CN106320357B - A kind of one-time formed mold of steel structure base - Google Patents

A kind of one-time formed mold of steel structure base Download PDF

Info

Publication number
CN106320357B
CN106320357B CN201610680369.0A CN201610680369A CN106320357B CN 106320357 B CN106320357 B CN 106320357B CN 201610680369 A CN201610680369 A CN 201610680369A CN 106320357 B CN106320357 B CN 106320357B
Authority
CN
China
Prior art keywords
plate
model
bottom plate
steel structure
structure base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610680369.0A
Other languages
Chinese (zh)
Other versions
CN106320357A (en
Inventor
程传法
丁天旭
程帆
王振林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Lu Ye Structural Steelwork Co Ltd
Original Assignee
Shandong Lu Ye Structural Steelwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Lu Ye Structural Steelwork Co Ltd filed Critical Shandong Lu Ye Structural Steelwork Co Ltd
Priority to CN201610680369.0A priority Critical patent/CN106320357B/en
Publication of CN106320357A publication Critical patent/CN106320357A/en
Application granted granted Critical
Publication of CN106320357B publication Critical patent/CN106320357B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/013Shuttering specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of one-time formed mold of steel structure base, including model A and Model B, two model A and the spaced setting of two Model Bs form entire mold, it is characterised in that:The model A includes top plate A, middle plate A and bottom plate A, the top plate A, the connecting plate A that middle plate A and bottom plate A is arranged in parallel by two welds together, the Model B includes top plate B, the connecting plate B that middle plate B and bottom plate B is arranged in parallel by two welds together, the bottom outside of the bottom plate A is welded with fixed plate, the both ends of the bottom plate B in the longitudinal direction are welded with buttcover plate, through-hole is both provided on the connecting plate A and top plate B, through-hole is both provided on the bottom plate A and buttcover plate, between the model A and Model B by the bolt that is mounted in through-hole connection the mold realizes the one-time-concreting molding of steel structure base pier, it saves manpower and time.

Description

A kind of one-time formed mold of steel structure base
Technical field
The present invention relates to technical field of building construction, are specifically exactly a kind of one-time formed mold of steel structure base.
Background technology
Foundation pier be it is a kind of using mechanically or manually in ground excavate pore-forming after footnote concrete and formed, due to cut Face size is larger, and length is relatively short, and rugosity is like pier, therefore referred to as pier foundation, and pier foundation can be divided into embedding rock pier according to whether embedding rock Basic and non-embedding rock pier foundation, can be divided into base expanding and base expanding pier foundation and straight pier foundation according to whether base expanding and base expanding, since pier foundation is easy for construction, Construction equipment is simple, and when construction is noiseless, and speed is fast, without friction, and easily verifies and whether reach the design supporting course to be gone, It can do experiment when necessary and measure its physical characteristic, because being widely used in each Industrial and Civil Engineering, science of bridge building, coal mine In the engineerings such as construction.
Pier foundation is chiefly used in tier building, since area of base is calculated by the design method of subsoil, eliminates Single pier load test, it is therefore, more welcome under conditions of duration anxiety.
But it is being typically all scene pouring in foundation pier at the construction field (site), and generally require in current pier foundation Zhi Sanci molds, pier foundation are generally divided into upper strata, middle level and bottom, and middle level is ramped shaped, need first to pour during pouring After having built bottom and having solidified substantially, then middle layer is poured, pour upper strata again after then waiting for middle layer solidification, pour layer by layer in this way It is longer to build the used time, the duration is not easy to grasp, and building trade has temperature and weather certain requirement, winter temperature It is low, it can not construct, while need more people's common operationals that could complete pouring for pier foundation in the construction process, waste people Power, and efficiency is low, it is most important that and the Production Time of pier foundation is long, it is impossible to control, the entire duration be caused to tie down, Wu Fashi The operation in existing later stage.
Invention content
The purpose of the present invention is to provide a kind of one-time formed mold of steel structure base, which realizes steel structure base The one-time-concreting molding of pier, saves manpower and time.
The technical scheme adopted by the invention to solve the technical problem is that:A kind of one-time formed mold of steel structure base, Including model A and Model B, two model A and the spaced setting of two Model Bs form entire mold, it is characterised in that:It is described Model A to include top plate A, middle plate A and bottom plate A, the top plate A, middle plate A and bottom plate A flat by two The connecting plate A of row setting welds together, and it is parallel by two with bottom plate B that the Model B includes top plate B, middle plate B The connecting plate B of setting welds together;
The bottom outside of the bottom plate A is welded with fixed plate;
The both ends of the bottom plate B in the longitudinal direction are welded with buttcover plate;
Through-hole is both provided on the connecting plate A and top plate B;
Through-hole is both provided on the bottom plate A and buttcover plate;
Between the model A and Model B by the bolt that is mounted in through-hole connection.
As an optimization, be welded between the connecting plate A and connecting plate A support plate A, the support plate A with it is upper Laminate A, middle plate A and bottom plate A welding, are welded with support plate B, the support between the connecting plate B and connecting plate B Plate B is welded with top plate B, middle plate B and bottom plate B.
As an optimization, it is welded with bearing diagonal between the connecting plate B and top plate B.
As an optimization, be arranged in parallel between the top plate A and bottom plate A, the middle plate A and top plate A and It is obliquely installed between bottom plate A, is arranged in parallel between the top plate B and bottom plate B, the middle plate B and top plate B It is obliquely installed between bottom plate B.
As an optimization, the middle plate A and middle plate B is isosceles trapezoid.
As an optimization, the fixed plate and buttcover plate are angle steel.
The beneficial effects of the invention are as follows:Compared with prior art, the one-time formed mould of a kind of steel structure base of the invention Tool, mold of the invention is made up of four outer layer models, adjacent to be bolted between the two, easy for assemble or unload, outside Layer sets a variety of support plates, ensures the stability of structure, service life is long, and mold of the invention can realize steel structure base pier Field fabrication, and one-pass molding saves the time, it is easy to operate effectively, can different size of basis according to actual needs Pier sets different size of mold, meets the needs of various models, substantially reduces the duration of engineering, and the basis produced Pier is high-quality, stable structure.
Description of the drawings
Fig. 1 is the stereogram of the present invention;
Fig. 2 is the stereogram of model A of the present invention;
Fig. 3 is the left view of model A of the present invention;
Fig. 4 is the stereogram of Model B of the present invention;
Fig. 5 is the left view of Model B of the present invention;
Wherein, 1 model A, 2 Model Bs, 3 top plate A, 4 middle plate A, 5 bottom plate A, 6 connecting plate A, 7 support plate A, 8 are fixed Plate, 9 top plate B, 10 middle plate B, 11 bottom plate B.12 connecting plate B, 13 support plate B, 14 buttcover plates, 15 bearing diagonals, 16 through-holes, 17 bolts.
Specific embodiment
As shown in Figs. 1-5, the one-time formed mold of a kind of steel structure base, including model A1 and Model B 2, two models The spaced setting of A1 and two Model B 2 forms entire mold, it is characterised in that:The model A1 include top plate A3, in Laminate A4 and bottom plate A5, the connecting plate A6 that the top plate A3, middle plate A4 and bottom plate A5 are arranged in parallel by two Weld together, the Model B 2 includes the company that top plate B9, middle plate B10 and bottom plate B11 are arranged in parallel by two Fishplate bar B12 welds together;
The bottom outside of the bottom plate A5 is welded with fixed plate 8;
The both ends of the bottom plate B11 in the longitudinal direction are welded with buttcover plate 14;
Through-hole 16 is both provided on the connecting plate A6 and top plate B9;
Through-hole 16 is both provided on the bottom plate A5 and buttcover plate 14;
It is connected between the model A1 and Model B 2 by the bolt 17 being mounted in through-hole.
As an optimization, it is equal that support plate A7, the support plate A7 are welded between the connecting plate A6 and connecting plate A6 It is welded with top plate A3, middle plate A4 and bottom plate A5, support plate is welded between the connecting plate B12 and connecting plate B12 B13, the support plate B13 are welded with top plate B9, middle plate B10 and bottom plate B11.
As an optimization, it is welded with bearing diagonal 15 between the connecting plate B12 and top plate B9.
As an optimization, it is arranged in parallel between the top plate A3 and bottom plate A5, the middle plate A4 and top plate It is obliquely installed, is arranged in parallel between the top plate B9 and bottom plate B11, the middle plate between A3 and bottom plate A5 It is obliquely installed between B10 and top plate B9 and bottom plate B11.
As an optimization, the middle plate A4 and middle plate B10 is isosceles trapezoid.
As an optimization, the fixed plate 8 and buttcover plate 14 are angle steel.
The casting method of steel structure base pier:First this mold is assembled, can scene poured, also can be at other Suitable place is poured, and four model loops form entire mold around assembling, and entire mold forms three layers, upper strata, middle level and Bottom, it is consistent with the shape of foundation pier, first by the horizontal positioned reinforcing bar of installation two in the bottom of mold, mould before pouring Be provided with corresponding hole on tool bottom, the both ends of reinforcing bar are clamped by bolt and mold bottom layer realization, when preventing from pouring, mold with Reinforcing bar generates dislocation, and extraneous destruction is prevented in course of hardening, strengthens the curing quality of foundation pier, while ensure base The structural stability of plinth pier.
In casting process, one-pass molding casting method can be selected, four perforative reinforcing bars are installed in the bottom of mold, Two of which is mutually perpendicular to other two, and four reinforcing bars of bottom are horizontally disposed, and four are placed vertically on upper strata and middle level The reinforcing bar of setting is fixedly connected between the reinforcing bar being disposed vertically and the horizontal positioned reinforcing bar of bottom, by pouring, optimized integration The reinforcing bar of cross-distribution inside pier, the guarantee of optimized integration pier structure intensity.After the completion of pouring, by mould release, by reinforcing bar On Bolt dismantling, entire foundation pier completes, and four in the vertical direction of foundation pier reinforcing bar upper end is equal by bolt Platform sling is connected with, it is simple and convenient by the lifting movement of platform sling optimized integration pier.
Steel structure base can directly use finished product, also can scene pouring.
Independent type steel architecture basics can be produced, communication type steel structure base can also be produced.
Steel structure base size, reconfigurable section, can be according to the different steel constructions for needing to produce different size, shape Basis.
The all directions own centre line of mold can find the center of steel structure base, ensure the centre bit of foundation pier It puts.
Primary to pour, one-pass molding, integrated connection property is more preferable, and performance is more preferably;Manpower is saved, the time is saved, saves money 30% or so;Winter can construct, and traditional forming method must pour at least 3 times, and winter weather is colder, can not construct, this hair Bright realization is primary to pour, and error is small.
Mold is made up of four outer layer models, adjacent to be bolted between the two, and easy for assemble or unload, outer layer is set A variety of support plates are put, ensure the stability of structure, service life is long, and mold of the invention can realize showing for steel structure base pier Field makes, and one-pass molding, saves the time, easy to operate effective, different size of foundation pier can set according to actual needs Different size of mold is put, meets the needs of various models, substantially reduces the duration of engineering, and the foundation pier matter produced It measures, stable structure.
Above-mentioned specific embodiment is only the specific case of the present invention, and scope of patent protection of the invention includes but not limited to The product form and style of above-mentioned specific embodiment, a kind of any steel structure base for meeting claims of the present invention are primary The appropriate variation or modification that molding mold and any person of an ordinary skill in the technical field do it, should all fall into this The scope of patent protection of invention.

Claims (6)

1. a kind of one-time formed mold of steel structure base, including model A(1)And Model B(2), two model A(1)With two Model B(2)Spaced setting forms entire mold, it is characterised in that:The model A(1)Including top plate A(3), middle level Plate A(4)With bottom plate A(5), the top plate A(3), middle plate A(4)With bottom plate A(5)It is arranged in parallel by two Connecting plate A(6)Weld together, the Model B(2)Including top plate B(9), middle plate B(10)With bottom plate B(11)It is logical Cross two connecting plate B being arranged in parallel(12)Weld together;
The bottom plate A(5)Bottom outside be welded with fixed plate(8);
The bottom plate B(11)Both ends in the longitudinal direction are welded with buttcover plate(14);
The connecting plate A(6)With top plate B(9)On be both provided with through-hole(16);
The bottom plate A(5)And buttcover plate(14)On be both provided with through-hole(16);
The model A(1)And Model B(2)Upper end by being mounted on connecting plate A(6)With top plate B(9)On through-hole (16)Interior bolt(17)Connection, the model A(1)And Model B(2)Lower end by being mounted on bottom plate A(5)And docking Plate(14)On through-hole(16)Interior bolt(17)Connection.
2. a kind of one-time formed mold of steel structure base according to claim 1, it is characterised in that:The connecting plate A(6)With connecting plate A(6)Between be welded with support plate A(7), the support plate A(7)Simultaneously with top plate A(3), middle plate A (4)With bottom plate A(5)Welding, the connecting plate B(12)With connecting plate B(12)Between be welded with support plate B(13), it is described Support plate B(13)Simultaneously with top plate B(9), middle plate B(10)With bottom plate B(11)Welding.
3. a kind of one-time formed mold of steel structure base according to claim 1 or 2, it is characterised in that:The company Fishplate bar B(12)With top plate B(9)Between be welded with bearing diagonal(15).
4. a kind of one-time formed mold of steel structure base according to claim 1 or 2, it is characterised in that:Described is upper Laminate A(3)With bottom plate A(5)Between be arranged in parallel, the middle plate A(4)With top plate A(3)With bottom plate A(5)Between It is obliquely installed, the top plate B(9)With bottom plate B(11)Between be arranged in parallel, the middle plate B(10)With top plate B (9)With bottom plate B(11)Between be obliquely installed.
5. a kind of one-time formed mold of steel structure base according to claim 1, it is characterised in that:The middle plate A(4)With middle plate B(10)For isosceles trapezoid.
6. a kind of one-time formed mold of steel structure base according to claim 1, it is characterised in that:The fixed plate (8)With buttcover plate(14)It is angle steel.
CN201610680369.0A 2016-08-18 2016-08-18 A kind of one-time formed mold of steel structure base Active CN106320357B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610680369.0A CN106320357B (en) 2016-08-18 2016-08-18 A kind of one-time formed mold of steel structure base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610680369.0A CN106320357B (en) 2016-08-18 2016-08-18 A kind of one-time formed mold of steel structure base

Publications (2)

Publication Number Publication Date
CN106320357A CN106320357A (en) 2017-01-11
CN106320357B true CN106320357B (en) 2018-07-10

Family

ID=57742929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610680369.0A Active CN106320357B (en) 2016-08-18 2016-08-18 A kind of one-time formed mold of steel structure base

Country Status (1)

Country Link
CN (1) CN106320357B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6237420A (en) * 1985-08-12 1987-02-18 Eidai Kako Kk Constructing method for concrete foundation
CN202064370U (en) * 2011-05-11 2011-12-07 北京中水恒信环境科技发展有限公司 Splicing type multi-ribbed-plate foundation structure
CN204282391U (en) * 2014-11-25 2015-04-22 中国建筑第六工程局有限公司 A kind of heel foundation formwork erecting structure
CN205369286U (en) * 2016-02-04 2016-07-06 河北晶通建筑科技有限公司 Prefabricated isolated footing mould

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6237420A (en) * 1985-08-12 1987-02-18 Eidai Kako Kk Constructing method for concrete foundation
CN202064370U (en) * 2011-05-11 2011-12-07 北京中水恒信环境科技发展有限公司 Splicing type multi-ribbed-plate foundation structure
CN204282391U (en) * 2014-11-25 2015-04-22 中国建筑第六工程局有限公司 A kind of heel foundation formwork erecting structure
CN205369286U (en) * 2016-02-04 2016-07-06 河北晶通建筑科技有限公司 Prefabricated isolated footing mould

Also Published As

Publication number Publication date
CN106320357A (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN103243638B (en) Bridge space radioactive concrete-filled steel tube bridge pier and construction method thereof
JP2020117902A (en) Assembly foundation of column and construction method thereof
CN210289267U (en) Assembled platform canopy
CN103061568B (en) Tapered hanging bracket high-position in-situ casting construction method of water tank of reverse taper shell heat-preservation water tower
CN106320357B (en) A kind of one-time formed mold of steel structure base
CN209040861U (en) A kind of steel reinforced concrete connection structure of assembled inverted arch combination arch wall injection concrete-steel
CN203947381U (en) A kind of steel concrete chain type plate
CN108978699B (en) Land integral prefabricated bearing platform and production and installation method thereof
CN203947410U (en) A kind of concrete plate beam hinge seam structure
CN205502058U (en) Pin -connected panel tower crane foundation
CN216839527U (en) Adopt assembled microvibration post structure of articulated node
CN102995560A (en) Thin-wall hollow pier lifting frame and use method thereof
CN201915420U (en) Foundation of temporary gate building
CN213198093U (en) Isolated pier mould
CN204112858U (en) The prefabricated enclosure wall of a kind of prestressed concrete
CN211897815U (en) Improve template device of pier stud steel bar protection layer qualification rate
CN113738102A (en) Template building block for civil engineering and manufacturing method and using method thereof
CN113136946A (en) Self-supporting assembly type seawater sea sand concrete frame structure and construction method
CN105822023A (en) Prefabricated shear-resistant connecting part for rammed-earth wall, molding method of prefabricated shear-resistant connecting part and rammed-earth wall
KR20030036380A (en) An iron plate frame work
CN206941628U (en) A kind of construction site enclosing prefabricated foundation
CN105525629A (en) Construction method and device of subway station
CN207160052U (en) A kind of skewback for connecting arcuate bead steel construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant