CN106320678A - Moving supporting frame installation method - Google Patents

Moving supporting frame installation method Download PDF

Info

Publication number
CN106320678A
CN106320678A CN201610795758.8A CN201610795758A CN106320678A CN 106320678 A CN106320678 A CN 106320678A CN 201610795758 A CN201610795758 A CN 201610795758A CN 106320678 A CN106320678 A CN 106320678A
Authority
CN
China
Prior art keywords
bracing frame
installation method
supporting frame
track
portable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610795758.8A
Other languages
Chinese (zh)
Inventor
胡金
卜延渭
王志新
樊海峰
张明明
王斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Construction Machine Construction Group Co ltd
Original Assignee
Shaanxi Construction Machine Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Construction Machine Construction Group Co ltd filed Critical Shaanxi Construction Machine Construction Group Co ltd
Priority to CN201610795758.8A priority Critical patent/CN106320678A/en
Publication of CN106320678A publication Critical patent/CN106320678A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B23/00Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A moving supporting frame installation method includes the steps that firstly, setting-out survey of a track center axis is carried out on a foundation, and backing plates are laid on the axis at intervals; secondly, a track is installed on the backing plates and subjected to elevation adjustment, and then track pressing plates are laid for positioning; thirdly, sliding wheels are temporarily fixed to the track, and the bottoms of supporting legs of a supporting frame are spliced into sheets and placed on the sliding wheels, wherein if the supporting frame deviates from the track center axis, the supporting frame is adjusted in place through a temporary fixing part; fourthly, the bottoms of the supporting legs of the supporting frame are fixed, an upper operating surface platform is subjected to block hoisting, and an empty space in the middle is filled up; fifthly, a net frame unit is finally screwed with bolts to be fixed after being wholly installed in place; sixthly, the fourth step and the fifth step are repeated, the body of the supporting frame is moved every time one net frame unit is installed, the process is carried out in this way till the last net frame unit is installed, and then the supporting frame is dismantled. The moving supporting frame installation method is easy to implement and low in cost and has promotional value.

