CN106295057B - A kind of earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting - Google Patents

A kind of earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting Download PDF

Info

Publication number
CN106295057B
CN106295057B CN201610707226.4A CN201610707226A CN106295057B CN 106295057 B CN106295057 B CN 106295057B CN 201610707226 A CN201610707226 A CN 201610707226A CN 106295057 B CN106295057 B CN 106295057B
Authority
CN
China
Prior art keywords
shield
screw conveyor
formula
settlement
casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610707226.4A
Other languages
Chinese (zh)
Other versions
CN106295057A (en
Inventor
王树英
瞿同明
阳军生
何卫
胡钦鑫
傅金阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201610707226.4A priority Critical patent/CN106295057B/en
Publication of CN106295057A publication Critical patent/CN106295057A/en
Application granted granted Critical
Publication of CN106295057B publication Critical patent/CN106295057B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of earth pressure balanced shield, EPBS Tu Cang into Ground surface settlement method caused by casting.According to shield initial phase of boring tunneling data and ground settlement data, by the relational expression for deriving Stratum Loss caused by shield driving parameter (N/v) and shield casting, inverse goes out screw conveyor casting efficiency eta and ground settlement groove width i, establishes Ground surface settlement formula of the shield when next ring tunnels:Next ring boring parameter is selected, formula is substituted into and calculates, to realize the prediction to earth's surface sedimentation value.The present invention is simple and practical, and adaptability is good, from shield driving mechanism establish Tu Cang into casting and ground settlement relational expression, can ground settlement caused by Accurate Prediction boring parameter, avoid earth's surface from generating excessive protuberance and sedimentation value.

Description

A kind of earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting
Technical field
The present invention relates to a kind of Ground surface settlement methods, and specifically, the present invention relates to a kind of earth pressure balanced shield, EPBS soil Storehouse is into Ground surface settlement method caused by casting.
Background technique
Important engineering method one of of the earth pressure balanced shield, EPBS engineering method as soft soil layer tunnel excavation is widely used in each both at home and abroad In metropolitan subway construction.However, having when excessive surface uplift caused by earth pressure balanced shield, EPBS tunneling construction and depression phenomenon Occur, ground settlement caused by shield driving still lacks practical, accurate prediction technique at present.
Ground settlement is derived from Stratum Loss.The loss of earth's surface caused by shield driving is mainly made of three parts, comprising: 1) shield Structure cutterhead reaches soil body Shi Tucang into Stratum Loss caused by casting;2) caused Stratum Loss when shield passes through;3) shield tail is infused Stratum Loss caused by slurry is insufficient.In three parts Stratum Loss, shield cutter reaches soil body Shi Tucang into caused by casting Layer loss mainly due to shield driving parameter with strata condition is incompatible causes.In each boring parameter of earth pressure balanced shield, EPBS In, the driving speed influence Tu Cang of shield is measured into soil, and the revolving speed of screw conveyor influences native storehouse soil discharge quantity, and Tu Cang is put down into casting Weighing apparatus affects the deformation of earth's surface, under specific geological conditions and ambient environmental conditions caused by prediction shield driving parameter The control of table settlement values, selection and earth's surface deformation for shield driving parameter is of great significance.
In currently practical construction, the boring parameter of EPB shield tunneling is more controlled according to the experiences of shield drivers, simultaneously It is fed back by surface subsidence monitoring value, when monitor value has transfinited or close to limit value, then adjusts screw conveyor speed or push away Into speed.This method there are three disadvantages, disadvantage first is that shield driving state modulator quality, be heavily dependent on shield The operating technology of structure driver, and the shield operating experience under similar stratum and buried depth;Disadvantage is second is that ground settlement information is anti- Present too late, when shield driver obtains replacement boring parameter information, excessive sedimentation or protuberance are had occurred and that, pipeline it is intensive, build (structure) builds the city that object stands in great numbers, and feedback procedure is slow, may cause excessive loss;Disadvantage third is that digging control process similar to black box Behavior, both the guidance foundation without tunneling process, the also clear range without boring parameter.
Chinese invention patent (application number: 201510746893.9, a kind of patent name: control of shield machine driving speed Method) relate generally to the control method of shield machine driving speed.The method, can be with by adjusting the Control for Speed Limitation potentiometer of shield machine The driving speed of shield machine is set to be greater than zero, less than or equal to the driving maximum speed of setting.I.e. the invention is provided from mechanical angle A method of control shield driving speed is not directed to shield driving speed and specifically should to command speed and lower speed The range of control.
Chinese invention patent (application number: 201310365004.5, patent name: electric tunnel shield construction ground is maximum Sedimentation value prediction technique) relate generally to a kind of maximum sedimentation value of electric tunnel shield construction ground surface prediction technique.This method will disturb Dynamic load is reduced to a taper load, is based on soil body mean value elastic half-space it is assumed that using Bu Xineisike solution and Integral Processing Obtain ground maximum settlement value.The invention fails to consider that Tu Cang is that error is biggish for shield tunnel into casting state, In practice, when native storehouse In-pit dumping amount, which is continued for less than, to be measured into soil, support pressure is excessive, can cause land upheaval.Obviously, the invention Having ignored into casting influences, and simple thinks that shield tunnel centainly settles, and ground settlement caused by this tunnels shield tunnel is pre- Survey is unreasonable.
Chinese invention patent (application number: 201110379662.0, patent name: urban rail transit shield forewarning on engineering failure Prediction technique) relate generally to a kind of prediction method for urban rail transit shield project.The invention is by analysis in shield tunnel The factor that ground settlement is influenced in road introduces many coefficients and forms prediction theory formula, in conjunction with engineering measurement data, using more The statistical methods such as first linear regression are fitted unknown parameter, form predictor formula, carry out Ground surface settlement.The invention it is main not Foot has: 1, Ground surface settlement formula is coarse, and the item at left and right sides of equation does not meet " dimension is consistent " principle, that is to say, that this Predictor formula is invalid in the physical sense.2, shield is not probed into deeply into earth's surface deformation relationship caused by casting, is relied on A large amount of measured datas are fitted unknown parameter using statistical means such as linear regressions.The main problem of such statistical method has: problem 1 It is the project data based on early period come fitting parameter, forms predictor formula, for exceeding the boring parameter of experience, fitting parameter is taken Value is inaccurate, that is, the similar stratum tunneled and buried depth is only applicable to, for fitting formula adaptability under new environmental condition Difference;Problem 2, which is that statistical data is sufficient, just can guarantee fitting precision, need to acquire and safeguard a large amount of field datas, troublesome in poeration.
Summary of the invention
High, pre- flow gauge quantization that technical problem to be solved by the invention is to provide a kind of precision of predictions, clear, prediction at This cheap, simple and practical earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting.
In order to solve the above technical problem, the present invention provides earth pressure balanced shield, EPBS Tu Cang into ground settlement caused by casting Prediction technique, comprising the following steps:
Step (1): when shield is in tunneling process, and support pressure starts to stablize, measurement shield in an endless tube piece time T Structure is discharged dregs volume V and dregs weight G and obtains the severe γ of dregs by dregs weight G divided by dregs volume V1;Record Driving speed v, screw conveyor revolving speed N, sediment improvement material add weight G1
Step (2): screw conveyor discharge dregs severe G and shield inherent parameters, that is, thread pitch when in conjunction with shield driving P, spiral shell machine core shaft diameter D1With spiral shell machine internal diameter D2, based on the unearthed efficiency eta of formula (1) inverse screw conveyor:
Wherein: N is screw conveyor revolving speed, D2For screw machine internal diameter, D1For screw machine shaft diameter, P is between rotating vanes Away from;
Step (3): dregs weight G, the practical soil excavation weight G of shield are discharged according to shield1, the addition of sediment improvement material Weight G2, calculate effectively to be unearthed in T time based on formula (2) and compare Ke:
Step (4): parameter i.e. original place layer severe γ is surveyed in combination2With driving speed v, shield reason is calculated based on formula (3) G is measured by into soil3;It is theoretical to measure G into soil in shield driving T time in the case where absolutely not Stratum Loss3Are as follows:
Step (5): compare K in conjunction with being effectively unearthede, spiral shell machine be unearthed efficiency eta, screw conveyor revolving speed N, screw conveyor parameter That is thread pitch P, spiral shell machine core shaft diameter D1With spiral shell machine internal diameter D2, dregs severe γ1, stratum severe γ2, shield driving diameter D with Driving speed v calculates Stratum Loss value V caused by native storehouse casting using formula (4)loss:
Step (6): in conjunction with Stratum Loss value and actual measurement ground settlement value is calculated, pass through formula (5) inverse ground settlement slot Width i:
Wherein: SmaxFor earth's surface maximum settlement point;X is the distance on cross section apart from tunnel central axis;I is heavy for ground Groove width is dropped, is distance of the subsidence curve symmetrical centre to knee of curve;
Step (7): the Ground surface settlement formula for considering shield driving parameter is established by formula (6):
Step (8): shield substitutes into formula (6) in new driving ring, by shield driving parameter, can predict that earth's surface will generate Sedimentation value.
In a new P. drechsleri, above-mentioned calculating step is repeated, new Ground surface settlement formula is obtained.
Earth pressure balanced shield, EPBS Tu Cang by adopting the above technical scheme is into Ground surface settlement method caused by casting, not always Settlement prediction, but when the shield cutter arrival soil body, the earth's surface generated since boring parameter is incompatible with strata condition is heavy Drop, therefore claim ground settlement caused by shield driving parameter, this part is deposited in the total settlement of shield driving overall process generation Account for critical role.
Initial phase of boring described in step (1) is not examination phase of boring, refers to that soil pressure has been completely set up in native storehouse, Shield starts the stage normally tunneled.
The unearthed efficiency eta of step (1) screw conveyor and step (5) described ground settlement groove width i are all in accordance with upper one The actual measurement ground settlement data inverse of ring obtains.Compared with through the method for experience value, method applicability provided by the invention Stronger, error derives from the stratum difference and boring parameter difference of adjacent section of jurisdiction.
The Ground surface settlement formula of shield driving parameter described in step (7), shield is after one ring of every driving, because of stratum Parameter, buried depth and sediment improvement Parameters variation need to re-start calculating according to above-mentioned process, to guarantee Ground surface settlement public affairs Formula has degree of precision.
Compared with prior art, the present invention the technical effects of the invention are that: process provides earth pressure balanced shield, EPBS picks Into speed, the quantitative relationship of screw conveyor casting speed and ground settlement, the unearthed efficiency eta of screw conveyor and earth's surface are given The quantization strategy of groove width i is settled, provides one kind for the analysis of Ground surface settlement caused by earth pressure balanced shield, EPBS boring parameter New scientific method:
Effect (1) can be mentioned by step (6) in the case where driving speed and bolt conveyer casting speed are set The sedimentation that the formula predictions earth's surface of confession will generate.Other than the prediction techniques such as method for numerical simulation, mathematical statistics method, we It is bright to provide a kind of Ground surface settlement method for fully considering shield into casting state, precision of prediction height of the present invention, pre- flow measurement Journey quantifies, is clear, and forecast cost is cheap, simple and practical.
Effect (2) complete, quantization the Ground surface settlement technology path that there is provided a set of based on boring parameter.
In conclusion the present invention is a kind of high precision of prediction, pre- flow gauge quantization, clear, forecast cost is cheap, simple reality Earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting.
Detailed description of the invention
Fig. 1 is the shield into Ground surface settlement Technology Roadmap caused by casting.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings.
Referring to Fig. 1, earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting, comprising the following steps:
Step (1): when shield is in tunneling process, and support pressure starts to stablize, measurement shield in an endless tube piece time T Structure is discharged dregs volume V and dregs weight G and obtains the severe γ of dregs by dregs weight G divided by dregs volume V1;Record Driving speed v, screw conveyor revolving speed N, sediment improvement material add weight G1
Step (2): screw conveyor discharge dregs severe G and shield inherent parameters, that is, thread pitch when in conjunction with shield driving P, spiral shell machine core shaft diameter D1With spiral shell machine internal diameter D2, based on the unearthed efficiency eta of formula (1) inverse screw conveyor:
Wherein: N is screw conveyor revolving speed, D2For screw machine internal diameter, D1For screw machine shaft diameter, P is between rotating vanes Away from;
Step (3): dregs weight G, the practical soil excavation weight G of shield are discharged according to shield1, the addition of sediment improvement material Weight G2, calculate effectively to be unearthed in T time based on formula (2) and compare Ke:
Step (4): parameter i.e. original place layer severe γ is surveyed in combination2With driving speed v, shield reason is calculated based on formula (3) G is measured by into soil3;It is theoretical to measure G into soil in shield driving T time in the case where absolutely not Stratum Loss3Are as follows:
Step (5): compare K in conjunction with being effectively unearthede, spiral shell machine be unearthed efficiency eta, screw conveyor revolving speed N, screw conveyor parameter That is thread pitch P, spiral shell machine core shaft diameter D1With spiral shell machine internal diameter D2, dregs severe γ1, stratum severe γ2, shield driving diameter D with Driving speed v calculates Stratum Loss value V caused by native storehouse casting using formula (4)loss:
Step (6): in conjunction with Stratum Loss value and actual measurement ground settlement value is calculated, pass through formula (5) inverse ground settlement slot Width i:
Wherein: SmaxFor earth's surface maximum settlement point;X is the distance on cross section apart from tunnel central axis;I is heavy for ground Groove width is dropped, is distance of the subsidence curve symmetrical centre to knee of curve;
Step (7): the Ground surface settlement formula for considering shield driving parameter is established by formula (6):
Step (8): shield substitutes into formula (6) in new driving ring, by shield driving parameter, can predict that earth's surface will generate Sedimentation value.
In a new P. drechsleri, above-mentioned calculating step is repeated, new Ground surface settlement formula is obtained.

Claims (2)

1. a kind of earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting, it is characterised in that: including following step It is rapid:
Step (1): when shield is in tunneling process, and support pressure starts to stablize, measurement shield in an endless tube piece time T is arranged The soil body of slagging tap product V and dregs weight G obtains the severe γ of dregs by dregs weight G divided by dregs volume V1;Record driving Speed v, screw conveyor revolving speed N, sediment improvement material add weight G2
Step (2): screw conveyor discharge dregs severe G and shield inherent parameters, that is, thread pitch P, spiral shell when in conjunction with shield driving Revolve conveyer axle diameter D1With screw conveyor internal diameter D2, based on the unearthed efficiency eta of formula (1) inverse screw conveyor:
Wherein: N is screw conveyor revolving speed, D2For screw conveyor internal diameter, D1For screw conveyor axle diameter, P is screw thread section Away from;
Step (3): dregs weight G, the practical soil excavation weight G of shield are discharged according to shield1, sediment improvement material addition weight G2, calculate effectively to be unearthed in T time based on formula (2) and compare Ke:
Step (4): parameter i.e. original place layer severe γ is surveyed in combination2With driving speed v, shield theory is calculated into soil based on formula (3) Measure G3;It is theoretical to measure G into soil in shield driving T time in the case where absolutely not Stratum Loss3Are as follows:
Step (5): compare K in conjunction with being effectively unearthede, screw conveyor be unearthed efficiency eta, screw conveyor revolving speed N, screw conveyor ginseng Number is thread pitch P, screw conveyor axle diameter D1With screw conveyor internal diameter D2, dregs severe γ1, stratum severe γ2、 Shield driving diameter D and driving speed v calculates Stratum Loss value V caused by native storehouse casting using formula (4)loss:
Step (6): in conjunction with Stratum Loss value and actual measurement ground settlement value is calculated, pass through formula (5) inverse ground settlement groove width I:
Wherein: SmaxFor earth's surface maximum settlement value;I is ground settlement groove width;
Step (7): the Ground surface settlement formula for considering shield driving parameter is established by formula (6):
Wherein, x is the distance on cross section apart from tunnel central axis, and P is thread pitch;
Step (8): shield substitutes into formula (6) in new driving ring, by shield driving speed v, screw conveyor revolving speed N, can be pre- The sedimentation value that geodetic table will generate.
2. earth pressure balanced shield, EPBS Tu Cang as described in claim 1 is into Ground surface settlement method caused by casting, feature exists In: in a new P. drechsleri, above-mentioned calculating step is repeated, iteration updates the unearthed efficiency eta of screw conveyor and earth's surface is heavy Groove width i is dropped, new Ground surface settlement formula is obtained.
CN201610707226.4A 2016-08-23 2016-08-23 A kind of earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting Active CN106295057B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610707226.4A CN106295057B (en) 2016-08-23 2016-08-23 A kind of earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610707226.4A CN106295057B (en) 2016-08-23 2016-08-23 A kind of earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting

Publications (2)

Publication Number Publication Date
CN106295057A CN106295057A (en) 2017-01-04
CN106295057B true CN106295057B (en) 2019-04-30

Family

ID=57615806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610707226.4A Active CN106295057B (en) 2016-08-23 2016-08-23 A kind of earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting

Country Status (1)

Country Link
CN (1) CN106295057B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165642A (en) * 2017-06-06 2017-09-15 中铁十九局集团轨道交通工程有限公司 Accurately control the shield construction method of ground settlement
CN110059448B (en) * 2019-05-22 2021-08-27 中南大学 Shield excavation surface settlement prediction method considering cutter head extrusion stratum deformation
CN111382473A (en) * 2020-02-13 2020-07-07 浙江大学城市学院 Method for predicting underground pipeline settlement caused by transverse crossing of shallow tunnel
CN111414574B (en) * 2020-03-17 2023-08-08 南京理工大学 Method for rapidly calculating soil discharge amount of soil pressure balance shield machine
CN112131530B (en) * 2020-09-24 2024-03-19 盾构及掘进技术国家重点实验室 Calculation and early warning method for slag discharge amount of earth pressure shield based on big data
CN112324451A (en) * 2020-11-02 2021-02-05 辽宁工程技术大学 Earth surface settlement and pipeline deformation early warning system based on muck monitoring for earth pressure balance shield
CN114118603B (en) * 2021-12-02 2022-06-14 华南理工大学 Soil pressure balance shield slag discharge amount estimation and correction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03275899A (en) * 1990-03-27 1991-12-06 Taisei Corp Excavation method of shield tunnel
CN103195435A (en) * 2013-03-22 2013-07-10 同济大学 Method for preventing shield penetration of building compact district from inducing ground subsidence
CN104766129A (en) * 2014-12-31 2015-07-08 华中科技大学 Subway shield construction surface deformation warning method based on temporal and spatial information fusion
CN105257312A (en) * 2015-11-06 2016-01-20 上海市机械施工集团有限公司 Control method of advance rate of shield tunneling machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03275899A (en) * 1990-03-27 1991-12-06 Taisei Corp Excavation method of shield tunnel
CN103195435A (en) * 2013-03-22 2013-07-10 同济大学 Method for preventing shield penetration of building compact district from inducing ground subsidence
CN104766129A (en) * 2014-12-31 2015-07-08 华中科技大学 Subway shield construction surface deformation warning method based on temporal and spatial information fusion
CN105257312A (en) * 2015-11-06 2016-01-20 上海市机械施工集团有限公司 Control method of advance rate of shield tunneling machine

Also Published As

Publication number Publication date
CN106295057A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106295057B (en) A kind of earth pressure balanced shield, EPBS Tu Cang is into Ground surface settlement method caused by casting
CN106285710B (en) A kind of earth pressure balanced shield, EPBS boring parameter control method based on earth's surface deformation
Tóth et al. Case studies of TBM tunneling performance in rock–soil interface mixed ground
Aksoy et al. Estimation of limit angle using laminated displacement discontinuity analysis in the Soma coal field, Western Turkey
CN108763752B (en) Method for determining construction tunneling parameters of lower water passing channel of shield tunnel
CN109299578A (en) Excavation of foundation pit causes the calculation method of lower sleeping existing shield tunnel protuberance deformation
Wan et al. Pore water pressure and total horizontal stress response to EPBM tunnelling in London Clay
CN107423524A (en) A kind of method of the prominent discharge disaster Hazard rank anticipation of long buried depth tunnel
CN111119902B (en) Tunnel dynamic construction method based on BP neural network
CN108533276A (en) Shield tunneling construction dregs monitoring device and dregs monitoring method
CN108665146B (en) Method for determining stability evaluation precision of large surface mine slope
CN104100272A (en) Quick construction method of tunnels traversing unfavorable geology
CN111594190A (en) Method for controlling shield tunneling parameters when shield passes through different risk sources
CN114417455A (en) Design prediction method for surface subsidence limit value of subway tunnel passing through high-speed railway
Zhang et al. Ground subsidence characteristics caused by construction of shallow-buried tunnel in a sandy soil composite formation
Bagherzadeh et al. Umbrella arch method performance, structural behavior and design elements utilizing in collapsing zones
CN113792369B (en) Soil deformation prediction method, system, equipment and readable storage medium
Lokhande et al. Assessment of pot-hole subsidence risk for Indian coal mines
Wang et al. Analysis of the control effect and parameter optimisation of urban surface deformation in underground coal mining with solid backfilling
CN110173269B (en) Construction control method for shallow tunnel to penetrate existing railway
CN110851991A (en) Underground water flow numerical simulation method
CN114218518B (en) Method for measuring and calculating settling volume of goaf of coal mine
Fillibeck et al. Prediction of tunnel-induced settlements in soft ground
CN114817826A (en) Equivalent subsidence-based mining overburden bed separation calculation method
Wang et al. Model test of TBM tunnel crossing large dip angle fault zone under high in situ stress

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant