CN106296041A - A kind of public organizations based on the big data technique of cloud computing energy consumption monitoring platform - Google Patents

A kind of public organizations based on the big data technique of cloud computing energy consumption monitoring platform Download PDF

Info

Publication number
CN106296041A
CN106296041A CN201610852565.1A CN201610852565A CN106296041A CN 106296041 A CN106296041 A CN 106296041A CN 201610852565 A CN201610852565 A CN 201610852565A CN 106296041 A CN106296041 A CN 106296041A
Authority
CN
China
Prior art keywords
data
unit
consumption
energy
typing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610852565.1A
Other languages
Chinese (zh)
Inventor
何力
赵启卫
陈俊丽
李思
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN DAOHENG SOFTWARE TECHNOLOGY Co Ltd
Original Assignee
SICHUAN DAOHENG SOFTWARE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN DAOHENG SOFTWARE TECHNOLOGY Co Ltd filed Critical SICHUAN DAOHENG SOFTWARE TECHNOLOGY Co Ltd
Priority to CN201610852565.1A priority Critical patent/CN106296041A/en
Publication of CN106296041A publication Critical patent/CN106296041A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor

Abstract

The invention discloses a kind of public organizations based on the big data technique of cloud computing energy consumption monitoring platform, energy resources consumption management son system and a cloud platform including multiple units at different levels, each higher level's subsystem in subordinate's subsystem and administrative administrative region directly under mechanism assign achievement data, each subordinate subsystem superior subsystem sends the energy resources consumption data of our unit and this unit subordinate subsystem add up;Sending identical data to described cloud platform while every one-level subsystem superior subsystem sends data, each data are preserved by cloud platform, carry out data download when user needs.The present invention has the functions such as warning, error correction prompting, task reminders;When make a report on data exceed threshold values is set when, platform can remind user to check;When user completes to report or when other task the most in time, and platform can be reminded in time;When energy resources consumption has sudden change when, platform can be reported to the police to responsible person.

Description

A kind of public organizations based on the big data technique of cloud computing energy consumption monitoring platform
Technical field
The present invention relates to a kind of public organizations based on the big data technique of cloud computing energy consumption monitoring platform.
Background technology
Saving the fundamental state policy that the energy is China, the energy of current China is possessed total amount and is allowed of no optimist, energy-consuming Increasing fast, energy consumption level is high, and ambient pressure is the hugest.Both the central and local governments' different aspects, have promulgated what energy conservation was correlated with Law, regulation and other requirements, provide omnibearing institutional guarantee to energy conservation, however, if it is desired to obtain the energy-conservation of maximum Benefit, needs to plan as a whole power-saving technology and economical operation method with energy conservation, and efficiently coordinates every energy conservation.
But existing public organizations energy resources consumption statistic information system has the disadvantages that
1, do not possess self-detection mechanism: when statistician input numerical value overrun time, it will not be reminded;Such as when consumption number According to or cost data compare logging data last time/contemporaneous data and exceed more than certain multiple, or when cost data is more than using The product of amount data and energy unit price peak, or cost data taking advantage of less than usage data and energy unit price minimum Long-pending, go back or exceed certain percentage ratio of the index consumption that higher level assigns.In that case, sometimes it is difficult to by interior careful mechanism Find mistake.
2, cannot ensure that High Availabitity and data zero loss of platform service, energy units the most at different levels need to set up data Center, any software and client, use softdog are installed, PC can only be used to realize.
3, complete the most in time to report as user or when other task, system can't be reminded in time.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, it is provided that a kind of based on the big data technique of cloud computing public Mechanism's energy consumption monitoring platform.
It is an object of the invention to be achieved through the following technical solutions: a kind of based on the big data technique of cloud computing public Mechanism's energy consumption monitoring platform, including energy resources consumption management son system and a cloud platform, the Mei Geshang of multiple units at different levels Level subsystem in subordinate's subsystem and administrative administrative region directly under mechanism assign achievement data, each subordinate subsystem is upwards Level subsystem sends the energy resources consumption data of our unit and this unit subordinate subsystem added up;At every one-level System superior subsystem sends identical data to described cloud platform while sending data, and each data are carried out by cloud platform Preserve, carry out data download when user needs;
Described subsystem includes statistician's module, person in charge of statistics's module and head of the unit's module;Described statistician's mould Block periodically fills in various base table data according to energy consumption consumption invoice or other effective bills, determine errorless after, submit to statistics negative Base table data are examined by duty people, as errorless in examined, person in charge of statistics submits to head of the unit's examination & verification, and head of the unit examines Core is errorless, and system is reported to administrative responsibile institution automatically.If person in charge of statistics or head of the unit are found to have when careful base table By mistake, this base table can be returned to statistician and remodify, submit to.
Described statistician's module includes:
Statistician logs in unit: log in for statistician;
System activates unit: after logging in for the first time statistician, the subsystem of our unit is carried out activation manipulation;
Index and consumption check unit: for checking achievement data and the basis of the subsystem transmission to our unit of higher level's subsystem The energy resources consumption of unit;
With managing typing unit: for fill in our unit include with can number, construction area, heating area, vehicle fleet size, Machine room quantity, machine room construction area, calculator room equipment general power and UPS installed capacity are in interior data;
Mechanism's essential information typing unit: include the detailed title of unit, organization mechanism code, mechanism's class for typing our unit Type, industry code, unit address, postcode, unit location zoning code and contact method are in interior essential information;
Condition of consumption typing and submission unit: the condition of consumption data in the some cycles of typing our unit, including consumption Data and cost data, wherein, before logging data, it is thus necessary to determine that corresponding use can manage the information of typing unit typing and be No correctly;When each resources consumption status data of typing, when usage data or cost data be not at normal interval, then enter Row abnormal prompt, described does not includes at normal interval: (1) when usage data or cost data compare logging data last time/with Issue is according to exceeding more than certain multiple, and wherein multiple value is configured by person in charge of statistics's module;(2) when cost data is more than using Amount data and the product of energy unit price peak, or cost data is less than the product of usage data with energy unit price minimum; (3) certain percentage ratio of the index consumption that higher level assigns is exceeded;Meanwhile, when data are normal data, then after typing completes Generate base table and send condition of consumption data to person in charge of statistics's module;When data include abnormal data, then typing complete with And generate base table after editor's abnormal cause to person in charge of statistics's module transmission resources consumption status data;Simultaneously to person in charge of statistics Module reports and submits information;
Essential information checks unit: for statistician check each typing with submit the base table submission time of unit to, state and in detail Thin information;And the function printing and deriving each base table of Excel is provided;Described state includes: (1) preserves state temporarily: represent Current data, for temporarily to preserve state, is not fully complete typing and submission, is repaiied with submitting unit continuation typing to by corresponding typing Change operation;(2) unexamined state: represent that current data is the most submitted, wait the examination of person in charge of statistics;(3) pending state: Represent that current data person in charge of statistics is the most censored, wait the examination & verification of head of the unit;(4) uploaded state: represent and examined Core, data have reported higher level's subsystem;(5) returned state: represent data examine or review process in, examine or Examination & verification is not passed through, and is retired, needs to re-type;
Data summarization unit: check in administrative administrative region, whether unit and subordinate's subsystem carry out data for statistician Report, when subordinate's subsystem and our unit administrative administrative region intra subsystem the most reported data, then collects generation and combines table;If having The non-reported data of clamp mechanism, system can provide corresponding prompting, if after selecting to force to submit to, system can be by non-reported data Unit is considered as 0 and reports to superior unit, if the data that the unit later stage of non-reported data submits to will be regarded as evening paper data, evening paper number According to reporting to superior unit..
Urge declaration form unit: for when the non-reported data of subordinate's subsystem, carry out urging report operation;
Abnormity diagnosis unit: for checking the status information by energy abnormal information and submitting the abnormality processing scheme of our unit to, Including untreated subelement, process neutron cells and have confirmed that subelement;
Statistician's message checks unit: for checking the message received;
Described person in charge of statistics's module includes:
Person in charge of statistics's login unit: log in for person in charge of statistics;
Index and consumption check unit: for checking achievement data and the basis of the subsystem transmission to our unit of higher level's subsystem The energy resources consumption of unit;
Digital map navigation unit: be used for consulting a map middle subsystem at the same level and directly under subordinate's subsystem, including checking address, phone Whether number, brief introduction, relative analysis and energy consumption exceed standard, and (being identified with red, yellow, and green color, red expression exceeds standard, and yellow represents i.e. To exceed standard, green expression consumption is normal);
Analytic unit: for analyzing the base table of our unit and subordinate's subsystem/combine table data, automatically generate various analysis chart and Report;Analyze subelement including average dose, administrative mechanism compares subelement, energy consumption and comprehensively analyzes subelement, regional analysis Unit, industry analysis subelement, Statistical Analysis Report subelement;
With energy anomaly analysis diagnosis unit: logical for checking and examine the abnormal with energy of statistician's typing and confirmation subunit examination & verification The abnormality processing scheme crossed, including untreated subelement, processes neutron cells, to be confirmed and have confirmed that subelement;
With situation checking unit: for monitoring the situation of the time period of selection, mechanism, the energy and consumption;Base table examine with Submit unit to: for examining the base table data that our unit statistician uploads;And the function deriving each base table of Excel is provided;Wherein, State in base table checking process includes: (1) not yet carries out measurement period state: represent that current base table can't be added up; (2) state to be logged: represent that this base table comes into timing statistics, but statistician does not also have logging data;(3) unexamined shape State: represent that statistician has submitted data to, wait the examination of person in charge of statistics;(4) pending state: represented person in charge of statistics Censored pass through, wait the examination & verification of head of the unit;(5) uploaded state: represent that this base table data unit director has examined Core passes through and reports;(6) returned state: examining or be found to have incorrect in examination & verification data procedures, needing statistician's weight Newly fill in and submit to;After passing, send the base table after having audited to head of the unit's module, be responsible for unit simultaneously People's module reports and submits information;Incorrect when checking process is found to have data, write exactly and return reason and can return statistician's module, simultaneously Information is reported and submitted to statistician's module;
Combine table examine and submit unit to: for examining the comprehensive table data that our unit statistician uploads;And the derivation each base of Excel is provided The function of table;Wherein, the state combined in table checking process includes: (1) not yet carries out measurement period state: represents current and combines table also Can not add up;(2) summary status is treated: represent that statistician is not the most to data summarization;(3) unexamined state: represent statistics Director does not the most examine;(4) pending state: represent the examination & verification waiting head of the unit;(5) uploaded state: table Show that this base table data unit director has audited by and reported;Exceed standard dispensing unit: for the consumption to statistician's module Situation typing configures with the times of ultra standard submitting unit to;
Index assigns unit: for accepting the index total amount that higher level issues, to our unit, subordinate's subsystem and in the respective administrative areas Directly under mechanism carry out the distribution of index;
Statistic unit: the energy consumption number in adding up administrative administrative region and under the different time cycle of subordinate's subsystem constituent parts According to, including Monthly Summary, collect in season, half a year collects, collect in year and mechanism's monthly magazine.Select comprehensive table, the days needing to check And mechanism.Uploaded state shows that this table has reported, public organizations' quantity, construction area, with can number, vehicle fleet size, The statistics of the six big energy sub-agencies time to selecting.And the function deriving each base table of Excel is provided;Person in charge of statistics's message is looked into See unit: for checking the message received;
Described head of the unit's module includes:
Head of the unit's login unit: log in for head of the unit;
Index and consumption check unit: for checking achievement data and the basis of the subsystem transmission to our unit of higher level's subsystem The energy resources consumption of unit;
Digital map navigation unit: be used for consulting a map middle subsystem at the same level and directly under subordinate's subsystem, including checking address, phone Whether number, brief introduction, relative analysis and energy consumption exceed standard, and (being identified with red, yellow, and green color, red expression exceeds standard, and yellow represents i.e. To exceed standard, green expression consumption is normal);
Analytic unit: for analyzing the base table of our unit and subordinate's subsystem/combine table data, automatically generate various analysis chart and Report;Analyze subelement including average dose, administrative mechanism compares subelement, energy consumption and comprehensively analyzes subelement, regional analysis Unit, industry analysis subelement, Statistical Analysis Report subelement;
With can anomaly analysis diagnosis unit: for check and audit statistician's typing with can be abnormal, including untreated subelement, Process neutron cells and have confirmed that subelement;
With situation checking unit: for monitoring the situation of the time period of selection, mechanism, the energy and consumption;
Base table examination & verification is with submission unit: for auditing the base table data that our unit statistician uploads;And the derivation each base of Excel is provided The function of table;Wherein, the state in base table review process includes: (1) not yet carries out measurement period state: represent current base table also Can not add up;(2) state to be logged: represent that this base table comes into timing statistics, but statistician does not also have typing number According to;(3) unexamined state: represent that statistician has submitted data to, wait the examination of person in charge of statistics;(4) pending state: table Show that person in charge of statistics has passed, wait the examination & verification of head of the unit;(5) uploaded state: represent this base table data sheet Position director has audited by and has reported;(6) returned state: examining or be found to have incorrect in examination & verification data procedures , need statistician to rewrite and submit to;After passing, send the base after having audited to head of the unit's module Table, reports and submits information to head of the unit's module simultaneously;Incorrect when checking process is found to have data, write exactly and return reason and can move back To statistician's module, report and submit information to statistician's module simultaneously;
Combine table examination & verification and submit unit to: for auditing the comprehensive table data that our unit statistician uploads;And the derivation each base of Excel is provided The function of table;Wherein, the state combined in table review process includes: (1) not yet carries out measurement period state: represents current and combines table also Can not add up;(2) summary status is treated: represent that statistician is not the most to data summarization;(3) unexamined state: represent statistics Director does not the most examine;(4) pending state: represent the examination & verification waiting head of the unit;(5) uploaded state: table Show that this base table data unit director has audited by and reported;Head of the unit's message checks unit: be used for checking reception The message arrived.
The described condition of consumption includes with typing unit:
Energy resources condition of consumption typing with submit to subelement: in the some cycles of typing our unit include water consume number According to, electricity consumption data, raw coal consumption data, natural gas consumption data, gasoline consumption data, diesel oil consumption data, heating power consumption Data and regenerative resource application data are at interior energy resources condition of consumption data, described energy resources condition of consumption packet Include usage data and cost data;Wherein, before typing energy resources condition of consumption data, it is thus necessary to determine that corresponding using can be managed The information of reason typing unit typing is the most correct;When each energy resources condition of consumption data of typing, when usage data or Cost data not when normal interval, then carries out abnormal prompt, described does not includes at normal interval: (1) when usage data or Cost data is compared logging data last time/contemporaneous data and is exceeded more than certain multiple, and wherein multiple value is by person in charge of statistics's module It is configured;(2) when cost data is more than the product of usage data with energy unit price peak, or cost data is less than consumption Data and the product of energy unit price minimum;(3) certain percentage ratio of the index consumption that higher level assigns is exceeded;Meanwhile, equal when data During for normal data, then after typing completes, send energy resources condition of consumption data to person in charge of statistics's module;Work as packet When including abnormal data, then after typing completes and edits abnormal cause, send energy resources consumption shape to person in charge of statistics's module Condition data;Report and submit information to person in charge of statistics's module simultaneously;
The typing of central machine room energy-consuming situation and submission subelement: including in the some cycles of typing our unit is total Power consumption and other energy consumptions are in interior central machine room energy-consuming status data;Described central machine room energy-consuming shape Condition data include usage data;Before typing central machine room energy-consuming status data, it is thus necessary to determine that corresponding using can manage The information of typing unit typing is the most correct;When each central machine room energy-consuming status data of typing, when usage data not When normal interval, then carry out abnormal prompt, described not normal interval include when usage data compare logging data last time/with Issue is according to exceeding more than certain multiple, and wherein multiple value is configured by person in charge of statistics's module;Meanwhile, it is normally when data During data, then to person in charge of statistics's module dispatching centre machine room energy-consuming status data after typing completes;When data include During abnormal data, then to person in charge of statistics's module dispatching centre machine room energy-consuming after typing completes and edits abnormal cause Status data;Report and submit information to person in charge of statistics's module simultaneously;
Heating energy resources condition of consumption typing with submit subelement to: in the some cycles of typing our unit, include heating Natural law, the heating energy are in interior central machine room energy-consuming status data;The described heating energy includes usage data and expense Data;Wherein, before typing heating energy resources condition of consumption data, it is thus necessary to determine that corresponding record with typing unit can be managed The information entered is the most correct;When each heating energy resources condition of consumption data of typing, when usage data or cost data Not when normal interval, then carry out abnormal prompt, described do not include at normal interval: (1) is when usage data or cost data Comparing logging data last time/contemporaneous data and exceed more than certain multiple, wherein multiple value is configured by person in charge of statistics's module; (2) when cost data is more than the product of usage data with energy unit price peak, or cost data is less than usage data and energy The product of source unit price minimum;(3) certain percentage ratio of the index consumption that higher level assigns is exceeded;Meanwhile, it is normal number when data According to time, then after typing completes to person in charge of statistics's module send energy resources condition of consumption data;When data include abnormal number According to time, then after typing completes and edits abnormal cause to person in charge of statistics's module send heating energy resources condition of consumption number According to;Report and submit information to person in charge of statistics's module simultaneously.
Described is the per day energy number in our unit's measurement period by energy number;Described construction area is this list All construction areas that position office uses;Described heating area is the building sides implementing winter heating in our unit office space Long-pending;Described vehicle fleet size is to belong to all bus quantity that our unit's official activity uses in our unit's measurement period;Described The quantity that machine room quantity is our unit's data center machine room;Described machine room construction area is that our unit's data center machine room makes With and the construction area in supporting room;Described equipment general power is the general power of all kinds of information technoloy equipment of data center machine room, guarantor The barrier air-conditioning general power of machine room constant temperature and humidity function, machine room distribution and the sum of auxiliary device general power;Described UPS installed capacity UPS installed capacity for our unit's data center machine room.
Described statistician's module, person in charge of statistics's module, head of the unit's module all include a Statistical Account unit: To the electricity consumption of energy unit, with water, use gas consumption statistic, according to the moon, season, half a year and the whole year statistics to consumption Yu expense, Increase and decrease amount is this month, season, half a year, yearly consumption or expense this month corresponding with previous year, season, half a year, year Consumption or the difference of expense.
The data of described base table and described comprehensive table include on year-on-year basis with growth and the minimizing of chain rate.
Described cloud platform includes a decision support module, for the data collected being carried out decision support, including district Territory energy consumption decision support unit and large-scale public organizations energy consumption decision support unit;
Described region energy consumption decision support unit uses the method for data mining to set up regional industrial energy consumption data mining model, Use to Regional Energy is estimated and the guidance of concrete decision method, seeks the key point that region is energy-conservation, including: use k- Means clustering algorithm analyzed area every profession and trade energy consumption characters, and single industry is clustered, find out high energy consumption, middle energy of the same trade Consumption, low energy consumption enterprise;The dependency being then based on like products process equipment in type of industry uses Mining Multidimensional Association Rules, Find out the dependency of like product technique, equipment, efficiency, instruct region energy conservation;
Described large-scale public organizations energy consumption decision support unit sets up large-scale public organizations energy consumption dynamic model for research, with Just large-scale public organizations energy consumption is carried out real-time dynamic forecast, solve large-scale Inst construction area and be not directly proportional to power consumption Problem, solve energy-saving constant-volumeization research, the bottleneck problem of quota energy simultaneously, audit and energy-conservation for large-scale public organizations energy consumptions The realization of system provides scientific guidance, according to magnanimity, randomness and the sequentiality feature of large-scale public organizations energy consumption data; Multiple linear regression and unitary autoregression algorithm is used to set up dynamic energy consumption data model.
The invention has the beneficial effects as follows:
(1) present invention is supplied to energy unit at different levels, authorities and Department of Office Affairs use, completes the energy of oneself Resources consumption statistical work.
(2) present invention achieves programming count and analysis, the automatic function reported by flow process.Energy units at different levels have only to Making a report on the capital consumption data of oneself on request and interior examine, system will be automatically performed statistics, analyze and report etc. work.
(3) present invention has the functions such as warning, error correction prompting, task reminders.When make a report on data exceed threshold values is set time Waiting, platform can remind user to check;When user completes to report or when other task the most in time, and platform can carry in time Wake up;When energy resources consumption has sudden change when, platform can be reported to the police to responsible person.
(4) present invention makes full use of the advantage of cloud computing technology, while improving resource utilization, it is ensured that platform takes High Availabitity and the data zero of business are lost;Energy resources consumption is analyzed by the advantage making full use of big data technique, for Managerial decision provides foundation.And further, energy units at different levels without set up data center, without install any software and Client, without using softdog, it is possible to use smart mobile phone, panel computer, notebook computer or PC.
(5) the invention provides colourful energy statistics, analyze chart and report, for authorities at different levels and office Transaction management office provides true, complete energy consumption statistic data, assists managing power consumption department to check the reality of administrative unit at any time Time with can situation, carry out reasonably with intervening and energy-conservation instruct offer support for administration of energy conservation department.
Accompanying drawing explanation
Fig. 1 is present configuration block diagram.
Detailed description of the invention
Technical scheme is described in further detail below in conjunction with the accompanying drawings:
As it is shown in figure 1, a kind of public organizations based on the big data technique of cloud computing energy consumption monitoring platform, including multiple units at different levels Energy resources consumption management son system and a cloud platform, each higher level's subsystem is to subordinate's subsystem and administrative administrative region In directly under mechanism assign achievement data, each subordinate subsystem superior subsystem sends the our unit and this list add up The energy resources consumption data of position subordinate subsystem;To institute while every one-level subsystem superior subsystem sends data Stating cloud platform and send identical data, each data are preserved by cloud platform, carry out data download when user needs.
In the present embodiment, it is three grades of subsystems.The first order is the Committee of Development and Reform, through Xin Wei Department of Office Affairs;The second level For authorities at different levels;The third level is energy unit.The most every one-level subsystem is divided into province/city/district the most from top to down.
The function that wherein Department of Office Affairs realizes includes:
(1) fill in and report and submit mechanism energy data;
(2) public organizations' energy resources consumption data in the respective administrative areas is collected;
(3) examine in base table, comprehensive table;
(4) mechanism energy consumption recording status is followed the tracks of;
(5) mechanism account information is checked;
(6) public organizations' energy resources consumption data in the respective administrative areas is analyzed;
(7) mechanism and the most Inst target energy are assigned;
(8) the most each public organizations energy consumption data is monitored in real time;
(9) report of mechanism annual analysis is generated;
(10) generate energy consumption data in the respective administrative areas comprehensively to analyze;
(11) this administrative region inner region energy consumption analysis is generated;
(12) industry energy consumption analysis in the respective administrative areas is generated;
(13) each public organizations energy anomaly analysis diagnosis in the respective administrative areas;
(14) each superscalar data of public organizations is arranged in the respective administrative areas;
(15) the most each public organizations are urged to report and submit mechanism energy consumption data in time;
(16) management mechanism energy information;
(17) digital map navigation checks unit information;
(18) message content is checked
The function that authorities realize is:
(1) filling in mechanism can data;
(2) administrative public organizations energy resources consumption data is collected;
(3) examine in base table, comprehensive table;
(4) mechanism energy consumption recording status is followed the tracks of;
(5) mechanism account information is checked;
(6) administrative public organizations energy resources consumption data is analyzed;
(7) mechanism and administrative public organizations target energy are assigned;
(8) administrative each public organizations energy consumption data is monitored in real time;
(9) report of mechanism annual analysis is generated;
(10) generate administrative mechanism energy consumption data comprehensively to analyze;
(11) this administrative region inner region energy consumption analysis is generated;
(12) the industry energy consumption analysis of administrative mechanism is generated;
(13) each public organizations administrative energy abnormality processing;
(14) each superscalar data of administrative public organizations is arranged;
(15) administrative each public organizations are urged to report and submit mechanism energy consumption data in time;
(16) management mechanism energy information;
(17) message content is checked.
The function that energy unit realizes is:
(1) fill in and report and submit mechanism energy data;
(2) mechanism energy consumption recording status is followed the tracks of;
(3) examine in base table;
(4) mechanism account information is checked;
(5) mechanism energy consumption data is monitored in real time;
(6) report of mechanism annual analysis is generated;
(7) generate mechanism energy consumption data comprehensively to analyze;
(8) mechanism energy abnormal data is processed;
(9) management mechanism energy information;
(10) each superscalar data of mechanism is arranged;
(11) message content is checked.
Concrete:
Described subsystem includes statistician's module, person in charge of statistics's module and head of the unit's module;Described statistician's mould Block periodically fills in various base table data according to energy consumption consumption invoice or other effective bills, determine errorless after, submit to statistics negative Base table data are examined by duty people, as errorless in examined, person in charge of statistics submits to head of the unit's examination & verification, and head of the unit examines Core is errorless, and system is reported to administrative responsibile institution automatically.If person in charge of statistics or head of the unit are found to have when careful base table By mistake, this base table can be returned to statistician and remodify, submit to.
Described statistician's module includes:
Statistician logs in unit: log in for statistician;
System activates unit: after logging in for the first time statistician, the subsystem of our unit is carried out activation manipulation;System After activation, needing to revise initialized cryptographic, system just can use.Wherein, activation manipulation uses and on fixing disc is System active coding, or the active coding that other modes obtain activates.
In the present embodiment, when forgetting login password, it would however also be possible to employ the mode of active coding carries out resetting password.
After having logged in and having activated, the operation of lower part unit can be carried out, specifically include:
Unit is checked and revised to personal information: for Modify password, amendment personal information (name, E-mail address and mobile phone);
Index and consumption check unit: for checking achievement data and the basis of the subsystem transmission to our unit of higher level's subsystem The energy resources consumption of unit;
Index and consumption check unit, it is shown that current facility water, electricity, coal, gas, oil, the index of new forms of energy and consumption, index is Assigned overall performane then by higher level, if index shows 0, represent that index is not the most assigned then.Consumption is use then Situation, does not the most use if consumption is shown as 0 expression.Consumption can represent with different colours, is used for and index size Quickly distinguishing: color represents that if green the i.e. consumption utilization rate that do not exceeds standard is not more than 80%, yellow represents that prompting reaches 80%-100% and no more than 100%, red expression has exceeded standard, i.e. more than 100%.
Wherein, consumption utilization rate=consumption/index, such as new forms of energy utilization rate=60000.34/50000*100%=120%, i.e. New forms of energy have exceeded standard.
With managing typing unit: include with can number, construction area, heating area, vehicle for fill in our unit Quantity, machine room quantity, machine room construction area, calculator room equipment general power and UPS installed capacity are in interior data.
In the present embodiment, it is the per day energy number in our unit's measurement period by energy number, is compiling including on duty (registration) personnel and all kinds of extra-staff.Computational methods:
With the natural law with energy number total amount/measurement period in energy number=our unit's Administrative Area measurement period.
Complement: fill in authorized personnel's quantity that our unit ratifies through relevant department.
Construction area: all construction areas that our unit's office uses, except dwelling house for staff and workers, including cooling area and heat supply Area.
Heating area: implement the construction area of winter heating in our unit office space;
Individual heating area: by the construction area of our unit's individual heating in our unit office space.
The area of charging per heat: installed heat metering device, by the charging per heat of the unit of heat consumption charge Heating area.
Individual heating heat capacity: the specified heating capacity of the boiler plant of our unit's individual heating.
Vehicle fleet size: belong to all bus quantity that our unit's official activity uses in our unit's measurement period.Including this Unit use car for public affairs quantity and by our unit pay oil consumption expense rent (borrowing) use vehicle fleet size.
Establishment vehicle fleet size: the vehicle programmed number that our unit ratifies through relevant department.
Car for public affairs quantity: our unit ensures the car for public affairs quantity that row noise uses.
Other use car quantity: our unit other by the quantity of cars.
Gasoline car quantity: consume the vehicle fleet size of gasoline in our unit's serviceable vehicle.
Diesel vehicle quantity: our unit uses the vehicle fleet size consuming diesel oil in vehicle.
Machine room quantity: the number of our unit's data center machine room.
Machine room construction area: our unit's data center machine room uses and the construction area in supporting room.
Equipment general power: the general power of all kinds of information technoloy equipment of data center machine room, the air-conditioning of guarantee machine room constant temperature and humidity function General power, machine room distribution and the sum of auxiliary device general power.Fill in the general power of all kinds of information technoloy equipment the most respectively, ensure machine room The air-conditioning general power of constant temperature and humidity function, machine room distribution and the data of auxiliary device general power.
UPS installed capacity: the UPS installed capacity of our unit's data center machine room.
Up-to-date keeping records can be shown after managing Data Enter success.If in next time with can information need to update, Can again insert and preserve, the page can show the time record of latest update.Fill in it with typing unit can be managed completing Rear just can carry out condition of consumption typing with submit to unit.
Mechanism's essential information typing unit: include the detailed title of unit, organization mechanism code, machine for typing our unit Structure type, industry code, unit address, postcode, unit location zoning code and contact method are at interior basic letter Breath.
Complete with after managing typing unit and mechanism's essential information typing unit, just can carry out condition of consumption typing with Submit the use of unit to.
Condition of consumption typing and submission unit: the condition of consumption data in the some cycles of typing our unit, including Usage data and cost data, wherein, before logging data, it is thus necessary to determine that corresponding use can manage the letter of typing unit typing Cease the most correct;When each resources consumption status data of typing, when usage data or cost data be not at normal interval, Then carry out abnormal prompt, described do not include at normal interval: (1) compares typing last time number when usage data or cost data Exceeding more than certain multiple according to/contemporaneous data, wherein multiple value is configured by person in charge of statistics's module;(2) cost data is worked as More than the product of usage data Yu energy unit price peak, or cost data is less than usage data and energy unit price minimum Product;(3) certain percentage ratio of the index consumption that higher level assigns is exceeded;Meanwhile, when data are normal data, then complete in typing Generate base table after one-tenth and send condition of consumption data to person in charge of statistics's module;When data include abnormal data, then complete in typing Become and generate base table after editor's abnormal cause and send resources consumption status data to person in charge of statistics's module;Simultaneously negative to statistics Duty people's module reports and submits information.
In the present embodiment, the described condition of consumption and typing unit include three below:
1, the typing of the energy resources condition of consumption and submission subelement: Select input date, in the some cycles of typing our unit Including water consumption data, electricity consumption data, raw coal consumption data, natural gas consumption data, gasoline consumption data, diesel oil consumption number According to, heating power consumption data and regenerative resource application data in interior energy resources condition of consumption data, described energy resources disappear Expense status data includes usage data and cost data.
Water consumption data: the actual used water amount in our unit's Office Area measurement period and cost data.
Electricity consumption data: the total electricity consumed in our unit's Office Area measurement period and cost data.Acquisition mode has two Kind: one is to obtain data from supply of electric power department;Two is each user of door-to-door inquiry and the public power consumption of statistics, then cumulative acquisition Overall consumption data.
Raw coal consumption data: fill in the raw coal real consumption amount in our unit's Office Area measurement period and cost data.
Natural gas consumption data: fill in the natural gas real consumption amount in our unit's Office Area measurement period and expense number According to.Data acquisition has two ways: one is centralizedly supply and use, gas company provide energy consumption data;Two is that a point family is purchased Buy, use, door-to-door inquiry and cumulative each customer consumption amount and expense.
Gasoline consumption data: the gasoline real consumption amount and expense used of handling official business in filling in our unit's measurement period." other With oil " should fill in because of heat supply in winter, daily fire the gasoline consumption figure that drinking water etc. is required.
Gasoline consumption figure and expense are equal to car for public affairs, the gasoline consumption figure of other purposes vehicles and expense and because winter supplies Warm, daily fire other required gasoline consumption figures and the summations of expense such as drinking water.
Diesel oil consumption data: the diesel oil real consumption amount and expense used of handling official business in filling in our unit's measurement period." other With oil " should fill in because of heat supply in winter, daily fire the diesel oil consumption figure that drinking water etc. is required.
Diesel oil consumption figure and expense are equal to car for public affairs, other purposes diesel oil of vehicle consumption figures and expense and because winter supplies Warm, daily fire other required diesel oil consumption figures and the summations of expense such as drinking water.
Heating power consumption data: fill in the outsourcing heating power consumption figure in our unit's Office Area measurement period and expense.Heating power disappears The amount of expense data obtain from thermal gauge.The expense of only filling in of thermal gauge is not installed.
The related data of regenerative resource application: fill in solar energy heat utilization system in our unit's Office Area measurement period System, solar photoelectric utilize system, shallow layer geothermal energy to utilize the related datas such as system.
Other multi-energy data: other multi-energy data used in filling in our unit's Office Area measurement period, consumption figure reference Corresponding conversion factor is converted to a ton standard coal, and fills in the type of the energy unlisted in this system in " () ".
Wherein, before typing energy resources condition of consumption data, it is thus necessary to determine that corresponding record with typing unit can be managed The information entered (needs to confirm: 1, construction area in the confirmation of subunit;2, by energy number;3, each vehicle fleet size) whether Correctly.
When each energy resources condition of consumption data of typing, when usage data or cost data be not at normal interval Time, then carry out abnormal prompt, described do not include at normal interval:
(1) compare logging data last time/contemporaneous data when usage data or cost data and exceed more than certain multiple, Qi Zhongbei Numerical value is configured by person in charge of statistics's module;
The configuration that exceeds standard refers to this logging data, and with a contrast of logging data last time, the setting of the configuration that exceeds standard is by adding up Director is arranged, if person in charge of statistics is not provided with times of ultra standard, is defaulted as when more than more than 4 times providing prompting letter Breath.Person in charge of statistics is not provided with times of ultra standard, then information is more than 4 times, exceeds standard if person in charge of statistics is provided with Multiple, then when exceeding this multiple, will provide information.
(2) when cost data is more than the product of usage data with energy unit price peak, or cost data is less than consumption Data and the product of energy unit price minimum.
Such as, the consumption of water is multiplied by the interval of the unit price of local water, and if water unit price is 2 ~ 3 yuan/cubic metre, the expense of water is just The most interval: 1345*2 ~ 1345*3, i.e. 2690 ~ 4035.
(3) certain percentage ratio of the index consumption that higher level assigns is exceeded;
This index is overall performane and the percentage ratio of the most all consumption sums that higher level assigns then for this unit, such as: Higher level assigns index for our unit: 2400, and within the most first 5 months, water consumption sum is: 6440, then service index the most For: 6440/2400%100%=268.33%.
In the present embodiment, filling in of consumption is converted to a ton standard coal.Concrete: water consumption unit is cubic meter, conversion For ton standard coal, by convert reference coefficient calculations, it may be assumed that consumption is multiplied by with reference to coefficient.
It is 0.0857 that water is converted to the coefficient of ton standard coal, then 1345*0.0857=115.2665, and native system retains two Position decimal, i.e. result are 115.27.
The filling in of electricity/coal/gas/oil/new forms of energy can exceed standard configuration prompt to data and consumption is converted to a ton standard coal, Index utilization rate then.Oil is divided into gasoline and diesel oil, wherein gasoline consumption figure be officer's car oil mass with other with oil masses it With.
Meanwhile, when data are normal data, then after typing completes, send energy resources to person in charge of statistics's module Condition of consumption data;When data include abnormal data, then to person in charge of statistics after typing completes and edits abnormal cause Module sends energy resources condition of consumption data;Report and submit information to person in charge of statistics's module simultaneously.
2, the typing of central machine room energy-consuming situation is with submission subelement: in the some cycles of typing our unit Central machine room energy-consuming status data including total electricity consumption and other energy consumptions;The described central machine room energy Condition of consumption data include usage data.
Before typing central machine room energy-consuming status data, it is thus necessary to determine that corresponding with managing typing unit typing Information the most correct.In the present embodiment, set including machine room construction area, equipment general power, all kinds of IT of data center machine room Standby general power, the guarantee air-conditioning general power of machine room constant temperature and humidity function, machine room distribution and auxiliary device general power and UPS installation Capacity.
When each central machine room energy-consuming status data of typing, when usage data is not at normal interval, then carry out At normal interval, abnormal prompt, described does not includes that comparing logging data last time/contemporaneous data when usage data exceedes certain multiple Above, wherein multiple value is configured by person in charge of statistics's module.
Meanwhile, when data are normal data, then to person in charge of statistics's module dispatching centre machine room after typing completes Energy-consuming status data;When data include abnormal data, then negative to statistics after typing completes and edits abnormal cause Duty people's module dispatching centre machine room energy-consuming status data;Report and submit information to person in charge of statistics's module simultaneously;
3, heating energy resources condition of consumption typing is with submission subelement: including in the some cycles of typing our unit adopts Warm natural law, the heating energy are in interior central machine room energy-consuming status data (water consumption, electricity consumption etc.);The described heating energy Including usage data and cost data.
Wherein, before typing heating energy resources condition of consumption data, it is thus necessary to determine that corresponding with managing typing list The information of unit's typing is the most correct.In the present embodiment, including heating area, individual heating area, the face of charging per heat Long-pending: heat metering device and individual heating heat capacity (hot-water boiler thermal power and steam boiler evaporation capacity) have been installed.
When each heating energy resources condition of consumption data of typing, when usage data or cost data be not or not normal district Between time, then carry out abnormal prompt, described do not include at normal interval: (1) compares record last time when usage data or cost data Entering data/contemporaneous data and exceed more than certain multiple, wherein multiple value is configured by person in charge of statistics's module;(2) expense is worked as Data are more than the product of usage data with energy unit price peak, or cost data is minimum with energy unit price less than usage data The product of value;(3) certain percentage ratio of the index consumption that higher level assigns is exceeded;Meanwhile, when data are normal data, then in record Energy resources condition of consumption data are sent to person in charge of statistics's module after having entered;When data include abnormal data, then in record Heating energy resources condition of consumption data are sent to person in charge of statistics's module after having entered and having edited abnormal cause;Simultaneously to system Meter director's module reports and submits information.
Essential information checks unit: checks each typing for statistician and submits the base table submission time of unit, state to And details;And the function printing and deriving each base table of Excel is provided;Described state includes: (1) preserves state temporarily: Represent that current data, for temporarily to preserve state, is not fully complete typing and submission, continue record by corresponding typing with submitting unit to Enter amendment operation;(2) unexamined state: represent that current data is the most submitted, wait the examination of person in charge of statistics;(3) pending State: represent that current data person in charge of statistics is the most censored, wait the examination & verification of head of the unit;(4) uploaded state: represented Through examination & verification, data have reported higher level's subsystem;(5) returned state: represent that data are examining or in review process, examine Or examination & verification is not passed through, and is retired, needs to re-type;Details: corresponding year can be checked according to the information of base table typing The content of month typing information.
Can check that the energy resources condition of consumption, data center machine room energy-consuming situation and heating energy resources disappear respectively Take situation.
Data summarization unit: check in administrative administrative region, whether unit and subordinate's subsystem count for statistician According to reporting, when subordinate's subsystem and our unit administrative administrative region intra subsystem the most reported data, then collect generation and combine table; If there being mechanism not have data to report, system can provide corresponding prompting, and the unit not having reported data is considered as 0 reports higher level single Position, the data that the unit later stage of non-reported data submits to will be regarded as evening paper data, and evening paper data will not report superior unit.
In the present embodiment, it is desirable to periodically report and submit step by step, the cycle is reported and submitted to be divided into monthly magazine, quarterly report, semiyearly report and annual report.
Urge declaration form unit: for when the non-reported data of subordinate's subsystem, carry out urging report operation.Higher level's subsystem can be checked The base table that the energy unit of subordinate does not also report/combine table.After urging report operation, head of the unit's module of subordinate's subsystem, statistics Director's module and statistician's module all can receive the information urging report.
Abnormity diagnosis unit: for checking the status information by energy abnormal information, including untreated subelement, processes neutron Unit and have confirmed that subelement;Statistician produces abnormal data in Input Process and submits to person in charge of statistics to examine, unit is born Duty people audits by reporting superior unit.
Statistician's message checks unit: for checking the message received.
Described person in charge of statistics's module includes:
Person in charge of statistics's login unit: log in for person in charge of statistics;
Unit is checked and revised to personal information: for Modify password, amendment personal information (name, E-mail address and mobile phone);
Index and consumption check unit: for checking achievement data and the basis of the subsystem transmission to our unit of higher level's subsystem The energy resources consumption of unit;
Digital map navigation unit: be used for consulting a map middle peer and directly under subordinate's subsystem, including check address, telephone number, Whether brief introduction, relative analysis and energy consumption exceed standard, and (being identified with red, yellow, and green color, red expression exceeds standard, and yellow represents and will surpass Mark, green expression consumption is normal);Digital map navigation includes affiliated department work department, if there is mechanism at the same level, can check Inst digital map navigation at the same level.The display address of current facility, telephone number, brief introduction, operation, can check in operation Current facility and relative analysis.Click on the position checking department work office by correspondence can be checked, check that relative analysis is by entrance point The analysis page.Statistic unit: the energy in adding up administrative administrative region and under the different time cycle of subordinate's subsystem constituent parts Consumption data, including Monthly Summary, collect in season, half a year collects, collect in year and mechanism's monthly magazine.Select need check comprehensive table, Days and mechanism.Uploaded state shows that this table has reported, and public organizations' quantity, construction area, use can number, vehicle numbers The statistics of amount, the six big energy sub-agencies time to selecting.And the function deriving each base table of Excel is provided;
Analysis specifically includes that, according to each Inst base table data, platform automatically generates various analysis chart and report.
Analysis includes that average dose analyzes subelement, administrative mechanism compares subelement, energy consumption and comprehensively analyzes subelement, region Analyze subelement, industry analysis subelement, Statistical Analysis Report subelement.
Average dose is analyzed subelement and is mainly comprised three modules: per capita the moon consumption standard coal, unit are moon consumption mark Quasi-coal, the contrast of nearest 3 years total consumptions.
(1) moon consumption standard coal per capita
Moon consumption standard coal=(the most having reported consumption and/month)/(the most having reported number and/month) per capita.
The most report consumption and turned for the water, electricity, gas in current facility and affiliated Lower Establishment, coal, oil, new forms of energy It is changed to a ton standard coal sum.As reported consumption then and being: 5275.46, the most report number and be: 792, July before calculating Report, per capita moon consumption standard coal: (5275.46/7)/(792/7)=6.66.
(2) unit are moon consumption standard coal
The unit are moon consumption standard coal=(the most reported consumption and/month)/(the most having reported area and/month)
The most report consumption and be converted to for the water, electricity, gas in current facility and affiliated Lower Establishment, coal, oil, new forms of energy Ton standard coal sum.As reported consumption then and being: 5275.46, the most having reported area and be: 306, before calculating, July goes up Report, moon consumption standard coal per capita: (5275.46/7)/(306/7)=17.24.
(3) nearly 3 years total amount ratios are relatively
Nearly 3 years report consumption and turn for the water, electricity, gas in current facility and affiliated Lower Establishment, coal, oil, new forms of energy It is changed to a ton standard coal sum.
Administrative mechanism compares subelement, compares last year and this year mechanism's energy consumption and is converted to the total amount of ton standard coal, including this Level and sub-level, such as certain Department of Office Affairs of district, this middle school of district last year and the comparison in this year.
Energy consumption comprehensively analyze subelement to the total consumption in water, electricity, gas, coal, oil, the big energy of new forms of energy six 1 year, per capita Consumption and unit are quantitative analysis.
Regional analysis subelement is three big modules: cake chart, form show, highly energy-consuming region and low power consuming region.Pie Figure shows the percentage ratio shared by regional energy consumption intuitively.Form is shown from high to low by percentage ratio, shows from high to low Which region is highly energy-consuming region, and which is low power consuming region.
Industry analysis includes that industry energy consumption analysis chart, energy consumption cartogram, water, electricity, coal, gas, oil and new forms of energy are shown Figure.Industry energy consumption analysis is the consumption of all clamp mechanism places industry under it, and energy unit does not has affiliated institutions, so industry is divided Analysis is absolutely.
Statistical Analysis Report subelement combines our unit, native system construction area, use can the feelings such as number, use energy equipment operation Condition, monthly (season) coal, combustion gas, fuel oil, electricity, heating power and water equal energy source resources consumption situation are analyzed evaluate.
With energy anomaly analysis diagnosis unit: for checking and auditing the abnormal, including untreated son with energy of statistician's typing Unit, process neutron cells, subelement to be confirmed and have confirmed that subelement;
With situation checking unit: for monitoring the situation of the time period of selection, mechanism, the energy and consumption;
(1) time period and the selection of mechanism
Time period: according to monthly magazine, quarterly report, semiyearly report, offer in year select the time period with can the displaying of situation.
The selection of mechanism, mechanism out listed by selection, check corresponding mechanism with can situation.Have selected time period and machine Click on after structure to submit to and can check that the time period chosen and using of mechanism can situation analysis.
The displaying figure of (2) the six big energy
The six big energy are showing according to monthly magazine, quarterly report, semiyearly report, annual report block diagram, and column color represents do not have if green The i.e. consumption utilization rate that exceeds standard is not more than 80%, and yellow represents that prompting has reached 80%--100% and no more than 100%, and red expression is Exceed standard, i.e. more than 100%.
Base table examines and submits unit to: for auditing the base table data that our unit statistician uploads;And derivation Excel is provided The function of each base table;In the present embodiment, enter and examine base table, examine that the data of nearly 4 years can be examined, often by base table Year 1 examines to the data of December.
Wherein, the state in base table review process includes: (1) not yet carries out measurement period state: represent current base table also Can not add up;(2) state to be logged: represent that this base table comes into timing statistics, but statistician does not also have typing number According to;(3) unexamined state: represent that statistician has submitted data to, wait the examination of person in charge of statistics;(4) pending state: table Show that person in charge of statistics has passed, wait the examination & verification of head of the unit;(5) uploaded state: represent this base table data sheet Position director has audited by and has reported;(6) returned state: examining or be found to have incorrect in examination & verification data procedures , need statistician to rewrite and submit to.
Person in charge of statistics examines, clicks on unexamined in public organizations' essential information (click on and examine) button, such as, selects In August, 2015 unexamined data.
Examining or examination & verification data procedures is being found to have incorrect, needing statistician to rewrite and submit to.
After passing, send the base table after having audited to head of the unit's module, simultaneously to head of the unit's mould Block reports and submits information;Incorrect when checking process is found to have data, write exactly and return reason and can return statistician's module, simultaneously to system Meter person's module reports and submits information.
Combine table examine and submit unit to: for examining the comprehensive table data that our unit statistician uploads;And derivation Excel is provided The function of each base table;Wherein, the state combined in table checking process includes: (1) not yet carries out measurement period state: represents current and combines Table can't be added up;(2) summary status is treated: represent that statistician is not the most to data summarization;(3) unexamined state: represent Person in charge of statistics does not the most examine;(4) pending state: represent the examination & verification waiting head of the unit;(5) shape has been reported State: represent that this base table data unit director has audited by and reported;
After passing, send the base table after having audited to head of the unit's module, simultaneously to head of the unit's module report Deliver letters breath.
Exceed standard dispensing unit: for joining the condition of consumption typing of statistician's module with the times of ultra standard submitting unit to Put.
The configuration that exceeds standard is to energy resources condition of consumption unit, data center machine room energy-consuming situation unit and heating energy The data of source resources consumption situation unit insert the setting of maximum.When statistician is in typing base table data, exceed if had The value arranged, will provide information, prompting: this secondary data exceedes last time more than 2 times, as logging data in January, 2015 is 2 logging datas in 779,2015 years are 1586, times of ultra standard: 1586/779=2.03, and at this moment system will provide information and exceedes Last time more than 2 times.
Index assigns unit: for accepting the index total amount that higher level issues, to our unit, subordinate's subsystem and this administrative area In territory directly under mechanism carry out the distribution of index.Concrete: if index is not assigned then, page general's display " currently without Receive the index that higher level assigns ".If index has been assigned then, the index that display is assigned, index be then water, electricity, coal, The total amount that gas, oil, new forms of energy higher level assign.
Person in charge of statistics's message checks unit: for checking the message received.
Described head of the unit's module includes:
Head of the unit's login unit: log in for head of the unit;
Index and consumption check unit: for checking achievement data and the basis of the subsystem transmission to our unit of higher level's subsystem The energy resources consumption of unit;
Digital map navigation unit: be used for consulting a map middle peer and directly under subordinate's subsystem, including check address, telephone number, Whether brief introduction, relative analysis and energy consumption exceed standard, and (being identified with red, yellow, and green color, red expression exceeds standard, and yellow represents and will surpass Mark, green expression consumption is normal);
Analytic unit: for analyzing the base table of our unit and subordinate's subsystem/combine table data, automatically generate various analysis chart and Report;Analyze subelement including average dose, administrative mechanism compares subelement, energy consumption and comprehensively analyzes subelement, regional analysis Unit, industry analysis subelement, Statistical Analysis Report subelement;
Statistic unit: the energy consumption number in adding up administrative administrative region and under the different time cycle of subordinate's subsystem constituent parts According to, including Monthly Summary, collect in season, half a year collects, collect in year and mechanism's monthly magazine.Select comprehensive table, the days needing to check And mechanism.Uploaded state shows that this table has reported, public organizations' quantity, construction area, with can number, vehicle fleet size, The statistics of the six big energy sub-agencies time to selecting.And the function deriving each base table of Excel is provided;
With can anomaly analysis diagnosis unit: for check and audit statistician's typing with can be abnormal, including untreated subelement, Process neutron cells and have confirmed that subelement;
With situation checking unit: for monitoring the situation of the time period of selection, mechanism, the energy and consumption;
Base table examines and submits unit to: for examining the base table data that our unit statistician uploads;And the derivation each base of Excel is provided The function of table;Wherein, the state in base table checking process includes: (1) not yet carries out measurement period state: represent current base table also Can not add up;(2) state to be logged: represent that this base table comes into timing statistics, but statistician does not also have typing number According to;(3) unexamined state: represent that statistician has submitted data to, wait the examination of person in charge of statistics;(4) pending state: table Show that person in charge of statistics has passed, wait the examination & verification of head of the unit;(5) uploaded state: represent this base table data sheet Position director has audited by and has reported;(6) returned state: examining or be found to have incorrect in examination & verification data procedures , need statistician to rewrite and submit to;After passing, send the base after having audited to head of the unit's module Table, reports and submits information to head of the unit's module simultaneously;Incorrect when checking process is found to have data, write exactly and return reason and can move back To statistician's module, report and submit information to statistician's module simultaneously;
Combine table examine and submit unit to: for examining the comprehensive table data that our unit statistician uploads;And the derivation each base of Excel is provided The function of table;Wherein, the state combined in table checking process includes: (1) not yet carries out measurement period state: represents current and combines table also Can not add up;(2) summary status is treated: represent that statistician is not the most to data summarization;(3) unexamined state: represent statistics Director does not the most examine;(4) pending state: represent the examination & verification waiting head of the unit;(5) uploaded state: table Show that this base table data unit director has audited by and reported;Head of the unit's message checks unit: be used for checking reception The message arrived.
In this embodiment, described statistician's module, person in charge of statistics's module, head of the unit's module all include a system Meter account unit: to the electricity consumption of energy unit, with water, use gas consumption statistic, according to the moon, season, half a year and the whole year to consumption and The statistics of expense, increase and decrease amount be this month, season, half a year, yearly consumption or expense this month corresponding with previous year, season, Half a year, the consumption in year or the difference of expense.
In the present embodiment, the data of described base table and described comprehensive table include on year-on-year basis with growth and the minimizing of chain rate.
Growth with chain rate automatically computes with minimizing system on year-on-year basis, uses arrow to show at the page:
The chain rate on year-on-year basis of every record compares display, ↑: represent and increase by a year-on-year basis;→: represent sequential growth rate;↓: represent and subtract on year-on-year basis Few;←: chain rate reduces.
Wherein, rate of change=(this year consumption-remove annual consumption)/remove annual consumption * 100%, such as in May, 2014 electricity consumption figure on year-on-year basis In May, 880,2013 electricity consumption 1074, rate of change=(880-1074)/1074*100%=-18.06% on year-on-year basis, represent and reduce on year-on-year basis 18.06%。
Chain rate rate of change=(the current moon consumption-last month consumption)/last month consumption * 100%, such as in May, 2014 electricity consumption figure In April, 880,2014 electricity consumption figure 1801, chain rate rate of change=(880-1801)/1801*100%=-51.14%, represent chain rate subtract Few 51.14%.
Be acquired energy consumption data, statistics and analysis is the basic function of this project platform, but its core value exists In passing through energy consumption data, analyzing by energy situation, find energy waste reason, carrying out reducing energy consumption for energy unit provides certainly Plan is supported.The mainly research of this project uses the method for data mining to set up a kind of new regional industrial energy consumption data mining.Cause This:
In the present embodiment, described cloud platform includes a decision support module, props up for the data collected are carried out decision-making Hold, including region energy consumption decision support unit and large-scale public organizations energy consumption decision support unit;
Described region energy consumption decision support unit uses the method for data mining to set up regional industrial energy consumption data mining model, Use to Regional Energy is estimated and the guidance of concrete decision method, seeks the key point that region is energy-conservation, including: use k- Means clustering algorithm analyzed area every profession and trade energy consumption characters, and single industry is clustered, find out high energy consumption, middle energy of the same trade Consumption, low energy consumption enterprise;The dependency being then based on like products process equipment in type of industry uses Mining Multidimensional Association Rules, Find out the dependency of like product technique, equipment, efficiency, instruct region energy conservation;
Described large-scale public organizations energy consumption decision support unit sets up large-scale public organizations energy consumption dynamic model for research, with Just large-scale public organizations energy consumption is carried out real-time dynamic forecast, solve large-scale Inst construction area and be not directly proportional to power consumption Problem, solve energy-saving constant-volumeization research, the bottleneck problem of quota energy simultaneously, audit and energy-conservation for large-scale public organizations energy consumptions The realization of system provides scientific guidance, according to magnanimity, randomness and the sequentiality feature of large-scale public organizations energy consumption data; Multiple linear regression and unitary autoregression algorithm is used to set up dynamic energy consumption data model.

Claims (7)

1. public organizations based on the big data technique of a cloud computing energy consumption monitoring platform, it is characterised in that: include multiple at different levels The energy resources consumption management son system of unit and a cloud platform, each higher level's subsystem is to subordinate's subsystem and administrative administration In region directly under mechanism assign achievement data, each subordinate subsystem superior subsystem send the our unit that add up with The energy resources consumption data of this unit subordinate subsystem;While every one-level subsystem superior subsystem sends data Sending identical data to described cloud platform, each data are preserved by cloud platform, carry out data download when user needs;
Described subsystem includes statistician's module, person in charge of statistics's module and head of the unit's module;Described statistician's mould Block periodically fills in various base table data according to energy consumption consumption invoice or other effective bills, determine errorless after, submit to statistics negative Duty people's module;Base table data are examined by person in charge of statistics's module, as errorless in examined, person in charge of statistics submits to unit and is responsible for People's module is audited;The examination & verification of head of the unit's module is errorless, and system is reported to higher level's subsystem automatically;If person in charge of statistics or list Position director finds wrong when careful base table, this base table is returned to statistician and remodifies/submit to;
Described statistician's module includes:
Statistician logs in unit: log in for statistician;
System activates unit: after logging in for the first time statistician, the subsystem of our unit is carried out activation manipulation;
Index and consumption check unit: for checking achievement data and the basis of the subsystem transmission to our unit of higher level's subsystem The energy resources consumption of unit;
With managing typing unit: for fill in our unit include with can number, construction area, heating area, vehicle fleet size, Machine room quantity, machine room construction area, calculator room equipment general power and UPS installed capacity are in interior data;
Mechanism's essential information typing unit: include the detailed title of unit, organization mechanism code, mechanism's class for typing our unit Type, industry code, unit address, postcode, unit location zoning code and contact method are in interior essential information;
Condition of consumption typing and submission unit: the condition of consumption data in the some cycles of typing our unit, including consumption Data and cost data, wherein, before logging data, it is thus necessary to determine that corresponding use can manage the information of typing unit typing and be No correctly;When each resources consumption status data of typing, when usage data or cost data be not at normal interval, then enter Row abnormal prompt, described does not includes at normal interval: (1) when usage data or cost data compare logging data last time/with Issue is according to exceeding more than certain multiple, and wherein multiple value is configured by person in charge of statistics's module;(2) when cost data is more than using Amount data and the product of energy unit price peak, or cost data is less than the product of usage data with energy unit price minimum; (3) certain percentage ratio of the index consumption that higher level assigns is exceeded;Meanwhile, when data are normal data, then after typing completes Generate base table and send condition of consumption data to person in charge of statistics's module;When data include abnormal data, then typing complete with And generate base table after editor's abnormal cause to person in charge of statistics's module transmission resources consumption status data;Simultaneously to person in charge of statistics Module reports and submits information;
Essential information checks unit: for statistician check each typing with submit the base table submission time of unit to, state and in detail Thin information;And the function printing and deriving each base table of Excel is provided;Described state includes: (1) preserves state temporarily: represent Current data, for temporarily to preserve state, is not fully complete typing and submission, is repaiied with submitting unit continuation typing to by corresponding typing Change operation;(2) unexamined state: represent that current data is the most submitted, wait the examination of person in charge of statistics;(3) pending state: Represent that current data person in charge of statistics is the most censored, wait the examination & verification of head of the unit;(4) uploaded state: represent and examined Core, data have reported higher level's subsystem;(5) returned state: represent data examine or review process in, examine or Examination & verification is not passed through, and is retired, needs to re-type;
Data summarization unit: check in administrative administrative region, whether unit and subordinate's subsystem carry out data for statistician Report, when subordinate's subsystem and our unit administrative administrative region intra subsystem the most reported data, then collects generation and combines table;If having The non-reported data of clamp mechanism, system can provide corresponding prompting, if after selecting to force to submit to, system can be by non-reported data Unit is considered as 0 and reports to superior unit;The data that the unit later stage of non-reported data submits to will be regarded as evening paper data, evening paper data Superior unit will not be reported to;
Urge declaration form unit: for when the non-reported data of subordinate's subsystem, carry out urging report operation;
Abnormity diagnosis unit: for checking the status information by energy abnormal information and submitting the abnormality processing scheme of our unit to, Including untreated subelement, process neutron cells and have confirmed that subelement;
Statistician's message checks unit: for checking the message received;
Described person in charge of statistics's module includes:
Person in charge of statistics's login unit: log in for person in charge of statistics;
Index and consumption check unit: for checking achievement data and the basis of the subsystem transmission to our unit of higher level's subsystem The energy resources consumption of unit;
Digital map navigation unit: be used for consulting a map middle subsystem at the same level and directly under subordinate's subsystem, including checking address, phone Whether number, brief introduction, relative analysis and energy consumption exceed standard;
Analytic unit: for analyzing the base table of our unit and subordinate's subsystem/combine table data, automatically generate various analysis chart and Report;Analyze subelement including average dose, administrative mechanism compares subelement, energy consumption and comprehensively analyzes subelement, regional analysis Unit, industry analysis subelement, Statistical Analysis Report subelement;
With energy anomaly analysis diagnosis unit: logical for checking and examine the abnormal with energy of statistician's typing and confirmation subunit examination & verification The abnormality processing scheme crossed, including untreated subelement, processes neutron cells, to be confirmed and have confirmed that subelement;
With situation checking unit: for monitoring the situation of the time period of selection, mechanism, the energy and consumption;
Base table examines and submits unit to: for examining the base table data that our unit statistician uploads;And the derivation each base of Excel is provided The function of table;Wherein, the state in base table checking process includes: (1) not yet carries out measurement period state: represent current base table also Can not add up;(2) state to be logged: represent that this base table comes into timing statistics, but statistician does not also have typing number According to;(3) unexamined state: represent that statistician has submitted data to, wait the examination of person in charge of statistics;(4) pending state: table Show that person in charge of statistics has passed, wait the examination & verification of head of the unit;(5) uploaded state: represent this base table data sheet Position director has audited by and has reported;(6) returned state: examining or be found to have incorrect in examination & verification data procedures , need statistician to rewrite and submit to;After passing, send the base after having audited to head of the unit's module Table, reports and submits information to head of the unit's module simultaneously;Incorrect when checking process is found to have data, write exactly and return reason and can move back To statistician's module, report and submit information to statistician's module simultaneously;
Combine table examine and submit unit to: for examining the comprehensive table data that our unit statistician uploads;And the derivation each base of Excel is provided The function of table;Wherein, the state combined in table checking process includes: (1) not yet carries out measurement period state: represents current and combines table also Can not add up;(2) summary status is treated: represent that statistician is not the most to data summarization;(3) unexamined state: represent statistics Director does not the most examine;(4) pending state: represent the examination & verification waiting head of the unit;(5) uploaded state: table Show that this base table data unit director has audited by and reported;(6) returned state: examining or in examination & verification data procedures It is found to have incorrect, needs statistician to rewrite and submit to;After passing, send examination & verification to head of the unit's module Base table after completing, reports and submits information to head of the unit's module simultaneously;Incorrect when checking process is found to have data, write exactly and move back Return reason and can return statistician's module, report and submit information to statistician's module simultaneously;Exceed standard dispensing unit: for statistician's module Condition of consumption typing with submit to unit times of ultra standard configure;
Index assigns unit: for accepting the index total amount that higher level issues, to our unit, subordinate's subsystem and in the respective administrative areas Directly under mechanism carry out the distribution of index;
Statistic unit: the energy consumption number in adding up administrative administrative region and under the different time cycle of subordinate's subsystem constituent parts According to, including Monthly Summary, collect in season, half a year collects, collect in year and mechanism's monthly magazine;Select comprehensive table, the days needing to check With mechanism, uploaded state show that this table has reported;Public organizations' quantity, construction area, with can number, vehicle fleet size, six The statistics of the big energy sub-agencies time to selecting;And the function deriving each base table of Excel is provided;
Person in charge of statistics's message checks unit: for checking the message received;
Described head of the unit's module includes:
Head of the unit's login unit: log in for head of the unit;
Index and consumption check unit: for checking achievement data and the basis of the subsystem transmission to our unit of higher level's subsystem The energy resources consumption of unit;
Digital map navigation unit: be used for consulting a map middle subsystem at the same level and directly under subordinate's subsystem, including checking address, phone Whether number, brief introduction, relative analysis and energy consumption exceed standard
Analytic unit: for analyzing the base table of our unit and subordinate's subsystem/combine table data, automatically generate various analysis chart and Report;Analyze subelement including average dose, administrative mechanism compares subelement, energy consumption and comprehensively analyzes subelement, regional analysis Unit, industry analysis subelement, Statistical Analysis Report subelement;
With can anomaly analysis diagnosis unit: for check and audit statistician's typing with can be abnormal, including untreated subelement, Process neutron cells and have confirmed that subelement;
With situation checking unit: for monitoring the situation of the time period of selection, mechanism, the energy and consumption;
Base table examination & verification is with submission unit: for auditing the base table data that our unit statistician uploads;And the derivation each base of Excel is provided The function of table;Wherein, the state in base table review process includes: (1) not yet carries out measurement period state: represent current base table also Can not add up;(2) state to be logged: represent that this base table comes into timing statistics, but statistician does not also have typing number According to;(3) unexamined state: represent that statistician has submitted data to, wait the examination of person in charge of statistics;(4) pending state: table Show that person in charge of statistics has passed, wait the examination & verification of head of the unit;(5) uploaded state: represent this base table data sheet Position director has audited by and has reported;(6) returned state: examining or be found to have incorrect in examination & verification data procedures , need statistician to rewrite and submit to;After passing, send the base after having audited to head of the unit's module Table, reports and submits information to head of the unit's module simultaneously;Incorrect when checking process is found to have data, write exactly and return reason and can move back To statistician's module, report and submit information to statistician's module simultaneously;
Combine table examination & verification and submit unit to: for auditing the comprehensive table data that our unit statistician uploads;And the derivation each base of Excel is provided The function of table;Wherein, the state combined in table review process includes: (1) not yet carries out measurement period state: represents current and combines table also Can not add up;(2) summary status is treated: represent that statistician is not the most to data summarization;(3) unexamined state: represent statistics Director does not the most examine;(4) pending state: represent the examination & verification waiting head of the unit;(5) uploaded state: table Show that this base table data unit director has audited by and reported;(6) returned state: examining or in examination & verification data procedures It is found to have incorrect, needs statistician to rewrite and submit to;After passing, send examination & verification to head of the unit's module Base table after completing, reports and submits information to head of the unit's module simultaneously;Incorrect when checking process is found to have data, write exactly and move back Return reason and can return statistician's module, report and submit information to statistician's module simultaneously;
Statistic unit: the energy consumption number in adding up administrative administrative region and under the different time cycle of subordinate's subsystem constituent parts According to, including Monthly Summary, collect in season, half a year collects, collect in year and mechanism's monthly magazine.
2. select comprehensive table, days and the mechanism needing to check;Uploaded state shows that this table has reported;Public organizations' quantity, Construction area, use can number, vehicle fleet size, the statistics of the six big energy sub-agencies time to selecting;And provide derivation Excel each The function of base table;
Head of the unit's message checks unit: for checking the message received.
A kind of public organizations based on the big data technique of cloud computing the most according to claim 1 energy consumption monitoring platform, it is special Levy and be: the described condition of consumption includes with typing unit:
Energy resources condition of consumption typing with submit to subelement: in the some cycles of typing our unit include water consume number According to, electricity consumption data, raw coal consumption data, natural gas consumption data, gasoline consumption data, diesel oil consumption data, heating power consumption Data and regenerative resource application data are at interior energy resources condition of consumption data, described energy resources condition of consumption packet Include usage data and cost data;Wherein, before typing energy resources condition of consumption data, it is thus necessary to determine that corresponding using can be managed The information of reason typing unit typing is the most correct;When each energy resources condition of consumption data of typing, when usage data or Cost data not when normal interval, then carries out abnormal prompt, described does not includes at normal interval: (1) when usage data or Cost data is compared logging data last time/contemporaneous data and is exceeded more than certain multiple, and wherein multiple value is by person in charge of statistics's module It is configured;(2) when cost data is more than the product of usage data with energy unit price peak, or cost data is less than consumption Data and the product of energy unit price minimum;(3) certain percentage ratio of the index consumption that higher level assigns is exceeded;Meanwhile, equal when data During for normal data, then after typing completes, send energy resources condition of consumption data to person in charge of statistics's module;Work as packet When including abnormal data, then after typing completes and edits abnormal cause, send energy resources consumption shape to person in charge of statistics's module Condition data;Report and submit information to person in charge of statistics's module simultaneously;
The typing of central machine room energy-consuming situation and submission subelement: including in the some cycles of typing our unit is total Power consumption and other energy consumptions are in interior central machine room energy-consuming status data;Described central machine room energy-consuming shape Condition data include usage data;Before typing central machine room energy-consuming status data, it is thus necessary to determine that corresponding using can manage The information of typing unit typing is the most correct;When each central machine room energy-consuming status data of typing, when usage data not When normal interval, then carry out abnormal prompt, described not normal interval include when usage data compare logging data last time/with Issue is according to exceeding more than certain multiple, and wherein multiple value is configured by person in charge of statistics's module;Meanwhile, it is normally when data During data, then to person in charge of statistics's module dispatching centre machine room energy-consuming status data after typing completes;When data include During abnormal data, then to person in charge of statistics's module dispatching centre machine room energy-consuming after typing completes and edits abnormal cause Status data;Report and submit information to person in charge of statistics's module simultaneously;
Heating energy resources condition of consumption typing with submit subelement to: in the some cycles of typing our unit, include heating Natural law, the heating energy are in interior central machine room energy-consuming status data;The described heating energy includes usage data and expense Data;Wherein, before typing heating energy resources condition of consumption data, it is thus necessary to determine that corresponding record with typing unit can be managed The information entered is the most correct;When each heating energy resources condition of consumption data of typing, when usage data or cost data Not when normal interval, then carry out abnormal prompt, described do not include at normal interval: (1) is when usage data or cost data Comparing logging data last time/contemporaneous data and exceed more than certain multiple, wherein multiple value is configured by person in charge of statistics's module; (2) when cost data is more than the product of usage data with energy unit price peak, or cost data is less than usage data and energy The product of source unit price minimum;(3) certain percentage ratio of the index consumption that higher level assigns is exceeded;Meanwhile, it is normal number when data According to time, then after typing completes to person in charge of statistics's module send energy resources condition of consumption data;When data include abnormal number According to time, then after typing completes and edits abnormal cause to person in charge of statistics's module send heating energy resources condition of consumption number According to;Report and submit information to person in charge of statistics's module simultaneously.
A kind of public organizations based on the big data technique of cloud computing the most according to claim 1 energy consumption monitoring platform, it is special Levy and be: described is the per day energy number in our unit's measurement period by energy number;Described construction area is this list All construction areas that position office uses;Described heating area is the building sides implementing winter heating in our unit office space Long-pending;Described vehicle fleet size is to belong to all bus quantity that our unit's official activity uses in our unit's measurement period;Described The quantity that machine room quantity is our unit's data center machine room;Described machine room construction area is that our unit's data center machine room makes With and the construction area in supporting room;Described equipment general power is the general power of all kinds of information technoloy equipment of data center machine room, guarantor The barrier air-conditioning general power of machine room constant temperature and humidity function, machine room distribution and the sum of auxiliary device general power;Described UPS installed capacity UPS installed capacity for our unit's data center machine room.
A kind of public organizations based on the big data technique of cloud computing the most according to claim 1 energy consumption monitoring platform, it is special Levy and be: described statistician's module, person in charge of statistics's module, head of the unit's module all include a Statistical Account unit: To the electricity consumption of energy unit, with water, use gas consumption statistic, according to the moon, season, half a year and the whole year statistics to consumption Yu expense, Increase and decrease amount is this month, season, half a year, yearly consumption or expense this month corresponding with previous year, season, half a year, year Consumption or the difference of expense.
A kind of public organizations based on the big data technique of cloud computing the most according to claim 1 energy consumption monitoring platform, it is special Levy and be: the data of described base table and described comprehensive table include on year-on-year basis with growth and the minimizing of chain rate.
A kind of public organizations based on the big data technique of cloud computing the most according to claim 1 energy consumption monitoring platform, it is special Levy and be: described cloud platform includes a decision support module, for the data collected being carried out decision support, including region Energy consumption decision support unit and large-scale public organizations energy consumption decision support unit;
Described region energy consumption decision support unit uses the method for data mining to set up regional industrial energy consumption data mining model, Use to Regional Energy is estimated and the guidance of concrete decision method, seeks the key point that region is energy-conservation, including: use k- Means clustering algorithm analyzed area every profession and trade energy consumption characters, and single industry is clustered, find out high energy consumption, middle energy of the same trade Consumption, low energy consumption enterprise;The dependency being then based on like products process equipment in type of industry uses Mining Multidimensional Association Rules, Find out the dependency of like product technique, equipment, efficiency, instruct region energy conservation;
Described large-scale public organizations energy consumption decision support unit sets up large-scale public organizations energy consumption dynamic model for research, with Just large-scale public organizations energy consumption is carried out real-time dynamic forecast, solve large-scale Inst construction area and be not directly proportional to power consumption Problem, solve energy-saving constant-volumeization research, the bottleneck problem of quota energy simultaneously, audit and energy-conservation for large-scale public organizations energy consumptions The realization of system provides scientific guidance, according to magnanimity, randomness and the sequentiality feature of large-scale public organizations energy consumption data; Multiple linear regression and unitary autoregression algorithm is used to set up dynamic energy consumption data model.
CN201610852565.1A 2016-09-27 2016-09-27 A kind of public organizations based on the big data technique of cloud computing energy consumption monitoring platform Pending CN106296041A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610852565.1A CN106296041A (en) 2016-09-27 2016-09-27 A kind of public organizations based on the big data technique of cloud computing energy consumption monitoring platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610852565.1A CN106296041A (en) 2016-09-27 2016-09-27 A kind of public organizations based on the big data technique of cloud computing energy consumption monitoring platform

Publications (1)

Publication Number Publication Date
CN106296041A true CN106296041A (en) 2017-01-04

Family

ID=57715552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610852565.1A Pending CN106296041A (en) 2016-09-27 2016-09-27 A kind of public organizations based on the big data technique of cloud computing energy consumption monitoring platform

Country Status (1)

Country Link
CN (1) CN106296041A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109688215A (en) * 2018-12-24 2019-04-26 安徽经邦软件技术有限公司 Report reporting system and implementation method based on group management
CN110097280A (en) * 2019-04-29 2019-08-06 兰州环境能源交易中心有限公司 Government and public organizations' diagnosis of energy saving and quota management system
CN113112245A (en) * 2021-04-30 2021-07-13 广州远正智能科技股份有限公司 Intelligent management method, system and storage medium for multi-level energy consumption quota of public institution
CN113516444A (en) * 2021-04-23 2021-10-19 广州远正智能科技股份有限公司 Public institution energy consumption data mobile terminal calculation method, system and readable storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8145540B2 (en) * 2008-02-28 2012-03-27 Alcatel Lucent Management platform and associated method for managing smart meters
CN103268531A (en) * 2013-05-17 2013-08-28 北京首钢自动化信息技术有限公司 Secondary energy management platform for energy center

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8145540B2 (en) * 2008-02-28 2012-03-27 Alcatel Lucent Management platform and associated method for managing smart meters
CN103268531A (en) * 2013-05-17 2013-08-28 北京首钢自动化信息技术有限公司 Secondary energy management platform for energy center

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
人到中年: "国家机关事务管理局公共机构能源资源消费统计信息系统培训课件", 《百度文库》 *
住234521: "国家机关事务管理局公共机构能源资源消费统计信息系统2014", 《百度文库》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109688215A (en) * 2018-12-24 2019-04-26 安徽经邦软件技术有限公司 Report reporting system and implementation method based on group management
CN109688215B (en) * 2018-12-24 2021-07-13 安徽经邦软件技术有限公司 Method for realizing report reporting based on group management
CN110097280A (en) * 2019-04-29 2019-08-06 兰州环境能源交易中心有限公司 Government and public organizations' diagnosis of energy saving and quota management system
CN113516444A (en) * 2021-04-23 2021-10-19 广州远正智能科技股份有限公司 Public institution energy consumption data mobile terminal calculation method, system and readable storage medium
CN113112245A (en) * 2021-04-30 2021-07-13 广州远正智能科技股份有限公司 Intelligent management method, system and storage medium for multi-level energy consumption quota of public institution

Similar Documents

Publication Publication Date Title
CN106251096A (en) A kind of public organizations' energy-consumption monitoring method based on the big data technique of cloud computing
CN106296041A (en) A kind of public organizations based on the big data technique of cloud computing energy consumption monitoring platform
CN105118005B (en) Communities ' Integrated management system
CN101706899A (en) Effective real estate user taxation information acquisition and management method
CN102332120A (en) Power intelligent business hall management system
CN111709626A (en) Water, electricity and heat comprehensive data abnormity analysis method and system, storage medium and terminal
CN114049150A (en) Engineering cost accounting management system
CN102467705A (en) Early warning mechanism for controlling operational risk of container terminal and method for implementing early warning mechanism
CN111080348A (en) Cost accounting control device applied to system economy and use method thereof
Guo et al. Research on the combinatorial optimization of EBs departure interval and vehicle configuration based on uncertain bi-level programming
Li et al. Emergy analysis-based study of the sustainable development of Kunming’s urban eco-economic system
CN113159607A (en) Intelligent management method, system and storage medium for public institution energy consumption quota
CN106548266A (en) A kind of unit operation mode decision method for considering hydro thermal coordination
Komor et al. Behavioral determinants of energy use in small commercial buildings; Implications for energy efficiency
CN114219222A (en) Renewable energy power tracking platform based on block chain technology
CN114529119A (en) Energy internet information consultation system
Üçtuğ et al. Life cycle assessment-based environmental impact analysis of a tier 4 data center: A case study in Turkey
Bilous Minimization of energy efficiency barriers in the context of optimization of management decisions in the process of sustainable development
Degaev Problems and prospects of billing systems in the housing and utilities sector of Russia
Lele et al. Research on design and implementation of smart energy system in digital economy era
Chenfei et al. Design and Implementation of an Intelligent Operation and Maintenance Management Cloud Platform for Green Buildings Group
Qu et al. Research on Accounting Information Sharing Mechanism:—Based on economic management perspective
Zhao et al. Research on the construction of data pool and the management model of data pool integrating block chain concept for ubiquitous electric power Internet of Things
Shen et al. Research on Power Enterprise Supplier Management System Based on Supplier Deep Portrait
CN206584397U (en) A kind of intelligent information management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104

RJ01 Rejection of invention patent application after publication