CN106329356A - Low voltage power distribution cabinet installation process - Google Patents

Low voltage power distribution cabinet installation process Download PDF

Info

Publication number
CN106329356A
CN106329356A CN201510383695.0A CN201510383695A CN106329356A CN 106329356 A CN106329356 A CN 106329356A CN 201510383695 A CN201510383695 A CN 201510383695A CN 106329356 A CN106329356 A CN 106329356A
Authority
CN
China
Prior art keywords
installation
distribution cabinet
power distribution
cabinet
wiring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510383695.0A
Other languages
Chinese (zh)
Inventor
孙巨岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Huihe Electrical Equipment Co ltd
Original Assignee
Tianjin Huihe Electrical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Huihe Electrical Equipment Co ltd filed Critical Tianjin Huihe Electrical Equipment Co ltd
Priority to CN201510383695.0A priority Critical patent/CN106329356A/en
Publication of CN106329356A publication Critical patent/CN106329356A/en
Pending legal-status Critical Current

Links

Landscapes

  • Distribution Board (AREA)

Abstract

本发明公开了一种低压配电柜安装工艺,包括如下步骤:步骤一:配电柜的安装;步骤二:硬母线安装;步骤三:柜内回路的安装布线;步骤四:安装后的检查;步骤五:电压表、电流表检验、操动,及联动试验。本发明,安装质量较好、安全性较强、且使用期限较长,满足了用户的使用需求。

This invention discloses an installation process for a low-voltage distribution cabinet, comprising the following steps: Step 1: Installation of the distribution cabinet; Step 2: Installation of the rigid busbar; Step 3: Installation and wiring of the circuits inside the cabinet; Step 4: Post-installation inspection; Step 5: Inspection, operation, and linkage test of voltmeters and ammeters. This invention offers superior installation quality, enhanced safety, and a longer service life, meeting user requirements.

Description

一种低压配电柜安装工艺A low-voltage power distribution cabinet installation process

技术领域technical field

本发明属于机电设备安装技术领域,尤其涉及一种低压配电柜安装工艺。The invention belongs to the technical field of electromechanical equipment installation, and in particular relates to an installation process of a low-voltage power distribution cabinet.

背景技术Background technique

低压配电柜的额定电流是交流50Hz,额定电压380v的配电系统作为动力,照明及配电的电能转换及控制之用。该产品具有分断能力强,动热稳定性好,电气方案引灵活,组合方便,系列性、实用性强,结构新颖等特点。The rated current of the low-voltage power distribution cabinet is AC 50Hz, and the power distribution system with a rated voltage of 380v is used for power conversion and control of power, lighting and power distribution. The product has the characteristics of strong breaking capacity, good dynamic and thermal stability, flexible electrical scheme, convenient combination, series, strong practicability, and novel structure.

配电柜的安装质量决定着配电柜的使用寿命、功能优劣以及安全性能强弱等,因此配电柜的安装工艺,一直是人们研究的课题。The installation quality of the power distribution cabinet determines the service life, function and safety performance of the power distribution cabinet. Therefore, the installation process of the power distribution cabinet has always been a subject of research.

发明内容Contents of the invention

本发明的目的是提供一种低压配电柜安装工艺,以解决现有技术中存在的上述问题。The object of the present invention is to provide a low-voltage power distribution cabinet installation process to solve the above-mentioned problems in the prior art.

为了实现本发明的目的,本发明提供了一种低压配电柜安装工艺,包括如下步骤:In order to achieve the purpose of the present invention, the present invention provides a low-voltage power distribution cabinet installation process, including the following steps:

步骤一:配电柜的安装Step 1: Installation of power distribution cabinet

(1)进行所述配电柜的底座制作安装,所述配电柜的底座用型钢制作,所述型钢先矫平直再下料;(1) Make and install the base of the power distribution cabinet, the base of the power distribution cabinet is made of profiled steel, and the profiled steel is first straightened and then blanked;

(2)将所述配电柜开箱;(2) Unpacking the distribution cabinet;

(3)将所述配电柜平稳地安装到基础槽钢上,柜间用螺栓拧紧,找平、找正后与基础槽钢焊接在一起,盘柜要用6mm的软铜线与接地干线相连,作为保护接地。(3) Install the power distribution cabinet on the basic channel steel smoothly, tighten the cabinets with bolts, level and align them, and weld them with the basic channel steel. , as a protective ground.

步骤二:硬母线安装Step 2: Hard busbar installation

(1)所述硬母线用低压瓷瓶或塑料支持固定;(1) The hard bus bar is supported and fixed with a low-voltage porcelain bottle or plastic;

(2)所述硬母线应该设计伸缩节,所述伸缩节间隔20cm设置一个;(2) The hard busbar should be designed with expansion joints, and the expansion joints are arranged at intervals of 20 cm;

(3)所述硬母线垂直布置时,交流L1、L2、L3相的排列应由上向下,直流母线的正极在上,负极在下,所述硬母线水平放置时,交流L1、L2、L3相的排列应自左至右,直流正负极的排列应自左向右;(3) When the hard bus is arranged vertically, the arrangement of the AC L1, L2, and L3 phases should be from top to bottom, the positive pole of the DC bus is on the top, and the negative pole is on the bottom. When the hard bus is placed horizontally, the AC L1, L2, L3 The arrangement of phases should be from left to right, and the arrangement of DC positive and negative poles should be from left to right;

步骤三:柜内回路的安装布线;Step 3: Installation and wiring of the circuit in the cabinet;

步骤四:安装后的检查;Step 4: Inspection after installation;

(1)检查各电器设备、电器元件及配电柜的安装质量是否符合安装要求及安装规范;(1) Check whether the installation quality of each electrical equipment, electrical components and power distribution cabinet meets the installation requirements and installation specifications;

(2)按U(L1)黄、V(L2)绿、W(L3)红的电源相序检查接线;(2) Check the wiring according to the power phase sequence of U (L1) yellow, V (L2) green, and W (L3) red;

(3)检查各接线端子接线是否符合安装规范,螺钉是否拧紧;(3) Check whether the wiring of each terminal meets the installation specifications and whether the screws are tightened;

步骤五:电压表、电流表检验、操动,及联动试验。Step 5: Voltmeter, ammeter inspection, operation, and linkage test.

与现有技术相比,本发明,安装质量较好、安全性较强、且使用期限较长,满足了用户的使用需求。Compared with the prior art, the present invention has better installation quality, stronger safety, and longer service life, which satisfies the use requirements of users.

附图说明Description of drawings

图1为本发明的方法流程图。Fig. 1 is a flow chart of the method of the present invention.

具体实施方式detailed description

为了使本发明的目的、技术方案及有益效果更加清楚明白,以下结合实施例,对本发明进行进一步详细说明。应当理解为此处所描述的具体实施例仅仅用以解释本发明,并不用于限制本发明的保护范围。In order to make the purpose, technical solutions and beneficial effects of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, and are not intended to limit the protection scope of the present invention.

如图1所示,本发明包括如下步骤:As shown in Figure 1, the present invention comprises the following steps:

1.配电柜的安装,1. The installation of the distribution cabinet,

(1)配电柜底座制作安装,配电柜底座一般用型钢制作,如角钢、槽钢等。钢材规格大小根据配电柜的尺寸和重量而定,型钢先矫平直在下料。(1) Manufacture and install the base of the power distribution cabinet. The base of the power distribution cabinet is generally made of section steel, such as angle steel and channel steel. The size of the steel is determined according to the size and weight of the power distribution cabinet. The section steel is straightened first before cutting.

(2)配电柜开箱配电柜到达现场后,按进度情况进行开箱检查。先查验合格证、产品说明书,在将主要检查内容要填写“设备开箱检查记录”(2) Unpacking of distribution cabinet After the distribution cabinet arrives at the site, unpack inspection according to the progress. First check the certificate of conformity and the product manual, and then fill in the "equipment unpacking inspection record" for the main inspection content

(3)配电柜的安装配电柜平稳地安装到基础槽钢上,柜间用螺栓拧紧,找平、找正后与基础槽钢焊接在一起,盘柜要用6mm的软铜线与接地干线相连,作为保护接地。固定底座用的底板由土建施工进行预埋。安装人员应配合或检查验收其的准确性。A柜安装在震动场所,应采取防震措施(如开防震沟,加弹性垫等)。B柜本体及柜内设备与各构件间连接应牢固。主控制柜、继电保护柜、自动装置柜等不宜与基础型钢焊死。C单独或成列安装时,其垂直度、水平度以及柜面不平度和柜间接缝的允许偏差施工要求安装D端子箱安装应牢固,封闭良好,安装位置应便于检查,成列安装时,应排列整齐,E柜的接地应牢固良好,装有电器的可开启的柜门,应以软导线与接地的金属构架可靠地连接。F柜内配线整齐、清晰、美观、导线绝缘良好,无损伤,柜的导线不应有接头,每个端子板的每侧接线一般为一根,不得超过两根。G柜内配线应采用截面不小于1.5mm、电压不低于400V的铜芯线。H柜内敷设的导线符合安装规范的要求,即同方向导线汇成一束捆扎,沿柜框布置导线,导线敷设应横平、竖值,转弯处应成圆弧过渡的直角。(3) Installation of the power distribution cabinet The power distribution cabinet is smoothly installed on the basic channel steel, and the cabinets are tightened with bolts. After leveling and aligning, they are welded together with the basic channel steel. connected to the mains as a protective earth. The bottom plate used to fix the base is pre-buried by civil construction. The installer should cooperate or check and accept its accuracy. A cabinet is installed in a place of vibration, and anti-vibration measures should be taken (such as opening anti-vibration trenches, adding elastic pads, etc.). The connection between the body of cabinet B and the equipment in the cabinet and each component should be firm. The main control cabinet, relay protection cabinet, automatic device cabinet, etc. should not be welded to the basic section steel. C When installed alone or in a row, the construction requirements for the verticality, levelness, unevenness of the cabinet surface and the allowable deviation of the joints between the cabinets are installed. D. The terminal box should be installed firmly and well closed. They should be arranged neatly, the grounding of cabinet E should be firm and good, and the openable cabinet doors equipped with electrical appliances should be reliably connected to the grounded metal frame with flexible wires. F The wiring in the cabinet is neat, clear, and beautiful, and the wires are well insulated and free from damage. There should be no joints for the wires in the cabinet. Generally, there is one wire on each side of each terminal board, and no more than two wires. The wiring in the G cabinet shall adopt copper core wires with a cross-section not less than 1.5mm and a voltage not lower than 400V. The wires laid in the H cabinet meet the requirements of the installation specification, that is, the wires in the same direction are bundled into a bundle, and the wires are arranged along the cabinet frame.

2.硬母线的安装2. Installation of hard busbar

低压母线用低压瓷瓶或塑料支持件固定。母线应该设计伸缩节,间隔20cm设置一个。母线垂直布置时,交流L1、L2、L3相的排列应由上向下,直流母线的正极在上,负极在下,母线水平放置时,交流L1、L2、L3相的排列应自左至右,直流正负极的排列应自左向右。安装完毕刷漆。Low-voltage busbars are fixed with low-voltage porcelain bottles or plastic supports. The busbar should be designed with expansion joints, one at an interval of 20cm. When the busbar is arranged vertically, the arrangement of the AC L1, L2 and L3 phases should be from top to bottom, the positive pole of the DC busbar is on the top, and the negative pole is on the bottom. When the busbar is placed horizontally, the arrangement of the AC L1, L2 and L3 phases should be from left to right. The arrangement of DC positive and negative poles should be from left to right. Painted after installation.

3.柜内回路的安装布线3. Installation and wiring of the circuit in the cabinet

4.安装后的检查4. Inspection after installation

(1).检查各电器设备、电器元件及配电柜的安装质量是否符合安装要求及安装规范。(1). Check whether the installation quality of each electrical equipment, electrical components and power distribution cabinet meets the installation requirements and installation specifications.

(2)按U(L1)黄、V(L2)绿、W(L3)红的电源相序检查接线。(2) Check the wiring according to the power supply phase sequence of U (L1) yellow, V (L2) green, and W (L3) red.

(3)检查各接线端子接线是否符合安装规范,螺钉是否拧紧。(3) Check whether the wiring of each terminal meets the installation specifications and whether the screws are tightened.

5.电压表、电流表检验、操动,及联动试验。5. Voltmeter, ammeter inspection, operation, and linkage test.

以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, it should be pointed out that, for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications can also be made. It should be regarded as the protection scope of the present invention.

Claims (1)

1. a low-voltage distribution cabinet mounting process, it is characterised in that comprise the steps:
Step one: the installation of power distribution cabinet
(1) the base fabrication and installation of described power distribution cabinet are carried out, the base section steel manufacture of described power distribution cabinet, institute State the straight blanking again of shaped steel elder generation leveling;
(2) described power distribution cabinet is unpacked;
(3) described power distribution cabinet is smoothly installed on the channel-section steel of basis, tightens with bolt between cabinet, levelling, look for Welding together with basis channel-section steel after just, the annealed copper wire of dish cabinet 6mm to be used is connected with ground connection main line, as guarantor Protect ground connection.
Step 2: hard bus is installed
(1) described hard bus low voltage porcelain bottle or plastics support are fixed;
(2) described hard bus should design telescopic joint, and described telescopic joint interval 20cm arranges one;
(3), when described hard bus is arranged vertically, the arrangement of exchange L1, L2, L3 phase should from top to bottom, direct current The positive pole of bus upper, negative pole under, during described hard bus horizontal positioned, exchange L1, L2, L3 phase row Row should from left to right, and the arrangement of direct current both positive and negative polarity should be from left to right;
Step 3: the installation wiring of cabinet inner looping;
Step 4: the inspection after installation;
(1) check the installation quality of each electric equipment, electric elements and power distribution cabinet whether meet installation requirement and Installation specification;
(2) press the power phase that U (L1) is yellow, V (L2) is green, W (L3) is red and check wiring;
(3) checking whether each binding post wiring meets installation specification, whether screw is tightened;
Step 5: the inspection of voltmeter, ammeter, actuating, and linkage test.
CN201510383695.0A 2015-06-30 2015-06-30 Low voltage power distribution cabinet installation process Pending CN106329356A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510383695.0A CN106329356A (en) 2015-06-30 2015-06-30 Low voltage power distribution cabinet installation process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510383695.0A CN106329356A (en) 2015-06-30 2015-06-30 Low voltage power distribution cabinet installation process

Publications (1)

Publication Number Publication Date
CN106329356A true CN106329356A (en) 2017-01-11

Family

ID=57727922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510383695.0A Pending CN106329356A (en) 2015-06-30 2015-06-30 Low voltage power distribution cabinet installation process

Country Status (1)

Country Link
CN (1) CN106329356A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108448467A (en) * 2018-05-22 2018-08-24 苏州三通华印电力工程有限公司 A kind of cell distribution box installation technology
CN108448465A (en) * 2018-05-17 2018-08-24 苏州三通华印电力工程有限公司 A kind of installation method of low-tension switch cabinet
CN108448466A (en) * 2018-05-17 2018-08-24 苏州三通华印电力工程有限公司 A kind of assembly method of high-tension switch cabinet
CN108598904A (en) * 2018-05-16 2018-09-28 苏州三通华印电力工程有限公司 A kind of installation method of high-voltage ring network switch cabinet
CN108598971A (en) * 2018-05-17 2018-09-28 苏州三通华印电力工程有限公司 A kind of installation method of high-tension switch cabinet
CN108616074A (en) * 2018-05-22 2018-10-02 苏州三通华印电力工程有限公司 A method of improving distribution box construction and installation efficiency
CN116388036A (en) * 2023-05-06 2023-07-04 黄正奎 Alignment and leveling method for cabinet screen and counter of power distribution cabinet

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108598904A (en) * 2018-05-16 2018-09-28 苏州三通华印电力工程有限公司 A kind of installation method of high-voltage ring network switch cabinet
CN108448465A (en) * 2018-05-17 2018-08-24 苏州三通华印电力工程有限公司 A kind of installation method of low-tension switch cabinet
CN108448466A (en) * 2018-05-17 2018-08-24 苏州三通华印电力工程有限公司 A kind of assembly method of high-tension switch cabinet
CN108598971A (en) * 2018-05-17 2018-09-28 苏州三通华印电力工程有限公司 A kind of installation method of high-tension switch cabinet
CN108448467A (en) * 2018-05-22 2018-08-24 苏州三通华印电力工程有限公司 A kind of cell distribution box installation technology
CN108616074A (en) * 2018-05-22 2018-10-02 苏州三通华印电力工程有限公司 A method of improving distribution box construction and installation efficiency
CN116388036A (en) * 2023-05-06 2023-07-04 黄正奎 Alignment and leveling method for cabinet screen and counter of power distribution cabinet

Similar Documents

Publication Publication Date Title
CN205195145U (en) Support is changed to insulator
CN105449612A (en) A conductive wire insulation support plate apparatus
CN104284537A (en) Adjustable base for electrical cabinet
CN205985893U (en) Electrified column switch professional equipment that changes of indirect bypass of 10kV circuit insulator spindle
CN102957104B (en) The remodeling method of transformer and GIS power distribution equipment flexible connection structures
CN205666343U (en) Modular looped netowrk cabinet earthing device
CN104242813A (en) Power supply structure for direct-current transmission line on-line monitoring device
CN104242202A (en) High-voltage non-segregated phase bus and mounting method thereof
CN110137867B (en) Method for live wiring in low-voltage cable branch box
CN207664569U (en) A kind of bareing bus bridge being installed between wall and transformer
CN100471022C (en) Wiring Method of Converter Transformer in Valve Hall of DC Transmission Project
CN201584691U (en) A special tool for 220KV double-circuit common-tower line entering the high-tension high-voltage strong electric field
CN204068041U (en) For the insulation isolation fixture of 10kV overhead distribution equipment
CN204046514U (en) A kind of power supply architecture for DC power transmission line on-Line Monitor Device
CN205646449U (en) Modular looped netowrk cabinet ground connection mechanism
CN202474753U (en) Platform transformer bus laying support
CN209822060U (en) Multifunctional combined training facility for simulation low-voltage distribution line
CN105119228B (en) A kind of aerial list of double back overhead transmission line adjusts back connect line bar and wiring construction
CN211654506U (en) Fixing device for mounting power converter
CN203589662U (en) Sectional ground wire connection structure
CN209571801U (en) A kind of concentration bus duct
CN223066673U (en) A high protection distribution box with wire sealing joints
CN200973006Y (en) Air insulation bus-bar slot
CN204045369U (en) Amorphous alloy transformer low voltage surge arrester mounting bracket
CN220691859U (en) On-load tap-changer support frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170111