CN106300421A CN201610793756.5A CN201610793756A CN106300421A CN 106300421 A CN106300421 A CN 106300421A CN 201610793756 A CN201610793756 A CN 201610793756A CN 106300421 A CN106300421 A CN 106300421A
Authority
CN
China
Prior art keywords
distributed power
isolated island
distributed
monitor terminal
power source
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610793756.5A
Other languages
Chinese (zh)
Other versions
CN106300421B (en
Inventor
李林
毕锐
曹军
何刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HKUST intelligence (Hefei) Technology Co., Ltd.
KEDA INTELLIGENT ELECTRICAL TECHNOLOGY CO., LTD.
Original Assignee
KEDA INTELLIGENT ELECTRICAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KEDA INTELLIGENT ELECTRICAL TECHNOLOGY Co Ltd filed Critical KEDA INTELLIGENT ELECTRICAL TECHNOLOGY Co Ltd
Priority to CN201610793756.5A priority Critical patent/CN106300421B/en
Publication of CN106300421A publication Critical patent/CN106300421A/en
Application granted granted Critical
Publication of CN106300421B publication Critical patent/CN106300421B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00007Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/388Islanding, i.e. disconnection of local power supply from the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/121Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention relates to the monitoring system of a kind of distributed power generation grid-connected system, including: distributed power generation grid connection interface device, complete the monitoring of distributed generation system, load, be monitored uploading of information to power dispatching station, perform the guidance command of power dispatching station;Monitor terminal, for detecting distributed power source site, the voltage of load point, electric current, performance number and grid-connected on off state, receives the remote signalling amount of distributed power source net-connected controller;Power dispatching station, for realizing the running state monitoring of the power distribution network of access distributed power source, controlling work, and according to task scope, it is achieved the energy management operation of distributed power source.The invention also discloses the isolated island guard method of the monitoring system of a kind of distributed power generation grid-connected system.The present invention, without setting up communication network specially, reduces system cost;In the case of system increases distributed power source newly, monitoring system, without increasing new hardware investment, can meet the requirement of distributed power source flexible access.

Description

The monitoring system of a kind of distributed power generation grid-connected system and isolated island guard method thereof
Technical field
The present invention relates to distributed power generation grid-connected system technical field based on carrier communication, a kind of distributed The monitoring system of electricity grid-connected system and isolated island guard method thereof.
Background technology
Being affected by country's new forms of energy policy, photovoltaic is distributed power source the oozing in tradition electricity consumption side of representative in a distributed manner Rate improves constantly thoroughly.Owing to distributed electrical source monomer installed capacity is less, installation site randomness is relatively big, therefore use installing specially Being monitored distributed power source with optical fiber, economy and motility are poor.At present, existing employing cloud platform mode realizes Scheme, the function for monitoring of distributed power source electric parameters can be completed.But realize the control to distributed power source by cloud platform The requirement to real-time and safety in operation power control cannot be met.Distributed power source is equipped with isolated island protection, but works as district In territory, distributed power source permeability improves constantly, and power supply is the isolated island protection of unit in a distributed manner, will be unable to give full play to distribution Advantage on formula power supply capacity, reducing installation distributed power source is the economy that power distribution network brings, and cannot improve power distribution network confession The reliability of electricity and safety.
Summary of the invention
The primary and foremost purpose of the present invention is to provide one to utilize existing alternating current circuit as communication transmission medium, it is achieved point The monitoring of cloth electricity generation system, improves distributed power source and accesses the motility of power distribution network, reduces dividing of monitoring system construction cost The monitoring system of cloth electricity generation grid-connecting system.
For achieving the above object, present invention employs techniques below scheme: the monitoring of a kind of distributed power generation grid-connected system System, including:
Distributed power generation grid connection interface device, completes the monitoring of distributed generation system, load, supervises to power dispatching station Uploading of control information, performs the guidance command of power dispatching station;
Monitor terminal, for detecting distributed power source site, the voltage of load point, electric current, performance number and grid-connected switch shape State, receives the remote signalling amount of distributed power source net-connected controller, including isolated island event signal, operating state signal;
Power dispatching station, for realizing accessing the running state monitoring of the power distribution network of distributed power source, control work, and according to Task scope, it is achieved the energy management operation of distributed power source.
Described distributed power generation grid connection interface device includes for detecting commonly connected point voltage, electric current and commonly connected The data acquisition unit of some on off state, protection common point connecting valve deciliter controlled for realization and security control list Unit, for metering and the electric energy metrical unit of quality testing and quality of power supply unit, for distributed generation system energy management The energy management unit controlled with islet operation.
Described monitor terminal includes the DG monitor terminal for distributed power source and the load monitoring terminal for load, institute State distributed power generation grid connection interface device and utilize carrier module, by power circuit and DG monitor terminal, power dispatching station phase Even.
Described monitor terminal uses response calling or timing to upload mode, uploads to distributed power generation grid connection interface device Supervision information;Described monitor terminal uses event triggered fashion, uploads event information to distributed power generation grid connection interface device;Institute State monitor terminal to be interacted with distributed power source net-connected controller by serial communication mode, when distributed power source cutting-in control When device occurs isolated island event, operation exception event, actively send event to monitor terminal.
Another object of the present invention is to provide the isolated island protection side of the monitoring system of a kind of distributed power generation grid-connected system Method, the method includes the step of following order:
(1) event information during DG monitor terminal receives distributed power source net-connected controller, when distributed power source net-connected controller When detecting isolated island event, DG monitor terminal sends isolated island event information, event information to distributed power generation grid connection interface device Including No. ID of distributed power source, isolated island goes out now and grid-connected point voltage, current value, and starts its first internal timing Device;
(2), after distributed power generation grid connection interface device receives the isolated island event information of monitor terminal, logic is differentiated according to isolated island Carry out distributed generation system isolated island differentiation;If differentiating that result is distributed generation system isolated island, then carry out points of common connection Switch trip operates, and completes order to DG monitor terminal transmission island disposal;Whereas if differentiate that result is distributed power generation System isolated island is judged by accident, then send isolated island erroneous judgement order to monitor terminal;
(3) monitor terminal receives distributed power generation grid connection interface device order in the timing of first timer, if Being that island disposal completes order, monitor terminal then sends out isolated island involution order, the same recurrence of disease at the same time next year of monitor terminal to distributed power controller Position first timer;If the erroneous judgement order of distributed generation system isolated island, monitor terminal is then sent out to distributed power controller The erroneous judgement order of distributed generation system isolated island, monitor terminal resets first timer simultaneously;First timer then after, if Do not receive the associated responses order about isolated island event of distributed grid-connected interface arrangement, the most directly carry out distributed power source grid-connected The sub-switching operation of some switch;The timing value of described first timer, by the traffic rate, distributed selected in monitoring system The isolated island of electricity generation grid-connecting interface arrangement decision logic and different distributions formula power-supply controller of electric differentiates that the time difference together decides on.
The isolated island of described distributed power generation grid connection interface device differentiates that logic is: when distributed power generation grid connection interface device connects After receiving the isolated island signal of any one DG monitor terminal, directly it is judged as distributed generation system isolated island.
The isolated island of described distributed power generation grid connection interface device differentiates that logic is: when distributed power generation grid connection interface device connects After receiving the isolated island signal of any one DG monitor terminal, set its internal second timer, when the timing of second timer In, if receiving the isolated island event signal that n DG monitor terminal is uploaded again, then it is judged as distributed generation system isolated island;As Fruit, in the timing of second timer, does not receives the isolated island event signal that n DG monitoring unit is uploaded, is then judged as distribution Formula electricity generation system isolated island is judged by accident;The value of n is set according to distributed generator islanding Detection accuracy statistical result;Second timing The timing of device is differentiated the time difference by the isolated island of different distributions formula power-supply controller of electric, and monitor terminal is grid-connected with distributed power generation Interface arrangement communication delay together decides on.
Under this isolated island differentiates logic, isolated island guard method is: first, and by protection and security control unit, tripping is public Junction point switch altogether;Secondly, by broadcast mode, the DG monitor terminal in distributed generation system issues island disposal and completes Order;Again, by energy management unit, carry out the energy balance of distributed generation system under island operation state;
After the island disposal that described DG monitor terminal receives distributed power generation grid connection interface device completes order, to distributed power source Net-connected controller transmission island disposal completes order, and the first timer that resets, and distributed power source net-connected controller proceeds to isolated island Control model, and no longer detection isolated island event;
DG monitor terminal in the timing of first timer, if do not receive distributed grid-connected interface arrangement with isolated island phase The order closed, will be timed to after date at first timer, will send power supply halt command to distributed power source net-connected controller, and Tripping site switch.
Under this isolated island differentiates logic, isolated island guard method is: in the case of second timer is not timed out, distributed power generation Grid-connecting apparatus judges distributed generation system isolated island, and first, by protection and security control unit, tripping points of common connection is opened Close;Secondly, by broadcast mode, the DG monitor terminal in distributed generation system issues island disposal and completes order;Again, By energy management unit, carry out the energy balance of distributed generation system under island operation state;
DG monitor terminal receives after the island disposal of distributed power generation grid connection interface device completes order, grid-connected to distributed power source Controller transmission island disposal completes order, and the first timer that resets, and distributed power source net-connected controller proceeds to isolated island control Pattern, and no longer detection isolated island event;
DG monitor terminal in the timing of first timer, if do not receive distributed grid-connected interface arrangement with isolated island phase The order closed, will be timed to after date at first timer, will send power supply halt command to distributed power source net-connected controller, and Tripping site switch;
Second timer then in the case of, distributed power generation grid-connecting apparatus does not judges distributed generation system isolated island, by extensively Broadcast mode, the DG monitor terminal in distributed generation system issues isolated island erroneous judgement order;
DG monitor terminal receives the isolated island erroneous judgement order of distributed power generation grid connection interface device, to distributed power source net-connected controller Transmission isolated island erroneous judgement order, and the first timer that resets, distributed power source net-connected controller involution isolated island testing process;
DG monitor terminal is in first timer timing, if not receiving the relevant to isolated island of distributed grid-connected interface arrangement Order, after date will be timed at first timer, power supply halt command will be sent to distributed power source net-connected controller, and and jump Open and site switch.
As shown from the above technical solution, the present invention uses carrier communication to build the communication structure of monitoring system, it is not necessary to special Set up communication network, reduce system cost;Simultaneously in the case of system increases distributed power source newly, monitoring system is without increasing New hardware investment, can meet the requirement of distributed power source flexible access.The present invention can improve only be equipped with passive isolated island inspection There is the problem in detection dead band in the isolated island detection of survey method, in the case of can lowering distributed power source paired running again, single simultaneously The probability of distributed generator islanding error detection, and for distributed generation system energy management control provide the foundation.
Accompanying drawing explanation
Fig. 1 is assembly of the invention structural representation.
Detailed description of the invention
As it is shown in figure 1, the monitoring system of a kind of distributed power generation grid-connected system, including: distributed power generation network interface dress Put, complete the monitoring of distributed generation system, load, be monitored uploading of information to power dispatching station, perform electric power and adjust The guidance command of degree mechanism;Monitor terminal, for detect distributed power source site, the voltage of load point, electric current, performance number with And grid-connected on off state, receive the remote signalling amount of distributed power source net-connected controller, including isolated island event signal, running status letter Number;Power dispatching station, for realizing accessing the running state monitoring of the power distribution network of distributed power source, control work, and according to Task scope, it is achieved the energy management operation of distributed power source.
As it is shown in figure 1, described distributed power generation grid connection interface device include for detect commonly connected point voltage, electric current with And the data acquisition unit of points of common connection on off state, protection common point connecting valve deciliter controlled for realization and peace Full control unit, for metering and the electric energy metrical unit of quality testing and quality of power supply unit, for distributed generation system The energy management unit that energy management and islet operation control.Described monitor terminal includes monitoring eventually for the DG of distributed power source End and the load monitoring terminal for load, described distributed power generation grid connection interface device utilizes carrier module, passes through electric lines of force Road is connected with DG monitor terminal, power dispatching station.Described monitor terminal uses response calling or timing to upload mode, to Distributed power generation grid connection interface device uploads supervision information;Described monitor terminal uses event triggered fashion, to distributed power generation Grid connection interface device uploads event information;Described monitor terminal is entered with distributed power source net-connected controller by serial communication mode Row is mutual, when occurring isolated island event, operation exception event in distributed power source net-connected controller, actively sends event to prison Control terminal.
This method includes the step of following order:
(1) event information during DG monitor terminal receives distributed power source net-connected controller, when distributed power source net-connected controller When detecting isolated island event, DG monitor terminal sends isolated island event information, event information to distributed power generation grid connection interface device Including No. ID of distributed power source, isolated island goes out now and grid-connected point voltage, current value, and starts its first internal timing Device;
(2), after distributed power generation grid connection interface device receives the isolated island event information of monitor terminal, logic is differentiated according to isolated island Carry out distributed generation system isolated island differentiation;If differentiating that result is distributed generation system isolated island, then carry out points of common connection Switch trip operates, and completes order to DG monitor terminal transmission island disposal;Whereas if differentiate that result is distributed power generation System isolated island is judged by accident, then send isolated island erroneous judgement order to monitor terminal;
(3) monitor terminal receives distributed power generation grid connection interface device order in the timing of first timer, if Being that island disposal completes order, monitor terminal then sends out isolated island involution order, the same recurrence of disease at the same time next year of monitor terminal to distributed power controller Position first timer;If the erroneous judgement order of distributed generation system isolated island, monitor terminal is then sent out to distributed power controller The erroneous judgement order of distributed generation system isolated island, monitor terminal resets first timer simultaneously;First timer then after, if Do not receive the associated responses order about isolated island event of distributed grid-connected interface arrangement, the most directly carry out distributed power source grid-connected The sub-switching operation of some switch;The timing value of described first timer, by the traffic rate, distributed selected in monitoring system The isolated island of electricity generation grid-connecting interface arrangement decision logic and different distributions formula power-supply controller of electric differentiates that the time difference together decides on.
The isolated island of described distributed power generation grid connection interface device differentiates that logic is: when distributed power generation grid connection interface device connects After receiving the isolated island signal of any one DG monitor terminal, directly it is judged as distributed generation system isolated island.
Under this isolated island differentiates logic, isolated island guard method is: first, and by protection and security control unit, tripping is public Junction point switch altogether;Secondly, by broadcast mode, the DG monitor terminal in distributed generation system issues island disposal and completes Order;Again, by energy management unit, carry out the energy balance of distributed generation system under island operation state;
After the island disposal that described DG monitor terminal receives distributed power generation grid connection interface device completes order, to distributed power source DG net-connected controller transmission island disposal in net-connected controller, i.e. Fig. 1 completes order, and the first timer that resets, distributed Power grid controller proceeds to isolated island control model, and no longer detection isolated island event;
DG monitor terminal in the timing of first timer, if do not receive distributed grid-connected interface arrangement with isolated island phase The order closed, will be timed to after date at first timer, will send power supply halt command to distributed power source net-connected controller, and Tripping site switch.
Another kind of situation, the isolated island of described distributed power generation grid connection interface device differentiates that logic is: when distributed power generation also After network interface device receives the isolated island signal of any one DG monitor terminal, set its internal second timer, fixed second Time device timing in, if receiving the isolated island event signal that n DG monitor terminal is uploaded again, be then judged as distributed power generation System isolated island;If in the timing of second timer, do not receive the isolated island event signal that n DG monitoring unit is uploaded, Then it is judged as that distributed generation system isolated island is judged by accident;The value of n is carried out according to distributed generator islanding Detection accuracy statistical result Set;The timing of second timer by different distributions formula power-supply controller of electric isolated island differentiate the time difference, and monitor terminal with Distributed power generation grid connection interface device communication delay together decides on.
Under this isolated island differentiates logic, isolated island guard method is: in the case of second timer is not timed out, distributed power generation Grid-connecting apparatus judges distributed generation system isolated island, and first, by protection and security control unit, tripping points of common connection is opened Close;Secondly, by broadcast mode, the DG monitor terminal in distributed generation system issues island disposal and completes order;Again, By energy management unit, carry out the energy balance of distributed generation system under island operation state;
DG monitor terminal receives after the island disposal of distributed power generation grid connection interface device completes order, grid-connected to distributed power source Controller transmission island disposal completes order, and the first timer that resets, and distributed power source net-connected controller proceeds to isolated island control Pattern, and no longer detection isolated island event;
DG monitor terminal in the timing of first timer, if do not receive distributed grid-connected interface arrangement with isolated island phase The order closed, will be timed to after date at first timer, will send power supply halt command to distributed power source net-connected controller, and Tripping site switch;
Second timer then in the case of, distributed power generation grid-connecting apparatus does not judges distributed generation system isolated island, by extensively Broadcast mode, the DG monitor terminal in distributed generation system issues isolated island erroneous judgement order;
DG monitor terminal receives the isolated island erroneous judgement order of distributed power generation grid connection interface device, to distributed power source net-connected controller Transmission isolated island erroneous judgement order, and the first timer that resets, distributed power source net-connected controller involution isolated island testing process;
DG monitor terminal is in first timer timing, if not receiving the relevant to isolated island of distributed grid-connected interface arrangement Order, after date will be timed at first timer, power supply halt command will be sent to distributed power source net-connected controller, and and jump Open and site switch.
Visible, during isolated island guard method based on distributed power generation grid-connected system monitoring system realizes, first, respectively The detection to system isolated island event of the distributed power source net-connected controller complete independently of DG monitor terminal;Secondly, orphan is being detected After island event occurs, distributed power source net-connected controller passes through serial communication mode, and it is right with it to be passed to by isolated island event information The DG monitor terminal answered;Again, DG monitor terminal is after receiving isolated island event information, by the carrier module in terminal, and should Information passes to distributed power generation grid connection interface device, and starts first timer.
In sum, the present invention uses carrier communication to build the communication structure of monitoring system, it is not necessary to set up communication network specially Network, reduces system cost;Simultaneously in the case of system increases distributed power source newly, monitoring system is thrown without increasing new hardware Money, can meet the requirement of distributed power source flexible access.The present invention can improve the orphan being only equipped with passive island detection method There is the problem in detection dead band in island detection, in the case of distributed power source paired running can being lowered again simultaneously, and single distributed power source The probability of isolated island error detection, and for distributed generation system energy management control provide the foundation.

Claims (9)

1. the monitoring system of a distributed power generation grid-connected system, it is characterised in that: including:
Distributed power generation grid connection interface device, completes the monitoring of distributed generation system, load, supervises to power dispatching station Uploading of control information, performs the guidance command of power dispatching station;
Monitor terminal, for detecting distributed power source site, the voltage of load point, electric current, performance number and grid-connected switch shape State, receives the remote signalling amount of distributed power source net-connected controller, including isolated island event signal, operating state signal;
Power dispatching station, for realizing accessing the running state monitoring of the power distribution network of distributed power source, control work, and according to Task scope, it is achieved the energy management operation of distributed power source.
The monitoring system of distributed power generation grid-connected system the most according to claim 1, it is characterised in that: described distributed Electricity grid connection interface device includes for detecting commonly connected point voltage, electric current and the data acquisition of points of common connection on off state Unit, for realize to common point connecting valve deciliter control protection and security control unit, for metering and quality testing Electric energy metrical unit and quality of power supply unit, the energy pipe that controls for distributed generation system energy management and islet operation Reason unit.
The monitoring system of distributed power generation grid-connected system the most according to claim 1, it is characterised in that: described monitor terminal Including the DG monitor terminal for distributed power source and the load monitoring terminal for load, described distributed power generation network interface Device utilizes carrier module, is connected with DG monitor terminal, power dispatching station by power circuit.
The monitoring system of distributed power generation grid-connected system the most according to claim 1, it is characterised in that: described monitor terminal Use response calling or timing to upload mode, upload supervision information to distributed power generation grid connection interface device;Described monitoring is eventually End uses event triggered fashion, uploads event information to distributed power generation grid connection interface device;Described monitor terminal passes through serial ports Communication mode interacts with distributed power source net-connected controller, when distributed power source net-connected controller occurs isolated island event, During operation exception event, actively send event to monitor terminal.
5. the isolated island protection of the monitoring system of the distributed power generation grid-connected system as according to any one of Claims 1-4 Method, the method includes the step of following order:
(1) event information during DG monitor terminal receives distributed power source net-connected controller, when distributed power source net-connected controller When detecting isolated island event, DG monitor terminal sends isolated island event information, event information to distributed power generation grid connection interface device Including No. ID of distributed power source, isolated island goes out now and grid-connected point voltage, current value, and starts its first internal timing Device;
(2), after distributed power generation grid connection interface device receives the isolated island event information of monitor terminal, logic is differentiated according to isolated island Carry out distributed generation system isolated island differentiation;If differentiating that result is distributed generation system isolated island, then carry out points of common connection Switch trip operates, and completes order to DG monitor terminal transmission island disposal;Whereas if differentiate that result is distributed power generation System isolated island is judged by accident, then send isolated island erroneous judgement order to monitor terminal;
(3) monitor terminal receives distributed power generation grid connection interface device order in the timing of first timer, if Being that island disposal completes order, monitor terminal then sends out isolated island involution order, the same recurrence of disease at the same time next year of monitor terminal to distributed power controller Position first timer;If the erroneous judgement order of distributed generation system isolated island, monitor terminal is then sent out to distributed power controller The erroneous judgement order of distributed generation system isolated island, monitor terminal resets first timer simultaneously;First timer then after, if Do not receive the associated responses order about isolated island event of distributed grid-connected interface arrangement, the most directly carry out distributed power source grid-connected The sub-switching operation of some switch;The timing value of described first timer, by the traffic rate, distributed selected in monitoring system The isolated island of electricity generation grid-connecting interface arrangement decision logic and different distributions formula power-supply controller of electric differentiates that the time difference together decides on.
Isolated island guard method the most according to claim 5, it is characterised in that: described distributed power generation grid connection interface device Isolated island differentiates that logic is: after distributed power generation grid connection interface device receives the isolated island signal of any one DG monitor terminal, directly Connect and be judged as distributed generation system isolated island.
Isolated island guard method the most according to claim 5, it is characterised in that: described distributed power generation grid connection interface device Isolated island differentiates that logic is: after distributed power generation grid connection interface device receives the isolated island signal of any one DG monitor terminal, if Its internal second timer fixed, in the timing of second timer, if receiving the orphan that n DG monitor terminal is uploaded again Island event signal, then be judged as distributed generation system isolated island;If in the timing of second timer, do not receive n The isolated island event signal that DG monitoring unit is uploaded, then be judged as that distributed generation system isolated island is judged by accident;The value of n is according to distributed electrical Source isolated island Detection accuracy statistical result is set;The timing of second timer is by different distributions formula power-supply controller of electric Isolated island differentiates the time difference, and monitor terminal together decides on distributed power generation grid connection interface device communication delay.
Isolated island guard method the most according to claim 6, it is characterised in that: under this isolated island differentiates logic, isolated island is protected Method is: first, and by protection and security control unit, tripping points of common connection switchs;Secondly, by broadcast mode, to dividing DG monitor terminal in cloth electricity generation system issues island disposal and completes order;Again, by energy management unit, carry out isolated island The energy balance of distributed generation system under running status;
After the island disposal that described DG monitor terminal receives distributed power generation grid connection interface device completes order, to distributed power source Net-connected controller transmission island disposal completes order, and the first timer that resets, and distributed power source net-connected controller proceeds to isolated island Control model, and no longer detection isolated island event;
DG monitor terminal in the timing of first timer, if do not receive distributed grid-connected interface arrangement with isolated island phase The order closed, will be timed to after date at first timer, will send power supply halt command to distributed power source net-connected controller, and Tripping site switch.
Isolated island guard method the most according to claim 7, it is characterised in that: under this isolated island differentiates logic, isolated island is protected Method is: in the case of second timer is not timed out, and distributed power generation grid-connecting apparatus judges distributed generation system isolated island, first First, by protection and security control unit, tripping points of common connection switchs;Secondly, by broadcast mode, to distributed power generation system DG monitor terminal in system issues island disposal and completes order;Again, by energy management unit, carry out under island operation state The energy balance of distributed generation system;
DG monitor terminal receives after the island disposal of distributed power generation grid connection interface device completes order, grid-connected to distributed power source Controller transmission island disposal completes order, and the first timer that resets, and distributed power source net-connected controller proceeds to isolated island control Pattern, and no longer detection isolated island event;
DG monitor terminal in the timing of first timer, if do not receive distributed grid-connected interface arrangement with isolated island phase The order closed, will be timed to after date at first timer, will send power supply halt command to distributed power source net-connected controller, and Tripping site switch;
Second timer then in the case of, distributed power generation grid-connecting apparatus does not judges distributed generation system isolated island, by extensively Broadcast mode, the DG monitor terminal in distributed generation system issues isolated island erroneous judgement order;
DG monitor terminal receives the isolated island erroneous judgement order of distributed power generation grid connection interface device, to distributed power source net-connected controller Transmission isolated island erroneous judgement order, and the first timer that resets, distributed power source net-connected controller involution isolated island testing process;
DG monitor terminal is in first timer timing, if not receiving the relevant to isolated island of distributed grid-connected interface arrangement Order, after date will be timed at first timer, power supply halt command will be sent to distributed power source net-connected controller, and and jump Open and site switch.
CN201610793756.5A 2016-08-31 2016-08-31 A kind of isolated island guard method of the monitoring system of distributed generation grid-connected system Active CN106300421B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610793756.5A CN106300421B (en) 2016-08-31 2016-08-31 A kind of isolated island guard method of the monitoring system of distributed generation grid-connected system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610793756.5A CN106300421B (en) 2016-08-31 2016-08-31 A kind of isolated island guard method of the monitoring system of distributed generation grid-connected system

Publications (2)

Publication Number Publication Date
CN106300421A true CN106300421A (en) 2017-01-04
CN106300421B CN106300421B (en) 2019-01-08

Family

ID=57673074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610793756.5A Active CN106300421B (en) 2016-08-31 2016-08-31 A kind of isolated island guard method of the monitoring system of distributed generation grid-connected system

Country Status (1)

Country Link
CN (1) CN106300421B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108829065A (en) * 2018-07-16 2018-11-16 东北大学 Distributed generation system time lag based on event triggering exports cooperative control method
CN109347138A (en) * 2018-09-25 2019-02-15 科大智能(合肥)科技有限公司 A kind of garden light storage micro-capacitance sensor control method
CN109387713A (en) * 2018-10-17 2019-02-26 东北大学 A kind of mixed method of distributed grid-connected isolated island detection
CN114123487A (en) * 2021-10-26 2022-03-01 国网浙江杭州市余杭区供电有限公司 Distributed power supply online centralized monitoring system and method based on power internet of things

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102280937A (en) * 2011-07-29 2011-12-14 深圳市科陆电子科技股份有限公司 Distributed energy monitoring system and method
CN103124068A (en) * 2013-01-31 2013-05-29 中国电力科学研究院 Anti-islanding protection system for distributed grid-connected system and protection method of anti-islanding protection system
CN103545931A (en) * 2013-10-30 2014-01-29 国家电网公司 Distributed type photovoltaic power generation grid connection interface device
CN104953622A (en) * 2015-07-30 2015-09-30 国网上海市电力公司 Distributed power connection monitoring system
CN105322565A (en) * 2015-11-06 2016-02-10 天津市静海县安慧电力工程安装有限公司 Monitoring system for distributed power supply connection and power distribution network integration protection method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102280937A (en) * 2011-07-29 2011-12-14 深圳市科陆电子科技股份有限公司 Distributed energy monitoring system and method
CN103124068A (en) * 2013-01-31 2013-05-29 中国电力科学研究院 Anti-islanding protection system for distributed grid-connected system and protection method of anti-islanding protection system
CN103545931A (en) * 2013-10-30 2014-01-29 国家电网公司 Distributed type photovoltaic power generation grid connection interface device
CN104953622A (en) * 2015-07-30 2015-09-30 国网上海市电力公司 Distributed power connection monitoring system
CN105322565A (en) * 2015-11-06 2016-02-10 天津市静海县安慧电力工程安装有限公司 Monitoring system for distributed power supply connection and power distribution network integration protection method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108829065A (en) * 2018-07-16 2018-11-16 东北大学 Distributed generation system time lag based on event triggering exports cooperative control method
CN109347138A (en) * 2018-09-25 2019-02-15 科大智能(合肥)科技有限公司 A kind of garden light storage micro-capacitance sensor control method
CN109347138B (en) * 2018-09-25 2021-12-14 科大智能(合肥)科技有限公司 Method for realizing control of park light storage micro-grid
CN109387713A (en) * 2018-10-17 2019-02-26 东北大学 A kind of mixed method of distributed grid-connected isolated island detection
CN109387713B (en) * 2018-10-17 2020-09-15 东北大学 Hybrid method for distributed grid-connected island detection
CN114123487A (en) * 2021-10-26 2022-03-01 国网浙江杭州市余杭区供电有限公司 Distributed power supply online centralized monitoring system and method based on power internet of things
CN114123487B (en) * 2021-10-26 2023-07-14 国网浙江杭州市余杭区供电有限公司 Distributed power supply online centralized monitoring system and method based on electric power Internet of things

Also Published As

Publication number Publication date
CN106300421B (en) 2019-01-08

Similar Documents

Publication Publication Date Title
CN103354353B (en) Intelligent power-distribution-network whole-line quick-reacting main protection and determination system and method
CN201812025U (en) Failure detection device for power transmission line
CN106300421A (en) The monitoring system of a kind of distributed power generation grid-connected system and isolated island guard method thereof
CN108520624A (en) A kind of low-voltage intelligent acquires the double channels acquisition method of complexes and low pressure acquisition
CN102306953B (en) Test method for secondary injection of power distribution automatization system
CN102195274A (en) Distribution line fault detection control method and system
CN104868843B (en) Data processing method for solar photovoltaic module array data collection device
CN105759179B (en) Based on zero sequence transient analysis low current neutral grounding system fault positioning system and method
CN107482780A (en) A kind of wireless distributed monitoring method, equipment and system
CN105548801B (en) Fault Locating Method suitable for power distribution network operation with closed ring
CN106532962B (en) Multiterminal flexible direct current converter station centralized control method, device and system
KR101514999B1 (en) Method and system for self-checking and self-separating of fault section by using smart protection devices in a power distribution system
CN107039976B (en) It is a kind of to lead the power distribution network intelligence anti-islanding system passively combined and configuration operation method
CN204758748U (en) Cubical switchboard intelligent integrated monitoring devices
CN203691057U (en) Arc online monitoring and protecting system
CN108548567A (en) A kind of transmission line online monitoring system with temperature monitoring
CN104868845A (en) Device and method for monitoring data of embedded solar photovoltaic module data
CN112421614A (en) Power distribution station self-healing control system and method based on local communication and topology identification
CN102570615A (en) Electric meter box intelligent supervising system
CN106059085B (en) A kind of the Wide Area Power stratification protection and control system
CN107742925A (en) The hard pressing plate method for inspecting of transformer station based on three-level network
CN204497849U (en) A kind ofly take into account measure and control device that is centralized, formula feeder automation on the spot
CN106160660A (en) photovoltaic module fault monitoring system
CN205178647U (en) Relay protection of transformer substation intelligence clamp plate system
CN201210629Y (en) Digital channel monitoring device for transforming plant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181112

Address after: No. 5111, Wangjiang West Road, Hefei, Anhui, Anhui

Applicant after: HKUST intelligence (Hefei) Technology Co., Ltd.

Applicant after: KEDA INTELLIGENT ELECTRICAL TECHNOLOGY CO., LTD.

Address before: 230088 Wangjiang West Road, Shushan District, Hefei, Anhui 5111

Applicant before: KEDA INTELLIGENT ELECTRICAL TECHNOLOGY CO., LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant