CN106300536A - A kind of electric power system reactive-load compensation storage battery monitoring system - Google Patents

A kind of electric power system reactive-load compensation storage battery monitoring system Download PDF

Info

Publication number
CN106300536A
CN106300536A CN201610807992.8A CN201610807992A CN106300536A CN 106300536 A CN106300536 A CN 106300536A CN 201610807992 A CN201610807992 A CN 201610807992A CN 106300536 A CN106300536 A CN 106300536A
Authority
CN
China
Prior art keywords
main body
host main
supplemental functionality
module
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610807992.8A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610807992.8A priority Critical patent/CN106300536A/en
Publication of CN106300536A publication Critical patent/CN106300536A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • H02J7/0021
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • H02J7/0026
    • H02J7/0091

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The present invention relates to a kind of electric power system reactive-load compensation storage battery monitoring system, including host main body and supplemental functionality;Host main body is provided with MCU control circuit, man machine operation interface, and the warning circuit that is connected with MCU control circuit and display driver circuit;Supplemental functionality is individually made into integration, and dismountable is arranged in host main body;Supplemental functionality includes testing circuit module, auxiliary power module, communication circuit module and temperature monitoring module.The present invention is by using Modularization assembled structure so that complete machine function and module number can be carried out the specially offered formula manufacturing according to the actual demand of client, thus have preferable motility, it is possible to meet the requirement of different client.

Description

A kind of electric power system reactive-load compensation storage battery monitoring system
Technical field
The invention belongs to electric power system reactive power compensation technology field, be specifically related to a kind of electric power system reactive-load compensation accumulator Monitoring system.
Background technology
Presently commercially available battery inspection product, is all complete machine type product, generally comprises MCU control circuit, testing circuit, report Alert circuit, display driver circuit, auxiliary power circuit, telecommunication circuit etc., each circuit module concentrated setting is in complete machine, but life Taking cost into account produce producer, the general switches using miniature relay to patrol and examine branch road as it and Samples selecting more, exist The shortcoming such as mechanical wear, service life are short;Along with the progress of technology, the requirement that battery maintenance is worked by a lot of equipment is the most increasingly Height, the performance of current relay test formula battery inspection can not meet the most far away a lot of visual plant to battery maintenance and electricity Pond power branch road duty judge requirement.
It addition, according to the how many demand of the amount of capacity of accumulator battery to be checked, number, it may be necessary to the road much patrolled and examined, Using multiple complete machine to process the accumulator of quantification traditionally, this results in client needs additionally to configure circuit each battery The detection information patrolling and examining product collects so that the wiring in rack is more complicated;Additionally from cost, waste numerous phases Same circuit module, such as wastes numerous man machine operation interfaces, causes the high of holistic cost.
Summary of the invention
For solving above-mentioned technical problem, the invention provides a kind of modularity, the effectively electric power system of reduction cost idle Compensate storage battery monitoring system.
Realize the technical scheme of the object of the invention: a kind of electric power system reactive-load compensation storage battery monitoring system, including main frame Body and supplemental functionality;Host main body is provided with MCU control circuit, man machine operation interface, and is connected with MCU control circuit Warning circuit and display driver circuit;It is characterized in that: supplemental functionality is individually made into integration, and dismountable be arranged on In host main body;Supplemental functionality includes testing circuit module, auxiliary power module, communication circuit module, monitoring temperature mould Block and the C45 plastic casing breaker for the external battery feed of break-make;Host main body is provided with placing chamber, each placing chamber sets C45 installs guide rail;Each supplemental functionality is provided with C45 and installs clamp rail, and each supplemental functionality card dress is fixed on C45 and installs guide rail On;Described C45 is installed one end of guide rail and is rotated by hinge and be arranged on the wall body of placing chamber one end, other end clamping or be spirally connected Being fixed on the wall body of the placing chamber other end, when the other end is not fixed, this installation guide rail can spin out from placing chamber, And expose to host main body;The appearance profile of host main body and each supplemental functionality is consistent, host main body and each auxiliary merit Module can be fixedly installed the most side by side, and each supplemental functionality adjoins the tail end setting of host main body.
The present invention is by using Modularization assembled structure so that complete machine function and module number can be according to the reality of client Demand, carries out the specially offered formula manufacturing, thus has preferable motility, it is possible to meet the requirement of different client.It addition, this For the bright client for having large number of accumulator, save more same parts owing to connecing, such as man machine interface, can Effectively to reduce holistic cost.
Accompanying drawing explanation
In order to make present disclosure be more likely to be clearly understood, below according to specific embodiment and combine accompanying drawing, The present invention is further detailed explanation, wherein
Fig. 1 is the front view of the first structure of the present invention;
Fig. 2 is a kind of internal structure schematic diagram of monitoring system shown in Fig. 1;
Fig. 3 is a kind of internal structure schematic diagram of the second structure of the present invention;
Fig. 4 is a kind of structural representation of supplemental functionality in monitoring system shown in Fig. 3;
Fig. 5 is a kind of structural representation of another kind structure of the present invention;
Fig. 6 is a kind of structural representation of supplemental functionality in monitoring system shown in Fig. 5.
Detailed description of the invention
(embodiment 1)
Fig. 1 and Fig. 2 shows the first detailed description of the invention of the present invention, and wherein, Fig. 1 is facing of the first structure of the present invention Figure;Fig. 2 is a kind of internal structure schematic diagram of monitoring system shown in Fig. 1.
The present embodiment is a kind of storage battery dedicated monitoring system of electrical power trans mission/distribution system, as shown in Fig. 1 and Fig. 2, including main frame originally Body 1 and supplemental functionality 2;Host main body is provided with MCU control circuit, man machine operation interface 11, and with MCU control circuit phase Warning circuit even and display driver circuit;Supplemental functionality is individually made into integration, and dismountable is arranged on host main body On.
Host main body is provided with placing chamber 12, each placing chamber sets C45 guide rail 13 is installed.
Supplemental functionality includes testing circuit module 21, auxiliary power module 22, communication circuit module 23, monitoring temperature Module 24 and the C45 plastic casing breaker 25 for the external battery feed of break-make.Each supplemental functionality is provided with C45 and installs Clamp rail, each function supplementary module card dress is fixed on C45 and installs on guide rail, and is electrically connected with host main body by plug-in type connection terminal Connect.The present embodiment is provided with two temperature monitoring modules, because in concrete practice, needs to arrange multiple temperature monitor, thus needs Want two temperature monitoring modules of chain.
It addition, the present embodiment also arranges containing cavity in host main body, containing cavity is provided with C45 install guide rail, described respectively Being additionally provided with C45 on function supplementary module and install clamp rail, each function supplementary module and C45 type chopper can be mounted side by side on this appearance Put in chamber, and its demolition and maintenance are the most convenient, be conducive to carrying out customized according to customer demand.
In the present embodiment, each temperature monitoring module set in including temperature monitoring circuit module body and with module this The temperature sensor of body plug-in electrical connection;Each temperature sensor preferably employs the SMD temperature that can paste on external connection battery Sensor.
Described C45 is installed one end of guide rail and is arranged on the wall body of placing chamber one end by hinge rotation, other end clamping Or on the wall body being fixed on the placing chamber other end that is spirally connected, when the other end is not fixed, this installation guide rail can revolve from placing chamber Produce, and expose to host main body.Can spin out owing to installing guide rail, and expose to the placing chamber of host main body, from And can be more convenient each supplemental functionality is fixed on this installation guide rail.
(embodiment 2)
Fig. 3 and Fig. 4 shows the second detailed description of the invention of the present embodiment, and wherein Fig. 4 is the one of another kind structure of the present invention Plant internal structure schematic diagram;Fig. 5 is a kind of structural representation of supplemental functionality in monitoring system shown in Fig. 4.
The present embodiment is substantially the same manner as Example 3, and difference is: one end of each supplemental functionality is provided with and has concurrently The porous type jack 41 that data communication connection and light current connect, the wall body of host main body placing chamber is provided with and this porous type jack Adaptive porous type inserting terminal 42;When supplemental functionality being fixed on C45 and installing on guide rail, only installation need to be rotated Guide rail, disposably can be connected the porous type jack of all supplemental functionality with the porous type inserting terminal in placing chamber Good, thus effectively simplify assembly operation.
In the present embodiment, each supplemental functionality each other and and host main body between data cube computation by described Porous type jack and porous type inserting terminal complete.
(embodiment 3)
The present embodiment is substantially the same manner as Example 4, and difference is: the wall body of described placing chamber is provided with slide rail, each porous Formula inserting terminal is provided with the guide rail adaptive with this slide rail, so that each porous type inserting terminal can free skating on slide rail Dynamic so that each porous type inserting terminal, when with porous type jack grafting on supplemental functionality, has more preferable adaptability.
(embodiment 4)
Fig. 5 and Fig. 6 shows the another kind of detailed description of the invention of the present invention, and wherein, Fig. 5 is the one of another kind structure of the present invention Structural representation;Fig. 6 is a kind of structural representation of supplemental functionality in monitoring system shown in Fig. 5.
The present embodiment is substantially the same manner as Example 1, and difference is: as shown in Figure 5, host main body and each miscellaneous function The appearance profile of module is consistent, and host main body and each supplemental functionality are fixedly installed the most side by side, and each miscellaneous function mould Block adjoins the tail end of host main body and arranges.
In the present embodiment, two abutting ends of both sides before and after each supplemental functionality, one end is provided with Electric plug with shutter 31, The other end is provided with electrical connection jack 32, and described host main body rear end also is provided with and the electrical connection jack of Electric plug with shutter 31 adaptation 32.This structure is assembling, more more convenient than embodiment 1.Electric plug with shutter 31 used and electrical connection jack 32 are excellent Choosing uses and has the porous type pluggable terminals that data communication connection and light current connect concurrently, thus meet each supplemental functionality each other it Between and and host main body between data cube computation.
Above-described embodiment is only for clearly demonstrating example of the present invention, and is not the embodiment party to the present invention The restriction of formula.For those of ordinary skill in the field, can also be made other on the basis of the above description different The change of form or variation.Here without also cannot all of embodiment be given exhaustive.

Claims (1)

1. an electric power system reactive-load compensation storage battery monitoring system, including host main body and supplemental functionality;Host main body It is provided with MCU control circuit, man machine operation interface, and the warning circuit that is connected with MCU control circuit and display driver circuit;Its It is characterised by: supplemental functionality is individually made into integration, and dismountable is arranged in host main body;Supplemental functionality includes Testing circuit module, auxiliary power module, communication circuit module, temperature monitoring module and for the external battery feed of break-make C45 plastic casing breaker;Host main body is provided with placing chamber, each placing chamber sets C45 guide rail is installed;Each supplemental functionality sets Having C45 to install clamp rail, each supplemental functionality card dress is fixed on C45 and installs on guide rail;Described C45 installs one end of guide rail and passes through Hinge rotates and is arranged on the wall body of placing chamber one end, in other end clamping or the wall body being fixed on the placing chamber other end that is spirally connected, When the other end is not fixed, this installation guide rail can spin out from placing chamber, and exposes to host main body;Host main body and The appearance profile of each supplemental functionality is consistent, and host main body and each supplemental functionality are fixedly installed the most side by side, and respectively Supplemental functionality adjoins the tail end of host main body and arranges.
CN201610807992.8A 2014-06-10 2014-06-10 A kind of electric power system reactive-load compensation storage battery monitoring system Withdrawn CN106300536A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610807992.8A CN106300536A (en) 2014-06-10 2014-06-10 A kind of electric power system reactive-load compensation storage battery monitoring system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410255882.6A CN104037847B (en) 2014-06-10 2014-06-10 Electric power system reactive-load compensation storage battery monitoring system
CN201610807992.8A CN106300536A (en) 2014-06-10 2014-06-10 A kind of electric power system reactive-load compensation storage battery monitoring system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410255882.6A Division CN104037847B (en) 2014-06-10 2014-06-10 Electric power system reactive-load compensation storage battery monitoring system

Publications (1)

Publication Number Publication Date
CN106300536A true CN106300536A (en) 2017-01-04

Family

ID=51468503

Family Applications (7)

Application Number Title Priority Date Filing Date
CN201610821413.5A Pending CN106483465A (en) 2014-06-10 2014-06-10 Electric power system reactive-load compensation storage battery monitoring system
CN201610808836.3A Withdrawn CN106405429A (en) 2014-06-10 2014-06-10 Monitoring system for reactive power compensation storage battery of power supply system
CN201610807992.8A Withdrawn CN106300536A (en) 2014-06-10 2014-06-10 A kind of electric power system reactive-load compensation storage battery monitoring system
CN201610821412.0A Pending CN106932724A (en) 2014-06-10 2014-06-10 A kind of reactive-load compensation storage battery monitoring system
CN201610808189.6A Withdrawn CN106451608A (en) 2014-06-10 2014-06-10 Reactive compensation storage battery monitoring system for power supply system
CN201610821883.1A Withdrawn CN107204639A (en) 2014-06-10 2014-06-10 Reactive-load compensation storage battery monitoring system
CN201410255882.6A Expired - Fee Related CN104037847B (en) 2014-06-10 2014-06-10 Electric power system reactive-load compensation storage battery monitoring system

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201610821413.5A Pending CN106483465A (en) 2014-06-10 2014-06-10 Electric power system reactive-load compensation storage battery monitoring system
CN201610808836.3A Withdrawn CN106405429A (en) 2014-06-10 2014-06-10 Monitoring system for reactive power compensation storage battery of power supply system

Family Applications After (4)

Application Number Title Priority Date Filing Date
CN201610821412.0A Pending CN106932724A (en) 2014-06-10 2014-06-10 A kind of reactive-load compensation storage battery monitoring system
CN201610808189.6A Withdrawn CN106451608A (en) 2014-06-10 2014-06-10 Reactive compensation storage battery monitoring system for power supply system
CN201610821883.1A Withdrawn CN107204639A (en) 2014-06-10 2014-06-10 Reactive-load compensation storage battery monitoring system
CN201410255882.6A Expired - Fee Related CN104037847B (en) 2014-06-10 2014-06-10 Electric power system reactive-load compensation storage battery monitoring system

Country Status (1)

Country Link
CN (7) CN106483465A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0762816A2 (en) * 1995-08-25 1997-03-12 Mitsubishi Denki Kabushiki Kaisha System for mounting an electronic module in a rack
CN201741989U (en) * 2010-03-11 2011-02-09 南车青岛四方机车车辆股份有限公司 Relay cabinet for railway vehicle cab
CN201955453U (en) * 2010-11-26 2011-08-31 浙江金弘科技有限公司 Battery itinerant detector

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100538384C (en) * 2007-06-29 2009-09-09 哈尔滨工业大学 A kind of test macro of power cell source
CN201237632Y (en) * 2008-08-08 2009-05-13 涂金龙 Intelligent accumulator checking and monitoring instrument
CN201508409U (en) * 2009-10-10 2010-06-16 佛山市柏克电力设备有限公司 Intelligent battery data logging device
CN202044256U (en) * 2011-03-07 2011-11-23 深圳优利特生物技术有限公司 Modified wall hanging type general diagnosing system
CN202512222U (en) * 2012-04-20 2012-10-31 东北石油大学 Detachable voltage intelligent polling instrument for storage battery
EP2873984A4 (en) * 2012-07-13 2016-05-11 Murata Manufacturing Co Sensor tag and sensor network system
CN203909252U (en) * 2014-06-10 2014-10-29 滁州品之达电器科技有限公司 Reactive-compensation storage battery monitoring system of power supply system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0762816A2 (en) * 1995-08-25 1997-03-12 Mitsubishi Denki Kabushiki Kaisha System for mounting an electronic module in a rack
CN201741989U (en) * 2010-03-11 2011-02-09 南车青岛四方机车车辆股份有限公司 Relay cabinet for railway vehicle cab
CN201955453U (en) * 2010-11-26 2011-08-31 浙江金弘科技有限公司 Battery itinerant detector

Also Published As

Publication number Publication date
CN106932724A (en) 2017-07-07
CN106451608A (en) 2017-02-22
CN107204639A (en) 2017-09-26
CN104037847A (en) 2014-09-10
CN106483465A (en) 2017-03-08
CN104037847B (en) 2016-08-24
CN106405429A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN106249172A (en) A kind of reactive-load compensation storage battery monitoring system
CN104037847B (en) Electric power system reactive-load compensation storage battery monitoring system
CN104035042B (en) The storage battery dedicated monitoring system of electrical power trans mission/distribution system
CN203909248U (en) Special storage battery monitoring system of power transmission and distribution system
CN203909249U (en) Special storage battery monitoring system of power transmission and distribution system
CN203909251U (en) Reactive-compensation storage battery monitoring system of power supply system
CN104035044B (en) Special accumulator monitoring system for power transmission and distribution system
CN104035045B (en) Electric storage battery monitoring system
CN203909252U (en) Reactive-compensation storage battery monitoring system of power supply system
CN203909250U (en) Power storage battery monitoring system
CN201294336Y (en) Integrated block terminal assembly
CN104035041B (en) Monitoring system for electric storage battery
CN204462836U (en) The electromagnetic compatibility test load box of automobile straight fuel-injection engine controller
CN208314145U (en) A kind of combination switch intelligent detection device
CN216529410U (en) Intelligent fast-plug switch module
CN216331537U (en) Intelligent charging pile integrated plug-in control module
CN219831282U (en) Energy storage BMS aging test device and system
CN218919368U (en) Connector for outdoor brightening module
CN113745857A (en) Intelligent fast-plugging switch module
CN110068742A (en) A kind of signal wire short-circuit test device
CN102682539A (en) Tristate alarm lamp circuit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170104

WW01 Invention patent application withdrawn after publication