CN106295960A - A kind of Sewage Plant intelligence operation, maintenance and installations and facilities state analysis method - Google Patents

A kind of Sewage Plant intelligence operation, maintenance and installations and facilities state analysis method Download PDF

Info

Publication number
CN106295960A
CN106295960A CN201610613007.XA CN201610613007A CN106295960A CN 106295960 A CN106295960 A CN 106295960A CN 201610613007 A CN201610613007 A CN 201610613007A CN 106295960 A CN106295960 A CN 106295960A
Authority
CN
China
Prior art keywords
maintenance
sewage plant
equipment
score value
installations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610613007.XA
Other languages
Chinese (zh)
Inventor
柯艳春
邓志安
肖晓笛
邓光跃
顾韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN YONKER WATER CO Ltd
Original Assignee
HUNAN YONKER WATER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN YONKER WATER CO Ltd filed Critical HUNAN YONKER WATER CO Ltd
Priority to CN201610613007.XA priority Critical patent/CN106295960A/en
Publication of CN106295960A publication Critical patent/CN106295960A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention discloses a kind of Sewage Plant intelligence operation, safeguard and installations and facilities state analysis method, based on RCM theory, and the management system that combination divides in detail collectively forms.This theory is the reliability situation according to equipment and component thereof, logic decision analytic process is used to determine installations and facilities state, and work out maintenance program according to this, determine required maintenance content and rational maintenance type, suitable maintenance interval and maintenance level etc., thus reach the purpose of optimization maintenance.The maintenance carried out under this theoretical direction, plant area's equipment is divided into the parts collection relevant to function, and founding mathematical models is analyzed, on the one hand equipment state can be carried out real-time analysis and carry out preventive maintenance pole, reduce and avoid equipment rebuilding as far as possible, it is ensured that the safety of use.On the other hand, the maintenance program that RCM analytic process determines constantly can be modified in practice process, gradual perfection, and the double flat weighing apparatus of economy and benefit is better achieved.

Description

A kind of Sewage Plant intelligence operation, maintenance and installations and facilities state analysis method
Technical field
The present invention relates to technical field of sewage, particularly a kind of Sewage Plant intelligence operation, maintenance and installations and facilities shape State analyzes method.
Background technology
Water resources problems has become one of key factor of restriction China economic development.Sewage treatment plant pollutes control as water The finish node of system processed, is water prevention and cure of pollution and the pith of water resource saving work.Affect Sewage Plant treatment effeciency Principal element include reasonability and the height of Sewage Plant operation and maintenance level of processing technological flow.In recent years, country And local government puts into substantial amounts of fund and strengthens management, build large quantities of sewage treatment plant, but due to unreasonable PROCESS FOR TREATMENT flow process and fall behind operation management work cause Sewage Plant could not give play to its due treatment effect.
At present, the management of sewage treatment plant the most mainly relies on artificial regulation and control.Artificial intervention fortune The setting of line parameter, every day, inspection device facility operation situation, periodically carried out large repairs to equipment and cleaning to structures, with Upper all its premises of administration behavior are to put into substantial amounts of manpower and materials.When Sewage Plant carries out large repairs stopping production, operation can be given Enterprise causes certain economic loss.When processing effluent quality instability, also to investigate device damage one by one and cause processing ring The probability of joint disabler, this work is the most complicated and loaded down with trivial details.
Sewage treatment plant, as the emphasis infrastructure of social development, is the strong guarantee of social sustainable development.At place On the premise of reason flow process is reasonable, it is desirable to play its effect to greatest extent and will rely on high-caliber Operational Management System.Automatically The lifting to operation management work of making rapid progress of change degree brings unprecedented good opportunity.
Summary of the invention
The technical problem to be solved is, not enough for prior art, it is provided that a kind of Sewage Plant intelligence operation, dimension Protect and installations and facilities state analysis method.
For solving above-mentioned technical problem, the technical solution adopted in the present invention is: a kind of Sewage Plant intelligence operation, safeguard and Installations and facilities state analysis method, comprises the following steps:
1) initial value of each equipment of Sewage Plant or facility is set as 100 points;
2) if a certain equipment of current Sewage Plant breaks down, then deducting points this equipment, deduction S divides;Meanwhile, under general headquarters being had jurisdiction over The score value of the identical device of remaining Sewage Plant same position is modified;The equipment place environment that current Sewage Plant is broken down Under the score value of associate device be modified;Sewage Plant equipment depreciation time limit score value is set as 10 points, according to the operation of equipment Duration, often uses and deducts a corresponding mark in;
3) after equipment completes maintenance, safeguard record by using terminal to upload, record the content safeguarded and safeguard result, Increase safeguard result error value adjust option, be divided into: overhaul, light maintenance and General Maintenance, corresponding score value be respectively 2 points, 1 Point, 0.5 point, after safeguarding that record completes, the mark deducted before is added, further according to safeguarding that result error value adjusts option Select, deduct corresponding mark.
Step 2) in, the method that the score value of the identical device of remaining the Sewage Plant same position under having jurisdiction over general headquarters is modified For: the correction value of the identical device score value of remaining the Sewage Plant same position under the linchpin of deduction general headquarters, correction value computing formula is: repair On the occasion of the=the first correction factor * S.
The device damage reason of different sewage factory same loci has certain intercommunity, and corresponding associated device deduction of points can Occur to remind the operations staff of other Sewage Plant to watch out for failure condition.And the equipment deduction of points being associated is passive, so taking advantage of With correction factor.
First correction factor is 0.1~0.5.
The introducing of correction factor is because, and correlation coefficient deduction of points belongs to passive deduction of points, cause be not due to itself damage and Deduction of points, but a kind of prompting function, remind the Sewage Plant operation personnel that is correlated with to notice whether it exists fault occurrence condition.
To the equipment that current Sewage Plant breaks down the method that is modified of the score value of associate device at ambient be: Deduct the equipment that current Sewage Plant breaks down the correction score value of associate device score value at ambient, revise score value and calculate public affairs Formula is: revise score value=the second correction factor * S.
Second correction factor is 0.1~0.5.
Compared with prior art, the had the beneficial effect that present invention of the present invention by RCM(centered by reliability Maintenance, Reliability-Centered Maintenance) based on theory, and it is common to combine the management system divided in detail Constitute.This theory is the reliability situation according to equipment and component thereof, uses logic decision analytic process to determine installations and facilities shape State, and work out maintenance program according to this, determine required maintenance content and rational maintenance type, suitable maintenance interval and dimension Repair rank etc., thus reach the purpose of optimization maintenance.The maintenance carried out under this theoretical direction, plant area's equipment is divided into The parts collection that function is relevant, and founding mathematical models is analyzed, on the one hand equipment state can be carried out real-time analysis and Carry out preventive maintenance pole, reduce and avoid equipment rebuilding as far as possible, it is ensured that the safety of use.On the other hand, RCM analytic process determines Maintenance program constantly can be modified in practice process, gradual perfection, be better achieved economy and benefit double flat weighing apparatus.
Accompanying drawing explanation
Fig. 1 is structural representation and the web terminal surface chart of the present invention.
Fig. 2 is status lamp color and implication explanation.
Fig. 3 is that maintaining controls logic chart.
Fig. 4 is the RCM deduction of points rule as a example by aerator.
Detailed description of the invention
Native system from top to bottom all for Sewage Plant structures and auxiliary device thereof are divided by function into pretreatment unit, Biochemical unit, advanced treating, water unit and sludge treatment unit.Be divided under each technique unit structures, equipment, Valve, instrument and other.Wherein construct and under items, comprise design parameter, architectural drawing, failure logging, maintenance record, management Handbook;Comprise facility installation drawing paper under equipment item, safeguard record, log, description of equipment;Valve type is comprised under valve item Number, maintenance record;Mter model, maintenance record, description of equipment is comprised under instrument item;Pipe-line system and electricity is comprised under other Gas system etc..
All above project constitutes Maintenance Management System, and based on this system, carries out RCM data analysis.
After RCM systematic analysis, system can provide repair prompt.Attendant can be according to prompting counterweight point device facility Carry out the arrangement of maintenance time and part replacement, the most again repair typing is achieved to system, form maintenance note Record.
Described repair prompt is divided into two kinds, and the maintenance including conventional sense is pointed out and comments based on RCM data analysis system Sentence the repair prompt after state.When operation personnel is during routine is patrolled and examined, utilize terminal unit (mobile phone or panel computer) After scanning the bar code of machine, the data that terminal unit meeting display device facility is relevant, including designed breeding, drawing etc. Deng, the most also staff can be pointed out the need of carrying out General Maintenance to equipment according to intrasystem administrative manual.Such as add Add lubricating oil etc..
Evaluation method based on RCM data analysis system is as follows:
Listing for emphasis equipment and safeguard item, each check item has corresponding score value.When monitor probe monitors to exceed standard situation time, Communication can feed back early warning (by web terminal and APP end), be confirmed and by failure condition typing meter by operation personnel scene spot check Calculation machine system, system is by choosing a bales catch except corresponding scores.
The initial value of each equipment or facility is 100 points, should be enterprising at its initial value when repair status occurs in equipment Row deduction of points.Deduction of points mechanism is as follows:
1. the same class equipment of corresponding different water factory carries out (after the aerator of such as A water factory breaks down and deducts points, always deducting points The score value (correction value takes 0.1) through revising also deducted by the aerator of the same node of B water factory under portion's linchpin;Deduction of points item and right Answer score value as it is shown on figure 3, as a example by aerator, by the parametric classification of aerator, a class is important operational factor and parts, such as electricity Whether the forward and backward bearing of machine is changed.Two classes are minor parameter, as electric motor fan is changed.The score value of one class parameter is 2 points, two class ginsengs The score value of number is 1 point.
Illustrate: the parts of aerator and other equipment are different, it is adaptable to the parameter type of aerator is not necessarily fitted For other equipment.Each equipment one, two class parameter is worked out by operation personnel, but score value is constant, and i.e. one class parameter score value is 2 Point, two class parameter score values are 1 point.
Particularly, form shown in Fig. 3 is system background operation, after operation personnel logs in and safeguards system interface, by hooking Option feeds back to backstage bales catch except mark.
2. it is contemplated that a certain proportion of mark is deducted (such as at second pond between the associate device under same running environment In, out of service because of fault when whole sludge pumps, in may causing pond, sludge quantity can not be discharged in time and increase, in same pond The properly functioning of mud scraper will be affected, and in such cases, outside scrubbing dredge pump deduction score value, deduction is passed through and revises by mud scraper Mark (correction value takes 0.1)).
Illustrating: the mark of deduction is the deduction mark × correction factor of faulty equipment, such as in citing, sludge pump is deducted 2 points, then the mud scraper being associated deduction mark is that 2 × 0.1=0.2 divides.Faulty equipment specifically deducts points mark then according to fault feelings Condition is uploaded by app end or panel computer section by operation personnel.System is according to the deduction of points automatically of operation record.
Especially, whether equipment has relatedness is to be formulated by operation personnel, and Computer Engineer will be according to operation personnel System is made correct programming in logic by the relatedness equipment list provided;Its two, in system logic design process will regulation The equipment that system only has direct correlation relation to different plant areas with node location and same on-site and faulty equipment is carried out Correction value is deducted points, rather than the equipment of above-mentioned situation is not deducted points.
Especially, the purpose taking correction value is that warning is associated with plant area or the normal device of the same node of different plant areas There is failure risk, remind operation personnel's trouble saving to occur.
3. depreciable life score value total score is 10 points, averagely assigns to each year, according to the operation duration of equipment, often uses 1 year I.e. deduct corresponding mark.
Such as: total score is designated as 10 points, and the depreciable life of such as aerator is 5 years, then divide for 10/5=2, i.e. aerator uses Within full 1 year, detain 2 points.
When its mark (100 ~ 80 points) in certain score value region, corresponding equipment state display green in terminal unit; It is shown as yellow in 80 ~ 60 points;Less than 60 points the most shown in red.
Deduction of points mechanism refers to Fig. 4.As a example by aerator, a class two class parameter score value is 88 points;Associate device score value is 2 Point;Depreciation item mark 10 points;Total score 100 points.Increasing deviation value, the bonus point principle of deviation value is shown in the 4th point of detailed description of the invention. Deviation value total score is 20 points, and the premise of bonus point is that this equipment had deduction of points behavior and by maintenance, so it is total not result in equipment The situation more than 100 points is divided to occur.
4. special, after equipment completes maintenance, attendant is it is necessary that upload by terminal and safeguard record, and record is tieed up The content protected and safeguard result.Especially, increase and safeguard that result error value adjusts option, be divided into: overhaul, light maintenance and routine Safeguarding, corresponding score value is respectively 2 points, 1 point, 0.5 point.After safeguarding that record completes, the mark that system the most first will be deducted before (due to the mark of fault deduction) is added, and further according to safeguarding that result error value adjusts the selection of option, deducts corresponding mark.
Illustrating: deduction of points and bonus point are carried out by the personnel in different posies, deduction of points is uploaded operation record by operation personnel, and (fault is remembered Record) after deducted by system;Bonus point is increased by system after then being uploaded maintenance record by attendant.Although result mark does not change Becoming, but have passed through two steps, the personnel in different posies can not be intersected and carried out operation.Last at the maintenance record of attendant There will be maintenance scale option, respectively overhaul, light maintenance and General Maintenance, after attendant can select according to fault degree, System removes 2 points, 1 point or 0.5 point according to option bales catch.
In the present system, failure logging is responsible for uploading, arranging by operation personnel;Safeguard that record is then responsible for by maintenance department. In the 4th, deviation value is only adjusted by attendant, is one to maintenance of equipment result and feeds back and supplement.And remaining The deduction of points of 3 is determined by operation system, only plays the effect of failure logging and early warning.
The result more than operated first avoid the occurrence of equipment keeped in repair complete but what system was reported to the police always, secondly for setting Standby fault, repair have also embodied on score value
After using this system then, equipment can be judged the need of carrying out maintenance, no by attendant according to equipment running status Need again at the stop production to overhaul carrying out whole plant.
Below only as a example by aerator illustrate equipment RCM management and state analysis, but be simultaneously applicable to Sewage Plant other Equipment, illustrates its deduction of points mechanism the most one by one at this.The protection domain of this invention includes all devices in Sewage Plant system.

Claims (6)

1. a Sewage Plant intelligence is runed, is safeguarded and installations and facilities state analysis method, it is characterised in that comprise the following steps:
1) initial value of each equipment of Sewage Plant or facility is set as 100 points;
2) if a certain equipment of current Sewage Plant breaks down, then deducting points this equipment, deduction S divides;Meanwhile, under general headquarters being had jurisdiction over The score value of the identical device of remaining Sewage Plant same position is modified;The equipment place environment that current Sewage Plant is broken down Under the score value of associate device be modified;Sewage Plant equipment depreciation time limit score value is set as that T divides, during according to the operation of equipment Long, often use and deduct a corresponding mark in;
3) after equipment completes maintenance, safeguard record by using terminal to upload, record the content safeguarded and safeguard result, increase Add safeguard result error value adjust option, be divided into: overhaul, light maintenance and General Maintenance, corresponding score value be respectively 2 points, 1 point, 0.5 point, after safeguarding that record completes, the mark deducted before is added, further according to safeguarding that result error value adjusts the choosing of option Select, deduct corresponding mark.
Sewage Plant intelligence the most according to claim 1 operation, maintenance and installations and facilities state analysis method, its feature exists In, step 2) in, the method that the score value of the identical device of remaining the Sewage Plant same position under having jurisdiction over general headquarters is modified is: button The correction value of the identical device score value of remaining the Sewage Plant same position under having jurisdiction over except general headquarters, correction value computing formula is: correction value= First correction factor * S.
Sewage Plant intelligence the most according to claim 2 operation, maintenance and installations and facilities state analysis method, its feature exists In, the first correction factor is 0.1~0.5.
Sewage Plant intelligence the most according to claim 1 operation, maintenance and installations and facilities state analysis method, its feature exists In, step 2) in, to the equipment that current Sewage Plant breaks down the side that is modified of the score value of associate device at ambient Method is: deduct the equipment that current Sewage Plant breaks down the correction score value of associate device score value at ambient, revise score value Computing formula is: revise score value=the second correction factor * S.
Sewage Plant intelligence the most according to claim 4 operation, maintenance and installations and facilities state analysis method, its feature exists In, the second correction factor is 0.1~0.5.
Sewage Plant intelligence the most according to claim 1 operation, maintenance and installations and facilities state analysis method, its feature exists In, S=100*(0.8~0.9);T=100*(0.1~0.2).
CN201610613007.XA 2016-07-29 2016-07-29 A kind of Sewage Plant intelligence operation, maintenance and installations and facilities state analysis method Pending CN106295960A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610613007.XA CN106295960A (en) 2016-07-29 2016-07-29 A kind of Sewage Plant intelligence operation, maintenance and installations and facilities state analysis method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610613007.XA CN106295960A (en) 2016-07-29 2016-07-29 A kind of Sewage Plant intelligence operation, maintenance and installations and facilities state analysis method

Publications (1)

Publication Number Publication Date
CN106295960A true CN106295960A (en) 2017-01-04

Family

ID=57663377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610613007.XA Pending CN106295960A (en) 2016-07-29 2016-07-29 A kind of Sewage Plant intelligence operation, maintenance and installations and facilities state analysis method

Country Status (1)

Country Link
CN (1) CN106295960A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109507957A (en) * 2017-09-15 2019-03-22 进金生实业股份有限公司 Cloud Intelligent power saving system for water process industry
CN110533289A (en) * 2019-07-23 2019-12-03 湖南九层台环境科技有限公司 A kind of village methane-generating pit system for unified management
CN111832162A (en) * 2020-06-29 2020-10-27 重庆中法供水有限公司 Three-dimensional visual factory management system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109507957A (en) * 2017-09-15 2019-03-22 进金生实业股份有限公司 Cloud Intelligent power saving system for water process industry
CN109507957B (en) * 2017-09-15 2022-04-01 进金生实业股份有限公司 Cloud intelligent power-saving system for water treatment industry
CN110533289A (en) * 2019-07-23 2019-12-03 湖南九层台环境科技有限公司 A kind of village methane-generating pit system for unified management
CN111832162A (en) * 2020-06-29 2020-10-27 重庆中法供水有限公司 Three-dimensional visual factory management system

Similar Documents

Publication Publication Date Title
CN108628291B (en) Expert intelligent diagnosis system based on simulation platform in waste incineration plant
CN103745293B (en) A kind of RCM analysis methods
CN106295960A (en) A kind of Sewage Plant intelligence operation, maintenance and installations and facilities state analysis method
CN109740930A (en) Maintenance policy is formulated and Reliability assessment method, terminal and computer storage medium
CN106875115A (en) A kind of equipment scheduling method for early warning and system based on big data
CN104820908A (en) A risk-based equipment integrity management system for oil refining enterprises
CN107176628A (en) A kind of Dispatching Control System and method for sewerage
CN110162555A (en) A kind of fired power generating unit start and stop and drop power output measure of supervision
CN109358587B (en) Hydroelectric generating set state maintenance decision method and system
CN109376872A (en) A kind of offshore wind farm unit maintenance system
CN113537523A (en) Substation equipment state maintenance and decision-making assisting method
CN111652758A (en) Hydropower station emergency disposal auxiliary system and emergency method
CN109885019A (en) A kind of fan condition automatic judging method
CN106600110A (en) Improving method and system for lean management of multi-cycle integrated outage plan of large power grid
JP2002316141A (en) Control center and network system for water treatment operation
CN209181200U (en) A kind of data center T4 grades of cold sources redundant safety energy efficiency control system
CN106557839B (en) Equipment maintenance strategy optimization method and system based on big data
CN108257041A (en) A kind of nuclear power plant system health assessment system
CN114723319B (en) Control method, system, medium and electronic terminal of full-flow water system
CN110275497A (en) A kind of determination method of the prevention and control of pollution source equipment harness status based on operation index LWRT-AQIOE
CN111675257B (en) Remote centralized control method and system for sewage treatment plant
CN112116107A (en) Water affair operation management method, system and computer readable storage medium
CN108256663A (en) A kind of nuclear power interruption of service risk real-time predicting method
CN112783104A (en) Intelligent monitoring system for factory
CN214301941U (en) Intelligent rainwater monitoring control and waterlogging prevention system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 518052 Room 201, building A, 1 front Bay Road, Shenzhen Qianhai cooperation zone, Shenzhen, Guangdong

Applicant after: Shenzhen Yongqing water limited liability company

Address before: 410330 the 319 National Road of Liuyang National Economic Development Zone, Changsha, Hunan.

Applicant before: HUNAN YONKER WATER CO., LTD.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104