Description

A kind of portable bracing frame installation method
Technical field
The present invention relates to steel structure net rack installing area, be specifically related to a kind of portable bracing frame installation method.
Background technology
Since entering 21st century, the step of China's state-of-the-art technology rapidly strides forward, and building industry scale constantly expands, Building level have also been obtained the biggest raising, and this just requires that the construction technology used in engineering must increasingly be come advanced, needs Constantly innovate, so could improve the construction level of enterprise, reduce construction cost, strengthen construction engineering quality.
In the installation process of steel structure net rack, prior art mainly has three kinds of methods: the first is on ground by rack The most assembled complete, entirety promotes;The second is rack to be divided into several unit, by unit form at installation on ground Become block, then air translation block on beam column, and centre is covered;The third is to set up crosshead, then carries out height Empty in bulk.
In the construction method of above-mentioned three kinds of rack engineerings, the hoisting process of first method easily cause rack become Shape, the extremely difficult control of rack amount of deflection;Second method is too high to beam column built from concrete requirement for bearing capacity, and dynamic load easily causes concrete Beam column crack, security risk is too high;And the construction cost of the third method is too high, crosshead can not recycle.
Summary of the invention
Present invention aims to above-mentioned the problems of the prior art, it is provided that a kind of portable bracing frame installation side Method, its construction cost economy, mode of operation rationally, simply, and disclosure satisfy that the requirement of safe construction.
To achieve these goals, the technical solution used in the present invention comprises the following steps:
The first step, on ground setting out survey orbit centre position axis, on axis interval lay backing plate;
Second step, on the backing plate laid attachment rail track is carried out Pass line adjustment, lay rail pressing plate afterwards Location;
3rd step, sliding wheel is temporarily fixed on track, is assembled into lamellar bottom the supporting leg of bracing frame and is placed on sliding On wheel;If bracing frame and orbit centre position axis have deviation, it is adjusted making to bracing frame by interim standing part Put in place;
4th step, it is fixed bottom the supporting leg of bracing frame, upper operating face platform is carried out block lifting, middle mend Empty;
Carry out twisting eventually fixing by bolt after 5th step, integral installation are in place;
6th step, repeat fourth, fifth step, after often installing a unit truss, the support body of movable supporting frame, successively class Push away, to removing bracing frame during last unit truss installation.
Zoning is divided into several unit by beam span or axis by described rack, is divided into initial hoisting area and slip region, Material is entered by region;Described bracing frame is assembled in initial hoisting area or initial cell, in original area lifting, other district by propping up Support has moved the construction of unit truss.
Described each unit truss before being installed by bracing frame, according to a ball node and three rod members, one Ball node and four rod members or block are combined.
The support body of support frame as described above is in moving process, and a vollyball node of unit truss lower edge is on bracing frame;Support After frame moves into place, by screw jack by the ball node jack-up of last row's lower edge of unit truss, make two of linking The centre of sphere absolute altitude of unit truss ball node is identical.
The operating surface platform span centre on support frame as described above top carries out load inspection, prevents preloading and carries out support body dimension Protect.
In use, the sliding wheel bottom supporting leg is provided with anti-sliding stop on track fore-and-aft direction to bracing frame Car stop.
And the staircase of walking upper and lower for operating personnel and corridor it is provided with on described bracing frame.
If described bracing frame runs into sleet or the wind-force extreme weather more than 5 grades, there is hydrops in ground, needs to pass through water Levelness readjusted by quasi-instrument.
Compared with prior art, the present invention has a following beneficial effect: by installing bracing frame in orbit to net Frame is divided into unit and installs, and saves and sets up the time that scaffold is spent in the past, decreases interval so that the overall duration Shorten.Traditional handicraft, when setting up scaffold, needs a large amount of workmen to participate in, and machinery use cost is relatively big, and required steel Material is many, and during dismounting, spillage of material is excessive, and unit truss, by assembling track and bracing frame, is depended on by the present invention in the same manner Secondary assembly, dramatically saves on artificial and machinery expenses, and this slide holder can be repeated as construction tool and make in addition With, it is to avoid steel wastes, reduce the total consumption in rack installation process.The present invention is in work progress, first to propping up The connection node of support is the most fixing, if bracing frame and orbit centre position axis have deviation, by interim standing part pair Bracing frame is adjusted being allowed to put in place, carries out twisting eventually fixing by bolt, so prevent from directly welding after integral installation is in place The dismounting caused is done over again, the interim fixing adjustment being easy to rack.The present invention is simple to operate, economical rationality, has promotional value.
Accompanying drawing explanation
The bracing frame three-dimensional model diagram used in Fig. 1 present invention;
The staircase structure stereogram set up on Fig. 2 bracing frame of the present invention;
The connecting joint structure schematic diagram of Fig. 3 bracing frame of the present invention;
The supporting leg polycrystalline substance schematic diagram of Fig. 4 bracing frame of the present invention;
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings.
Seeing Fig. 1-4, movable type bracing frame installation method of the present invention, by the rack zoning of subdivisional work, is entered by region Material;By beam span or axis, zoning is divided into unit form, is divided into initial hoisting area and slip region.Bracing frame is assembled in and initially hangs Dress district or initial cell, original area lifts, other district uses bracing frame to move, the scheme construction installed in situ.In advance by every district Or steel ball, rod member are put in order used by unit rack each several part, stack neat, at turnover zone, rod member is assembled into a ball three with crane Bar, ball four bar, block etc., carry out original area or unit rack is installed, after every district or unit install formation rigid structure, Interim hold-down support, when span is excessive, needs in the middle of rack to support prop;Movable supporting frame, carries out next district or unit Install;Often moving a district or unit, rack lower edge must have a vollyball on bracing frame, after bracing frame moves into place, uses spiral shell Last row's lower edge top dome of rack is risen by rotating jack, it is ensured that installing zone or unit and a upper district or unit centre of sphere absolute altitude are same One absolute altitude.
1, selection
1. material: according to design requirement, calculate the material selecting steel, calculates tensile strength measured value and the surrender of steel The ratio of intensity measurement value;Steel should have significantly surrenders step, calculates its percentage elongation;Steel should have good chemical property And processing performance;Steel product quality standard meets national regulations requirement.2. wlding: during manual welding, material should be selected according to steel material Selecting welding rod, its performance answers the regulation of compliant;Automatically, semiautomatic welding, submerged-arc welding time, welding wire and solder flux should be with theme metal materials Material adapts, and the tensile strength of its motlten metal should be less than the tensile strength of wlding.3. bolt: select high-strength bolt.
2, portable supporting frame construction technology
1. process technology: in processing technology, in conjunction with the working ability of factory, makes critical process and production link Necessary technical measures, including the measure deformed when preventing component handling, it is ensured that the measure of bore size precision, it is ensured that weldering Connect quality and control the measure of welding deformation, it is ensured that the measure etc. of coating quality.Specifically implement to produce, mainly have welding Time, use jig frame special, it is ensured that welding assembly precision;Component boring must use pattern to bore, and during component conveying, has made special Pallet for transporting, facilitates handling etc., in order to strictly control product quality.
2. technology installed and used by bracing frame:
A. for preventing bracing frame from installing appearance deformation, in installation process, by bracing frame assembled in bulk in ground surface platform Body, then lift.The type of attachment of bracing frame node is that bolt connects, and after block assembly completes, reaches twisting at the beginning of bolt Torque value, after integral assembling completes, then twists eventually.
When B. using, can not preloading on platform;If have preloading, load need to be spread out and put, and is placed on corresponding with supporting leg as far as possible Platform on;Span centre forbids preloading;Forbid to tamper any rod member of support body, bolt;Every day checks support body twice, carries out support body dimension Protect.
C. when bracing frame uses, in orbit before and after car stop is set, prevent from using the reach of central wheel or after move;
If D. have sleet, wind-force more than the act of god factors such as 5 grades, bracing frame need to be checked comprehensively, tie up Protect;Especially when rainy, ground has hydrops easily to sink, and needs to readjust bracing frame level with level gauge, prevents local Sink.
3. bracing frame demolition technique
A. vertical transport equipment pulley to be used and rope for removing bracing frame transport or tower crane coordinates, and forbid to throw out without care Disorderly throw, and to making personnel and user of service tells somebody what one's real intentions are, it is stipulated that contact term and method, specify responsibility, to ensure that bracing frame is torn open Except time its vertical transport equipment energy safe handling.
B. after the supporting framework accessory pulled down is transported to ground, should clear up in time, by qualified, reuse after needing trimming And should scrap add differentiation, by specification stack.Pieces O.K. should be maintained in time, send stores keeping after maintenance in case from now on Use.
C. when bracing frame is removed, chance strong wind, heavy rain, big greasy weather should stop operation;Operator's safety to be fastened during dismounting Band, wears soft on-slip shoes, pricks puttee;In bracing frame demolishing process, substitute the most halfway, as substituted, then should be in safe practice Middle explanation of telling somebody what one's real intentions are is clear.
4. bracing frame safe practice
A. specification and the quality of the selected material for support body has to comply with relevant technical specification regulation.
B. frame structure should have enough bearing capacities, it is ensured that frame structure has enough rigidity, strength and stability.
C. bracing frame scaffold board to be paved with, pave, must not have single springboard, probe plate.
D. bracing frame arranges the staircase upper and lower for operating personnel or chute at suitable position.
E. tackle scaffold after strong wind or heavy rain to check comprehensively.
3, step is implemented
1. No. 43 orbit centre position axis of setting out survey on ground, on axis, every 500mm spacing lays a backing plate; Attachment rail, carries out Pass line adjustment to track, and lays rail pressing plate;Sliding wheel is temporarily fixed on track, will support It is assembled into lamellar bottom frame supporting leg to be arranged on wheel;Bracing frame leg is installed, upper operating face platform is carried out block Body lifts, middle short covering;High-strength bolt is carried out twisting eventually after installing by entirety;
2. upper people's stair being done slabbing, two ends angle steel is stuck on supporting frame, and banister is with plain bolt even It is connected on stair beam;Lay safety net on operating platform, safety net is laid 50mm solid wood, and firm with iron wire colligation; Operating platform front arranges 1.2m railing, and employing is articulated and connected;Interface channel is set between support body, and railing is set.
3. after installing a unit, to jack release, movable supporting frame support body, the like, single to last Bracing frame is removed during unit.
4. bracing frame is removed: the protective equipments such as bracing frame guard rail, safety rope, scaffold board, safety net are torn open by A. Remove, short covering component in the middle of supporting rack platform is removed, then block is removed;B. people's stair on bracing frame are carried out block Body is removed;C. bracing frame supporting leg is carried out block, dismantling of track;D. bracing frame block is carried out component and fitting dismounting, by component and fitting Carry out maintenance and be transported to storehouse warehousing, in order to again with.

Claims (8)

1. a portable bracing frame installation method, it is characterised in that comprise the following steps:
The first step, on ground setting out survey orbit centre position axis, on axis interval lay backing plate;
Second step, on the backing plate laid attachment rail track is carried out Pass line adjustment, lay rail pressing plate location afterwards;
3rd step, sliding wheel is temporarily fixed on track, is assembled into lamellar bottom the supporting leg of bracing frame and is placed on sliding wheel On;If bracing frame and orbit centre position axis have deviation, it is adjusted being allowed to bracing frame by interim standing part Position;
4th step, it is fixed bottom the supporting leg of bracing frame, upper operating face platform is carried out block lifting, middle short covering;
Carry out twisting eventually fixing by bolt after 5th step, integral installation are in place;
6th step, repeat fourth, fifth step, after often installing a unit truss, the support body of movable supporting frame, the like, extremely Bracing frame is removed during last unit truss installation.
The most portable bracing frame installation method, it is characterised in that: described rack presses beam span or axle Zoning is divided into several unit by line, is divided into initial hoisting area and slip region, enters material by region;At the beginning of described bracing frame is assembled in On beginning hoisting area or initial cell, moved the construction of unit truss by bracing frame in original area lifting, other district.
The most portable bracing frame installation method, it is characterised in that: described each unit truss is logical Before crossing bracing frame installation, carry out group according to a ball node and three rod members, a ball node and four rod members or block Close.
The most portable bracing frame installation method, it is characterised in that: the support body of support frame as described above is moving During, a vollyball node of unit truss lower edge is on bracing frame;After bracing frame moves into place, will by screw jack The ball node jack-up of last row's lower edge of unit truss, the centre of sphere absolute altitude making two unit truss ball nodes of linking is identical.
The most portable bracing frame installation method, it is characterised in that: the operating surface platform on bracing frame top Span centre carries out load inspection, prevents preloading and carries out support body maintenance.
The most portable bracing frame installation method, it is characterised in that: support frame as described above is in the process of use In, the sliding wheel bottom supporting leg is provided with the car stop of anti-sliding stop on track fore-and-aft direction.
The most portable bracing frame installation method, it is characterised in that: it is provided with confession on described bracing frame Operating personnel is up and down and the staircase of walking and corridor.
The most portable bracing frame installation method, it is characterised in that: if described bracing frame runs into sleet Or the extreme weather that wind-force is more than 5 grades, there is hydrops in ground, needs to readjust levelness by level gauge.
CN201610795758.8A 2016-08-31 2016-08-31 Moving supporting frame installation method Pending CN106320678A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610795758.8A CN106320678A (en) 2016-08-31 2016-08-31 Moving supporting frame installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610795758.8A CN106320678A (en) 2016-08-31 2016-08-31 Moving supporting frame installation method

Publications (1)

Publication Number Publication Date
CN106320678A true CN106320678A (en) 2017-01-11

Family

ID=57786540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610795758.8A Pending CN106320678A (en) 2016-08-31 2016-08-31 Moving supporting frame installation method

Country Status (1)

Country Link
CN (1) CN106320678A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284598A (en) * 2019-05-30 2019-09-27 中国华冶科工集团有限公司 The installation method and device of spherical net brace roof structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0645507A2 (en) * 1993-09-23 1995-03-29 Gerald Merkel Scaffolding platform
CN201560575U (en) * 2009-11-11 2010-08-25 鞍钢建设集团有限公司 Operation platform device
CN202000648U (en) * 2011-01-05 2011-10-05 文会儒 Inverted installation mechanism for scaffold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0645507A2 (en) * 1993-09-23 1995-03-29 Gerald Merkel Scaffolding platform
EP0645507A3 (en) * 1993-09-23 1995-07-26 Gerald Merkel Scaffolding platform.
CN201560575U (en) * 2009-11-11 2010-08-25 鞍钢建设集团有限公司 Operation platform device
CN202000648U (en) * 2011-01-05 2011-10-05 文会儒 Inverted installation mechanism for scaffold

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈培生: "大跨度网架轨道式平台滑移安装技术", 《安徽建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284598A (en) * 2019-05-30 2019-09-27 中国华冶科工集团有限公司 The installation method and device of spherical net brace roof structure

Similar Documents

Publication Publication Date Title
CN108468430B (en) Hoisting and sliding construction method for large-span unequal-height support steel truss structure
CN103061506B (en) Construction method of steel structure dome
CN203947771U (en) A kind of Bailey beam pendent form support system
CN104141383A (en) Bailey beam suspension formwork supporting system and construction method thereof
CN107013038A (en) A kind of steel structure slipping of building roof lighting Zhongting changes column construction method
US3486583A (en) Arrangement at vertically adjustable stands
CN211775640U (en) Modular staircase regularization steel protection passageway
CN113463522A (en) Auxiliary device and method for bent cap construction
CN107558719A (en) For high-rise frame steel construction adjustable mobile operating platform and its construction method
CN110656570A (en) Telescopic pedestrian bridge, construction device and construction method
CN112144889A (en) Mounting construction method for sliding assembly type building steel structure
CN108547225A (en) A kind of assembly moving type security construction of prevention work job platform and construction method and application
CN211114737U (en) A construction operation platform in elevator well for tower crane promotes
CN106320678A (en) Moving supporting frame installation method
CN203795311U (en) Multi-leg high pier and slip form construction device
US20080250579A1 (en) Modular Support Catch System
CN213871393U (en) Protection structure that portal bracing beam lifted
CN104278628A (en) Light hanging basket applicable to bridge detection and maintenance operations
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN206844680U (en) Steel vestibule installation on ground load transfer device
KR101733948B1 (en) Both sides supporting type loading deck for landing of building materials
CN107542273B (en) Core column type high-rise mast construction method
CN112919314B (en) Device for assisting in translational transportation and installation of overweight steel column and construction method
CN219732716U (en) Complete equipment for safety quality control of installation of full-bolt connection steel structure
CN115288287B (en) Inclined installation system and installation method for oversized fusiform column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170111