CN106295095A - New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity - Google Patents
New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity Download PDFInfo
- Publication number
- CN106295095A CN106295095A CN201510250170.XA CN201510250170A CN106295095A CN 106295095 A CN106295095 A CN 106295095A CN 201510250170 A CN201510250170 A CN 201510250170A CN 106295095 A CN106295095 A CN 106295095A
- Authority
- CN
- China
- Prior art keywords
- low permeability
- pressure
- production capacity
- prediction
- sandstone reservoir
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The present invention provides a kind of new method based on Conventional Logs prediction low permeability sandstone reservoir production capacity, should include based on the new method of Conventional Logs prediction low permeability sandstone reservoir production capacity: step 1, combine well-log information according to core analyzing data, obtain underlying parameter;Step 2, determines flow coefficient, free-boundary problem;Step 3, utilizes multiple regression to set up yield Quantitative Prediction Model;Step 4, sets up capability forecasting simplicity plate, is predicted low permeability sandstone reservoir production capacity;Step 5, sets up pressure break and selects layer plate, evaluates low permeability sandstone reservoir the need of carrying out pressure break;Step 6, sets up post-flush production prediction plate, post-flush production is carried out quantitative forecast.Current oil field high degree of prospecting stage hypotonic saturating sandstone reservoir evaluating production capacity and the difficulty of prediction should be solved, it is achieved that low permeability sandstone reservoir production capacity is qualitative and quantitative assessment based on new method of Conventional Logs prediction low permeability sandstone reservoir production capacity.
Description
Technical field
The present invention relates to oil exploration technology field, especially relate to a kind of based on Conventional Logs prediction hyposmosis sand
The new method of rock reservoir productivity.
Background technology
Started both at home and abroad the research of low permeability reservoir evaluating production capacity earlier, but be mostly the macroscopical geology to low permeability reservoir and
The qualitative description of micro-flow characteristics.Forefathers from geology, well logging, stratum, the many-sides such as change carried out comprehensive study,
Achieve important understanding and achievement, oil-gas exploration has played important function, be concentrated mainly on the following aspects: 1. lead to
Cross having been found that low-permeability oil deposit geologic feature is studied, specify that low-permeability oil deposit sedimentation type and Dominated Factors;2. low
Permeable reservoir strata seepage theory aspect, imbibition mechanism is goed deep into by Chinese scholars by substantial amounts of experiment and theoretical research
Ground is analyzed and establishes the imbibition mathematical model of some low-permeability fissured oil reservoir, and result of study shows in low infiltration sandrock
There is obvious non-darcy flow;The most different low-permeability oil deposits, the rock core that perm-plug method is close, due to throat size
Different with the regularity of distribution, it is the biggest that water surveys permeability contrast.Under reservoir conditions, it is not constant that the water of rock core surveys permeability,
But with the parameter of barometric gradient change.More domestic oil fields define some for low permeability reservoir production capacity and scheme targetedly
Version, can predict production capacity effectively, has preferable reference to current low permeability sandstone reservoir evaluating production capacity and instructs meaning
Justice, but the most do not utilize the technology of well-log information intutive forecasting production capacity at present.We have invented for this kind of new based on
The new method of Conventional Logs prediction low permeability sandstone reservoir production capacity, solves above technical problem.
Summary of the invention
It is an object of the invention to provide one and utilize well-log information, return for different sedimentation type low permeability sandstone reservoirs
Production Forecast Models, what finishing drilling well yield carried out quantitative forecast predicts low permeability sandstone reservoir based on Conventional Logs
The new method of production capacity.
The purpose of the present invention can be achieved by the following technical measures: predicts low permeability sandstone reservoir based on Conventional Logs
The new method of production capacity, should include based on the new method of Conventional Logs prediction low permeability sandstone reservoir production capacity: step 1, root
Combine well-log information according to core analyzing data, obtain underlying parameter;Step 2, determines flow coefficient, free-boundary problem;
Step 3, utilizes multiple regression to set up yield Quantitative Prediction Model;Step 4, sets up capability forecasting simplicity plate, to hypotonic
Sandstone reservoir production capacity is predicted thoroughly;Step 5, sets up pressure break and selects layer plate, evaluates low permeability sandstone reservoir the need of entering
Row pressure break;Step 6, sets up post-flush production prediction plate, post-flush production is carried out quantitative forecast.
The purpose of the present invention realizes also by following technical measures:
In step 1, air permeability K, core intersection h are obtained by conventional logging explanation;Obtained by crude oil analysis data
Obtain ground viscosity of crude μ;Free-boundary problem λ is obtained by free-boundary problem experiment;Examination is obtained by formation testing data
Oil daily oil production q of target zone, strata pressure PeWith flowing pressure Pw。
In step 2, air permeability K, core intersection h and the ground viscosity of crude μ obtained is utilized to calculate the flowing of reservoir
Coefficient;Use strata pressure PeWith flowing pressure PwCalculate producing pressure differential Δ P, with daily oil production q, producing pressure differential Δ P and oil reservoir
Thickness h calculates reservoir productivity index per meter ηo。
In step 2, flow coefficient refers to the ratio of formation capacity K*h and underground viscosity of crude μ, represents that fluid is in rock stratum
The complexity of middle flowing;Formation capacity is the product of Effective thickness of formation h and air permeability K;Producing pressure differential Δ P refers to
Strata pressure PeWith flowing pressure PwDifference;Productivity index per meter ηoRefer under production of units pressure differential deltap P, unit reservoir thick
Oil well daily oil production q of degree h.
In step 3, based on hyposmosis non-darcy flow, it is considered to the constant-pressure boundary circle oil reservoir center a bite starting pressure is hung down
The well yield formula of straight well:
In formula: Q well yield, m3/d;
Pe, PwfSupply boundary pressure and producing well flowing bottomhole pressure (FBHP), MPa;
re, rwDrainage radius, wellbore radius, m;
K reservoir effective permeability, mD;
H reservoir thickness, m;
μ FFV, mPa s;
λ free-boundary problem, MPa/m;
The all parameters utilizing above-mentioned acquisition draw the quantitative relation formula of flow coefficient and productivity index per meter:
Correlation coefficient, R=0.902
In formula: ηoProductivity index, t/MPa d
KoOil reservoir oleic permeability, mD
H effective pay thickiness, m
μoOil reservoir oil viscosity, mPa s
λ free-boundary problem, MPa/m.
In step 4, predict that low permeability sandstone reservoir production capacity is carried out according to the quantitative relationship of flow coefficient with productivity index per meter
Prediction, it was predicted that individual well layer is daily oil production under different producing pressure differentials.
In steps of 5, according to the flow coefficient of individual well layer, utilize flow coefficient and pressure coefficient to set up cross plot, be used for commenting
Valency low permeability sandstone reservoir is the need of carrying out pressure break.
In step 6, for needing the well layer of pressure break, according to determining of the flow coefficient after formation fracturing and productivity index per meter
Magnitude relation, for difference seam pressure reduction lower day long, different oil-producing prognostic chart version, carries out quantitative forecast to post-flush production.
New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity in the present invention, for low permeability reservoir
The difficult problem that fracturing methods risk is high, it is proposed that the pressure break combined with production capacity with geologic(al) factor, reservoir factor selects layer evaluation figure
Version and production forecast plate, it is achieved the qualitative and quantitative assessment of production capacity after low permeability sandstone reservoir pressure break.The method utilizes rock
The heart, log well, the data such as test determine the parameter that capability forecasting is relevant, on this basis, the method utilizing multiple regression,
Productivity prediction model and production forecast plate before pressure break is set up for the low permeability sandstone reservoir of different sedimentation types.For improving
The production capacity of low permeability reservoir, it is necessary to the well that on the block that preferably petroleum-geologic condition is good, reserves abundance is high, physical property is good, in skill
On the basis of art economic evaluation, for different geological conditions, select optimal pressure break mode, reach the mesh of fracturing yield increasing
's.The preferably parameter of pressure break well and story selecting, so the most effective after qualitatively judging wellfracturing, and to needing pressure break
Well layer, sets up post-flush production Quantitative Prediction Model.This invention utilizes Conventional Logs prediction low permeability sandstone reservoir to produce
The new method of energy, solves current oil field high degree of prospecting stage hypotonic saturating sandstone reservoir evaluating production capacity and the difficulty of prediction,
Achieve that low permeability sandstone reservoir production capacity is qualitative and quantitative assessment.
Accompanying drawing explanation
Fig. 1 is that the one of the new method based on Conventional Logs prediction low permeability sandstone reservoir production capacity of the present invention is embodied as
The flow chart of example;
Fig. 2 be the present invention a specific embodiment in dam, Dongying Depression s_4 formation beach sand low permeability reservoir production forecast plate;
Fig. 3 is that a specific embodiment Zhong Tan dam sand pressure break of the present invention selects layer to evaluate plate;
Fig. 4 be the present invention a specific embodiment in dam, the Dongying Depression s_4 formation beach sand reservoir long flow coefficient of difference dummy joint with
Day oil-producing graph of a relation.
Detailed description of the invention
For making the above and other objects, features and advantages of the present invention to become apparent, cited below particularly go out preferred embodiment,
And coordinate shown in accompanying drawing, it is described in detail below.
As it is shown in figure 1, the new method based on Conventional Logs prediction low permeability sandstone reservoir production capacity that Fig. 1 is the present invention
Flow chart.
Step 101: combine well-log information according to core analyzing data, obtains underlying parameter.Explained by conventional logging and obtain
Air permeability K, core intersection h;Ground viscosity of crude μ is obtained by crude oil analysis data;Pass through free-boundary problem
Experiment obtains free-boundary problem λ;The day oil-producing of formation testing target zone, strata pressure P is obtained by formation testing datacWith flowing pressure
Power Pw。
Step 102: determine flow coefficient, free-boundary problem.Utilize air permeability K, core intersection h and the ground obtained
Face viscosity of crude μ calculates the flow coefficient of reservoir;Use strata pressure PeWith flowing pressure PwCalculate producing pressure differential Δ P, with day
Oil-producing, producing pressure differential and core intersection calculate reservoir productivity index per meter ηo。
Described flow coefficient refers to the ratio of formation capacity (k*h) and underground viscosity of crude (μ), represents that fluid is in rock stratum
The complexity of middle flowing.Formation capacity is the product of Effective thickness of formation (h) and permeability (k).
Described producing pressure differential Δ P refers to strata pressure PeWith flowing pressure PwDifference.
Described productivity index per meter ηoRefer to the oil well day oil-producing of (Δ P) under production of units pressure reduction, unit reservoir thickness (h)
Amount (q).
Step 103: utilize multiple regression to set up yield Quantitative Prediction Model.Based on hyposmosis non-darcy flow, it is considered to start
The well yield formula (not considering skin factor) (1) of constant-pressure boundary circle oil reservoir center a bite peupendicular hole of pressure, profit
The quantitative relation formula (2) of flow coefficient and productivity index per meter is drawn by all parameters of above-mentioned acquisition.
In formula: Q well yield, m3/d;
Pe, PwfSupply boundary pressure and producing well flowing bottomhole pressure (FBHP), MPa;
re, rwDrainage radius, wellbore radius, m;
K reservoir effective permeability, mD;
H reservoir thickness, m;
μ FFV, mPa s;
λ free-boundary problem, MPa/m;
Correlation coefficient, R=0.902
In formula: ηoProductivity index, t/MPa d
KoOil reservoir oleic permeability, mD
H effective pay thickiness, m
μoOil reservoir oil viscosity, mPa s
λ free-boundary problem, MPa/m.
Step 104: low permeability sandstone reservoir production capacity is entered according to the quantitative relationship of described flow coefficient with productivity index per meter
Row prediction.Also can get yield quantitative forecast plate simultaneously, carry out individual well layer daily oil production under different producing pressure differentials
Prediction.As shown in Figure 2, in accompanying drawing 2, flow coefficient determined by basis and the quantitative relationship of productivity index per meter, set up
Yield quantitative forecast plate, carries out the prediction of daily oil production under different producing pressure differentials of individual well layer.
Step 105: according to the flow coefficient of described individual well layer, utilizes flow coefficient and pressure coefficient to set up cross plot, uses
In evaluating low permeability sandstone reservoir the need of carrying out pressure break, as shown in Figure 3.
Step 106: after sentencing knowledge according to above-mentioned plate, for needing the well layer of pressure break, according to the flow coefficient after formation fracturing
With the quantitative relationship of productivity index per meter, for difference seam pressure reduction lower day long, different oil-producing prognostic chart version, produce after pressure break
Amount carries out quantitative forecast, as shown in Figure 4.
New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity in the present invention, provides in conjunction with core analysis
Material and test data, return the capability forecasting plate setting up a series of practicability and effectiveness based on well-log information, and with Dongying Depression
Prediction checking has been carried out, it was predicted that result is good with actual test result concordance as a example by dam, beach sand reservoir.
Claims (8)
1. new method based on Conventional Logs prediction low permeability sandstone reservoir production capacity, it is characterised in that should be based on conventional logging
The new method of data prediction low permeability sandstone reservoir production capacity includes:
Step 1, combines well-log information according to core analyzing data, obtains underlying parameter;
Step 2, determines flow coefficient, free-boundary problem;
Step 3, utilizes multiple regression to set up yield Quantitative Prediction Model;
Step 4, sets up capability forecasting simplicity plate, is predicted low permeability sandstone reservoir production capacity;
Step 5, sets up pressure break and selects layer plate, evaluates low permeability sandstone reservoir the need of carrying out pressure break;
Step 6, sets up post-flush production prediction plate, post-flush production is carried out quantitative forecast.
New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity the most according to claim 1, its feature
It is, in step 1, is explained by conventional logging and obtain air permeability K, core intersection h;By crude oil analysis data
Obtain ground viscosity of crude μ;Free-boundary problem λ is obtained by free-boundary problem experiment;Obtained by formation testing data
Daily oil production q of formation testing target zone, strata pressure PeWith flowing pressure Pw。
New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity the most according to claim 2, its feature
It is, in step 2, utilizes air permeability K, core intersection h and the ground viscosity of crude μ that obtain to calculate the stream of reservoir
Dynamic coefficient;Use strata pressure PeWith flowing pressure PwCalculate producing pressure differential Δ P, with daily oil production q, producing pressure differential Δ P and oil
Layer thickness h calculates reservoir productivity index per meter ηo。
New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity the most according to claim 3, its feature
Being, in step 2, flow coefficient refers to the ratio of formation capacity K*h and underground viscosity of crude μ, represents that fluid is at rock
The complexity of flowing in Ceng;Formation capacity is the product of Effective thickness of formation h and air permeability K;Producing pressure differential Δ P is
Refer to strata pressure PeWith flowing pressure PwDifference;Productivity index per meter ηoRefer under production of units pressure differential deltap P, unit reservoir
Oil well daily oil production q of thickness h.
New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity the most according to claim 1, its feature
It is, in step 3, based on hyposmosis non-darcy flow, it is considered to start the constant-pressure boundary circle oil reservoir center of pressure flatly
The well yield formula of peupendicular hole:
In formula: Q well yield, m3/d;
Pe, PwfSupply boundary pressure and producing well flowing bottomhole pressure (FBHP), MPa;
re, rwDrainage radius, wellbore radius, m;
K reservoir effective permeability, mD;
H reservoir thickness, m;
μ FFV, mPa s;
λ free-boundary problem, MPa/m;
The all parameters utilizing above-mentioned acquisition draw the quantitative relation formula of flow coefficient and productivity index per meter:
Correlation coefficient, R=0.902
In formula: ηoProductivity index, t/MPa d
KoOil reservoir oleic permeability, mD
H effective pay thickiness, m
μoOil reservoir oil viscosity, mPa s
λ free-boundary problem, MPa/m.
New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity the most according to claim 1, its feature
It is, in step 4, predicts that low permeability sandstone reservoir production capacity is entered according to the quantitative relationship of flow coefficient with productivity index per meter
Row prediction, it was predicted that individual well layer is daily oil production under different producing pressure differentials.
New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity the most according to claim 1, its feature
It is, in steps of 5, according to the flow coefficient of individual well layer, utilizes flow coefficient and pressure coefficient to set up cross plot, be used for
Evaluate low permeability sandstone reservoir the need of carrying out pressure break.
New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity the most according to claim 1, its
It is characterised by, in step 6, for needing the well layer of pressure break, refers to every meter of oil recovery according to the flow coefficient after formation fracturing
The quantitative relationship of number, for difference seam pressure reduction lower day long, different oil-producing prognostic chart version, carries out the most pre-to post-flush production
Survey.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510250170.XA CN106295095B (en) | 2015-05-15 | 2015-05-15 | Method based on Conventional Logs prediction low permeability sandstone reservoir production capacity |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510250170.XA CN106295095B (en) | 2015-05-15 | 2015-05-15 | Method based on Conventional Logs prediction low permeability sandstone reservoir production capacity |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106295095A true CN106295095A (en) | 2017-01-04 |
CN106295095B CN106295095B (en) | 2018-11-30 |
Family
ID=57631157
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510250170.XA Active CN106295095B (en) | 2015-05-15 | 2015-05-15 | Method based on Conventional Logs prediction low permeability sandstone reservoir production capacity |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106295095B (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107366526A (en) * | 2017-07-25 | 2017-11-21 | 中国石油天然气股份有限公司 | A kind of screening technique for the compact oil reservoir that suitable carbon dioxide mixed phase drives |
CN107944620A (en) * | 2017-11-21 | 2018-04-20 | 西南石油大学 | A kind of Non-linear of individual well steady state productivity |
CN107965315A (en) * | 2017-11-24 | 2018-04-27 | 中国石油大港油田勘探开发研究院 | A kind of low-permeability oil deposit PRODUCTION FORECASTING METHODS |
CN108915664A (en) * | 2018-07-03 | 2018-11-30 | 成都北方石油勘探开发技术有限公司 | Oil well production increasing judgment method based on big data |
CN110188388A (en) * | 2019-04-26 | 2019-08-30 | 中国石油集团西部钻探工程有限公司 | Utilize the method for nuclear-magnetism pressure physical property index assessment sandy gravel materials physical property |
CN111123362A (en) * | 2019-12-18 | 2020-05-08 | 中国石油天然气集团有限公司 | Fractured conglomerate reservoir quality classification method and device and readable storage medium |
CN111706320A (en) * | 2020-06-30 | 2020-09-25 | 陕西延长石油(集团)有限责任公司 | Measure well/layer rapid screening plate establishing method based on yield and water content change master control factor cluster analysis |
CN112012727A (en) * | 2020-08-03 | 2020-12-01 | 中海油田服务股份有限公司 | Method for obtaining gas phase effective permeability and prediction method of reservoir productivity |
CN112069690A (en) * | 2020-09-11 | 2020-12-11 | 中海石油(中国)有限公司 | Evaluation method for test productivity of deep water fault block oil reservoir long horizontal well multistage oil nozzle |
CN112257271A (en) * | 2020-10-26 | 2021-01-22 | 中国海洋石油集团有限公司 | Single-well productivity calculation method for sandstone oil reservoir under shielding of igneous rocks |
CN112541607A (en) * | 2019-09-23 | 2021-03-23 | 中国石油天然气股份有限公司 | Volcanic oil reservoir productivity prediction method and device |
CN112561279A (en) * | 2020-12-09 | 2021-03-26 | 中国石油化工股份有限公司胜利油田分公司孤岛采油厂 | Identification method and system for high-water-consumption zone |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7369979B1 (en) * | 2005-09-12 | 2008-05-06 | John Paul Spivey | Method for characterizing and forecasting performance of wells in multilayer reservoirs having commingled production |
CN103577886A (en) * | 2012-08-06 | 2014-02-12 | 中国石油化工股份有限公司 | Staged fracturing yield prediction method of low-permeability gas reservoir horizontal well |
CN103590824A (en) * | 2013-10-21 | 2014-02-19 | 中国石油天然气股份有限公司 | Productivity calculation method for tight gas horizontal wells modified by multi-stage fracturing |
CN104134101A (en) * | 2014-07-23 | 2014-11-05 | 中国石油集团川庆钻探工程有限公司 | Low-seepage reservoir natural gas productivity prediction method |
CN102865059B (en) * | 2012-09-26 | 2015-01-21 | 中国石油天然气股份有限公司 | Method and device for predicting capacity of fissure-hole type oil deposit |
CN102721636B (en) * | 2012-06-27 | 2015-02-18 | 中国石油大学(北京) | Method for determining stress sensitivity of fractured low-permeability reservoir based on scale model |
CN104389594A (en) * | 2014-10-13 | 2015-03-04 | 成都创源油气技术开发有限公司 | Shale gas well productivity evaluation and prediction method |
-
2015
- 2015-05-15 CN CN201510250170.XA patent/CN106295095B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7369979B1 (en) * | 2005-09-12 | 2008-05-06 | John Paul Spivey | Method for characterizing and forecasting performance of wells in multilayer reservoirs having commingled production |
CN102721636B (en) * | 2012-06-27 | 2015-02-18 | 中国石油大学(北京) | Method for determining stress sensitivity of fractured low-permeability reservoir based on scale model |
CN103577886A (en) * | 2012-08-06 | 2014-02-12 | 中国石油化工股份有限公司 | Staged fracturing yield prediction method of low-permeability gas reservoir horizontal well |
CN102865059B (en) * | 2012-09-26 | 2015-01-21 | 中国石油天然气股份有限公司 | Method and device for predicting capacity of fissure-hole type oil deposit |
CN103590824A (en) * | 2013-10-21 | 2014-02-19 | 中国石油天然气股份有限公司 | Productivity calculation method for tight gas horizontal wells modified by multi-stage fracturing |
CN104134101A (en) * | 2014-07-23 | 2014-11-05 | 中国石油集团川庆钻探工程有限公司 | Low-seepage reservoir natural gas productivity prediction method |
CN104389594A (en) * | 2014-10-13 | 2015-03-04 | 成都创源油气技术开发有限公司 | Shale gas well productivity evaluation and prediction method |
Non-Patent Citations (10)
Title |
---|
周红,等主编;: "《实用油藏工程 2004年9月第1版》", 30 September 2004, 中国地质大学出版社 * |
孙焕泉,等,主编;: "《胜利油田开发技术论文集(2010-2011) 2012年11月第1版》", 30 November 2012, 石油工业出版社 * |
宛利红,等;: "致密油藏多元回归产能预测方法研究与应用", 《油气井测试》 * |
封立香,等;: "多参数综合分析指导基山地区低渗透储层压裂改造", 《测井技术》 * |
庞秋维,等;: "X油田试油层自然产能预测方法研究", 《长江大学学报(自然科学版)》 * |
曲悦铭,等;: "压裂效果预测方法研究", 《数学的实践与认识》 * |
李绍杰,: "考虑压敏及启动压力梯度的低渗透油藏产量递减模型及其应用", 《中国科技信息》 * |
沈秀通,等编,: "《采油工程师实用简明手册 1992年2月第1版》", 28 February 1992, 石油工业出版社 * |
王军磊,: "低渗透五点井网油藏工程评价方法", 《中国优秀硕士学位论文全文数据库基础科学辑(月刊)》 * |
胡高贤,等;: "多元回归分析在低渗透油藏产能预测中的应用", 《油气田地面工程》 * |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107366526A (en) * | 2017-07-25 | 2017-11-21 | 中国石油天然气股份有限公司 | A kind of screening technique for the compact oil reservoir that suitable carbon dioxide mixed phase drives |
CN107944620B (en) * | 2017-11-21 | 2021-11-09 | 西南石油大学 | Nonlinear prediction method for single-well steady-state production performance |
CN107944620A (en) * | 2017-11-21 | 2018-04-20 | 西南石油大学 | A kind of Non-linear of individual well steady state productivity |
CN107965315A (en) * | 2017-11-24 | 2018-04-27 | 中国石油大港油田勘探开发研究院 | A kind of low-permeability oil deposit PRODUCTION FORECASTING METHODS |
CN108915664A (en) * | 2018-07-03 | 2018-11-30 | 成都北方石油勘探开发技术有限公司 | Oil well production increasing judgment method based on big data |
CN110188388A (en) * | 2019-04-26 | 2019-08-30 | 中国石油集团西部钻探工程有限公司 | Utilize the method for nuclear-magnetism pressure physical property index assessment sandy gravel materials physical property |
CN110188388B (en) * | 2019-04-26 | 2022-10-25 | 中国石油集团西部钻探工程有限公司 | Method for evaluating glutenite reservoir physical property by utilizing nuclear magnetic pressure physical property index |
CN112541607A (en) * | 2019-09-23 | 2021-03-23 | 中国石油天然气股份有限公司 | Volcanic oil reservoir productivity prediction method and device |
CN111123362A (en) * | 2019-12-18 | 2020-05-08 | 中国石油天然气集团有限公司 | Fractured conglomerate reservoir quality classification method and device and readable storage medium |
CN111706320B (en) * | 2020-06-30 | 2023-02-28 | 陕西延长石油(集团)有限责任公司 | Measure well/layer rapid screening plate establishing method based on yield and water content change master control factor cluster analysis |
CN111706320A (en) * | 2020-06-30 | 2020-09-25 | 陕西延长石油(集团)有限责任公司 | Measure well/layer rapid screening plate establishing method based on yield and water content change master control factor cluster analysis |
CN112012727A (en) * | 2020-08-03 | 2020-12-01 | 中海油田服务股份有限公司 | Method for obtaining gas phase effective permeability and prediction method of reservoir productivity |
CN112012727B (en) * | 2020-08-03 | 2023-08-15 | 中海油田服务股份有限公司 | Method for obtaining effective permeability of gas phase and method for predicting reservoir productivity |
CN112069690A (en) * | 2020-09-11 | 2020-12-11 | 中海石油(中国)有限公司 | Evaluation method for test productivity of deep water fault block oil reservoir long horizontal well multistage oil nozzle |
CN112069690B (en) * | 2020-09-11 | 2024-03-08 | 中海石油(中国)有限公司 | Evaluation method for deep water fault block oil reservoir long horizontal well multi-stage oil nozzle test productivity |
CN112257271A (en) * | 2020-10-26 | 2021-01-22 | 中国海洋石油集团有限公司 | Single-well productivity calculation method for sandstone oil reservoir under shielding of igneous rocks |
CN112257271B (en) * | 2020-10-26 | 2022-08-30 | 中国海洋石油集团有限公司 | Single-well productivity calculation method for sandstone oil reservoir under shielding of igneous rocks |
CN112561279B (en) * | 2020-12-09 | 2023-02-24 | 中国石油化工股份有限公司胜利油田分公司孤岛采油厂 | Identification method and system for high-water-consumption zone |
CN112561279A (en) * | 2020-12-09 | 2021-03-26 | 中国石油化工股份有限公司胜利油田分公司孤岛采油厂 | Identification method and system for high-water-consumption zone |
Also Published As
Publication number | Publication date |
---|---|
CN106295095B (en) | 2018-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106295095A (en) | New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity | |
CN112561144B (en) | Method for evaluating main control factor of productivity of tight oil fracturing horizontal well and predicting productivity | |
CN112343587B (en) | Identification characterization method for dominant seepage channel of ultralow permeability oil reservoir | |
Dongbo et al. | Well spacing optimization for Sulige tight sand gas field, NW China | |
CN104500055B (en) | A kind of extra-low permeability oil reservoirs Water Flooding Layer water saturation computational methods | |
CN104564041A (en) | Low-permeability clastic rock reservoir effectiveness evaluation method based on development permeability lower limit | |
CN104695950A (en) | Prediction method for volcanic rock oil reservoir productivity | |
CN105952427A (en) | Method for predicting and evaluating low permeability oil reservoir water-injection induced cracks | |
CN110130882A (en) | A kind of oil reservoir region evaluation method based on well logging test data | |
CN104747144B (en) | Geological stratum selection method based on natural gas multi-stratum series partial pressure combined solution | |
CN104965979A (en) | Tight sandstone effective reservoir identifying method | |
CN102041995A (en) | System for monitoring complicated oil deposit flooding conditions | |
CN105317407B (en) | A kind of development approach of ultra-high water cut stage Untabulated reservoirs | |
CN103742130A (en) | High permeability band characterization method based on time varying | |
CN105931125B (en) | A kind of more cluster volume fracturing horizontal well production prediction techniques of densification oil section | |
Zhang et al. | An evaluation method of volume fracturing effects for vertical wells in low permeability reservoirs | |
Wang et al. | Effects of wellbore interference on concurrent gas production from multi-layered tight sands: A case study in eastern Ordos Basin, China | |
Wang et al. | Quantitative evaluation of transport efficiency of fault-reservoir composite migration pathway systems in carbonate petroliferous basins | |
CN109209307A (en) | A kind of method of quantitative analysis waterflood development of low-permeability reservoirs effect | |
Niu et al. | Analyzing major controlling factors of shale oil'sweet spots' in the Chang-7 member of the Triassic Yanchang Formation, Ordos Basin | |
Quan et al. | Modeling analysis of coalbed methane co-production interference: A case study in Eastern Yunnan Basin, China | |
RU2320869C1 (en) | Method to determine permeability and porosity of oil-saturated reservoirs | |
CN108561129A (en) | Craven fault block reservoirs water to oil area remaining oil fast appraisement method | |
Barbe et al. | Quantitative analysis of infill performance: Robertson Clearfork Unit | |
Gonzalez et al. | Effect of Natural-Fracture Density on Production Variability of Individual Wells in the Nikanassin Tight Gas Formation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |