CN106293959A - The creation method of a kind of Pending tasks and device - Google Patents

The creation method of a kind of Pending tasks and device Download PDF

Info

Publication number
CN106293959A
CN106293959A CN201610589313.4A CN201610589313A CN106293959A CN 106293959 A CN106293959 A CN 106293959A CN 201610589313 A CN201610589313 A CN 201610589313A CN 106293959 A CN106293959 A CN 106293959A
Authority
CN
China
Prior art keywords
pending tasks
target data
execution time
pending
tasks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610589313.4A
Other languages
Chinese (zh)
Inventor
郭于晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LeTV Holding Beijing Co Ltd
LeTV Mobile Intelligent Information Technology Beijing Co Ltd
Original Assignee
LeTV Holding Beijing Co Ltd
LeTV Mobile Intelligent Information Technology Beijing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LeTV Holding Beijing Co Ltd, LeTV Mobile Intelligent Information Technology Beijing Co Ltd filed Critical LeTV Holding Beijing Co Ltd
Priority to CN201610589313.4A priority Critical patent/CN106293959A/en
Publication of CN106293959A publication Critical patent/CN106293959A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/54Interprogram communication
    • G06F9/543User-generated data transfer, e.g. clipboards, dynamic data exchange [DDE], object linking and embedding [OLE]

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the present invention provides creation method and the device of a kind of Pending tasks, and in solution prior art, Pending tasks foundation step is loaded down with trivial details, cannot quickly create the problem of Pending tasks, simplifies the foundation step of Pending tasks, it is achieved the quick establishment of Pending tasks.The creation method of described Pending tasks, including: receive the interpolation request instruction that for instruction, the target data in shear plate is added to Pending tasks;According to the instruction of described interpolation request instruction, the target data in described shear plate is utilized to create Pending tasks.

Description

The creation method of a kind of Pending tasks and device
Technical field
The present embodiments relate to technical field of data processing, particularly relate to creation method and the dress of a kind of Pending tasks Put.
Background technology
Universal, when recording Pending tasks along with intelligent terminal, it is not necessary to by Pending tasks record on paper or electronics In form, directly can create Pending tasks in the calendar applications of smart machine, and also possess prompting function, but When creating Pending tasks, generally require and first open calendar applications, then add Pending tasks, input or paste shearing Data in plate are as the content of Pending tasks, and input execution time, alerting pattern and the number of repetition etc. of Pending tasks, Pending tasks needs first to start calendar applications during creating, and then inputs multiple parameters of Pending tasks, Pending tasks Foundation step loaded down with trivial details.
Inventor, during realizing the present invention, finds that the foundation step of prior art Pending tasks is loaded down with trivial details, it is impossible to fast The establishment Pending tasks of speed.
Summary of the invention
The embodiment of the present invention provides creation method and the device of a kind of Pending tasks, solves Pending tasks wound in prior art Build complex steps, cannot quickly create the problem of Pending tasks, simplify the foundation step of Pending tasks, it is achieved Pending tasks fast Speed creates.
The embodiment of the present invention provides the creation method of a kind of Pending tasks, and the method includes: receives and is used for indicating and will shear Target data in plate adds the interpolation request instruction of Pending tasks to;According to the instruction of described interpolation request instruction, utilize institute State the target data in shear plate and create Pending tasks.
The embodiment of the present invention provides the establishment device of a kind of Pending tasks, and this device includes: receive unit, receives and is used for referring to Show the interpolation request instruction that the target data in shear plate is added to Pending tasks;Processing unit, for according to described interpolation The instruction of request instruction, utilizes the target data in described shear plate to create Pending tasks.
The creation method of a kind of Pending tasks that the embodiment of the present invention provides and device, receive in shear plate for instruction Target data add the interpolation request instruction of Pending tasks to, according to adding the instruction of request instruction, utilize in shear plate Target data creates Pending tasks, when creating Pending tasks, adds request instruction by sending, quickly utilizes in shear plate Target data create Pending tasks, it is not necessary to start calendar applications, it is not necessary to input Pending tasks multiple parameters, with existing The foundation step of technology Pending tasks is loaded down with trivial details, it is impossible to quickly creating Pending tasks and compare, the embodiment of the present invention simplifies pending The foundation step of task, it is achieved the quick establishment of Pending tasks.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is this Some bright embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to root Other accompanying drawing is obtained according to these accompanying drawings.
The schematic flow diagram of the creation method of a kind of Pending tasks that Fig. 1 provides for the embodiment of the present invention;
The schematic flow diagram of the idiographic flow of the creation method of a kind of Pending tasks that Fig. 2 provides for the embodiment of the present invention;
The structural representation creating device of a kind of Pending tasks that Fig. 3 provides for the embodiment of the present invention.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under not making creative work premise, broadly falls into the scope of protection of the invention.
The embodiment of the present invention provides the creation method of a kind of Pending tasks, as it is shown in figure 1, the method includes:
Step 11, receives the interpolation request instruction that the target data in shear plate is added to Pending tasks for instruction;
When being embodied as, add the target data in shear plate to Pending tasks add for the ease of receiving for instruction Add request instruction, the button creating Pending tasks can be increased in shear plate, when user clicks on, be i.e. considered as receiving To the interpolation request instruction that for instruction, the target data in shear plate is added to Pending tasks;Can also be on notifications hurdle The notice bar of middle shear plate increases the button creating Pending tasks, when user clicks on, be i.e. considered as receiving for Target data in shear plate is added to the interpolation request instruction of Pending tasks by instruction, and wherein, the data in shear plate are roots Duplication or shearing manipulation according to user copy in shear plate, and the target data in shear plate can be text data, it is possible to To be view data, the most preferably, this target data is text data, in addition, it is necessary to explanation, when target data is figure During as data, before creating Pending tasks, need to extract text data from view data, and utilize the textual data extracted According to creating Pending tasks, the method extracting text data from view data can use prior art, and here is omitted.
Step 13, according to the instruction of interpolation request instruction, utilizes the target data in shear plate to create Pending tasks.
In the method that the embodiment of the present invention provides, receive and add the target data in shear plate to pending for instruction The interpolation request instruction of business, according to the instruction of interpolation request instruction, utilizes the target data in shear plate to create Pending tasks, When creating Pending tasks, add request instruction by sending, quickly utilize the target data in shear plate to create Pending tasks, Without starting calendar applications, it is not necessary to multiple parameters of input Pending tasks, with the foundation step of prior art Pending tasks Loaded down with trivial details, it is impossible to quickly creating Pending tasks and compare, the embodiment of the present invention simplifies the foundation step of Pending tasks, it is achieved pending The quick establishment of task.
In a kind of possible embodiment, in the method that the embodiment of the present invention provides, utilize the number of targets in shear plate According to creating Pending tasks, including: from target data, obtain the execution Time And Event information of Pending tasks;According to get Perform Time And Event information creating Pending tasks.
When being embodied as, when creating Pending tasks, need to input multiple parameters of Pending tasks, such as: perform time, thing Part information, alerting pattern, number of repetition etc., the alerting pattern of Pending tasks, number of repetition can take default setting, such as: Alerting pattern default setting is that alarm clock jingle bell is reminded, and number of repetition default setting is not for repeat, and the execution time of Pending tasks Then needing with event information to obtain from target data, wherein, the event information of Pending tasks can be the part of target data Or all, the most preferably, using target data as the event information of Pending tasks, the execution time of Pending tasks refers to pending The initial time of task, in a kind of possible embodiment, in the method that the embodiment of the present invention provides, obtains from target data Take the execution time of Pending tasks, including: obtain in target data for characterizing the temporal information of time;According to from target data In the temporal information that gets and current system date, calculate the execution time of Pending tasks.
When being embodied as, when obtaining the execution time of Pending tasks from target data, need first to obtain in the object time For characterizing the temporal information of time, such as: tomorrow morning, rear afternoon, after three days etc., then according to obtaining from target data The temporal information got and current system date, calculate the execution time of Pending tasks.Time letter is obtained from target data Breath, can mate the text data in target data with the temporal information prestored, one by one to obtain target data In temporal information, it is also possible to by intellectual learning+knowledge otherwise from target data obtain temporal information.Need explanation It is, when calculating the execution time of Pending tasks, if getting from target data in temporal information without the concrete moment, then to adopt With concrete moment corresponding to the temporal information pre-set, such as: in default setting, corresponding concrete in the morning in temporal information Moment is 10:00, and concrete moment corresponding to afternoon in temporal information is 15:00, evening in temporal information corresponding concrete Moment is 21:00.
As more specific embodiment, it is assumed that the current system date is 2016-4-24 day 10:50, and target data is: bright Registration colleague carrys out meeting room in all February in the it morning, then the temporal information obtained from target data is " tomorrow morning ", then count The execution time of the Pending tasks obtained is 2016-4-25 day 10:00.
As another more specific embodiment, if target data comprising multiple temporal information, then according to target data In first temporal information calculate execution time of Pending tasks, it is assumed that the current system date is 2016-4-24 day 10:50, Target data is: process the task being not fully complete yesterday tomorrow morning, then the temporal information obtained from target data is " bright It morning " and " yesterday ", when the execution time of calculated Pending tasks, according to first temporal information got " tomorrow morning " calculates, and the execution time of the most calculated Pending tasks is 2016-4-25 day 10:00.
As another more specific embodiment, if target data does not comprises the temporal information showing the concrete moment, example As: do not comprise in target data: the temporal informations such as the morning, afternoon, evening, then acquiescence uses the current system moment as pending That is engaged in specifically performs the moment, it is assumed that the current system date is 2016-4-24 day 10:50, and target data is: process will be not fully complete tomorrow Task, then the temporal information obtained from target data is " tomorrow ", then do not wrap due in the temporal information that gets Include the temporal information showing the concrete moment, when the execution time of calculated Pending tasks, use the current system moment to make Specifically performing the moment for Pending tasks, the execution time of the most calculated Pending tasks is 2016-4-25 day 10:50.
Certainly, if it will be apparent to a skilled person that, the execution time of calculated Pending tasks is early than working as Front system data, such as: the current system date is 2016-4-24 10:50, and the execution time of calculated Pending tasks For 2016-4-19 10:00, owing to the date that can not return to before the current system date processes task, therefore, it is determined that for target Temporal information in data is unreasonable, and the execution time of prompting input Pending tasks, when being embodied as, it is judged that holding of Pending tasks Whether the row time can use method of the prior art early than the current system date, and here is omitted.
In a kind of possible embodiment, in the method that the embodiment of the present invention provides, when according to the execution got Between and event information create before Pending tasks, the method also comprises determining that whether the execution time is later than the current system date, if It is to perform according to the step performing Time And Event information creating Pending tasks got, otherwise, prompting input Pending tasks The execution time, and according to event information and receive the execution time create Pending tasks.
The creation method of the Pending tasks that the embodiment of the present invention provides is described in detail book below in conjunction with Fig. 2, such as Fig. 2 Shown in, the concrete steps of the creation method of the Pending tasks that the embodiment of the present invention provides include:
Step 21, replicates or shears data to shear plate;
Step 22, receives the interpolation request instruction that the target data in shear plate is added to Pending tasks for instruction, Specifically, in notifications hurdle, increasing, in the notice bar of shear plate, the button adding Pending tasks, user clicks on and can send out Send interpolation request instruction;
Step 23, obtains the execution Time And Event information of Pending tasks, specifically, from number of targets from target data According to middle acquisition for characterizing the temporal information of time, and calculate pending according to the temporal information got and current system date The execution time of task, using target data as the event information of Pending tasks;
Step 24, it is judged that whether the execution time got is later than the current system date, if so, performs step 25, otherwise, Perform step 26;
Step 25, according to the execution Time And Event information creating Pending tasks got;
Step 26, the execution time of prompting input Pending tasks, and according to the execution time inputted and the time got Information creating Pending tasks.
As more specific embodiment, user can replicate or shear data and can show the most multiple to shear plate, system System is to the prompting of shear plate, and data have been replicated or clipped in shear plate by prompting user, shear plate stores user replicate or The data sheared are in case pasting and using.
Assume to increase in shear plate to create Pending tasks button, when this establishment Pending tasks button is triggered, be considered as Receive the interpolation request instruction that for instruction, the target data in shear plate is added to Pending tasks, jump directly to pending The establishment interface of task, certainly, owing to can also show the notice bar of shear plate, therefore, in order to more in notifications hurdle Utilize the data creation Pending tasks of shear plate easily, it is also possible in notifications hurdle, at the notice bar of shear plate, wound is set Build the prompt access of Pending tasks, namely the button creating Pending tasks is set, when the button of this establishment Pending tasks is triggered Time, it is considered as receiving the interpolation request instruction that the target data in shear plate is added to for instruction Pending tasks, directly jumps Forward the establishment interface of Pending tasks to.
If it should be noted that all text datas of data in shear plate, then the text data in shear plate being made For target data, and utilize target data to create Pending tasks, namely utilize the text data in shear plate to create Pending tasks; If the data in shear plate include text data and view data, then using the text data in shear plate as target data, and Utilize target data to create Pending tasks, namely utilize the text data in shear plate to create Pending tasks;If in shear plate Data are view data, then need to extract text data from view data, and using the text data that extracts as number of targets According to, utilize target data to create Pending tasks, namely utilize the text data comprised in view data to create Pending tasks.
Create Pending tasks interface, need input the content of Pending tasks, the execution time, deadline, alerting pattern, Affiliated project, priority and remark information, the content of Pending tasks can be using target data in shear plate all as pending The content of task, it is also possible to extract event information in the target data from shear plate, using the event information extracted as treating Do the content of task, certainly, the most preferably, using the target data in shear plate all as the content of Pending tasks, certainly, It will be apparent to a skilled person that the content of Pending tasks can be modified by user, namely in shear plate Target data is modified, and using amended target data as the content of Pending tasks;The content of Pending tasks has inputted After one-tenth, need the target data from shear plate obtains the execution time of Pending tasks, specifically:
When obtaining the execution time of Pending tasks from target data, need first to obtain in the object time for characterizing the time Temporal information, such as: tomorrow morning, rear afternoon, after three days etc., then according to the time letter got from target data Breath and current system date, calculate the execution time of Pending tasks.Temporal information is obtained from target data, can be by target Text data in data mates one by one with the temporal information prestored, to obtain the temporal information in target data, Temporal information can also be obtained otherwise from target data by intellectual learning+knowledge.It should be noted that it is pending calculating During execution time of task, if getting from target data in temporal information without the concrete moment, then use and pre-set In the concrete moment that temporal information is corresponding, such as: in default setting, concrete moment corresponding to morning in temporal information is 10:00, Concrete moment corresponding to afternoon in temporal information is 15:00, and concrete moment corresponding to evening in temporal information is 21:00.
Such as: assuming that the current system date is 2016-4-24 day 10:50, target data is: tomorrow morning in all February Registration colleague carrys out meeting room, then the temporal information obtained from target data is " tomorrow morning ", the most calculated pending The execution time of business is 2016-4-25 day 10:00;If target data comprising multiple temporal information, then according in target data First temporal information calculate execution time of Pending tasks, it is assumed that the current system date is 2016-4-24 day 10:50, mesh Mark data are: process the task being not fully complete yesterday tomorrow morning, then the temporal information obtained from target data is " tomorrow The morning " and " yesterday ", when the execution time of calculated Pending tasks, " bright according to first temporal information got It morning " calculate, the execution time of the most calculated Pending tasks is 2016-4-25 day 10:00;If in target data Do not comprise the temporal information showing the concrete moment, such as: target data does not comprises: the temporal informations such as the morning, afternoon, evening, Then acquiescence uses the current system moment specifically to perform the moment as Pending tasks, it is assumed that the current system date is 2016-4-24 Day 10:50, target data is: process the task being not fully complete tomorrow, then the temporal information obtained from target data is " bright My god ", then owing to the temporal information that gets not including showing the temporal information in concrete moment, at calculated Pending tasks The execution time time, use the current system moment specifically to perform moment, the most calculated Pending tasks as Pending tasks The execution time be 2016-4-25 day 10:50.
Certainly, if it will be apparent to a skilled person that, the execution time of calculated Pending tasks is early than working as Front system data, such as: the current system date is 2016-4-24 10:50, and the execution time of calculated Pending tasks For 2016-4-19 10:00, owing to the date that can not return to before the current system date processes task, therefore, it is determined that for target Temporal information in data is unreasonable, and the execution time of prompting input Pending tasks, when being embodied as, it is judged that holding of Pending tasks Whether the row time can use method of the prior art early than the current system date, and here is omitted.
Other option in Pending tasks can input according to the prompting of system, specifically: cutting of Pending tasks On the only date, directly can input according to predetermined format when inputting the deadline of Pending tasks, it is also possible to open display day Go through interface, directly select the deadline of Pending tasks, certainly, to skilled artisan would appreciate that in calendar interface It is to go in the past to remind user to process Pending tasks owing to the current system date there should be no return to, therefore, the deadline of Pending tasks Phase needs to be later than the current system date, and the deadline of Pending tasks also needs to be later than the execution time of Pending tasks, if The deadline of the Pending tasks of user's input is early than current system date or the deadline of the Pending tasks of user's input Early than the execution time of Pending tasks, then prompting user re-enters the deadline of Pending tasks;The prompting side of Pending tasks Formula can provide one or more tabs for user to select, such as: alarm clock calling mode, informing display alarm at that time etc., Open/close, it is, of course, also possible to provide, the function button reminded, choose whether to open prompting function for user;Treat in input When doing task items, can select in the tab that classification belonging to Pending tasks provides;The priority of Pending tasks can Be configured with the significance level according to Pending tasks, such as: if Pending tasks is important, and must complete, then can be by This Pending tasks is set to high priority, if Pending tasks is inessential and has been not necessary to, then can be set by this Pending tasks Being set to low priority, certainly, the height of priority is selected according to Pending tasks by user, and such as, this Pending tasks is high Priority tasks;And the remark information of Pending tasks, points for attention or the out of Memory of this Pending tasks can be inputted, by with Family decides whether input content, when all items of Pending tasks has all inputted, has clicked on button, has completed Pending tasks Establishment.
After Pending tasks has created, the Pending tasks created can be shown in calendar applications, it is possible to To show the Pending tasks created in notifications hurdle.
In the present embodiment, receive for indicating the interpolation that the target data in shear plate is added to Pending tasks request to refer to Order, according to the instruction of interpolation request instruction, utilizes the target data in shear plate to create Pending tasks, is creating Pending tasks Time, add request instruction by sending, quickly utilize the target data in shear plate to create Pending tasks, it is not necessary to start calendar Application program, it is not necessary to multiple parameters of input Pending tasks, loaded down with trivial details with the foundation step of prior art Pending tasks, it is impossible to quickly Establishment Pending tasks compare, the embodiment of the present invention simplifies the foundation step of Pending tasks, it is achieved the quick wound of Pending tasks Build.
The establishment device of a kind of Pending tasks that the embodiment of the present invention provides, as it is shown on figure 3, this device includes: receive single Unit 31, receives the interpolation request instruction that the target data in shear plate is added to Pending tasks for instruction;Processing unit 33, For the instruction according to interpolation request instruction, the target data in shear plate is utilized to create Pending tasks.
In the device that the embodiment of the present invention provides, receive and add the target data in shear plate to pending for instruction The interpolation request instruction of business, according to the instruction of interpolation request instruction, utilizes the target data in shear plate to create Pending tasks, When creating Pending tasks, add request instruction by sending, quickly utilize the target data in shear plate to create Pending tasks, Without starting calendar applications, it is not necessary to multiple parameters of input Pending tasks, with the foundation step of prior art Pending tasks Loaded down with trivial details, it is impossible to quickly creating Pending tasks and compare, the embodiment of the present invention simplifies the foundation step of Pending tasks, it is achieved pending The quick establishment of task.
In a kind of possible embodiment, in the device that the embodiment of the present invention provides, processing unit 33 utilizes shear plate In target data create Pending tasks, specifically for: obtain from target data Pending tasks execution Time And Event letter Breath;According to the execution Time And Event information creating Pending tasks got.
In a kind of possible embodiment, in the device that the embodiment of the present invention provides, processing unit 33 is from target data The execution time of middle acquisition Pending tasks, specifically for: obtain in target data for characterizing the temporal information of time;According to from The temporal information got in target data and current system date, calculate the execution time of Pending tasks.
In a kind of possible embodiment, in the device that the embodiment of the present invention provides, processing unit 33 is according to acquisition Before the execution Time And Event information creating Pending tasks arrived, it is additionally operable to: determine whether the execution time is later than current system day Phase, if so, performing according to the step performing Time And Event information creating Pending tasks got, otherwise, prompting input is treated Do the execution time of task, and create Pending tasks according to event information with receiving the execution time.
In a kind of possible embodiment, in the device that the embodiment of the present invention provides, target data includes text data.
The establishment device of Pending tasks that the embodiment of the present invention provides, can integrated in the user terminal, such as: mobile phone, In panel computer and wearable smart machine, for quickly creating Pending tasks according to the data in shear plate, wherein, receive Unit 31 can use receiver or signal receiver etc., processing unit 33 can use the processors such as CPU.
The creation method of a kind of Pending tasks that the embodiment of the present invention provides and device, receive in shear plate for instruction Target data add the interpolation request instruction of Pending tasks to, according to adding the instruction of request instruction, utilize in shear plate Target data creates Pending tasks, when creating Pending tasks, adds request instruction by sending, quickly utilizes in shear plate Target data create Pending tasks, it is not necessary to start calendar applications, it is not necessary to input Pending tasks multiple parameters, simplify The foundation step of Pending tasks, it is achieved the quick establishment of Pending tasks.
Device embodiment described above is only schematically, and the wherein said unit illustrated as separating component can To be or to may not be physically separate, the parts shown as unit can be or may not be physics list Unit, i.e. may be located at a place, or can also be distributed on multiple NE.Can be selected it according to the actual needs In some or all of module realize the purpose of the present embodiment scheme.Those of ordinary skill in the art are not paying creativeness Work in the case of, be i.e. appreciated that and implement.
Through the above description of the embodiments, those skilled in the art it can be understood that to each embodiment can The mode adding required general hardware platform by software realizes, naturally it is also possible to pass through hardware.Based on such understanding, on State the part that prior art contributes by technical scheme the most in other words to embody with the form of software product, should Computer software product can store in a computer-readable storage medium, such as ROM/RAM, magnetic disc, CD etc., including some fingers Make with so that a computer equipment (can be personal computer, server, or the network equipment etc.) performs each and implements The method described in some part of example or embodiment.
Last it is noted that above example is only in order to illustrate technical scheme, it is not intended to limit;Although With reference to previous embodiment, the present invention is described in detail, it will be understood by those within the art that: it still may be used So that the technical scheme described in foregoing embodiments to be modified, or wherein portion of techniques feature is carried out equivalent; And these amendment or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (10)

1. the creation method of a Pending tasks, it is characterised in that the method includes:
Receive the interpolation request instruction that for instruction, the target data in shear plate is added to Pending tasks;
According to the instruction of described interpolation request instruction, the target data in described shear plate is utilized to create Pending tasks.
Method the most according to claim 1, it is characterised in that utilize the target data in described shear plate to create pending Business, including:
The execution Time And Event information of Pending tasks is obtained from described target data;
According to the execution Time And Event information creating Pending tasks got.
Method the most according to claim 2, it is characterised in that when obtaining the execution of Pending tasks from described target data Between, including:
Obtain in described target data for characterizing the temporal information of time;
According to the temporal information got from described target data and current system date, calculate holding of described Pending tasks The row time.
Method the most according to claim 2, it is characterised in that according to the execution Time And Event information creating got Before Pending tasks, the method also includes:
Determine whether the described execution time is later than the current system date, if so, perform according to the execution Time And Event got The step of information creating Pending tasks, otherwise, prompting inputs the execution time of described Pending tasks, and according to described event information Pending tasks is created with receiving the execution time.
5. according to the method according to any one of claim 1-4, it is characterised in that described target data includes text data.
6. the establishment device of a Pending tasks, it is characterised in that this device includes:
Receive unit, receive the interpolation request instruction that for instruction, the target data in shear plate is added to Pending tasks;
Processing unit, for the instruction according to described interpolation request instruction, utilizes the target data in described shear plate to create and treats Do task.
Device the most according to claim 6, it is characterised in that described processing unit utilizes the number of targets in described shear plate According to creating Pending tasks, specifically for:
The execution Time And Event information of Pending tasks is obtained from described target data;
According to the execution Time And Event information creating Pending tasks got.
Device the most according to claim 7, it is characterised in that described processing unit obtains pending from described target data The execution time of task, specifically for:
Obtain in described target data for characterizing the temporal information of time;
According to the temporal information got from described target data and current system date, calculate holding of described Pending tasks The row time.
Device the most according to claim 8, it is characterised in that described processing unit according to execution time of getting and Before event information creates Pending tasks, it is additionally operable to:
Determine whether the described execution time is later than the current system date, if so, perform according to the execution Time And Event got The step of information creating Pending tasks, otherwise, prompting inputs the execution time of described Pending tasks, and according to described event information Pending tasks is created with receiving the execution time.
10. according to the device according to any one of claim 6-9, it is characterised in that described target data includes text data.
CN201610589313.4A 2016-07-22 2016-07-22 The creation method of a kind of Pending tasks and device Pending CN106293959A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610589313.4A CN106293959A (en) 2016-07-22 2016-07-22 The creation method of a kind of Pending tasks and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610589313.4A CN106293959A (en) 2016-07-22 2016-07-22 The creation method of a kind of Pending tasks and device

Publications (1)

Publication Number Publication Date
CN106293959A true CN106293959A (en) 2017-01-04

Family

ID=57652174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610589313.4A Pending CN106293959A (en) 2016-07-22 2016-07-22 The creation method of a kind of Pending tasks and device

Country Status (1)

Country Link
CN (1) CN106293959A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109918093A (en) * 2019-03-11 2019-06-21 杭州随笔记网络技术有限公司 A method of task is quickly created in desktop end task management class application program

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030154207A1 (en) * 2002-02-14 2003-08-14 Atsushi Naito Information processing system
US6760728B1 (en) * 2000-09-27 2004-07-06 Palmsource, Inc. Method and apparatus for importing and exporting directory and calendar information to and from personal information management applications
CN102404447A (en) * 2010-09-09 2012-04-04 Lg电子株式会社 Mobile terminal and memo management method thereof
US20120131116A1 (en) * 2010-11-15 2012-05-24 Van Quy Tu Controlling data transfer on mobile devices
CN104902066A (en) * 2014-03-03 2015-09-09 Lg电子株式会社 Mobile terminal and controlling method thereof
US20160148148A1 (en) * 2014-11-21 2016-05-26 Oracle International Corporation System and method for changing resource calendars by editing calendar views

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6760728B1 (en) * 2000-09-27 2004-07-06 Palmsource, Inc. Method and apparatus for importing and exporting directory and calendar information to and from personal information management applications
US20030154207A1 (en) * 2002-02-14 2003-08-14 Atsushi Naito Information processing system
CN102404447A (en) * 2010-09-09 2012-04-04 Lg电子株式会社 Mobile terminal and memo management method thereof
US20120131116A1 (en) * 2010-11-15 2012-05-24 Van Quy Tu Controlling data transfer on mobile devices
CN104902066A (en) * 2014-03-03 2015-09-09 Lg电子株式会社 Mobile terminal and controlling method thereof
US20160148148A1 (en) * 2014-11-21 2016-05-26 Oracle International Corporation System and method for changing resource calendars by editing calendar views

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109918093A (en) * 2019-03-11 2019-06-21 杭州随笔记网络技术有限公司 A method of task is quickly created in desktop end task management class application program

Similar Documents

Publication Publication Date Title
CN106156998A (en) The management method of a kind of Pending tasks and device
CN104461239B (en) A kind of information interacting method and device
CN105138630A (en) Schedule prompt method and terminal
US9977655B2 (en) System and method for automatic extraction of software design from requirements
CN109492152B (en) Method, device, computer equipment and storage medium for pushing custom content
CN109033466B (en) Page sharing method calculates equipment and computer storage medium
CN112199007A (en) Menu display method and device, electronic equipment and storage medium
CN109388506A (en) A kind of data processing method and electronic equipment
CN109740041B (en) Webpage crawling method and device, storage medium and computer equipment
AU2019240698A1 (en) An application server and computer readable storage medium for generating project specific configuration data
CN106408250A (en) Schedule management method and terminal
CN110110306A (en) Method for exhibiting data, device, terminal and computer readable storage medium
CN113805962B (en) Application page display method and device and electronic equipment
CN107885569A (en) Based on the PUSH message method of reseptance and device for listening monotype
CN108197210A (en) User based on friend relation interacts reading method and computing device
CN110750244A (en) Code synchronization method and device, electronic equipment and storage medium
US20160239809A1 (en) Systems and methods for implementing minimally obstructive multifunctional horizontally oriented calendar
CN106293959A (en) The creation method of a kind of Pending tasks and device
CN113238747A (en) Label generation method and system for self-adaptive container display
CN112597123A (en) Data multi-version dynamic switching method and device
CN110134469B (en) Festival theme switching method and device and computer equipment
CN106251120A (en) A kind of method of information management and terminal
CN109445779A (en) The rendering method and terminal device of multiple-language user interface
US20140344250A1 (en) Enhanced search refinement for personal information services
CN106708540B (en) Universal time selection method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104

WD01 Invention patent application deemed withdrawn after publication