CN106326562A CN201610721128.6A CN201610721128A CN106326562A CN 106326562 A CN106326562 A CN 106326562A CN 201610721128 A CN201610721128 A CN 201610721128A CN 106326562 A CN106326562 A CN 106326562A
Authority
CN
China
Prior art keywords
accumulation
energy
unit
boiler
supercritical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610721128.6A
Other languages
English (en)
Other versions
CN106326562B (zh
Inventor
高明明
洪烽
刘吉臻
杨婷婷
李丞亮
陈�峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201610721128.6A priority Critical patent/CN106326562B/zh
Publication of CN106326562A publication Critical patent/CN106326562A/zh
Application granted granted Critical
Publication of CN106326562B publication Critical patent/CN106326562B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Abstract

本发明属于电站锅炉性能运行状态分析的技术领域,涉及一种超临界循环流化床锅炉机组蓄能量化方法。所述方法为:对超临界CFB锅炉机组蓄能建立模型,利用机组的历史数据确定超临界CFB锅炉蓄能模型中的蓄能参数,根据确定蓄能参数后的超临界CFB锅炉蓄能模型结合机组的实时数据对机组的蓄能进行观测。本发明提供一种超临界循环流化床锅炉机组蓄能量化方法,能够明确CFB锅炉机组的动态过程中蓄能变迁情况,提高机组控制水平。

Description

一种超临界循环流化床锅炉机组蓄能量化方法
技术领域
本发明属于电站锅炉性能运行状态分析的技术领域,涉及一种超临界循环流化床锅炉机组蓄能量化方法。
背景技术
循环流化床(Circulating Fluidized Bed,CFB)燃烧技术是洁净煤技术中最具商业化潜力、污染排放控制成本最低的技术。其煤种适应性强,是消纳大量煤矸石、煤泥的最有效手段。目前,我国CFB锅炉机组的装机总投运容量约91000MW,占火电装机总容量的12.1%。
火电机组运行优化控制的核心内容之一就是充分挖掘并综合利用机组中的蓄能。普通煤粉炉机组整个热力系统内部储存了大量的热量,例如管道和加热器的金属热量、工质能量等。改变工质的流量、温度或者工作压力等可以存储或释放系统的蓄能,进而影响机组运行。
为提高CFB机组供电效率,提升市场竞争力,大型化成为必然趋势。世界首台600MW超临界CFB锅炉于2013年在四川白马投运,与亚临界CFB锅炉相比,超临界CFB锅炉提升了供电效率,但负荷对燃料侧的响应更慢,主汽压力控制难度剧增。CFB锅炉中燃烧放热来自存在于床料中并不断循环的大量未燃烬碳,而不像煤粉炉,来自瞬时加入的燃料。CFB锅炉复杂的燃烧方式,增加了锅炉的惯性、迟延,但也提供了相当可观的燃料侧蓄能十分可观,若能深入分析、量化超临界CFB机组燃料侧及汽水侧的蓄能,可为超临界CFB锅炉机组优化运行指引方向,实时确定机组动态过程中的能量变迁情况,提升超临界CFB锅炉机组控制水平,进一步提高其市场竞争力。
发明内容
本发明的目的在于,提供一种超临界循环流化床锅炉机组蓄能量化方法,能够明确CFB锅炉机组的动态过程中蓄能变迁情况,提高机组控制水平,其特征在于,所述系统包括:
数据选取与预处理模块;
超临界CFB锅炉蓄能建模模块;
超临界CFB机组蓄能观测模块;
DCS系统与数据库。
所述DCS系统与数据库将机组运行的历史数据及实时数据传输给所述数据选取与预处理模块;所述数据选取与预处理模块对历史数据处理,选合适的计算支撑数据传输给所述超临界CFB锅炉蓄能建模模块,选取对应的实时数据作为支撑数据传输给所述超临界CFB机组蓄能观测模块;所述超临界CFB锅炉蓄能建模模块建立超临界CFB锅炉机组蓄能方程,并利用计算数据确定蓄能模型中相应的参数传输给与所述超临界CFB机组蓄能观测模块。
具体技术方案如下:
一种超临界循环流化床锅炉机组蓄能量化方法,所述方法为:对超临界CFB锅炉机组蓄能建立模型,利用机组的历史数据确定超临界CFB锅炉蓄能模型中的蓄能参数,根据确定蓄能参数后的超临界CFB锅炉蓄能模型结合机组的实时数据对机组的蓄能进行观测。
进一步地,所述方法中对超临界CFB锅炉机组蓄能建立模型由超临界CFB锅炉蓄能建模模块实现,机组的历史数据由数据选取与预处理模块从DCS系统与数据库中选取,对机组的蓄能进行观测由超临界CFB机组蓄能观测模块实现。
进一步地,所述DCS系统与数据库将机组与所述数据选取与预处理模块连接,所述数据选取与预处理模块与所述超临界CFB锅炉蓄能建模模块、超临界CFB机组蓄能观测模块连接,所述超临界CFB锅炉蓄能建模模块与超临界CFB机组蓄能观测模块连接;所述DCS系统与数据库将机组运行的历史数据传输给所述数据选取与预处理模块;所述DCS系统与数据库将机组的实时运行数据传输给所述超临界CFB机组蓄能观测模块;所述超临界CFB机组蓄能观测模块将超临界CFB锅炉蓄能建模模块的模型分析结果整合,结合机组实时运行数据对机组的蓄能进行观测。
进一步地,包括以下步骤:
步骤1)利用所述超临界CFB锅炉蓄能建模模块建立CFB锅炉蓄能模型;
步骤2)利用所述数据选取与预处理模块,从DCS系统与数据库中选取不同负荷段下机组负荷动态变化较为频繁的历史运行数据;所述机组负荷动态变化较为频繁是指机组负荷的改变大于机组额定负荷的10%-15%;
步骤3)根据,利用步骤2)中选取的数据结合步骤1)建立的超临界CFB锅炉蓄能模型得到不同负荷段下蓄能模型中的参数,确定蓄能能力,得到确定蓄能参数后的蓄能模型;
步骤4)所述超临界CFB锅炉蓄能观测模块根据步骤3)中得到的确定蓄能参数后的蓄能模型,结合所述数据选取与预处理模块中选取的对应实时数据对超临界CFB机组蓄能进行量化观测。
进一步地,所述超临界CFB锅炉蓄能模型为:
- C h dh m d t + C B d B d t = η b Q F - Q o = ΔQ F o
式中CB为即燃碳蓄热系数,MJ/kg;B(t)为炉膛内未燃烧的残碳质量,kg;ηb为锅炉热效率,%;QF为入炉给煤量热值,MJ/s,QF=FHF;F(t)为给煤量,kg/s;HF为煤的实时单位发热量值,MJ/kg;Qo为锅炉的有效输出能量,MJ/s。
进一步地,所述超临界CFB锅炉蓄能模型为超临界CFB锅炉燃料侧蓄能模型和超临界CFB锅炉汽水侧蓄能模型的结合;所述超临界CFB锅炉燃料侧蓄能模型为:
C B d B d t = η b H d B d t = η b Q F - Q r = ΔQ F r
式中H为残碳单位发热量值,MJ/kg;QF为入炉给煤量热值,MJ/s;Qr为锅炉吸热量,MJ/s。
进一步地,所述超临界CFB锅炉汽水侧蓄能模型为:
- C h dh m d t = Q r + q f h f - q d h d = Q r - Q o = ΔQ r o
式中Ch为焓增蓄热系数,单位为kg·s;hm为超临界锅炉汽水系统中间点焓值,单位为kJ/kg;Qr为锅炉吸热量,MJ/s;qf和qd分别为给水流量和主蒸汽流量,kg/s;hf和hd分别为给水焓值和主蒸汽焓值,MJ/kg。
与现有技术相比,本发明具有以下优点:
(1)针对超临界CFB锅炉独特的燃烧方式,对其炉膛内可观的燃料侧及汽水侧蓄能进行了系统建模和量化方法,客服了超临界CFB锅炉蓄热无法通过有效的实验仪器进行在线测量的难题。
(2)该方法适应于不同炉型、容量的超临界CFB机组,方便工程应用。
(3)完全通过机理分析进行超临界CFB锅炉蓄能能力和容量,没有增加任何硬件设备,为超临界CFB锅炉的运行优化提供了理论支撑和中间检测。
附图说明
图1是一种超临界循环流化床锅炉机组蓄能量化方法原理图;
图2是实施例一机组运行过程中超临界循环流化床机组运行曲线一;
图3是实施例一机组运行过程中超临界循环流化床机组运行曲线二。
下面结合附图和具体实施方式对本发明作进一步的说明。
具体实施方式
实施例一
一种超临界循环流化床锅炉机组蓄能量化方法,包括以下步骤:
S1利用所述超临界CFB锅炉蓄能建模模块建立CFB锅炉燃料侧及汽水侧蓄能模型;
S2利用所述数据选取与预处理模块,从DCS系统与数据库中选取不同负荷段下机组负荷动态变化较为频繁的历史运行数据;
S3根据步骤S1建立超临界CFB锅炉燃料侧及汽水侧蓄能模型,利用
S2中选取的数据得到不同负荷段下蓄能模型中的参数,确定蓄能能力;
S4所述超临界CFB锅炉蓄能观测模块根据步骤S3中得到的蓄能参数等,结合所述数据选取与预处理模块中选取的对应实时数据对超临界CFB机组蓄能进行量化观测。
所述步骤S1中超临界CFB锅炉蓄能模型为:
- C h dh m d t + C B d B d t = η b Q F - Q o = ΔQ F o - - - ( 1 )
式中CB为即燃碳蓄热系数,MJ/kg;B(t)为炉膛内未燃烧的残碳质量,kg;ηb为锅炉热效率,%;QF为入炉给煤量热值,MJ/s,QF=FHF;F(t)为给煤量,kg/s;HF为煤的实时单位发热量值,MJ/kg;Qo为锅炉的有效输出能量,MJ/s。
其中超临界CFB锅炉燃料侧蓄能模型为:
C B d B d t = η b H d B d t = η b Q F - Q r = ΔQ F r - - - ( 2 )
式中H为残碳单位发热量值,MJ/kg;QF为入炉给煤量热值,MJ/s;Qr为锅炉吸热量,MJ/s。
控制系统回路中用实发功率信号与实际给煤量来自动地校正燃料发热量:
dH F ( t ) d t = W ( t ) F ( t ) - - - ( 3 )
H F ( t k + 1 ) = H F ( t k ) + ΔH F ≈ H F ( t k ) + T s ( dH F ( t ) d t ) - - - ( 4 )
式中W(t)为t时刻机组的发电功率,MW。
根据质量守恒可计算得到炉膛内未燃烧的残碳质量:
d B ( t ) d t = F ( t ) · C a r - R c - - - ( 5 )
式中Car为煤的收到基碳质量份额,%;RC为碳总体燃烧反应速率,kg/s;根据工程经验,假设Car为常数,排渣含碳量及飞灰含碳量忽略不计。
炉膛内未燃烧残碳质量的燃烧速度Rc是流化床炉膛内未燃烧残碳的总质量、床温、氧气浓度的函数:
R c = B ( t ) × ( 1 m p dm p d t ) = 6 M C k c C o 2 B ( t ) d c ρ c - - - ( 6 )
式中:MC为碳的摩尔质量,单位为kg/kmol;kc为碳颗粒的燃烧速率常数;CO2为氧气浓度,单位为kmol/m3;dc为碳颗粒平均直径,单位为m;ρc为碳颗粒的密度,单位为kg/m3
循环流化床锅炉中碳颗粒燃烧速率常数kc的表达式:
kc=0.513Texp(-9160/T) (7)
式中:T为炉膛床温,单位为K;
碳颗粒氧气浓度在控制系统中可以近似取平均值,由入炉总风量PM(t)决定,其表达式为:
C o 2 ( t ) = k o 2 P M ( t ) - - - ( 8 )
式中:ko2为总风量PM(t)与氧气浓度的相关系数,取值范围0.0035~0.0055,一般取0.0050;PM(t)为总风量,单位为Nm3/s。
其中超临界CFB锅炉汽水侧蓄能模型为:
- C h dh m d t = Q r + q f h f - q d h d = Q r - Q o = ΔQ r o - - - ( 9 )
式中Ch为焓增蓄热系数,单位为kg·s;hm为超临界锅炉汽水系统中间点焓值,单位为kJ/kg;Qr为锅炉吸热量,MJ/s;qf和qd分别为给水流量和主蒸汽流量,kg/s;hf和hd分别为给水焓值和主蒸汽焓值,MJ/kg。
所述步骤S3,对于超临界CFB机组蓄能模型中的参数,锅炉热效率ηb一般在90~94%;残碳的单位发热量H一般取值29.5~30MJ/kg;Ch为焓增蓄热系数可由机组稳态工况下的运行数据带入式(1)得到。
1、超临界循环流化床锅炉汽水侧蓄能模型
超临界煤粉炉的能量平衡方程为
d(Mwhw+Mshs+MmcmT)/dt=Qr+qfhf-qdhd (2)
式中Mw和hw分别为锅炉内水的有效质量,kg,水的比焓平均值MJ/kg;Ms和hs分别为锅炉内蒸汽的有效质量,kg,蒸汽比焓平均值MJ/kg;Mm、cm、T分别为锅炉有效金属质量,kg、金属比热,MJ/(kg·K),金属平均温度,K;Qr为锅炉吸热量,MJ/s;qf和qd分别为给水流量和主蒸汽流量,kg/s;hf和hd分别为给水焓值和主蒸汽焓值,MJ/kg。
式(2)左边项为超临界煤粉炉的锅炉蓄热,是工质和受热面金属中蓄热的总和。对于超临界锅炉汽水侧蓄能工程上一般采用中间点焓值hm作为衡量锅炉能量平衡状况的信号。
- C h dh m d t = Q r + q f h f - q d h d - - - ( 3 )
- C h = M w ∂ h w ∂ p d + M s ∂ h s ∂ p d + M m c m ∂ T ∂ p d - - - ( 4 )
Ch为焓增蓄热系数,单位为kg·s。
锅炉产生的蒸汽并不全部做功,一部分能量通过回热加热系统传递给水,锅炉的有效输出能量为
Qo=qdhd-qfhf (5)
式(2)等号右侧可表示为
ΔQro=Qr+qfhf-qdhd=Qr-Qo (6)
2、超临界循环流化床锅炉燃料侧蓄能模型
煤粉炉燃料瞬间燃烧,可认为在某一时刻有式(10)成立,锅炉蓄热仅体现在汽水侧,即单位压力变动时锅炉所释放或储存的能量。
Qr=ηbQF=ηbFHF (7)
式中ηb为锅炉热效率,%;QF为入炉给煤量热值,MJ/s;HF为煤的实时单位发热量值,MJ/kg。
而CFB特殊的流态化燃烧方式使得燃料侧的蓄能十分可观,有式(8)成立:
C B d B d t = η b H d B d t = η b Q F - Q r = ΔQ F r - - - ( 8 )
式中CB为锅炉残碳蓄热系数,值为焦炭热值乘以锅炉效率,单位为MJ/kg,等式左边表示燃料侧蓄能。
根据质量守恒可计算得到炉膛内未燃烧的残碳质量:
d B ( t ) d t = F ( t ) · C a r - R c - - - ( 9 )
式中Car为煤的收到基碳质量份额,%;RC为碳总体燃烧反应速率,kg/s;根据工程经验,假设Car为常数,排渣含碳量及飞灰含碳量忽略不计。
炉膛内未燃烧残碳质量的燃烧速度Rc是流化床炉膛内未燃烧残碳的总质量、床温、氧气浓度的函数:
R c = B ( t ) × ( 1 m p dm p d t ) = 6 M C k c C o 2 B ( t ) d c ρ c - - - ( 10 )
式中:MC为碳的摩尔质量,单位为kg/kmol;kc为碳颗粒的燃烧速率常数;CO2为氧气浓度,单位为kmol/m3;dc为碳颗粒平均直径,单位为m;ρc为碳颗粒的密度,单位为kg/m3
循环流化床锅炉中碳颗粒燃烧速率常数kc的表达式:
kc=0.513Texp(-9160/T) (11)
式中:T为炉膛床温,单位为K;
碳颗粒氧气浓度在控制系统中可以近似取平均值,由入炉总风量PM(t)决定,其表达式为:
C o 2 ( t ) = k o 2 P M ( t ) - - - ( 12 )
式中:ko2为总风量PM(t)与氧气浓度的相关系数,取值范围0.0035~0.0055,一般取0.0050;PM(t)为总风量,单位为Nm3/s。
由式(2)~(12)可推导出超临界CFB锅炉蓄能平衡方程:
- C h dh m d t + C B d B d t = η b Q F - Q o = ΔQ F o - - - ( 13 )
对于超临界CFB机组蓄能模型中的参数,锅炉热效率ηb一般在90~94%;残碳的单位发热量H一般取值29.5~30MJ/kg;Ch为焓增蓄热系数可由机组稳态工况下的运行数据带入式(13)得到。
3、实验验证
以某600MW超临界中间再热CFB机组为例,结合现场运行过程,量化分析该超临界CFB锅炉机组燃料侧及汽水侧蓄能。
将实际负荷跟踪到位且AGC基本不变的工况段称为平稳阶段,其余为动态阶段。如图2和图3所示,机组在450分钟内AGC指令升降频繁,各主要运行参数都在合理范围内。锅炉内残碳热值取30MJ/kg,锅炉效率为93%,残碳蓄热系数CB为27.9MJ/kg。结合平稳状态运行数据,利用式(13)可计算出焓增蓄热系数Ch在负荷360MW至490MW之间从440000kg·s变动至400000kg·s。中间点焓值在平稳阶段变动较小,波动值为±3kJ/kg,变化速率一般在2~3kJ/(kg·min);在动态阶段波动值为±60kJ/kg,升负荷变化速率可达10kJ/(kg·min),降负荷变化速率可达7kJ/(kg·min)。平稳阶段,锅炉内残碳量波动范围为±800kg,变化速率一般在10~50kg/min。动态阶段,锅炉内残碳量波动值达到2200kg,升负荷变化速率最快为325kg/min,并能维持7.5min,降负荷变化速率稍慢。上述动态阶段,超临界CFB机组汽水侧蓄能变化速率约240MJ/min,汽水侧蓄能升负荷最大过程变化量为1440MJ;燃料侧蓄能变化速率约9068MJ/min,燃料侧蓄能最大过程变化量为68006MJ。

Claims (7)

1.一种超临界循环流化床锅炉机组蓄能量化方法,其特征在于,所述方法为:对超临界CFB锅炉机组蓄能建立模型,利用机组的历史数据确定超临界CFB锅炉蓄能模型中的蓄能参数,根据确定蓄能参数后的超临界CFB锅炉蓄能模型结合机组的实时数据对机组的蓄能进行观测。
2.根据权利要求1所述的方法,其特征在于,所述方法中对超临界CFB锅炉机组蓄能建立模型由超临界CFB锅炉蓄能建模模块实现,机组的历史数据由数据选取与预处理模块从DCS系统与数据库中选取,对机组的蓄能进行观测由超临界CFB机组蓄能观测模块实现。
3.根据权利要求2所述的方法,其特征在于,所述DCS系统与数据库将机组与所述数据选取与预处理模块连接,所述数据选取与预处理模块与所述超临界CFB锅炉蓄能建模模块、超临界CFB机组蓄能观测模块连接,所述超临界CFB锅炉蓄能建模模块与超临界CFB机组蓄能观测模块连接;所述DCS系统与数据库将机组运行的历史数据传输给所述数据选取与预处理模块;所述DCS系统与数据库将机组的实时运行数据传输给所述超临界CFB机组蓄能观测模块;所述超临界CFB机组蓄能观测模块将超临界CFB锅炉蓄能建模模块的模型分析结果整合,结合机组实时运行数据对机组的蓄能进行观测。
4.根据权利要求2所述的方法,其特征在于,包括以下步骤:
步骤1)利用所述超临界CFB锅炉蓄能建模模块建立CFB锅炉蓄能模型;
步骤2)利用所述数据选取与预处理模块,从DCS系统与数据库中选取不同负荷段下机组负荷动态变化较为频繁的历史运行数据;所述机组负荷动态变化较为频繁是指机组负荷的改变大于机组额定负荷的10%-15%;
步骤3)根据,利用步骤2)中选取的数据结合步骤1)建立的超临界CFB锅炉蓄能模型得到不同负荷段下蓄能模型中的参数,确定蓄能能力,得到确定蓄能参数后的蓄能模型;
步骤4)所述超临界CFB锅炉蓄能观测模块根据步骤3)中得到的确定蓄能参数后的蓄能模型,结合所述数据选取与预处理模块中选取的对应实时数据对超临界CFB机组蓄能进行量化观测。
5.根据权利要求1-4任一所述的一种超临界循环流化床锅炉机组蓄能量化方法,其特征在于,所述超临界CFB锅炉蓄能模型为:
- C h dh m d t + C B d B d t = η b Q F - Q o = ΔQ F o
式中CB为即燃碳蓄热系数,MJ/kg;B(t)为炉膛内未燃烧的残碳质量,kg;ηb为锅炉热效率,%;QF为入炉给煤量热值,MJ/s,QF=FHF;F(t)为给煤量,kg/s;HF为煤的实时单位发热量值,MJ/kg;Qo为锅炉的有效输出能量,MJ/s。
6.根据权利要求5所述的一种超临界循环流化床锅炉机组蓄能量化方法,其特征在于,所述超临界CFB锅炉蓄能模型为超临界CFB锅炉燃料侧蓄能模型和超临界CFB锅炉汽水侧蓄能模型的结合;所述超临界CFB锅炉燃料侧蓄能模型为:
C B d B d t = η b H d B d t = η b Q F - Q r = ΔQ F r
式中H为残碳单位发热量值,MJ/kg;QF为入炉给煤量热值,MJ/s;Qr为锅炉吸热量,MJ/s。
7.根据权利要求6任一所述的一种超临界循环流化床锅炉机组蓄能量化方法,其特征在于,所述超临界CFB锅炉汽水侧蓄能模型为:
- C h dh m d t = Q r + q f h f - q d h d = Q r - Q o = ΔQ r o
式中Ch为焓增蓄热系数,单位为kg·s;hm为超临界锅炉汽水系统中间点焓值,单位为kJ/kg;Qr为锅炉吸热量,MJ/s;qf和qd分别为给水流量和主蒸汽流量,kg/s;hf和hd分别为给水焓值和主蒸汽焓值,MJ/kg。
CN201610721128.6A 2016-08-24 2016-08-24 一种超临界循环流化床锅炉机组蓄能量化方法 Expired - Fee Related CN106326562B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610721128.6A CN106326562B (zh) 2016-08-24 2016-08-24 一种超临界循环流化床锅炉机组蓄能量化方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610721128.6A CN106326562B (zh) 2016-08-24 2016-08-24 一种超临界循环流化床锅炉机组蓄能量化方法

Publications (2)

Publication Number Publication Date
CN106326562A true CN106326562A (zh) 2017-01-11
CN106326562B CN106326562B (zh) 2020-01-24

Family

ID=57791406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610721128.6A Expired - Fee Related CN106326562B (zh) 2016-08-24 2016-08-24 一种超临界循环流化床锅炉机组蓄能量化方法

Country Status (1)

Country Link
CN (1) CN106326562B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106897819A (zh) * 2017-01-21 2017-06-27 华北电力大学 一种循环流化床机组变负荷过程中给煤量合理性检测方法及系统
CN108087856A (zh) * 2017-11-21 2018-05-29 华北电力大学 一种超临界循环流化床机组主蒸汽压力预测系统及方法
CN108875165A (zh) * 2018-06-01 2018-11-23 清华大学 基于运行数据的锅炉特性标定方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104615845A (zh) * 2014-12-19 2015-05-13 兰州大学 一种超临界洪水风险分析方法
CN105157007A (zh) * 2015-09-22 2015-12-16 国家电网公司 超超临界二次再热1000mw机组锅炉蒸汽冲管方法
CN105262119A (zh) * 2015-09-29 2016-01-20 中国电力科学研究院 一种蓄能用电系统的节能评价和节能控制方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104615845A (zh) * 2014-12-19 2015-05-13 兰州大学 一种超临界洪水风险分析方法
CN105157007A (zh) * 2015-09-22 2015-12-16 国家电网公司 超超临界二次再热1000mw机组锅炉蒸汽冲管方法
CN105262119A (zh) * 2015-09-29 2016-01-20 中国电力科学研究院 一种蓄能用电系统的节能评价和节能控制方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
高明明 等: ""600MW超临界循环流化床锅炉控制系统研究"", 《中国电机工程学报》 *
高明明 等: ""超临界CFB锅炉主蒸汽压力控制系统研究"", 《动力工程学报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106897819A (zh) * 2017-01-21 2017-06-27 华北电力大学 一种循环流化床机组变负荷过程中给煤量合理性检测方法及系统
CN106897819B (zh) * 2017-01-21 2020-07-31 华北电力大学 一种循环流化床机组变负荷过程中给煤量合理性检测方法及系统
CN108087856A (zh) * 2017-11-21 2018-05-29 华北电力大学 一种超临界循环流化床机组主蒸汽压力预测系统及方法
CN108087856B (zh) * 2017-11-21 2019-10-01 华北电力大学 一种超临界循环流化床机组主蒸汽压力预测系统及方法
CN108875165A (zh) * 2018-06-01 2018-11-23 清华大学 基于运行数据的锅炉特性标定方法
CN108875165B (zh) * 2018-06-01 2022-10-21 清华大学 基于运行数据的锅炉特性标定方法

Also Published As

Publication number Publication date
CN106326562B (zh) 2020-01-24

Similar Documents

Publication Publication Date Title
CN102466238B (zh) 用于分析燃烧系统的运行的方法和系统
Park et al. Coupled fluid dynamics and whole plant simulation of coal combustion in a tangentially-fired boiler
CN106326562A (zh) 一种超临界循环流化床锅炉机组蓄能量化方法
CN103670536A (zh) 一种火力发电厂汽轮机调门流量的调节方法
CN108518666B (zh) 一种以煤为燃料的煤粉锅炉稳燃系统及方法
Wang et al. Flexibility and efficiency co-enhancement of thermal power plant by control strategy improvement considering time varying and detailed boiler heat storage characteristics
CN103471408A (zh) 一种加热炉高温烟气余热利用系统及方法
CN113358692B (zh) 锅炉高温受热面外壁温度测点布置方法及温度检测系统
CN102494323B (zh) 电站锅炉高温管系炉外壁温测量采集点的布局方法
CN111931346A (zh) 一种燃煤锅炉入炉煤低位热值的实时计算方法及应用
Zhang et al. Dynamic modeling and coupling characteristics analysis of biomass power plant integrated with carbon capture process
CN102588986B (zh) 基于风冷干排渣技术的锅炉优化设计方法
CN108021027B (zh) 一种超临界循环流化床机组输出功率预测系统及方法
CN213362403U (zh) 基于壁温预测的燃煤机组水冷壁超温控制系统
CN106705034B (zh) 一种超临界循环流化床锅炉机组快速变负荷控制方法
CN106051782A (zh) 一种实时估算垃圾热值的方法
CN117634270A (zh) 一种基于蔗渣锅炉模拟配风与给料优化的节能提效方法
CN112097232A (zh) 基于壁温预测的燃煤机组水冷壁超温控制系统及方法
CN103673650A (zh) 一种钢厂富余煤气与饱和蒸汽综合利用系统及方法
Wołowicz et al. Gas turbine selection for feedwater repowering.
CN207146409U (zh) 垃圾筛上物焚烧锅炉
CN104268789A (zh) 一种确定钢铁企业能源综合调度可行解的方法
CN106524141A (zh) 一种亚临界循环流化床锅炉机组快速变负荷控制方法
CN106287682B (zh) 一种亚临界循环流化床锅炉机组蓄能量化方法
Wiatros-Motyka Power plant design and management for unit cycling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200124

Termination date: 20200824

CF01 Termination of patent right due to non-payment of annual fee