CN106314804A - Method for precisely controlling time delay of parachute opening device based on different temperatures - Google Patents

Method for precisely controlling time delay of parachute opening device based on different temperatures Download PDF

Info

Publication number
CN106314804A
CN106314804A CN201610785847.4A CN201610785847A CN106314804A CN 106314804 A CN106314804 A CN 106314804A CN 201610785847 A CN201610785847 A CN 201610785847A CN 106314804 A CN106314804 A CN 106314804A
Authority
CN
China
Prior art keywords
opening device
time
parachute opening
self
inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610785847.4A
Other languages
Chinese (zh)
Other versions
CN106314804B (en
Inventor
王海珍
谭浩
王莉
王挺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVIC Aerospace Life Support Industries Ltd
Original Assignee
AVIC Aerospace Life Support Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AVIC Aerospace Life Support Industries Ltd filed Critical AVIC Aerospace Life Support Industries Ltd
Priority to CN201610785847.4A priority Critical patent/CN106314804B/en
Publication of CN106314804A publication Critical patent/CN106314804A/en
Application granted granted Critical
Publication of CN106314804B publication Critical patent/CN106314804B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64DEQUIPMENT FOR FITTING IN OR TO AIRCRAFT; FLIGHT SUITS; PARACHUTES; ARRANGEMENTS OR MOUNTING OF POWER PLANTS OR PROPULSION TRANSMISSIONS IN AIRCRAFT
    • B64D25/00Emergency apparatus or devices, not otherwise provided for
    • B64D25/08Ejecting or escaping means
    • B64D25/10Ejector seats

Abstract

A method for precisely controlling the time delay of a parachute opening device based on different temperatures, comprises the following steps: (1) after the starting of the ejection, high pressure fuel gas enters the thermal battery component of a parachute opening device from a seat control system, the thermal battery is activated, and the parachute opening device is powered; (2) the initialization of the parachute opening device system is conducted, the timer begins timekeeping, the power-on self-test of parachute opening device is conducted, and the preset delay time or artificially preset delay time is obtained from external memory according to the result of the power-on self-test; (3) the ambient temperature of the parachute opening device is obtained through a temperature sensor, the activation time of thermal battery is determined; (4) after the height of parachute opening device is determined and the height determining time is recorded, the real output delay time of the parachute opening device can be obtained by the following formula: real output delay time = preset delay time-thermal battery activation time-program running time-program running time; (5) executing the time delay action of the parachute opening device, and an ignition command is outputted. The accurate time delay output of the parachute opening device can be achieved at 55-70 DEG C, and the safety life saving performance of an ejection seat is improved at different temperatures.

Description

A kind of based on the method accurately controlling parachute opening device time delay under different temperatures
Technical field
The present invention relates to a kind of based on the method accurately controlling parachute opening device time delay under different temperatures, be particularly suited for based on bullet Penetrating in the parachute opening device system of seat, the research and development for parachute opening device provide new technical thought and solution route.
Background technology
Parachute opening device is as the standby system of ejection life-saving system, it is desirable to when master control program controller lost efficacy, the most defeated Go out delay time, to ensure that system is normally launched.It is fixing sharp that parachute opening device time delay at present uses default delay time to deduct thermal cell Live time, because under thermal cell different temperatures, activationary time is variant, cause the output delay time error of parachute opening device relatively big (error ± 100ms), ejection escape performance is affected.
Summary of the invention
The technical problem to be solved in the present invention is, for existing parachute opening device delay technique above shortcomings, it is provided that one Plant based on the method accurately controlling parachute opening device time delay under different temperatures, it is achieved-55 DEG C~70 DEG C of parachute opening device accurate delays outputs, carry High ejector seat safe life-saving performance at different temperatures.
The present invention solves that above-mentioned technical problem be the technical scheme is that
A kind of based on the method accurately controlling parachute opening device time delay under different temperatures, specifically include following steps:
(1), after launching startup, the high-pressure gas from seat control system enters the thermal cell assembly of parachute opening device, thermal cell Activating, parachute opening device powers on;
(2), after parachute opening device powers on, parachute opening device system initialization, intervalometer starts timing, and parachute opening device power-on self-test, according to upper Electricity self-detection result obtains from external memory storage and presets delay time or be manually set default delay time;
(3) obtain the ambient temperature residing for parachute opening device by temperature sensor, determine Activation Time of Thermal Battery;
(4), after determining that the height residing for parachute opening device record highly determine the time by height sensor, parachute opening device is obtained True output delay time=preset delay time-Activation Time of Thermal Battery (different temperatures activationary time is variant)-program fortune During row, m-height determines the time;
(5) the true output delay time of parachute opening device obtained according to step (4), performs parachute opening device deferred action, the most defeated Go out firing command.
By such scheme, when in described step (2), power-on self-test includes the self-inspection of initial signal ROM, intervalometer self-inspection, time delay Between preset value self-inspection, the self-inspections simultaneously of three road static pressure, when the self-inspection of initial signal ROM is normal, carry out next step intervalometer self-inspection, Otherwise record self-inspection frequency of abnormity and abnormality, and again start power up self-inspection flow process;When intervalometer self-inspection, delay time are pre- If self-inspections are all normal while of value self-inspection, three road static pressure, obtain from external memory storage and preset delay time;When intervalometer self-inspection is different Often or delay time preset value self-inspection is abnormal or during three road static pressure self-inspection exception simultaneously, sets default delay time as 3.15s.
By such scheme, described step (3) Activation Time of Thermal Battery determines that mode is: according to the performance of selected thermal cell, The activationary time interval to different temperatures divides, and obtains the Activation Time of Thermal Battery that corresponding temperature is interval.
By such scheme, described step (4) the Program operation time includes System Initialization time, self-inspection time, self-inspection Terminate before execution time delay the time.
Compared with prior art, beneficial effects of the present invention :-55 DEG C~70 DEG C of parachute opening devices can be realized by this control method Accurate delay (error ± 20ms), as backup life saving system, parachute opening device ensures to realize accurate delay output under various circumstances, Improve ejector seat safe life-saving performance at different temperatures, strengthen the operation confidence of pilot.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention parachute opening device hardware positionality schematic diagram;
Fig. 2 is that the embodiment of the present invention is based on accurately controlling parachute opening device delays time to control flow chart under different temperatures.
Detailed description of the invention
With embodiment, technical solution of the present invention is described in detail below in conjunction with the accompanying drawings.
With reference to shown in Fig. 1, in the embodiment of the present invention, parachute opening device includes thermal cell assembly, sensor cluster, parachute opening device also with External memory storage connects, and the high-pressure gas from seat control system activates mechanism by thermal cell and enters the thermal cell of parachute opening device Assembly, thermal cell activates, and sensor cluster mainly includes temperature sensor and height sensor, and temperature sensor is opened for acquisition Ambient temperature residing for umbrella device, height sensor is for determining the height residing for parachute opening device, and external memory storage is used for presetting time delay Time.
With reference to shown in Fig. 2, based on the method accurately controlling parachute opening device time delay under different temperatures in the embodiment of the present invention, specifically Comprise the steps:
(1), after launching startup, the high-pressure gas from seat control system enters the thermal cell assembly of parachute opening device, thermal cell Activating, parachute opening device powers on;
(2), after parachute opening device powers on, parachute opening device system initialization, intervalometer starts timing, parachute opening device power-on self-test, powers on certainly Inspection includes the self-inspection of initial signal ROM, intervalometer self-inspection, delay time preset value self-inspection, (height sensor is corresponding for three road static pressure Three tunnels) self-inspection simultaneously, when the self-inspection of initial signal ROM is normal, carry out next step intervalometer self-inspection, otherwise record self-inspection is abnormal Number of times and abnormality, and again start power up self-inspection flow process;When intervalometer self-inspection, delay time preset value self-inspection, three roads are quiet When pressure self-inspection simultaneously is all normal, obtains from external memory storage and preset delay time;When intervalometer self-inspection exception or delay time are pre- If when value self-inspection exception or three road static pressure self-inspection exception simultaneously, setting and preset delay time as 3.15s;
(3) obtaining the ambient temperature residing for parachute opening device by temperature sensor, determine Activation Time of Thermal Battery, thermal cell swashs Live time determines that mode is: according to the performance of selected thermal cell, and the activationary time interval to different temperatures divides, and it is right to obtain Answer the Activation Time of Thermal Battery of temperature range;
(4), after determining that the height residing for parachute opening device record highly determine the time by height sensor, parachute opening device is obtained True output delay time=preset delay time-Activation Time of Thermal Battery (different temperatures activationary time is variant)-program fortune During row, m-height determines the time, and wherein, program runtime includes System Initialization time, self-inspection time, and self-inspection terminates to holding Time before line delay;
(5) the true output delay time of parachute opening device obtained according to step (4), performs parachute opening device deferred action, the most defeated Go out firing command.
Obviously, above-described embodiment is only for clearly demonstrating example of the present invention, and not to the present invention The restriction of embodiment.For those of ordinary skill in the field, what spirit under this invention was extended out is aobvious and easy The change seen or variation still in protection scope of the present invention among.

Claims (4)

1. one kind based on the method accurately controlling parachute opening device time delay under different temperatures, it is characterised in that specifically include following steps:
(1) after launching startup, the high-pressure gas from seat control system enters the thermal cell assembly of parachute opening device, and thermal cell swashs Living, parachute opening device powers on;
(2), after parachute opening device powers on, parachute opening device system initialization, intervalometer starts timing, and parachute opening device power-on self-test, according to powering on certainly Inspection result obtains from external memory storage and presets delay time or be manually set default delay time;
(3) obtain the ambient temperature residing for parachute opening device by temperature sensor, determine Activation Time of Thermal Battery;
(4), after determining that the height residing for parachute opening device record highly determine the time by height sensor, parachute opening device is obtained true Output delay time=default delay time-Activation Time of Thermal Battery-program runtime-highly determine the time;
(5) the true output delay time of parachute opening device obtained according to step (4), performs parachute opening device deferred action, last output point Fire instruction.
The most according to claim 1 based on the method accurately controlling parachute opening device time delay under different temperatures, it is characterised in that institute State power-on self-test in step (2) and include the self-inspection of initial signal ROM, intervalometer self-inspection, delay time preset value self-inspection, three road static pressure Self-inspection simultaneously, when the self-inspection of initial signal ROM is normal, carries out next step intervalometer self-inspection, otherwise record self-inspection frequency of abnormity And abnormality, and again start power up self-inspection flow process;When intervalometer self-inspection, delay time preset value self-inspection, three road static pressure with When Shi Zijian is all normal, obtains from external memory storage and preset delay time;When intervalometer self-inspection exception or delay time preset value When self-inspection exception or three road static pressure self-inspection exception simultaneously, set and preset delay time as 3.15s.
The most according to claim 1 based on the method accurately controlling parachute opening device time delay under different temperatures, it is characterised in that institute State step (3) Activation Time of Thermal Battery and determine that mode is: according to the performance of selected thermal cell, during to the activation that different temperatures is interval Between divide, obtain the Activation Time of Thermal Battery that corresponding temperature is interval.
The most according to claim 1 based on the method accurately controlling parachute opening device time delay under different temperatures, it is characterised in that institute Stating step (4) Program to run the time and include System Initialization time, self-inspection time, self-inspection terminates to performing before time delay the time.
CN201610785847.4A 2016-08-31 2016-08-31 A method of it is delayed based on parachute opening device is accurately controlled under different temperatures Active CN106314804B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610785847.4A CN106314804B (en) 2016-08-31 2016-08-31 A method of it is delayed based on parachute opening device is accurately controlled under different temperatures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610785847.4A CN106314804B (en) 2016-08-31 2016-08-31 A method of it is delayed based on parachute opening device is accurately controlled under different temperatures

Publications (2)

Publication Number Publication Date
CN106314804A true CN106314804A (en) 2017-01-11
CN106314804B CN106314804B (en) 2018-09-11

Family

ID=57789821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610785847.4A Active CN106314804B (en) 2016-08-31 2016-08-31 A method of it is delayed based on parachute opening device is accurately controlled under different temperatures

Country Status (1)

Country Link
CN (1) CN106314804B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110645957A (en) * 2019-10-23 2020-01-03 航宇救生装备有限公司 Q fixed point representation method of height sensor of umbrella opener
CN111123886A (en) * 2019-12-06 2020-05-08 武汉航空仪表有限责任公司 Comprehensive testing device and testing method for program controller
CN112208774A (en) * 2020-10-15 2021-01-12 航宇救生装备有限公司 Electronic parachute opener for dual-mode dual-redundancy emergency ejection lifesaving
CN112249345A (en) * 2020-10-15 2021-01-22 航宇救生装备有限公司 Device and method for indicating state of chair-mounted electronic umbrella opener
CN112817222A (en) * 2020-12-25 2021-05-18 武汉航空仪表有限责任公司 Device and method for detecting action time of automatic unlocking device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1315249A (en) * 1971-11-16 1973-05-02 Fairchild Industries Vehicle seat restraining system
US4911382A (en) * 1989-01-17 1990-03-27 Grumman Aerospace Corporation Safe electro ballistic escape sequencing system
CN202817104U (en) * 2012-09-19 2013-03-20 航宇救生装备有限公司 Thermal battery activator
CN203704802U (en) * 2013-10-12 2014-07-09 江西新余国科科技有限公司 Delay control device with accurate timing function
CN204088476U (en) * 2014-09-25 2015-01-07 航宇救生装备有限公司 A kind of needle stimulus live-in dividing plate igniter for thermal cell
CN105303110A (en) * 2015-09-29 2016-02-03 江苏金源锻造股份有限公司 System for mechanical seat design with displacing function
CN105513165A (en) * 2015-12-30 2016-04-20 陕西烽火电子股份有限公司 Onboard catapulting floating emergency positioning device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1315249A (en) * 1971-11-16 1973-05-02 Fairchild Industries Vehicle seat restraining system
US4911382A (en) * 1989-01-17 1990-03-27 Grumman Aerospace Corporation Safe electro ballistic escape sequencing system
CN202817104U (en) * 2012-09-19 2013-03-20 航宇救生装备有限公司 Thermal battery activator
CN203704802U (en) * 2013-10-12 2014-07-09 江西新余国科科技有限公司 Delay control device with accurate timing function
CN204088476U (en) * 2014-09-25 2015-01-07 航宇救生装备有限公司 A kind of needle stimulus live-in dividing plate igniter for thermal cell
CN105303110A (en) * 2015-09-29 2016-02-03 江苏金源锻造股份有限公司 System for mechanical seat design with displacing function
CN105513165A (en) * 2015-12-30 2016-04-20 陕西烽火电子股份有限公司 Onboard catapulting floating emergency positioning device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘占辰: "热电池激活时间研究", 《火工品》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110645957A (en) * 2019-10-23 2020-01-03 航宇救生装备有限公司 Q fixed point representation method of height sensor of umbrella opener
CN110645957B (en) * 2019-10-23 2021-10-15 航宇救生装备有限公司 Q fixed point representation method of height sensor of umbrella opener
CN111123886A (en) * 2019-12-06 2020-05-08 武汉航空仪表有限责任公司 Comprehensive testing device and testing method for program controller
CN112208774A (en) * 2020-10-15 2021-01-12 航宇救生装备有限公司 Electronic parachute opener for dual-mode dual-redundancy emergency ejection lifesaving
CN112249345A (en) * 2020-10-15 2021-01-22 航宇救生装备有限公司 Device and method for indicating state of chair-mounted electronic umbrella opener
CN112249345B (en) * 2020-10-15 2024-04-16 航宇救生装备有限公司 Chair-mounted electronic umbrella opener state indicating device and method
CN112817222A (en) * 2020-12-25 2021-05-18 武汉航空仪表有限责任公司 Device and method for detecting action time of automatic unlocking device

Also Published As

Publication number Publication date
CN106314804B (en) 2018-09-11

Similar Documents

Publication Publication Date Title
CN106314804A (en) Method for precisely controlling time delay of parachute opening device based on different temperatures
US10125691B2 (en) Bowed rotor start using a variable position starter valve
RU2603206C2 (en) Method of turbo unit starting at reduced heat imbalance
US10125690B2 (en) Method and system for starting up an aircraft turbomachine
US20170234231A1 (en) Bowed rotor start mitigation in a gas turbine engine
ES2705575T3 (en) Control of an intake door for the start-up of a gas turbine engine
EP3495627B1 (en) System and method for rotor bow mitigation
RU2690600C2 (en) Gas turbine start-up device and method, gas turbine rotation speed control method and corresponding gas turbine and gas turbine engine
RU2016130041A (en) METHOD AND SYSTEM FOR RELIABLE STARTING OF A TURBINE ENGINE
RU2016125745A (en) METHOD OF AUTOMATIC CONTROL OF THE OPERATING MODE OF A GAS TURBINE ENGINE OF A HELICOPTER APPROPRIATE A CONTROL DEVICE AND A HELICOPTER EQUIPPED WITH SUCH A DEVICE
CN204065047U (en) A kind of jet vane ablation test device
ES2528277T3 (en) Starting procedure of a turbomachine machine
US8151573B2 (en) Turbomachine flameout confirmation
EP3401530B1 (en) Method and system for setting an acceleration schedule for engine start
RU2016151378A (en) METHOD AND DEVICE FOR TURBOJET ENGINE TRACTION CONTROL
RU2015150038A (en) METHOD AND DEVICE FOR GENERATING A FUEL CONSUMPTION TEAM FOR INJECTION IN A COMBUSTION CHAMBER OF A GAS TURBINE ENGINE
RU2015122765A (en) METHOD FOR MONITORING THE STARTING OF A GAS-TURBINE INSTALLATION ENGINE
US10451509B2 (en) Method for determining a fault within a flow divider
US20210087972A1 (en) Systems and methods for starting a gas turbine engine
US20210215104A1 (en) Method and system for controlling operation of an engine using an engine controller
CN105258581A (en) Low-air-pressure delay time test system for infantry grenade
US11002238B2 (en) Method and system for starting an engine
RU2017126310A (en) METHOD AND SYSTEM OF INERTING A FUEL TANK
RU2019107759A (en) METHOD FOR MONITORING MALFUNCTIONS OF STARTING VALVE OF GAS TURBINE ENGINE
RU2422683C1 (en) Control method of gas turbine plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant