CN106289711B - A kind of force test in wind tunnel method suitable for lattice round steel pipe power transmission tower - Google Patents

A kind of force test in wind tunnel method suitable for lattice round steel pipe power transmission tower Download PDF

Info

Publication number
CN106289711B
CN106289711B CN201610636217.0A CN201610636217A CN106289711B CN 106289711 B CN106289711 B CN 106289711B CN 201610636217 A CN201610636217 A CN 201610636217A CN 106289711 B CN106289711 B CN 106289711B
Authority
CN
China
Prior art keywords
tower
power transmission
transmission tower
lattice
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610636217.0A
Other languages
Chinese (zh)
Other versions
CN106289711A (en
Inventor
游溢
何成
李文胜
李妍
晏致涛
张龙
赵建平
王欣欣
刘阳
崔晓东
徐凯
赵爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Xinjiang Electric Power Co Ltd
Original Assignee
Chongqing University
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Xinjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Xinjiang Electric Power Co Ltd filed Critical Chongqing University
Priority to CN201610636217.0A priority Critical patent/CN106289711B/en
Publication of CN106289711A publication Critical patent/CN106289711A/en
Application granted granted Critical
Publication of CN106289711B publication Critical patent/CN106289711B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/06Measuring arrangements specially adapted for aerodynamic testing

Abstract

The invention discloses a kind of force test in wind tunnel methods suitable for lattice round steel pipe power transmission tower:Including building power transmission tower model, whole tower experiment is decoupled, tests and is calculated so as to obtain the wind load of whole section and each section paragraph by paragraph.The method of the present invention causes the experiment of lattice steel pipe power transmission tower wind tunnel force measurement both to consider the difference of different tower section structure types and geometric dimension, in turn ensure the consistency of boundary conditions of experiment tower section and practical structures, obtained experimental result can more realistically reflect actual conditions.

Description

A kind of force test in wind tunnel method suitable for lattice round steel pipe power transmission tower
Technical field
The present invention relates to a kind of force test in wind tunnel methods, and in particular to one kind is suitable for lattice round steel pipe and transmits electricity The force test in wind tunnel method of tower.
Background technology
Rigid model wind tunnel test in the prior art is divided into two kinds of manometric test and dynamometer check, but power transmission tower is because it is Cancelled structure, so generally use aerodynamic balance measuring method obtains Shape Coefficient.Aerodynamic balance measuring can be divided into whole tower test again With two class of sectionalization test.Whole tower test is directly to measure wind load suffered by whole tower, and full tower is set using unified Shape Coefficient Meter, but this test method has ignored the difference of tower head, cross-arm and wind characteristic caused by the different structure form of tower body segment Not.Sectionalization test is then individually to take out a certain tower section to be tested, although the Shape Coefficient of different tower sections can be respectively obtained, But the actually located wind field of tower section is changed, does not account for influence of the up and down or left and right structure to the tower section flow field.Therefore, The experimental data that more than test method obtains cannot fully reflect actual conditions.
Although related specifications give using rod piece diameter, fundamental wind pressure as parameter round cross-section rod Shape Coefficient value, When carrying out steel pipe Deethanizer design, the bar cross section type included by whole tower is various, and the aerodynamic interference between rod piece is not in specification Middle embodiment, it is therefore necessary to which steel tube tower Shape Coefficient is obtained by wind tunnel test.
Invention content
In view of this, the purpose of the present invention is to provide a kind of wind-tunnel surveys suitable for lattice round steel pipe power transmission tower Power test method, under the premise of each tower section stress wind field is not changed, test method of the invention can measure different knots respectively The tower section Shape Coefficient of configuration formula.
Technical scheme is as follows:
A kind of force test in wind tunnel method suitable for lattice round steel pipe power transmission tower includes the following steps:
Step 1:Power transmission tower model is built, by the use of lattice steel tube tower as power transmission tower model, and by lattice steel pipe Tower makes dismountable multi-segment structure from top to bottom, and individually each section is an overall structure;
Step 2:Whole tower is suspended on a stent, then carries out dynamometer check, obtains the wind load of whole tower;
Step 3:By the one section of dismounting topmost of lattice steel tube tower, then remainder is suspended on above-mentioned stent, so The dynamometer check with step 2 the same terms is carried out to remainder steel tube tower afterwards, obtains the wind load of remainder steel tube tower, Then gained wind load twice is subtracted each other into the wind load as removed part;
Step 4:With reference to step 3, each section is gradually removed from top to bottom, it is enterprising that remainder then is suspended on above-mentioned stent Row dynamometer check obtains each section of wind load successively using the method for step 3.
Further, lattice steel tube tower is split between nine sections, adjacent two sections by being set between main material in step 1 Connector is attached.
Further, the connector is aluminum pipe, and the aluminum pipe is divided into the caliber and steel pipe of three sections of upper, middle and lower, wherein interlude The outer tube diameter of tower main material is identical, upper-lower section caliber is identical with caliber in steel tube tower main material.
Further, the stent includes a root post and a hanger bracket, and the hitch point set on institute's hanger bracket is described outstanding Hanger is detachably mounted to by bolt on column, and height of the hanger bracket on column can be adjusted by bolt.
Further, when the power transmission tower model is suspended on stent, the ground clearance of power transmission tower model for 0.5cm ~ 2cm it Between.
Further, when the power transmission tower model is suspended on stent, the ground clearance of power transmission tower model is 1cm.
The beneficial effects of the present invention are:The method of the present invention causes the experiment of lattice steel pipe power transmission tower wind tunnel force measurement both to examine Consider the difference of different tower section structure types and geometric dimension, in turn ensure the boundary condition one of experiment tower section and practical structures Cause property, obtained experimental result can more realistically reflect actual conditions.
Description of the drawings
In order to make the purpose of the present invention, technical solution and advantageous effect clearer, the present invention provides drawings described below and carries out Explanation:
Fig. 1 is lattice steel tube tower structure diagram;
Fig. 2 is supporting structure schematic diagram.
Specific embodiment
The invention will be further described in the following with reference to the drawings and specific embodiments, so that those skilled in the art can be with It is better understood from the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
As shown in the figure, a kind of force test in wind tunnel method suitable for lattice round steel pipe power transmission tower, including following step Suddenly:
Step 1:Power transmission tower model is built, by the use of lattice steel tube tower as power transmission tower model, and by lattice steel pipe Tower makes dismountable multi-segment structure from top to bottom, and individually each section is an overall structure;
Step 2:Whole tower is suspended on a stent, then carries out dynamometer check, obtains the wind load of whole tower;
Step 3:By the one section of dismounting topmost of lattice steel tube tower, then remainder is suspended on above-mentioned stent, so The dynamometer check with step 2 the same terms is carried out to remainder steel tube tower afterwards, obtains the wind load of remainder steel tube tower, Then gained wind load twice is subtracted each other into the wind load as removed part;
Step 4:With reference to step 3, each section is gradually removed from top to bottom, it is enterprising that remainder then is suspended on above-mentioned stent Row dynamometer check obtains each section of wind load successively using the method for step 3.
In the present embodiment, lattice steel tube tower is split into nine sections in step 1, such as the 1-9 marked in Fig. 1, adjacent two sections Between by between main material set connector be attached.
In the present embodiment, the connector is aluminum pipe, and the aluminum pipe is divided into three sections of upper, middle and lower, wherein the caliber of interlude with The outer tube diameter of steel tube tower main material is identical, upper-lower section caliber is identical with caliber in steel tube tower main material.
In the present embodiment, the stent includes a root post and a hanger bracket as described in Figure 2, is set on institute's hanger bracket Hitch point 11, the hanger bracket are detachably mounted to by bolt on column, and height of the hanger bracket on column can lead to Cross bolt adjusting.
In the present embodiment, when the power transmission tower model is suspended on stent, when the power transmission tower model is suspended on stent, The ground clearance of power transmission tower model is 1cm.
The method of the present embodiment causes the experiment of lattice steel pipe power transmission tower wind tunnel force measurement both to consider different tower section structure shapes The difference of formula and geometric dimension in turn ensures the consistency of boundary conditions of experiment tower section and practical structures, obtained experimental result It can more realistically reflect actual conditions.
Embodiment described above is only to absolutely prove preferred embodiment that is of the invention and being lifted, protection model of the invention It encloses without being limited thereto.The equivalent substitute or transformation that those skilled in the art are made on the basis of the present invention, in the present invention Protection domain within.Protection scope of the present invention is subject to claims.

Claims (6)

  1. A kind of 1. force test in wind tunnel method suitable for lattice round steel pipe power transmission tower, it is characterised in that:Including following step Suddenly:
    Step 1:Build power transmission tower model, by the use of lattice steel tube tower as power transmission tower model, and by lattice steel tube tower from Top to bottm makes dismountable multi-segment structure, and individually each section is an overall structure;
    Step 2:Whole tower is suspended on a stent, then carries out dynamometer check, obtains the wind load of whole tower;
    Step 3:By the one section of dismounting topmost of lattice steel tube tower, then remainder is suspended on above-mentioned stent, it is then right Remainder steel tube tower carries out the dynamometer check with step 2 the same terms, obtains the wind load of remainder steel tube tower, then will Gained wind load subtracts each other the wind load as removed part twice;
    Step 4:With reference to step 3, each section is gradually removed from top to bottom, then remainder is suspended on above-mentioned stent and is surveyed Power is tested, and each section of wind load is obtained successively using the method for step 3.
  2. 2. the force test in wind tunnel method according to claim 1 suitable for lattice round steel pipe power transmission tower, feature It is:In step 1 by lattice steel tube tower be split into nine sections, adjacent two sections between by between main material set connector carry out Connection.
  3. 3. the force test in wind tunnel method according to claim 2 suitable for lattice round steel pipe power transmission tower, feature It is:The connector is aluminum pipe, and the aluminum pipe is divided into three sections of upper, middle and lower, and wherein the caliber of interlude and steel tube tower main material is outer Caliber is identical, the caliber of upper-lower section is identical with caliber in steel tube tower main material.
  4. 4. the force test in wind tunnel method according to claim 1 suitable for lattice round steel pipe power transmission tower, feature It is:The stent includes a root post and a hanger bracket, is provided with hitch point on the hanger bracket, the hanger bracket passes through Bolt is detachably mounted on column, and height of the hanger bracket on column is adjusted by bolt.
  5. 5. the force test in wind tunnel method according to claim 1 suitable for lattice round steel pipe power transmission tower, feature It is:When the power transmission tower model is suspended on stent, power transmission tower model ground clearance is between 0.5cm ~ 2cm.
  6. 6. the force test in wind tunnel method according to claim 5 suitable for lattice round steel pipe power transmission tower, feature It is:When the power transmission tower model is suspended on stent, the ground clearance of power transmission tower model is 1cm.
CN201610636217.0A 2016-08-05 2016-08-05 A kind of force test in wind tunnel method suitable for lattice round steel pipe power transmission tower Active CN106289711B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610636217.0A CN106289711B (en) 2016-08-05 2016-08-05 A kind of force test in wind tunnel method suitable for lattice round steel pipe power transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610636217.0A CN106289711B (en) 2016-08-05 2016-08-05 A kind of force test in wind tunnel method suitable for lattice round steel pipe power transmission tower

Publications (2)

Publication Number Publication Date
CN106289711A CN106289711A (en) 2017-01-04
CN106289711B true CN106289711B (en) 2018-06-12

Family

ID=57665073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610636217.0A Active CN106289711B (en) 2016-08-05 2016-08-05 A kind of force test in wind tunnel method suitable for lattice round steel pipe power transmission tower

Country Status (1)

Country Link
CN (1) CN106289711B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107328548A (en) * 2017-05-24 2017-11-07 国家电网公司 A kind of extra-high voltage multiloop power transmission tower Shape Coefficient test method
CN107894319A (en) * 2017-12-29 2018-04-10 中国能源建设集团浙江省电力设计院有限公司 A kind of test device of round steel pipe bar Shape Coefficient
CN110276157A (en) * 2019-06-28 2019-09-24 中国铁塔股份有限公司 A kind of the Wind load calculating method and relevant device of single-tube communication tower
CN112098038B (en) * 2020-08-27 2022-09-20 汕头大学 Rigid body model multipoint synchronous force measuring method under three-dimensional wind action
CN113465957A (en) * 2021-05-17 2021-10-01 中国人民解放军第六九O五工厂 Antenna lift mast wind-resistant simulation test system
CN113374329B (en) * 2021-07-08 2022-11-18 重庆科技学院 Cross oblique material double-limb connecting node and power transmission tower angle steel connecting structure
CN113670562B (en) * 2021-08-11 2023-07-14 中国南方电网有限责任公司超高压输电公司广州局 Support tower device and method for simulating collapse of power transmission tower in wind tunnel test
CN113504025B (en) * 2021-09-13 2021-12-14 中国航天空气动力技术研究院 Dynamic load testing method for wind tunnel with large attack angle and low frequency structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201527334U (en) * 2009-10-29 2010-07-14 浙江省电力公司超高压建设分公司 Novel large-span electricity transmission steel pipe tower aeroelastic model
CN102609579A (en) * 2012-01-31 2012-07-25 浙江省电力设计院 Three-dimensional wind-resistant design method for power transmission tower
CN102853989A (en) * 2012-09-07 2013-01-02 广东电网公司佛山供电局 Swing aeroelastic model and shock-test wind tunnel test method thereby
CN103293012A (en) * 2013-04-28 2013-09-11 国家电网公司 Method using static force scale model to test power transmission tower
CN205333291U (en) * 2016-01-29 2016-06-22 重庆大学 Lattice formula transmission tower elasticity model

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01240835A (en) * 1988-03-23 1989-09-26 Sumitomo Heavy Ind Ltd Wind tunnel model experimental method and model for wind tunnel experiment
KR101576511B1 (en) * 2014-03-07 2015-12-10 (주)제이피엠엔지니어링 A 3D Triangular Mesh Modeling in Stair-type Offshore Wind Tower

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201527334U (en) * 2009-10-29 2010-07-14 浙江省电力公司超高压建设分公司 Novel large-span electricity transmission steel pipe tower aeroelastic model
CN102609579A (en) * 2012-01-31 2012-07-25 浙江省电力设计院 Three-dimensional wind-resistant design method for power transmission tower
CN102853989A (en) * 2012-09-07 2013-01-02 广东电网公司佛山供电局 Swing aeroelastic model and shock-test wind tunnel test method thereby
CN103293012A (en) * 2013-04-28 2013-09-11 国家电网公司 Method using static force scale model to test power transmission tower
CN205333291U (en) * 2016-01-29 2016-06-22 重庆大学 Lattice formula transmission tower elasticity model

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"格构式圆截面钢管塔风荷载特性的风洞试验研究";项国通;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》;20130615(第06期);C038-288 *
"格构式钢管输电塔风振系数研究";杨靖波 等;《建筑结构学报》;20100515(第S2期);182-186 *
"特高压输电塔线体系气弹模型设计与风洞试验";李正良 等;《空气动力学学报》;20110228;第29卷(第1期);102-106+113 *

Also Published As

Publication number Publication date
CN106289711A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106289711B (en) A kind of force test in wind tunnel method suitable for lattice round steel pipe power transmission tower
CN103033314B (en) Torsion calibration method for measurement beam used for ship model wave load test
CN105004504B (en) The starting of oscillation wind speed appraisal procedure and selection method of composite insulator
CN107907311A (en) A kind of wire icing of transmission line unbalanced tensile force test method and system
CN112115588B (en) Multi-working-condition simulation analysis method for power transmission line channel
CN102507067B (en) Pre-stressed anchor cable stress state real-time monitoring system based on vibration wire sensing technology
CN101893497A (en) Out-of-plane frequency method for testing cable force of planar cable rod system
CN106225637A (en) A kind of sag observation bar and observation procedure thereof
CN103321468B (en) Stay-supported triangular truss anemometer tower
CN104458455B (en) Narrow base power transmission steel pipe tower space tower leg structured testing method
Li et al. Investigation of the spatial coherence function of wind loads on lattice frame structures
CN106153465A (en) A kind of Architecture Outer Curtain Wall load test device
CN202730804U (en) Compressometer
CN110807220B (en) Method for calculating instantaneous cable force of bridge inhaul cable with anti-noise function
CN208251184U (en) A kind of pattern foundation pit supporting structure model casing with FBG monitoring function
CN108896266B (en) A kind of method for arranging of balance measurement route
CN208313483U (en) A kind of transmission line of electricity corner steel tower electrification jacking tensile test system
CN205634605U (en) Device that lifting device shelved
Chang et al. Thermal analysis of highway overhead support structures
CN207248471U (en) Extra-high voltage direct current converter valve Experimental Study on Seismic Behavior device
CN208187332U (en) A kind of large scale structure deflection test device
CN203285134U (en) Wire-bracing-type triangular truss wind measuring tower
CN109471997B (en) Wind deflection distance calculation method for insulator string
CN207180656U (en) One kind radially converges deformation measurement device for tunnel model test
CN104502052B (en) The three-component method of bridge main beam static(al) under the synergy of a kind of test wind and rain

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant