X2 by the X2GW of described common support between described target BS and source base station to be connected.
2. the method for claim 1, it is characterised in that described target BS be macro base station or Home eNodeB.
3. method as claimed in claim 2, it is characterised in that when described target BS is macro base station, Described target BS and source base station are consulted to determine that the process of the X2GW of common support includes:
Described target BS increases X2GW so that the X2GW increased is consistent with what source base station was supported, And the X2GW increased is fed back to described source base station;
When described target BS is Home eNodeB, described target BS and source base station are consulted to determine common support The process of X2GW include:
Described target BS updates X2GW so that the X2GW of renewal is consistent with what source base station was supported, And the X2GW of renewal is fed back to described source base station.
4. method as claimed in claim 1 or 2, it is characterised in that described source base station be macro base station or Home eNodeB.
5. method as claimed in claim 4, it is characterised in that when described source base station is macro base station, institute State target BS to consult to determine that the process of the X2GW of common support includes with source base station:
The X2GW that self supports is fed back to described source base station by described target BS, and described source base station is from institute State and the X2GW of target BS support selects increase X2GW so that the X2GW increased and target base Stand support consistent;
When described source base station is Home eNodeB, described target BS and source base station are consulted to determine common support The process of X2GW includes:
The X2GW that self supports is fed back to described source base station by described target BS, and described source base station is from institute State and the X2GW that target BS is supported selects update X2GW so that the X2GW of renewal and target base Stand support consistent.
6. method as claimed in claim 5, it is characterised in that described source base station is from described target BS The X2GW supported selects update X2GW so that the X2GW of renewal and the one of target BS support The process caused includes:
Before described source base station updates X2GW, the X2 application protocol AP layer link that there is currently is released Bleed off, and after release completes, current X2GW is gone registration, after going registration to complete, Xiang Xuan The X2GW selecting renewal sends registration message.
7. a base station equipment, it is characterised in that this equipment includes:
First negotiation element, in transport layer address acquisition procedure, the X2 net that perception is supported with source base station When closing GW difference, consult to determine the X2GW of common support with source base station;
Link setup unit, by the X2GW of described common support, is connected with setting up X2 between source base station.
8. equipment as claimed in claim 7, it is characterised in that described base station equipment be macro base station or Home eNodeB.
9. equipment as claimed in claim 8, it is characterised in that when described base station equipment is macro base station, Described first negotiation element, consults to determine that the X2GW of common support refers to source base station:
Described first negotiation element, increases X2GW so that the X2GW increased supports with source base station Unanimously, and by the X2GW increased described source base station is fed back to;
When described base station equipment is Home eNodeB, described first negotiation element, consult to determine altogether with source base station Refer to the X2GW supported:
Described first negotiation element, updates X2GW so that the X2GW of renewal supports with source base station Unanimously, and by the X2GW of renewal described source base station is fed back to.
10. the equipment as described in claim 7,8 or 9, it is characterised in that described base station equipment is also wrapped Include:
Second negotiation element, in transport layer address acquisition procedure, consults to determine common with target BS The X2GW held;
Now, described link setup unit, by the X2GW of described common support, and build between target BS Vertical X2 connects.
11. equipment as claimed in claim 10, it is characterised in that when described base station equipment is macro base station, Described second negotiation element, consults to determine that the X2GW of common support refers to target BS:
Receive the X2GW himself supported of described target BS feedback, support from described target BS X2GW selects increase X2GW so that the X2GW increased is consistent with what target BS was supported;
When described base station equipment is Home eNodeB, described second negotiation element, consult to determine with target BS The common X2GW supported refers to:
Receive the X2GW himself supported of described target BS feedback, support from described target BS X2GW selects update X2GW so that the X2GW of renewal is consistent with what target BS was supported.
12. equipment as claimed in claim 11, it is characterised in that described second negotiation element is from described The X2GW that target BS is supported selects update X2GW so that the X2GW of renewal and target BS That supports unanimously refers to:
Described second negotiation element, before updating X2GW, the X2 application protocol AP that will exist before Layer link discharges, and after release completes, current X2GW goes registration, goes registration to complete it After, send registration message to selecting the X2GW updated.
CN201510369003.7A 2015-06-29 2015-06-29 Method for establishing X2 connection and connection device Withdrawn CN106332302A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510369003.7A CN106332302A (en) 2015-06-29 2015-06-29 Method for establishing X2 connection and connection device
PCT/CN2015/094598 WO2017000472A1 (en) 2015-06-29 2015-11-13 X2 connection establishment method and base station device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510369003.7A CN106332302A (en) 2015-06-29 2015-06-29 Method for establishing X2 connection and connection device

Publications (1)

Publication Number Publication Date
CN106332302A true CN106332302A (en) 2017-01-11

Family

ID=57607717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510369003.7A Withdrawn CN106332302A (en) 2015-06-29 2015-06-29 Method for establishing X2 connection and connection device

Country Status (2)

Country Link
CN (1) CN106332302A (en)
WO (1) WO2017000472A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114867098A (en) * 2021-02-03 2022-08-05 中国电信股份有限公司 Method for de-registration of user equipment in a 5G network, UDM network element, and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130044639A1 (en) * 2010-05-11 2013-02-21 Samsung Electronics Co. Ltd. Apparatus and method for setting up communication relationship
CN103582173A (en) * 2012-08-09 2014-02-12 中兴通讯股份有限公司 Notification method and system of transport layer address
CN103582167A (en) * 2012-08-09 2014-02-12 中兴通讯股份有限公司 X2 connection establishment processing method, managing method and device
CN103857060A (en) * 2012-11-29 2014-06-11 中兴通讯股份有限公司 Method, system and gateway for acquiring identify-address matching relationship in home evolved node B

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103716847B (en) * 2012-09-28 2019-06-14 北京三星通信技术研究有限公司 A method of X2 is established by gateway
US9451530B2 (en) * 2012-11-02 2016-09-20 Telefonaktiebolaget L M Ericsson (Publ) Methods for base-station-to-base-station connection management

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130044639A1 (en) * 2010-05-11 2013-02-21 Samsung Electronics Co. Ltd. Apparatus and method for setting up communication relationship
CN103582173A (en) * 2012-08-09 2014-02-12 中兴通讯股份有限公司 Notification method and system of transport layer address
CN103582167A (en) * 2012-08-09 2014-02-12 中兴通讯股份有限公司 X2 connection establishment processing method, managing method and device
CN103857060A (en) * 2012-11-29 2014-06-11 中兴通讯股份有限公司 Method, system and gateway for acquiring identify-address matching relationship in home evolved node B

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
ALCATEL-LUCENT: "Way forward on X2 GW", 《3GPP TSG-RAN3 MEETING #83BIS R3-140977》 *
ZTE: "The enhencement on X2 SETUP procedure", 《3GPP TSG-RAN3 MEETING #84 R3-141207》 *

Also Published As

Publication number Publication date
WO2017000472A1 (en) 2017-01-05

Similar Documents

Publication Publication Date Title
TWI713341B (en) Method and user equipment of 5gsm state mapping
EP3694254B1 (en) Handover method in wireless communication system and apparatus therefor
US10674420B2 (en) Method, apparatus, and system for routing user plane data in mobile network
US11653296B2 (en) Isolated network slice selection
CN104982081B (en) For providing the device and method of service in mobile communication system
TWI733216B (en) Methods for handling on invalid pdu session and a user equipment thereof
CN105122855B (en) Utilize the transport network layer address discovery of X2 gateway
CN103716847B (en) A method of X2 is established by gateway
KR20120093072A (en) Method and apparatus for supporting user equipment mobility in a wierless communication system
CN109996303A (en) A kind of method and communication entity of system switching
US20120163300A1 (en) Method and system for acquiring route strategies
JP2021531678A (en) Handling of integrity protection in gNB-CU-UP
JP7135122B2 (en) Redirection method, communication system and communication device
CN110831032B (en) Method and device for processing wireless capability change of terminal device
US20230232311A1 (en) Traffic Routing Towards Local Area Data Network Per Application Function Request
TW202215897A (en) Method for pdu session establishment accept handling and user equipment thereof
WO2015062643A1 (en) Keeping user equipment in a state attached to a cellular communication network during offloading of cellular data to another communication network
US20150289224A1 (en) METHOD AND SYSTEM TO IMPROVE REGISTRATION FOR VoLTE DEVICES IN LTE NETWORKS
US11259218B2 (en) Systems and methods for handover of dual connectivity user equipment
CN104519594B (en) Connect method for building up and device, system
CN107005937A (en) Method for the enhanced energy saver mode of wireless device
CN107079047A (en) The apparatus and method that domain for network assistance is selected
WO2020049347A1 (en) User triggered wlan to cellular voice session transfer
TWI728800B (en) Methods and user equipment for handling pdn connection
CN106612528B (en) Base station and its method for choosing MME

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170111

WW01 Invention patent application withdrawn after publication