CN106295900A - A kind of city intelligent energy management system - Google Patents

A kind of city intelligent energy management system Download PDF

Info

Publication number
CN106295900A
CN106295900A CN201610692074.5A CN201610692074A CN106295900A CN 106295900 A CN106295900 A CN 106295900A CN 201610692074 A CN201610692074 A CN 201610692074A CN 106295900 A CN106295900 A CN 106295900A
Authority
CN
China
Prior art keywords
load
energy
model
time
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610692074.5A
Other languages
Chinese (zh)
Inventor
杜玉吉
钱辉金
邢甜媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Energy Saving Research Institute Co Ltd
Original Assignee
Changzhou Energy Saving Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Energy Saving Research Institute Co Ltd filed Critical Changzhou Energy Saving Research Institute Co Ltd
Priority to CN201610692074.5A priority Critical patent/CN106295900A/en
Publication of CN106295900A publication Critical patent/CN106295900A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2465Query processing support for facilitating data mining operations in structured databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2216/00Indexing scheme relating to additional aspects of information retrieval not explicitly covered by G06F16/00 and subgroups
    • G06F2216/03Data mining
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2216/00Indexing scheme relating to additional aspects of information retrieval not explicitly covered by G06F16/00 and subgroups
    • G06F2216/05Energy-efficient information retrieval
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Abstract

The invention discloses a kind of city intelligent energy management system, under the air-conditioning comfort premise of the urban energy management system of present invention terminal temperature difference in ensureing energy feed region, realize the hydraulic equilibrium of whole energy transmission lines system, the loss that minimizing system is unnecessary, and assist to improve Architectural Equipment operation level, reduce maintenance management personnel and overspending.The method that the present invention uses is by arranging a set of analog systems, load prediction to terminal temperature difference in advance, set the running status that whole system is optimum, then carrying out real-time optimizing and revising by real-time feedback control system, it is achieved optimization, the most energy-conservation operation purpose.

Description

A kind of city intelligent energy management system
Technical field
The present invention relates to a kind of energy management system.
Background technology
Urban energy supply includes power supply, cooling, heat supply, confession combustion gas, supplying hot water etc., and this is for the cooling in city, confession Hot systems, proposes a kind of novel city intelligent energy conservation way.The cooling in city, heat supply refer to a certain specific region Interior buildings, by special energy centre centralized system for cold water or hot water, are supplied to region building concentration by region pipe network Cold heat supply.
City cold and heat supply system also exists characteristic complicated and changeable, and system is in the running of every day, by external rings Border condition and the impact of the condition of use, running status all the time is all ceaselessly changing.For this change, conventional city Energy supply system is to reach energy-conservation purpose, uses variable flow system more, and each branch service supplies water according to self needing regulation The frequency of circulating pump.But the change of a branch service flow, certainly will affect the change of supervisor's net flow system flow, and supervisor's net is The change of system certainly will cause again the change of other branch service flows, and the hydraulic regime between branch system influences each other so that Whole air conditioning system is run in the environment of being constantly in a disorderly change, and the imbalance of pipe network system is at city multiple-energy-source Show particularly evident in the system of associating energy supply.On this basis, a lot of designing units can consider in each pipe-line system Increase some self-balancing valves to regulate.The result ultimately resulted in is exactly: the energy consumption of system variable-flow operation saving is wasted again Overcoming on the resistance of balanced valve, the most stable of operation of the system that do not realizes and truly energy-conservation.
Usual whole urban energy supply system be divided into hot and cold water prepare, hot and cold water conveying and hot and cold water use three portions Point, form loop, secondary loop and load side loop.Loop by Cooling and Heat Source (boiler, heat pump, handpiece Water Chilling Units etc.), Primary pump, confession return pipe and balance pipe composition, be responsible for the preparation of hot and cold water;Secondary loop by communicating pipe, outdoor transmission pipeline network, two Level pump, plate change primary side for water return pipeline, plate type heat exchanger composition, responsible hot and cold water conveying;Load side loop is by plate-type heat-exchange Device, end water circulating pump, end supply backwater pipe network, tail end air conditioner equipment form, and are responsible for the use of hot and cold water.As shown in Figure 1.
The control mode of traditional energy management system is simple feedback control, i.e. according to temperature, pressure transducer Line is monitored, and signal is fed back to corresponding water pump and electrically operated valve regulates accordingly.
(1) the index circuit pressure reduction that first load side end water circulating pump is typically according to detecting carries out frequency conversion control System, this control be wind dish based on terminal temperature difference, coil pipe or packaged air conditioner etc. be mounted with electric two-way valve or electric adjustable Joint valve.When end-equipment starts, electric two-way valve or electric control valve are opened or regulation, when end-equipment quits work, and electricity Dynamic two-port valve or electric control valve are also accordingly turned off.Along with electric two-way valve or electric control valve are opened, closed or regulate, supply back Pressure reduction between water pipe can change therewith.Now, pressure difference signal is fed back to load side water pump by differential pressure controller, utilizes and becomes Frequency modulation speed meets the basic pressure difference of least favorable user.
The problem existed: the change of outdoor climate etc. and the change of indoor temperature and humidity, if not affecting opening of electric two-way valve Closing or the aperture of electric control valve, water circulating pump will not carry out variable-flow operation, often result in the waste of energy;More have The switch of user's end of profit or regulation affect the pressure reduction of index circuit the most hardly, and water circulating pump is the same will not frequency modulation fortune OK.
(2) secondly the change of the temperature that two stage pump typically changes secondary side water main according to the plate detected carries out frequency conversion Control, when plate change secondary side supply water temperature change time, the frequency of regulation two stage pump, ensure that plate changes secondary side supply water temperature permanent Fixed.
The problem existed: the temperature signal on secondary side water main has certain time delay, it is impossible to feed back end in time The most real service condition of user;The change of one of them user's two stage pump flow can affect the change of supervisor's net flow system flow, The change of supervisor's net flow system flow can affect again the change of other branch service flows, influences each other, mutually between branch system Interference, causes system to be constantly in unbalanced running status.
(3) primary pump often sets according to the metered flow of Cooling and Heat Source equipment, and constant flow runs.
The problem existed: the reality such as equipment such as heat pump main frame, can run under 50% ~ 150% state of metered flow, and not Must be that the device efficiency under metered flow is the highest, cause system operationally, the flow between a two stage pump has difference in flow, and one Directly it is being balanced by balance pipe, is causing the waste of energy.
(4) additionally, system often arranges such as static balancing valve or dynamic balance valve, according to design conditions or debugging working condition Set initial opening, according to the resistance of branch path is increased or decreased, realize the balance of pipe network.
Existing problems: design conditions or debugging working condition are often widely different with actual operating mode, and the effect of balanced valve is past Toward widely different with expected effect;The regulation of balanced valve is a kind of regulation increasing resistance of pipe system loss, setting the most, energy Amount waste is the most serious.
Summary of the invention
It is an object of the invention to provide a kind of city intelligent energy management system, it is achieved the water of whole energy transmission lines system Dynamic balance, reduces the loss that system is unnecessary.
The present invention solves the concrete scheme of its technical problem:
A kind of city intelligent energy management system, comprises the steps:
The first step: set up the simulation management model of whole urban energy supply;
Energy preparation system, pipe network conveying system and user are used the system integration in unification by urban energy supply phantom In one big system, simulation management model establishment step is as follows:
(1) set up the cooling and heating load computation model of energy supply user: as much as possible will be for all buildings of energy range according to difference Building industry situation, different set up corresponding BUILDINGS MODELS towards, different building height, the meteorologic parameter outdoor by input calculates The cooling and heating load of all buildings in the range of going out energy supply;
(2) all of for system distributing system is set up model: include pipe network blood circulation, secondary pipe network blood circulation, an end End subscriber blood circulation;
(3) performance parameter of all devices in gathering system, including load performance parameter and the pump operating characteristic of heat pump main frame Curve;
(4) by said system, model, device performance parameters all being combined, a whole set of simulation management mould is formed Type;
Second step: set up the customer charge prediction management system in the range of energy supply;
Customer charge prediction management system is premise based on cooling and heating load computation model, can be by the meteorological money of following a period of time Material parameter input, to cooling and heating load computation model, calculates the cooling and heating load numerical value of following a period of time, in conjunction with history run number According to, automatically generate future customer load data;This customer charge prediction management system mainly includes load Analysis prediction, load pipe Reason;
(1) load Analysis prediction is based on carry calculation model, the phantom of the building by setting up, and inputs location Typical meteorological parameter or following meteorologic parameter, can to Building Indoor Environment parameter, architectural environment control system operation conditions and Building energy consumption carries out annual hourly load simulation and forecast and calculates;
(2) load management is to be analyzed by the load data of load Analysis prediction data with actual motion, by big number According to management, optimize correcting load computation model, and accurate can analyze future load situation;
3rd step: set up real-time energy supply data collecting system;
The collection of real time data mainly includes the collection of Outdoor Air Parameters, the collection of end-equipment service condition, energy supplying system The collection of actual operating data,
(1) collection of Outdoor Air Parameters: Real-time Collection outdoor temperature humidity, atmospheric pressure parameter;
(2) collection of end-equipment service condition: include the unlatching of end-equipment, close, regulate change;
(3) collection of energy supplying system actual operating data: refer to monitor energy supplying system practical operation situation, gathers real-time confession backwater Temperature, pressure, flow actual operating data;
4th step: predicted load inputs simulation management model, finds out the initial launch operating point of optimum;
Load prediction is managed the predicted load that systematic analysis goes out, is input in the load model assembly of simulation management model, Run the phantom of urban energy supply, calculate optimum according to pipe network distributing system model and equipment performance characteristics analysis meter Initial launch operating point;
5th step: according to simulation results, initialization system runs optimal initial launch operating point;
The optimal operating condition point 4th step simulation run obtained, by control system, is input in actual energy supplying system, makees Run optimal initial launch operating point for system, energy supplying system is regulated for the first time;
6th step: the service data that timing acquiring is real-time, inputs simulation management model, calculates real-time optimal operating condition; According to the data of energy supply data collecting system Real-time Collection, timing input simulation management model, analysis meter calculates real-time Optimal operating condition point;
7th step: according to simulation results, initialization system runs optimal real time execution operating point;
By the 6th step calculated optimal operating condition point data, by control system, it is input in actual energy supplying system, right Energy supplying system regulates again, has both ensured the air-conditioning using effect of terminal temperature difference in energy feed region, can realize again whole The secondary hydraulic equilibrium of individual energy transmission lines system, the optimal operating condition point that the system that reaches is real-time;
8th step: set up large database concept, periodically optimizes load prediction management system and simulation management model so that it is at utmost connect Nearly practical situation;Set up the large database concept of whole urban energy supply, periodically optimize load prediction management system and simulation management Model so that it is at utmost close to practical situation, runs to provide for system optimization and supplies essentially according to, it is achieved whole urban energy The wisdomization answering system manages.
The air-conditioning of the urban energy management system of present invention terminal temperature difference in ensureing energy feed region uses comfortable Under degree premise, it is achieved the hydraulic equilibrium of whole energy transmission lines system, reduce the loss that system is unnecessary, and assist raising building to set Standby operation level, reduces maintenance management personnel and overspending.The method that the present invention uses is by arranging a set of analog systems, Load prediction to terminal temperature difference in advance, is set the running status that whole system is optimum, then is existed by real-time feedback control system Carry out real-time optimizing and revising, it is achieved optimization, the most energy-conservation operation purpose.
Accompanying drawing explanation
Fig. 1 is traditional cities energy supply system control principle simplification figure.
Fig. 2 is the urban energy supply system management method system flow chart of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawings the present invention is described in further detail, but protection scope of the present invention is not limited to Described embodiment.
Urban energy supply system management method system flow chart is as in figure 2 it is shown, specifically comprise the following steps that
The first step: set up the simulation management model of whole urban energy supply;
Energy preparation system, pipe network conveying system and user are used the system integration in unification by urban energy supply phantom In one big system.Phantom is the nearest with the degree of closeness of real system, and whole system is controlled the most favourable by simulation result, because of The most crucial content of this present invention is exactly to must be set up the phantom most like with reality.Building of Simulation Model step is as follows:
(1) set up the cooling and heating load computation model of energy supply user: as much as possible will be for all buildings of energy range according to difference Building industry situation, different set up corresponding BUILDINGS MODELS, by ginsengs such as the meteorological datas that input is outdoor towards, different building height Number is the cooling and heating load of all buildings in the range of can calculating energy supply;
(2) all of for system distributing system is set up model: include pipe network blood circulation, secondary pipe network blood circulation, an end End subscriber blood circulation.
(3) performance of all devices in gathering system: such as part load performance parameter, the pump operating characteristic of heat pump main frame Curve etc..
(4) by said system, model, device performance parameters all being combined, a whole set of simulation management is formed Model.
Second step: set up the customer charge prediction management system in the range of energy supply;
Customer charge prediction management system is premise based on cooling and heating load computation model, except can be by the gas of following a period of time As the parameter inputs such as data to cooling and heating load computation model, calculate outside the cooling and heating load numerical value of following a period of time, it is also possible to In conjunction with history data, automatically generate future customer load data.This management system mainly includes load Analysis prediction, load Management.
(1) load Analysis prediction is based on carry calculation model, the phantom of the building by setting up, and inputs place The data such as area typical meteorological parameter or following meteorologic parameter, can be to ambient parameter, architectural environments such as the architecture indoor wet light of heat Control system operation conditions and building energy consumption etc. carry out annual 8760 hours hourly load simulation and forecasts and calculate.
(2) load management is to be analyzed by the load data of load Analysis prediction data with actual motion, passes through Big data management, optimizes correcting load computation model, and accurate can analyze future load situation.
3rd step: set up real-time energy supply data collecting system;
The collection of real time data mainly includes the collection of Outdoor Air Parameters, the collection of end-equipment service condition, energy supplying system The collection of actual operating data.
(1) collection of Outdoor Air Parameters: the change of outdoor microenvironment can affect the accuracy of prediction load equally, passes through The parameters such as Real-time Collection outdoor temperature humidity, atmospheric pressure, provide reliable analytical data for load prediction management system.
(2) collection of end-equipment service condition: the start and stop of end-user equipment can enter along with personnel or leave and send out Changing, actually used load can along with the unlatching of end-equipment, close, there is the change of artificial property in regulation etc..Only by negative Lotus prediction management system is cannot really to grasp the change of end actual load, the most also needs to gather end-equipment and uses feelings Condition data use the correction of load in real time.
(3) collection of energy supplying system actual operating data: refer to monitor energy supplying system practical operation situation, gather real-time confession The actual operating data such as return water temperature, pressure, flow.
4th step: predicted load inputs simulation management model, finds out the initial launch operating point of optimum;
Load prediction is managed the predicted load that systematic analysis goes out, is input in the load model assembly of simulation management model. Run the phantom of urban energy supply, analyze according to pipe network distributing system model and equipment performance characteristics etc. and calculate optimum Initial launch operating point.
5th step: according to simulation results, initialization system runs optimal initial launch operating point;
The optimal operating condition point 4th step simulation run obtained, by control system, is input in actual energy supplying system, makees Run optimal initial launch operating point for system, energy supplying system is regulated for the first time.
6th step: the service data that timing acquiring is real-time, inputs simulation management model, calculates real-time optimum operation work Condition;
According to the data of energy supply data collecting system Real-time Collection, input simulation management model regularly (can be set), analyze Calculate real-time optimal operating condition point.
7th step: according to simulation results, initialization system runs optimal real time execution operating point;
By the 6th step calculated optimal operating condition point data, by control system, it is input in actual energy supplying system, right Energy supplying system regulates again.Both ensured the air-conditioning using effect of terminal temperature difference in energy feed region, and can realize again whole The secondary hydraulic equilibrium of individual energy transmission lines system, the optimal operating condition point that the system that reaches is real-time.
8th step: set up large database concept, periodically optimizes load prediction management system and simulation management model so that it is maximum journey Degree is close to practical situation.
Set up the large database concept of whole urban energy supply, the energy supply pipe including house, business, hotel, office etc. Reason data.Periodically optimize load prediction management system and simulation management model so that it is at utmost close to practical situation, for system Optimized running provides the wisdomization management essentially according to, it is achieved whole urban energy supply system.
(1) set up urban energy data base, city difference can be carried out, with diagnosing, providing for policymaker at different levels by object Multidimensional, directly perceived, comprehensive, deep load prediction and simulation management model data, lay good for urban energy planning next time Good basis.
(2) setting up urban energy data base, setting up can be to the energy resource consumption carrying out Intelligent Support with energy and emission reduction work Information network.By energy resource consumption information network, can consult at any time each time with can situation and energy-conservation with energy equipment Situation, scrap build situation.Can be to the power consumption behavior of city difference energy object and energy market segmentation, it is each right to automatically analyze The use energy index of elephant, gives warning in advance to energy consumption trend, exercises supervision energy-saving and emission-reduction work.

Claims (1)

1. a city intelligent energy management system, it is characterised in that comprise the steps:
The first step: set up the simulation management model of whole urban energy supply;
Energy preparation system, pipe network conveying system and user are used the system integration in unification by urban energy supply phantom In one big system, simulation management model establishment step is as follows:
Set up the cooling and heating load computation model of energy supply user: all buildings by confession energy range as much as possible are built according to different Building industry situation, different set up corresponding BUILDINGS MODELS towards, different building height, the meteorologic parameter outdoor by input can calculate The cooling and heating load of all buildings in the range of going out energy supply;
All of for system distributing system is set up model: include that pipe network blood circulation, secondary pipe network blood circulation, an end are used Family blood circulation;
The performance parameter of all devices in gathering system, load performance parameter and pump operating characteristic including heat pump main frame are bent Line;
By said system, model, device performance parameters all being combined, form a whole set of simulation management model;
Second step: set up the customer charge prediction management system in the range of energy supply;
Customer charge prediction management system is premise based on cooling and heating load computation model, can be by the meteorological money of following a period of time Material parameter input, to cooling and heating load computation model, calculates the cooling and heating load numerical value of following a period of time, in conjunction with history run number According to, automatically generate future customer load data;This customer charge prediction management system mainly includes load Analysis prediction, load pipe Reason;
(1) load Analysis prediction is based on carry calculation model, the phantom of the building by setting up, and inputs location Typical meteorological parameter or following meteorologic parameter, can to Building Indoor Environment parameter, architectural environment control system operation conditions and Building energy consumption carries out annual hourly load simulation and forecast and calculates;
(2) load management is to be analyzed by the load data of load Analysis prediction data with actual motion, by big number According to management, optimize correcting load computation model, and accurate can analyze future load situation;
3rd step: set up real-time energy supply data collecting system;
The collection of real time data mainly includes the collection of Outdoor Air Parameters, the collection of end-equipment service condition, energy supplying system The collection of actual operating data,
(1) collection of Outdoor Air Parameters: Real-time Collection outdoor temperature humidity, atmospheric pressure parameter;
(2) collection of end-equipment service condition: include the unlatching of end-equipment, close, regulate change;
(3) collection of energy supplying system actual operating data: refer to monitor energy supplying system practical operation situation, gathers real-time confession backwater Temperature, pressure, flow actual operating data;
4th step: predicted load inputs simulation management model, finds out the initial launch operating point of optimum;
Load prediction is managed the predicted load that systematic analysis goes out, is input in the load model assembly of simulation management model, Run the phantom of urban energy supply, calculate optimum according to pipe network distributing system model and equipment performance characteristics analysis meter Initial launch operating point;
5th step: according to simulation results, initialization system runs optimal initial launch operating point;
The optimal operating condition point 4th step simulation run obtained, by control system, is input in actual energy supplying system, makees Run optimal initial launch operating point for system, energy supplying system is regulated for the first time;
6th step: the service data that timing acquiring is real-time, inputs simulation management model, calculates real-time optimal operating condition;
According to the data of energy supply data collecting system Real-time Collection, timing input simulation management model, analysis meter calculates reality Time optimal operating condition point;
7th step: according to simulation results, initialization system runs optimal real time execution operating point;
By the 6th step calculated optimal operating condition point data, by control system, it is input in actual energy supplying system, right Energy supplying system regulates again, has both ensured the air-conditioning using effect of terminal temperature difference in energy feed region, can realize again whole The secondary hydraulic equilibrium of individual energy transmission lines system, the optimal operating condition point that the system that reaches is real-time;
8th step: set up large database concept, periodically optimizes load prediction management system and simulation management model so that it is at utmost connect Nearly practical situation;Set up the large database concept of whole urban energy supply, periodically optimize load prediction management system and simulation management Model so that it is at utmost close to practical situation, runs to provide for system optimization and supplies essentially according to, it is achieved whole urban energy The wisdomization answering system manages.
CN201610692074.5A 2016-08-19 2016-08-19 A kind of city intelligent energy management system Pending CN106295900A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610692074.5A CN106295900A (en) 2016-08-19 2016-08-19 A kind of city intelligent energy management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610692074.5A CN106295900A (en) 2016-08-19 2016-08-19 A kind of city intelligent energy management system

Publications (1)

Publication Number Publication Date
CN106295900A true CN106295900A (en) 2017-01-04

Family

ID=57661671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610692074.5A Pending CN106295900A (en) 2016-08-19 2016-08-19 A kind of city intelligent energy management system

Country Status (1)

Country Link
CN (1) CN106295900A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108921412A (en) * 2018-06-22 2018-11-30 中船第九设计研究院工程有限公司 A kind of project feasibility assessment system based on simulation intelligence
CN109373438A (en) * 2018-09-11 2019-02-22 太原理工大学 Heating energy-saving control method and system based on transfer learning algorithm
CN109740888A (en) * 2018-12-24 2019-05-10 新奥数能科技有限公司 The calculation method and device of energy loss, storage medium, electronic device
CN110175785A (en) * 2019-05-30 2019-08-27 杭州安脉盛智能技术有限公司 Extending type energy lean supply method and system
CN110244576A (en) * 2019-05-31 2019-09-17 大连海心信息工程有限公司 A kind of two net balance methods adjusted based on Computer Simulation
CN111025895A (en) * 2019-04-21 2020-04-17 贾继刚 Building energy-saving control system based on artificial intelligence
CN111090241A (en) * 2018-10-24 2020-05-01 中国电力科学研究院有限公司 Energy system visualization method
CN111442478A (en) * 2020-03-10 2020-07-24 珠海派诺科技股份有限公司 Air conditioning system optimization control method, intelligent terminal and storage device
CN111626453A (en) * 2020-02-20 2020-09-04 南京绿慧能源科技有限公司 Positive feedback energy station group control system, method, storage medium and electronic equipment
CN113671830A (en) * 2021-08-10 2021-11-19 浙江浙能技术研究院有限公司 Thermal power generating unit cold end optimization closed-loop control method based on intelligent scoring
CN113776143A (en) * 2021-09-17 2021-12-10 江苏图创建筑工程有限公司 Energy-saving pipeline combined structure and method for reducing fluid resistance of efficient cold and heat supply system
CN113819513A (en) * 2021-10-19 2021-12-21 吉林建筑大学 Urban clean heat supply control method and system based on artificial intelligence
CN113836785A (en) * 2021-07-28 2021-12-24 南京尔顺科技发展有限公司 Municipal regional intelligent water supply system and artificial intelligent control optimization method thereof
CN114440419A (en) * 2021-12-31 2022-05-06 博锐尚格科技股份有限公司 Control method, device and equipment for secondary pump system of cold station and storage medium
WO2023004809A1 (en) * 2021-07-30 2023-02-02 西门子(中国)有限公司 Modeling method and apparatus for smart energy management system, and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100256958A1 (en) * 2007-11-12 2010-10-07 The Industry & Academic Cooperation In Chungnam National University Method for predicting cooling load
CN104515271A (en) * 2013-09-30 2015-04-15 代建国 Energy conservation optimization control system and method for central air conditioner refrigeration station system
CN104566765A (en) * 2013-10-16 2015-04-29 嘉日国际集团控股有限公司 Overall energy saving control method of central air conditioner
CN104791903A (en) * 2015-04-30 2015-07-22 北京上庄燃气热电有限公司 Intelligent heating network dispatching system
CN105868487A (en) * 2016-04-11 2016-08-17 中国建筑科学研究院 Energy saving expert system based on energy consumption device models

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100256958A1 (en) * 2007-11-12 2010-10-07 The Industry & Academic Cooperation In Chungnam National University Method for predicting cooling load
CN104515271A (en) * 2013-09-30 2015-04-15 代建国 Energy conservation optimization control system and method for central air conditioner refrigeration station system
CN104566765A (en) * 2013-10-16 2015-04-29 嘉日国际集团控股有限公司 Overall energy saving control method of central air conditioner
CN104791903A (en) * 2015-04-30 2015-07-22 北京上庄燃气热电有限公司 Intelligent heating network dispatching system
CN105868487A (en) * 2016-04-11 2016-08-17 中国建筑科学研究院 Energy saving expert system based on energy consumption device models

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108921412B (en) * 2018-06-22 2021-12-24 中船第九设计研究院工程有限公司 Project feasibility evaluation system based on simulation intelligence
CN108921412A (en) * 2018-06-22 2018-11-30 中船第九设计研究院工程有限公司 A kind of project feasibility assessment system based on simulation intelligence
CN109373438A (en) * 2018-09-11 2019-02-22 太原理工大学 Heating energy-saving control method and system based on transfer learning algorithm
CN111090241A (en) * 2018-10-24 2020-05-01 中国电力科学研究院有限公司 Energy system visualization method
CN109740888A (en) * 2018-12-24 2019-05-10 新奥数能科技有限公司 The calculation method and device of energy loss, storage medium, electronic device
CN111025895A (en) * 2019-04-21 2020-04-17 贾继刚 Building energy-saving control system based on artificial intelligence
CN110175785A (en) * 2019-05-30 2019-08-27 杭州安脉盛智能技术有限公司 Extending type energy lean supply method and system
CN110244576A (en) * 2019-05-31 2019-09-17 大连海心信息工程有限公司 A kind of two net balance methods adjusted based on Computer Simulation
CN110244576B (en) * 2019-05-31 2022-05-17 大连海心信息工程有限公司 Two-network balancing method based on computer simulation adjustment
CN111626453A (en) * 2020-02-20 2020-09-04 南京绿慧能源科技有限公司 Positive feedback energy station group control system, method, storage medium and electronic equipment
CN111442478A (en) * 2020-03-10 2020-07-24 珠海派诺科技股份有限公司 Air conditioning system optimization control method, intelligent terminal and storage device
CN113836785A (en) * 2021-07-28 2021-12-24 南京尔顺科技发展有限公司 Municipal regional intelligent water supply system and artificial intelligent control optimization method thereof
CN113836785B (en) * 2021-07-28 2024-02-13 南京尔顺科技发展有限公司 Municipal area intelligent water supply system and artificial intelligent control optimization method thereof
WO2023004809A1 (en) * 2021-07-30 2023-02-02 西门子(中国)有限公司 Modeling method and apparatus for smart energy management system, and storage medium
CN113671830A (en) * 2021-08-10 2021-11-19 浙江浙能技术研究院有限公司 Thermal power generating unit cold end optimization closed-loop control method based on intelligent scoring
CN113776143A (en) * 2021-09-17 2021-12-10 江苏图创建筑工程有限公司 Energy-saving pipeline combined structure and method for reducing fluid resistance of efficient cold and heat supply system
CN113819513A (en) * 2021-10-19 2021-12-21 吉林建筑大学 Urban clean heat supply control method and system based on artificial intelligence
CN114440419A (en) * 2021-12-31 2022-05-06 博锐尚格科技股份有限公司 Control method, device and equipment for secondary pump system of cold station and storage medium
CN114440419B (en) * 2021-12-31 2023-10-27 博锐尚格科技股份有限公司 Control method, device, equipment and storage medium of cold station secondary pump system

Similar Documents

Publication Publication Date Title
CN106295900A (en) A kind of city intelligent energy management system
US20210123625A1 (en) Low-cost commissioning method for the air-conditioning systems in existing large public buildings
CN102541015B (en) Intelligent energy efficiency control system and method
CN104698843B (en) A kind of data center's energy-saving control method based on Model Predictive Control
CN201255459Y (en) Weather compensator
CN108916986A (en) The secondary network flow-changing water dynamic balance of information physical fusion regulates and controls method and system
CN109932896A (en) A kind of control method and system of building energy consumption
CN101949559A (en) Intelligent energy-saving mixed water heat supply method
CN114383299B (en) Central air-conditioning system operation strategy optimization method based on big data and dynamic simulation
CN107274303A (en) City heat supply energy consumption wisdom management and control technology platform
Li et al. Reinforcement learning of room temperature set-point of thermal storage air-conditioning system with demand response
Wang et al. Energy consumption prediction for water-source heat pump system using pattern recognition-based algorithms
CN204943795U (en) A kind of central air conditioner room efficiency optimization system
CN114576698B (en) Multi-target monitoring based active disturbance rejection source network tail end collaborative self-optimization-seeking heat supply regulation and control method
CN109917646A (en) A kind of district cooling and heating equipment optimization operating system and method
CN202338984U (en) Energy-saving system of central air conditioner
Meng et al. Reduction in on-off operations of an air source heat pump with active thermal storage and demand response: An experimental case study
CN112781131A (en) Method for analyzing operation energy efficiency of refrigerating machine room and achieving high efficiency and energy conservation after optimization
Sun et al. Research on control strategy integrated with characteristics of user's energy-saving behavior of district heating system
Lei et al. Prediction method of energy consumption for high building based on LMBP neural network
CN105115113A (en) Energy efficiency optimizing system of central air-conditioner room
CN105299846A (en) Machine room group control device and method based on overall relevance optimization
Li et al. Control method of multi-energy system based on layered control architecture
Ma et al. Test and evaluation of energy saving potentials in a complex building central chilling system using genetic algorithm
Tarasov et al. Mathematical modeling of the forecast and standby heating modes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104