CN106311798A - Finish drawing process for special-shaped steel tube body - Google Patents

Finish drawing process for special-shaped steel tube body Download PDF

Info

Publication number
CN106311798A
CN106311798A CN201610688458.XA CN201610688458A CN106311798A CN 106311798 A CN106311798 A CN 106311798A CN 201610688458 A CN201610688458 A CN 201610688458A CN 106311798 A CN106311798 A CN 106311798A
Authority
CN
China
Prior art keywords
steel pipe
pipe
obform body
rolling
hollow billet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610688458.XA
Other languages
Chinese (zh)
Other versions
CN106311798B (en
Inventor
高锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinchang County Rijia Copper Co Ltd
Original Assignee
Xinchang County Rijia Copper Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchang County Rijia Copper Co Ltd filed Critical Xinchang County Rijia Copper Co Ltd
Priority to CN201610688458.XA priority Critical patent/CN106311798B/en
Publication of CN106311798A publication Critical patent/CN106311798A/en
Application granted granted Critical
Publication of CN106311798B publication Critical patent/CN106311798B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/15Making tubes of special shape; Making tube fittings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C1/00Manufacture of metal sheets, metal wire, metal rods, metal tubes by drawing
    • B21C1/16Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes
    • B21C1/22Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes specially adapted for making tubular articles

Abstract

The invention discloses a finish drawing process for a special-shaped steel tube body. The process comprises the following steps of (1) preparation of ram materials; (2) perforating treatment of a tube billet; (3) hot rolling treatment of a hollow billet; (4) drawing treatment of a hollow steel tube; (5) acid dipping of the special-shaped steel tube body; (6) sizing and reducing treatment of the special-shaped steel tube body; and (7) packaging of finished products. According to the finish drawing process, the structure is simple, the defective rate is reduced, and the cost is lowered; meanwhile, the finish drawing process is simple, the practical production requirements are met, and the comprehensive utilization rate is increased; moreover, the special-shaped steel tube body is machines more convenient and faster by strictly controlling the blanking size, the heating time, the pickling time and the pickling temperature in the technological process; the rate of later finished products is increased, and economic benefits of products are increased.

Description

A kind of finish draw technique of steel pipe obform body
Technical field
The present invention relates to the finish draw technique of a kind of steel pipe obform body.
Background technology
19th century younger oil exploitation, naval vessel, boiler, the manufacture of aircraft, for the second time world during Two World Wars The manufacture of big apparatus of thermo-electric power boiler after the war, the development of chemical industry and the drilling of petroleum gas and transport etc., the most effectively promote Steel Tube Industries in kind, yield and qualitative development.Steel pipe be applied not only to conveyance fluid and powdery solid, exchange heat energy, Manufacture machine components and container, it or a kind of economic steel.Building structure rack, pillar and machinery mount is manufactured with steel pipe, Weight can be alleviated, save metal 20~40%, and batch production mechanized construction can be realized.Highway bridge is manufactured not with steel pipe But steel can be saved, simplify construction, and the area of stopping off, investment reduction and maintenance cost can be greatly reduced.
Steel pipe obform body is the type in steel pipe.At present, steel pipe obform body is the most medical with the industry such as chemical industry, refrigeration In, it is indispensable part during copper covered steel pipeline connects.Along with perfecting of countries in the world environmental protection law, export to the ground such as European Union In the household appliances of district and country, the heavy metal of parts all must control in allowed band.Being processed into of domestic steel pipe obform body Filling heavy metal squeezing and pressing method continued to use by type the most always, and the greatest drawback of this process is to ensure that content of beary metal is up to standard In causing removing copper-clad steel pipe, the remaining complex process of lead, cycle length, cost height, exist what the most universal thus technique produced Abnormity copper-clad steel pipe remnants lead content exceeds standard phenomenon.Additionally during the remaining lead of cleaning, surrounding can be polluted, And also directly affect the physical and mental health of operator.
Summary of the invention
Present invention aim at providing the finish draw technique of a kind of steel pipe obform body for the deficiency existing for prior art Technical scheme, significantly improve machining accuracy and the work efficiency of steel pipe obform body, reduction in the numbers of seconds, cost-effective expense, with Time this finish draw technique simple, meet the production requirement of reality, improve comprehensive utilization ratio.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
The finish draw technique of a kind of steel pipe obform body, it is characterised in that comprise the steps:
1) raw-material preparation:
A, according to design drawing and processing technique requirement, and consider that the length after steel pipe finish draw is to determine the drop-down chi of steel pipe Very little, carry out the blanking of pipe further according to the size determined, and with pipeline beveling machine, the pipe after blanking is carried out retaining wall on slope;
B, the pipe that blanking is good is carried out size, tolerance, end surface inclination, pipeline section burr, chamfering and the inspection of length dimension Look into, it is ensured that it reaches the processing request of reality, it is simple to the post-production of pipe and process;
C, to checking qualified pipe to carry out the flushing on surface, the impurity on its surface is rinsed well, it is to avoid affect the later stage Process to pipe;
2) perforation of pipe processes:
A, pipe bore a hole before, pipe is fixed on lathe, is drilled with on the drilling equipment end face to pipe threaded end Internal point, so that it is guaranteed that the perforation degree of accuracy of pipe, prevents deviation occur during perforation;
B, again with rotary heating furnace to centering after pipe carry out heat treated, by the attemperating unit in rotary heating furnace Control the heating-up temperature of pipe, until the temperature of pipe reaches the requirement of perforation, then with pushing piercing machine, pipe is bored a hole Process so that pipe is made for hollow billet after perforation;
3) hot rolling of hollow billet processes:
The head end of hollow billet is fixedly clamped by a, the clamping device first passed through on hot-rolling mill workbench, by adjusting claw Shrinkage degree so that claw is firmly fixing with hollow billet to be connected, and improves the fixation performance of hollow billet, and the tail end of hollow billet passes through Bracket system is lifted fixing, improves stability further;
After b, hollow billet fix, open heater so that the coil being wound around on the heating rod in rolling pipe starts heating, Heat is delivered to the surface of rolling pipe again by the heat sink on heating rod, thus preheats rolling pipe so that surface Temperature reaches the temperature value of hot rolling;
C, when the surface temperature of rolling pipe rises to the value specified, rolling pipe is moved to the head end of hollow billet, then passes through Rolling pipe is moved down by retractor device, and during until rolling pipe just contacts with the surface of hollow billet, retractor device quits work, and drives Device drives rolling pipe to move toward end from the head end of hollow billet, ultimately generates hollow steel pipe;
4) drawing of hollow steel pipe processes:
Hollow steel pipe is heated to 100~300 DEG C by a, employing high-frequency induction heating apparatus;
B, with drawbench, air steel pipe carried out drawing process again, keep the outside dimension processing capacity of hollow steel pipe 0~ 6mm, internal diameter size processing capacity is 0.5~1mm, until hollow steel pipe is drawn into required steel pipe obform body;
5) pickling processes of steel pipe obform body:
A, by fixed mount, steel pipe obform body is immersed in pre-immersion trough, by the liquid in pre-immersion trough to steel pipe obform body Carry out preliminary pickling processes;
B, again fixed mount is moved in acid storage, steel pipe obform body is carried out pickling processes, pickling Immersion time be 5~ 12min, and acid liquor temperature is 50~60 DEG C;
With hot water, steel pipe obform body is carried out operation after c, pickling, maintains water temperature at more than 85 DEG C, clean 3 times, then Dry up with high-pressure blast;
6) tube reducing of determining of steel pipe obform body processes:
A, the steel pipe obform body after pickling processes is carried out cooling process, steel pipe metamer is fully immersed in coolant Cooling down, cool time is 12~24h;
B, cooled down after, carry out determining tube reducing process to steel pipe obform body with size-reducing mill;
C, finally two ends before and after steel pipe metamer are excised, and steel pipe obform body is carried out straightening processing;
7) finished product packing processes:
Use measurement apparatus size and the flexibility of steel pipe obform body are checked, and to steel pipe obform body inside and outside Surface checks, it is ensured that crackle, scuffing, impression does not occur in the surfaces externally and internally of steel pipe obform body so that it is meet adding of reality Work requirement, more standard compliant steel pipe obform body is carried out the printing of model specification, and the external coating to steel pipe obform body One layer of paint, then through final packaging warehouse-in.
Further, in step 2) step b in, the heating-up temperature of rotary heating furnace is 600~750 DEG C.
Further, step 3) step a in, then when hollow billet being clamped fixing, first according to the actual processing of hollow billet Length and requirement, carry out the adjustment of bracket locations, so that the hollow billet of different processing dimension can be by fixation.
Further, in step 6) and step 7) between steel pipe obform body need through expansion process, by reeler to steel The wall thickness of pipe obform body carries out expansion, and the wall unevenness that elimination tube rolling causes is even, also makes the interior appearance of steel pipe obform body simultaneously Face is smooth so that steel pipe obform body is more round just.
Further, in step 4) in, the drawing speed of drawbench is 5~30m/min.
Further, in step 3) in, after processing hollow steel pipe machines, clearing apparatus is opened, and air pump is by connecting Pipe provides source of the gas for spray boom, and spray boom carries out cleaning work by shower nozzle to workbench again, and mobile device drives spray boom to move simultaneously, So that the everywhere on workbench can be cleaned up.
Further, in step 6) b in, need steel pipe obform body is carried out electrochemical deoiling process after pickling processes, rotate dress Putting drive steel pipe obform body to rotate, hot alkaline solution carries out oily waste degradation process by sprayer unit to steel pipe obform body.
Finish draw technique of the present invention is simple, and overall procedure automation degree is high, it is simple to actual operation and use. The precision of the steel pipe obform body simultaneously produced by this finish draw technique is high, and quality of finished product good, defect rate is low, and energy loss is little.And And this technical process is by strictly controlling blank size, heat time heating time and pickling time, pickling temperature so that steel pipe obform body It is the most convenient to process, and improves the trimmed size in later stage, improves the economic benefit of product.
Present configuration is simple, practical, significantly improves machining accuracy and the work efficiency of steel pipe obform body, reduces secondary Product rate, cost-effective expense, this finish draw technique is simple simultaneously, meets the production requirement of reality, improves comprehensive utilization ratio.
Detailed description of the invention
The finish draw technique of a kind of steel pipe obform body, comprises the steps:
1) raw-material preparation:
A, according to design drawing and processing technique requirement, and consider that the length after steel pipe finish draw is to determine the drop-down chi of steel pipe Very little, carry out the blanking of pipe further according to the size determined, and with pipeline beveling machine, the pipe after blanking is carried out retaining wall on slope;
B, the pipe that blanking is good is carried out size, tolerance, end surface inclination, pipeline section burr, chamfering and the inspection of length dimension Look into, it is ensured that it reaches the processing request of reality, it is simple to the post-production of pipe and process;
C, to checking qualified pipe to carry out the flushing on surface, the impurity on its surface is rinsed well, it is to avoid affect the later stage Process to pipe;
2) perforation of pipe processes:
A, pipe bore a hole before, pipe is fixed on lathe, is drilled with on the drilling equipment end face to pipe threaded end Internal point, so that it is guaranteed that the perforation degree of accuracy of pipe, prevents from occurring during perforation deviation, reduces pipe wall unevenness, improve secondary Bite condition;
B, again with rotary heating furnace to centering after pipe carry out heat treated, by the attemperating unit in rotary heating furnace Control the heating-up temperature of pipe, until the temperature of pipe reaches the requirement of perforation, then with pushing piercing machine, pipe is bored a hole Process so that pipe is made for hollow billet after perforation, and the heating-up temperature of rotary heating furnace is 600~750 DEG C, and heat treated can To improve the plasticity of pipe, reduce resistance of deformation, prepare good worked structure for tube rolling, be effectively improved the performance of metal, with Shi Caiyong rotary heating furnace is adapted to the heating of the pipe of different-diameter and length, and rotary heating furnace is so that pipe simultaneously Be heated evenly, heat time heating time, section, improved the efficiency of heating surface, and automaticity is the highest, it is simple to actual operation and use;
3) hot rolling of hollow billet processes:
The head end of hollow billet is fixedly clamped by a, the clamping device first passed through on hot-rolling mill workbench, by adjusting claw Shrinkage degree so that claw is firmly fixing with hollow billet to be connected, and improves the fixation performance of hollow billet, and the tail end of hollow billet passes through Bracket system is lifted fixing, improves stability further, then when hollow billet being clamped fixing, first according to the reality of hollow billet Processing length and requirement, carry out the adjustment of bracket locations, so that the hollow billet of different processing dimension can be by fixation;
After b, hollow billet fix, open heater so that the coil being wound around on the heating rod in rolling pipe starts heating, Heat is delivered to the surface of rolling pipe again by the heat sink on heating rod, thus preheats rolling pipe so that surface Temperature reaches the temperature value of hot rolling;
C, when the surface temperature of rolling pipe rises to the value specified, rolling pipe is moved to the head end of hollow billet, then passes through Rolling pipe is moved down by retractor device, and during until rolling pipe just contacts with the surface of hollow billet, retractor device quits work, and drives Device drives rolling pipe to move toward end from the head end of hollow billet, ultimately generates hollow steel pipe;
D, after when processing, hollow steel pipe machines, clearing apparatus is opened, and air pump provides source of the gas by connecting tube for spray boom, Spray boom carries out cleaning work by shower nozzle to workbench again, and mobile device drives spray boom to move simultaneously, so that on workbench Everywhere can be cleaned up, by the processing enhanced convenience that can be designed so that steel pipe obform body of clearing apparatus Automatization, the hot-rolling mill process to following hollow billet of being also more convenient for, improves work quality and operating rate, reduction in the numbers of seconds, reduces The loss of energy consumption;
4) drawing of hollow steel pipe processes:
Hollow steel pipe is heated to 100~300 DEG C by a, employing high-frequency induction heating apparatus;
B, with drawbench, air steel pipe carried out drawing process again, keep the outside dimension processing capacity of hollow steel pipe 0~ 6mm, internal diameter size processing capacity is 0.5~1mm, until hollow steel pipe to be drawn into required steel pipe obform body, drawbench Drawing speed is 5~30m/min;
5) pickling processes of steel pipe obform body:
A, by fixed mount, steel pipe obform body is immersed in pre-immersion trough, by the liquid in pre-immersion trough to steel pipe obform body Carry out preliminary pickling processes;
B, again fixed mount is moved in acid storage, steel pipe obform body is carried out pickling processes, pickling Immersion time be 5~ 12min, and acid liquor temperature is 50~60 DEG C, needs steel pipe obform body is carried out electrochemical deoiling process, tumbler after pickling processes Driving steel pipe obform body to rotate, hot alkaline solution carries out oily waste degradation process by sprayer unit to steel pipe obform body;
With hot water, steel pipe obform body is carried out operation after c, pickling, maintains water temperature at more than 85 DEG C, clean 3 times, then Dry up with high-pressure blast, the corrosion resistance and good of the steel pipe obform body after pickling processes, extend the use of steel pipe obform body Life-span;
6) tube reducing of determining of steel pipe obform body processes:
A, the steel pipe obform body after pickling processes is carried out cooling process, steel pipe metamer is fully immersed in coolant Cooling down, cool time is 12~24h;
B, cooled down after, carry out determining tube reducing process to steel pipe obform body with size-reducing mill;
C, finally two ends before and after steel pipe metamer are excised, and steel pipe obform body is carried out straightening processing;
7) expansion of steel pipe obform body processes:
By reeler, the wall thickness of steel pipe obform body being carried out expansion, the wall unevenness that elimination tube rolling causes is even, the most also The surfaces externally and internally making steel pipe obform body is smooth so that steel pipe obform body is more round just;
8) finished product packing processes:
Steel pipe obform body needs to process through expansion, by reeler, the wall thickness of steel pipe obform body is carried out expansion, eliminates The wall unevenness that tube rolling causes is even, and the surfaces externally and internally simultaneously also making steel pipe obform body is smooth so that steel pipe obform body is more round just
Use measurement apparatus size and the flexibility of steel pipe obform body are checked, and to steel pipe obform body inside and outside Surface checks, it is ensured that crackle, scuffing, impression does not occur in the surfaces externally and internally of steel pipe obform body so that it is meet adding of reality Work requirement, more standard compliant steel pipe obform body is carried out the printing of model specification, and the external coating to steel pipe obform body One layer of paint, then through final packaging warehouse-in.
These are only the specific embodiment of the present invention, but the technical characteristic of the present invention is not limited thereto.Any with this Based on bright, for realizing essentially identical technique effect, done ground simple change, equivalent or modification etc., all contain Among protection scope of the present invention.

Claims (7)

1. the finish draw technique of a steel pipe obform body, it is characterised in that: comprise the steps:
1) raw-material preparation:
A, according to design drawing and processing technique requirement, and consider the length after steel pipe finish draw to determine the drop-down size of steel pipe, Carry out the blanking of pipe further according to the size determined, and with pipeline beveling machine, the pipe after blanking is carried out retaining wall on slope;
B, the pipe that blanking is good is carried out size, tolerance, end surface inclination, pipeline section burr, chamfering and the inspection of length dimension, really Protect its processing request reaching reality, it is simple to the post-production of pipe and process;
C, to checking qualified pipe to carry out the flushing on surface, the impurity on its surface is rinsed well, it is to avoid affect the later stage to pipe The process of base;
2) perforation of pipe processes:
A, pipe bore a hole before, pipe is fixed on lathe, is drilled with centering with on the drilling equipment end face to pipe threaded end Hole, so that it is guaranteed that the perforation degree of accuracy of pipe, prevents deviation occur during perforation;
B, with rotary heating furnace, the pipe after centering is carried out heat treated again, controlled by attemperating unit in rotary heating furnace The heating-up temperature of pipe, until the temperature of pipe reaches the requirement of perforation, then carries out perforation process with pushing piercing machine to pipe, Pipe is made to be made for hollow billet after perforation;
3) hot rolling of hollow billet processes:
The head end of hollow billet is fixedly clamped by a, the clamping device first passed through on hot-rolling mill workbench, by adjusting the contraction of claw Degree so that claw is firmly fixing with hollow billet to be connected, and improves the fixation performance of hollow billet, and the tail end of hollow billet passes through bracket Device is lifted fixing, improves stability further;
After b, hollow billet fix, open heater so that the coil being wound around on the heating rod in rolling pipe starts heating, heat It is delivered to the surface of rolling pipe again by the heat sink on heating rod, thus rolling pipe is preheated so that the temperature on surface Reach the temperature value of hot rolling;
C, when the surface temperature of rolling pipe rises to the value specified, rolling pipe is moved to the head end of hollow billet, then by flexible Rolling pipe is moved down by device, and during until rolling pipe contacts with the surface of hollow billet, retractor device quits work, and driving means is driven Action roller tube rolling moves toward end from the head end of hollow billet, ultimately generates hollow steel pipe;
4) drawing of hollow steel pipe processes:
Hollow steel pipe is heated to 100~300 DEG C by a, employing high-frequency induction heating apparatus;
B, with drawbench, air steel pipe carried out drawing process again, keep the outside dimension processing capacity of hollow steel pipe 0~6mm, Internal diameter size processing capacity is 0.5~1mm, until hollow steel pipe is drawn into required steel pipe obform body;
5) pickling processes of steel pipe obform body:
A, by fixed mount, steel pipe obform body is immersed in pre-immersion trough, by the liquid in pre-immersion trough, steel pipe obform body is carried out Preliminary pickling processes;
B, again fixed mount is moved in acid storage, steel pipe obform body is carried out pickling processes, pickling Immersion time be 5~ 12min, and acid liquor temperature is 50~60 DEG C;
With hot water, steel pipe obform body is carried out operation after c, pickling, maintains water temperature at more than 85 DEG C, clean 3 times, then with high Pressure wind is done;
6) tube reducing of determining of steel pipe obform body processes:
A, the steel pipe obform body after pickling processes is carried out cooling process, steel pipe metamer is fully immersed in coolant and carries out Cooling, cool time is 12~24h;
B, cooled down after, carry out determining tube reducing process to steel pipe obform body with size-reducing mill;
C, finally two ends before and after steel pipe metamer are excised, and steel pipe obform body is carried out straightening processing;
7) finished product packing processes:
Use measurement apparatus that size and the flexibility of steel pipe obform body are checked, and the surfaces externally and internally to steel pipe obform body Check, it is ensured that crackle, scuffing, impression does not occur in the surfaces externally and internally of steel pipe obform body so that it is the processing meeting reality is wanted Ask, more standard compliant steel pipe obform body is carried out the printing of model specification, and the external coating one layer to steel pipe obform body Paint, then through final packaging warehouse-in.
The finish draw technique of a kind of steel pipe obform body the most according to claim 1, it is characterised in that: in described step 2) step In rapid b, the heating-up temperature of rotary heating furnace is 600~750 DEG C.
The finish draw technique of a kind of steel pipe obform body the most according to claim 1, it is characterised in that: in described step 3) step In rapid a, when hollow billet being clamped fixing, first according to actual processing length and the requirement of hollow billet, carry out bracket locations Adjust, so that the hollow billet of different processing dimension can be by fixation.
The finish draw technique of a kind of steel pipe obform body the most according to claim 1, it is characterised in that: in described step 6) and institute State step 7) between steel pipe obform body need through expansion process, by reeler, the wall thickness of steel pipe obform body is carried out expansion, The wall unevenness that elimination tube rolling causes is even, and the surfaces externally and internally simultaneously also making steel pipe obform body is smooth so that steel pipe obform body is more Circle is just.
The finish draw technique of a kind of steel pipe obform body the most according to claim 1, it is characterised in that: in described step 4) in, The drawing speed of described drawbench is 5~30m/min.
The finish draw technique of a kind of steel pipe obform body the most according to claim 1, it is characterised in that: in described step 3) in, After processing hollow steel pipe machines, clearing apparatus is opened, and air pump provides source of the gas, spray boom to pass through by connecting tube for spray boom again Shower nozzle carries out cleaning work to workbench, and mobile device drives spray boom to move, so that the everywhere on workbench is all simultaneously Can be cleaned up.
The finish draw technique of a kind of steel pipe obform body the most according to claim 1, it is characterised in that: in described step 6) step In rapid b, needing to carry out steel pipe obform body electrochemical deoiling process after pickling processes, tumbler drives steel pipe obform body to rotate, heat Aqueous slkali carries out oily waste degradation process by sprayer unit to steel pipe obform body.
CN201610688458.XA 2016-08-18 2016-08-18 A kind of finish draw technique of steel pipe obform body Active CN106311798B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610688458.XA CN106311798B (en) 2016-08-18 2016-08-18 A kind of finish draw technique of steel pipe obform body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610688458.XA CN106311798B (en) 2016-08-18 2016-08-18 A kind of finish draw technique of steel pipe obform body

Publications (2)

Publication Number Publication Date
CN106311798A true CN106311798A (en) 2017-01-11
CN106311798B CN106311798B (en) 2019-01-08

Family

ID=57743184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610688458.XA Active CN106311798B (en) 2016-08-18 2016-08-18 A kind of finish draw technique of steel pipe obform body

Country Status (1)

Country Link
CN (1) CN106311798B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115430995A (en) * 2022-09-05 2022-12-06 攀钢集团成都钢钒有限公司 Manufacturing method of 50Mn18Cr4V nonmagnetic steel pipe

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07144223A (en) * 1993-11-19 1995-06-06 Nakajima Kokan Kk Manufacture of square steel tube with large diameter with emphasis on improving quality and uniformizing radiused shape of corner
CN101992230A (en) * 2010-11-10 2011-03-30 江苏华程工业制管股份有限公司 Method for manufacturing profiled steel pipe
CN104209363A (en) * 2014-08-27 2014-12-17 无锡市华牧机械有限公司 Stainless steel pipe processing technology
CN104551667A (en) * 2013-10-16 2015-04-29 无锡江南高精度冷拔管有限公司 Cold-rolled high-hardness seamless steel pipe manufacturing method
CN105127236A (en) * 2015-08-18 2015-12-09 马鞍山市华科实业有限公司 Manufacturing method for special-shaped steel pipes special for logistics shelves

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07144223A (en) * 1993-11-19 1995-06-06 Nakajima Kokan Kk Manufacture of square steel tube with large diameter with emphasis on improving quality and uniformizing radiused shape of corner
CN101992230A (en) * 2010-11-10 2011-03-30 江苏华程工业制管股份有限公司 Method for manufacturing profiled steel pipe
CN104551667A (en) * 2013-10-16 2015-04-29 无锡江南高精度冷拔管有限公司 Cold-rolled high-hardness seamless steel pipe manufacturing method
CN104209363A (en) * 2014-08-27 2014-12-17 无锡市华牧机械有限公司 Stainless steel pipe processing technology
CN105127236A (en) * 2015-08-18 2015-12-09 马鞍山市华科实业有限公司 Manufacturing method for special-shaped steel pipes special for logistics shelves

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115430995A (en) * 2022-09-05 2022-12-06 攀钢集团成都钢钒有限公司 Manufacturing method of 50Mn18Cr4V nonmagnetic steel pipe

Also Published As

Publication number Publication date
CN106311798B (en) 2019-01-08

Similar Documents

Publication Publication Date Title
CN102527767B (en) Cold drawing welded tube manufacture process for high-accuracy hydraulic oil cylinder
CN104307876A (en) Production process of precise seamless steel tube for hydraulic cylinder
CN102873512A (en) Manufacture method of large-caliber medium-and-thick-wall seamless steel tube for nuclear power plant
CN101444881A (en) Technology for repairing surfacing of piston rod of super large marine diesel engine
CN112404163B (en) Preparation method of high-performance difficult-deformation metal precision seamless pipe
CN108098269A (en) A kind of preparation for processing of high intensity high-precision Ti6Al4V titanium alloy pipes
CN110899335A (en) Short-process manufacturing method of small-caliber marine titanium alloy seamless pipe
CN106944494A (en) A kind of preparation method of heavy caliber thick wall seamless titanium alloy barrel body
EP2228149B1 (en) Production method of internally-ribbed steel pipe
CN212598017U (en) Production line of large-diameter high-performance stainless steel seamless pipe
CN112024638A (en) Production line and production process of large-diameter high-performance stainless steel seamless pipe
CN106311798A (en) Finish drawing process for special-shaped steel tube body
CN104400196B (en) Magnadure welding method
CN104708269A (en) Method for machining large-diameter super-thin-walled tubular product made of high-deformation materials
CN103231218B (en) A kind of fast preparation method of titanium alloy pipe
CN102873126B (en) Manufacturing method of large-aperture thin-walled seamless steel tube for nuclear power plant
CN103170809A (en) Machining process of lower water outtake bent tube
CN103231205B (en) A kind of manufacture method of roller-way roller
CN107335970A (en) A kind of preparation method of hollow bolt
CN104148439B (en) A kind of milling method of high precision titanium alloy pipe
CN113441568B (en) Cold machining manufacturing method of large-caliber thin-wall zirconium alloy pipe
CN100349686C (en) Friction welding method for making short tie-in oil pipe
CN106584036A (en) Welded type seamless tube machining method
CN210115609U (en) Automatic brazing device for magnetic core tube
CN110369546B (en) Method for producing large-diameter titanium alloy hot-rolled seamless pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 312500 No. 48 Chusiwan Road, Xinchang Industrial Park, Xinchang County, Shaoxing City, Zhejiang Province

Applicant after: Zhejiang Rijia Copper Technology Co.,Ltd.

Address before: 312500 East Road, Yulin Street, Xinchang County, Shaoxing City, Zhejiang Province, 488

Applicant before: XINCHANG RIJIA COPPER CO.,LTD.

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A fine drawing process for special-shaped steel pipe

Effective date of registration: 20211227

Granted publication date: 20190108

Pledgee: Xinchang Zhejiang rural commercial bank Limited by Share Ltd.

Pledgor: Zhejiang Rijia Copper Technology Co.,Ltd.

Registration number: Y2021330002630

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230831

Granted publication date: 20190108

Pledgee: Xinchang Zhejiang rural commercial bank Limited by Share Ltd.

Pledgor: Zhejiang Rijia Copper Technology Co.,Ltd.

Registration number: Y2021330002630

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Fine Drawing Process for Steel Pipe Shapes

Effective date of registration: 20230911

Granted publication date: 20190108

Pledgee: Bank of China Limited by Share Ltd. Xinchang branch

Pledgor: Zhejiang Rijia Copper Technology Co.,Ltd.

Registration number: Y2023330002009