CN106288478A - A kind of injector for normal-temperature natural-gas injection LNG cold boil-off gas - Google Patents

A kind of injector for normal-temperature natural-gas injection LNG cold boil-off gas Download PDF

Info

Publication number
CN106288478A
CN106288478A CN201610860272.8A CN201610860272A CN106288478A CN 106288478 A CN106288478 A CN 106288478A CN 201610860272 A CN201610860272 A CN 201610860272A CN 106288478 A CN106288478 A CN 106288478A
Authority
CN
China
Prior art keywords
nozzle
gas
mixing chamber
injector
expansion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610860272.8A
Other languages
Chinese (zh)
Inventor
付子航
冯亮
蒲波
杨玉霞
刘方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Gas and Power Group Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC Gas and Power Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC Gas and Power Group Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201610860272.8A priority Critical patent/CN106288478A/en
Publication of CN106288478A publication Critical patent/CN106288478A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B9/00Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point
    • F25B9/08Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point using ejectors

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention relates to a kind of injector for normal-temperature natural-gas injection LNG cold boil-off gas, it is characterized in that: include a jet pipe, one end of described jet pipe is entrance point, the other end is the port of export, described jet pipe is sequentially arranged a suction chamber, a mixing chamber and a diffusion room by entrance point to the port of export, described mixing chamber is a flat segments, and described diffusion room is an expansion pipe, and described suction chamber is a contraction pipeline section with the junction of mixing chamber;Entrance point at described jet pipe arranges a nozzle extended to suction chamber, and described nozzle is sequentially arranged a contraction section and an expansion segment by nozzle entrance to jet expansion;In the side of described suction chamber, one induction tunnel is set.

Description

A kind of injector for normal-temperature natural-gas injection LNG cold boil-off gas
Technical field
The present invention relates to a kind of injector for normal-temperature natural-gas injection LNG cold boil-off gas, belong to natural Gas technical field of memory.
Background technology
LNG (Liquefied Natural Gas, liquefied natural gas) receiving station typically carry the reception of LNG, storage and Gasify outer transmission function.Owing to LNG is cryogen, although LNG plant has good insulation, but during production run Inevitably producing a certain amount of BOG (Boiled Off Gas, boil-off gas), along with the increase of BOG quantity, LNG stores Intrasystem temperature and pressure can raise.If LNG storage tank internal pressure is higher than the safety relief pressure of default, then can lead Causing tank deck relief valve to open, the BOG that directly releases burns to flare system, with the pressure of stabilisation systems.This large amount of discharge BOG's Blood pressure lowering mode can cause the huge waste of natural gas.
Therefore, one of key issue that during BOG processing system is the LNG receiving station design phase, necessary emphasis considers.At present LNG receiving station processes the mode of BOG mainly a following two: 1, BOG condensation technology again, BOG is condensed into LNG and reclaims, This needs the outer defeated traffic demand that the holding of LNG receiving station is higher;2, direct compress technique, the BOG in LNG storage tank is through low pressure pressure After contracting machine and high pressure compressor are pressurized to the pressure needed for pipe network transmission successively, it are directly entered multi-purpose station pipeline and deliver to downstream user. Additionally, more and more LNG receiving stations are except need to also need to the Middle Voltage of short-distance and medium-distance direct in addition to the defeated pipe network of high pressure length supplies Supply, therefore outer defeated natural gas is divided into high pressure (about 9MPa) and middle pressure (about 4.0MPa) to carry by some LNG receiving stations.In Pressure natural gas often can need to carry after being adjusted to required pressure by high pressure.
In prior art, middle pressure, high pressure compressor, after-condenser are generally set for reclaiming BOG, LNG receiving station, and adjust The equipment such as pressure valve, had both needed energy to compress BOG, and had needed again energy that by high pressure, natural gas is adjusted to middle pressure, and the equipment that causes is thrown The problems such as money height, energy consumption height, complex operation, complex process, and there is also the application restriction of duty requirements.
Summary of the invention
For the problems referred to above, it is an object of the invention to provide one and boil-off gas can be made to condense and simple for structure, technique again It is simply to the injector of normal-temperature natural-gas injection low-temperature evaporation gas.
For achieving the above object, the present invention is by the following technical solutions: a kind of natural for the liquefaction of normal-temperature natural-gas injection The injector of gas low-temperature evaporation gas, it is characterised in that: including that a jet pipe, one end of described jet pipe are entrance point, the other end is for going out Mouth end, described jet pipe is sequentially arranged a suction chamber, a mixing chamber and a diffusion room by entrance point to the port of export, and described mixing chamber is One flat segments, described diffusion room is an expansion pipe, and described suction chamber is a contraction pipeline section with the junction of mixing chamber;Institute The entrance point stating jet pipe arranges a nozzle extended to suction chamber, and described nozzle is sequentially arranged one by nozzle entrance to jet expansion Contraction section and an expansion segment;In the side of described suction chamber, one induction tunnel is set.
Described mixing chamber and the total length shrinking pipeline section are 1080mm, a diameter of 110mm of described mixing chamber, described diffusion The a length of 1910mm of room, the outlet diameter of described diffusion room is 380mm, a length of 820mm of described nozzle, described nozzle A diameter of 30mm of smallest cross-sectional, the outlet diameter of described nozzle is 110mm.
Due to the fact that and take above technical scheme, it has the advantage that the present invention in use, in LNG receiving station Gasification natural gas enter the nozzle in injector, after the contraction section and expansion segment of nozzle, be ejected to the suction of injector Room, natural gas forms low pressure in suction chamber, so that BOG is entered suction chamber, natural gas and BOG through induction tunnel by injection Fluid-mixing is sufficiently mixed at mixing chamber and diffusion indoor, and the pressure at diffusion indoor gas can be gone up, by whole The pressure loss of device controls within the scope of receivable;The present invention is capable of condensing again of BOG, it is not necessary to arranges and condenses The equipment such as device, pressure regulator valve, technical process is simple, economy is prominent.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the present invention;
Fig. 2 is that the size of the present invention arranges schematic diagram;
Fig. 3 is internal pressure field distribution cloud atlas of the present invention.
Detailed description of the invention
With embodiment, the present invention is described in detail below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, the present invention includes a jet pipe 1, and one end of jet pipe 1 is entrance point, and the other end is the port of export, spray Pipe 1 is sequentially arranged suction chamber 2, mixing chamber 3 and a diffusion room 4 by entrance point to the port of export, and wherein, mixing chamber 3 is one flat Straight length, diffusion room 4 is an expansion pipe, and suction chamber 2 is a contraction pipeline section with the junction of mixing chamber 3.Import at jet pipe 1 End arranges a nozzle 5 extended to suction chamber 2, and nozzle 5 is sequentially arranged a contraction section 51 and by nozzle entrance to jet expansion Expansion segment 52.One induction tunnel 6 is set in the side of suction chamber 2.
In a preferred embodiment, mixing chamber 3 and the total length shrinking pipeline section are 1080mm, the diameter of mixing chamber 3 For 110mm, a length of 1910mm of diffusion room 4, the outlet diameter of diffusion room 4 is 380mm, a length of 820mm of nozzle 5, spray A diameter of 30mm of the smallest cross-sectional of mouth 5, the outlet diameter of nozzle 5 is 110mm.The setting of above-mentioned size is capable of natural gas and draws Penetrate the technology requirement of the typical condition of BOG.
Work process and the principle of the present invention are as follows: present invention General Principle based on la farr pipe, pass through numerical simulation Optimize and formed a kind of injector being applicable to normal-temperature natural-gas injection cryogenic vaporizer, at pressure corresponding to two kinds of fluids and stream Optimal injection rate and liquefied fraction can be reached in weight range, there is higher factory application and be worth.The present invention in use, Gasification natural gas in LNG receiving station enters the nozzle 5 in injector, sprays after the contraction section 51 and expansion segment 52 of nozzle 5 Going out the suction chamber 2 to injector, the size through the nozzle 5 of particular design can make natural gas form low pressure in suction chamber 2, So that BOG is entered suction chamber 2 through induction tunnel 6 by injection.The fluid-mixing of natural gas and BOG is in mixing chamber 3 and diffusion room 4 Inside being sufficiently mixed, in diffusion room 4, the pressure of gas can be gone up, and controls the pressure loss of whole device to connect Within the scope of receipts.The present invention is capable of condensing again of BOG, it is not necessary to arrange the equipment such as after-condenser, pressure regulator valve, technical process Simply, economy highlights.
Below with the effect of an instantiation explanation present invention:
The LNG gasification natural gas supplied materials pressure of certain LNG receiving station is 2.0MPaG, and temperature is 10 DEG C;BOG system of LNG receiving station The BOG of system pressure after compression reaches 0.8MPaG, and temperature is-140 DEG C, and BOG connects the induction tunnel 6 of injector.Along with natural Gas enters injector, and BOG gas is inhaled into injector and is sufficiently mixed outer defeated with natural gas.The mass ratio of induced-to-inducing air of this device, i.e. by The ratio of the mass flow of driving fluid BOG and driving fluid quality of natural gas flow, is 69.3%, and this receiving station BOG is Generation amount 112t/h during size, can process maximum for a receiving station BOG hour generation amount when flow of control LNG is 177t/h Finish.The outer defeated gas pressure of mixing is 1MPa.
The present invention only illustrates with above-described embodiment, the structure of each parts, arranges position and to connect be all to have Changed, on the basis of technical solution of the present invention, all improvement individual part carried out according to the principle of the invention and equivalent Conversion, the most should not get rid of outside protection scope of the present invention.

Claims (2)

1. the injector for normal-temperature natural-gas injection LNG cold boil-off gas, it is characterised in that: include a spray Pipe, one end of described jet pipe is entrance point, and the other end is the port of export, and described jet pipe is sequentially arranged a suction by entrance point to the port of export Enter the room, a mixing chamber and a diffusion room, described mixing chamber is a flat segments, and described diffusion room is an expansion pipe, described suction The junction with mixing chamber of entering the room is a contraction pipeline section;Entrance point at described jet pipe arranges a nozzle extended to suction chamber, Described nozzle is sequentially arranged a contraction section and an expansion segment by nozzle entrance to jet expansion;Arrange in the side of described suction chamber One induction tunnel.
A kind of injector for normal-temperature natural-gas injection LNG cold boil-off gas, its It is characterised by: described mixing chamber and the total length shrinking pipeline section are 1080mm, a diameter of 110mm of described mixing chamber, described expansion The a length of 1910mm of pressure chamber, the outlet diameter of described diffusion room is 380mm, a length of 820mm of described nozzle, described nozzle A diameter of 30mm of smallest cross-sectional, the outlet diameter of described nozzle is 110mm.
CN201610860272.8A 2016-09-28 2016-09-28 A kind of injector for normal-temperature natural-gas injection LNG cold boil-off gas Pending CN106288478A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610860272.8A CN106288478A (en) 2016-09-28 2016-09-28 A kind of injector for normal-temperature natural-gas injection LNG cold boil-off gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610860272.8A CN106288478A (en) 2016-09-28 2016-09-28 A kind of injector for normal-temperature natural-gas injection LNG cold boil-off gas

Publications (1)

Publication Number Publication Date
CN106288478A true CN106288478A (en) 2017-01-04

Family

ID=57716197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610860272.8A Pending CN106288478A (en) 2016-09-28 2016-09-28 A kind of injector for normal-temperature natural-gas injection LNG cold boil-off gas

Country Status (1)

Country Link
CN (1) CN106288478A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999035436A1 (en) * 1998-01-08 1999-07-15 Bg Plc A method of and apparatus for returning a boil-off gas to its liquid phase
CN2494917Y (en) * 2001-08-09 2002-06-12 上海工程技术大学 Peak regulator for natural gas
JP2003277778A (en) * 2002-03-25 2003-10-02 Mitsui Eng & Shipbuild Co Ltd Method and apparatus for manufacturing natural gas hydrate
CN102954667A (en) * 2011-08-11 2013-03-06 林德股份公司 Method for compacting boil off gas
CN103225740A (en) * 2013-04-22 2013-07-31 中国海洋石油总公司 BOG processing system utilizing pressure energy of LNG receiving station
WO2016017973A1 (en) * 2014-07-31 2016-02-04 대우조선해양 주식회사 System and method for supplying fuel
CN205156507U (en) * 2015-11-23 2016-04-13 重庆耐德工业股份有限公司 BOG is equipment of liquefying again
CN206131510U (en) * 2016-09-28 2017-04-26 中国海洋石油总公司 A ejector that is used for normal atmospheric temperature natural gas to draw penetrating liquefied natural gas low temperature evaporation gas

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999035436A1 (en) * 1998-01-08 1999-07-15 Bg Plc A method of and apparatus for returning a boil-off gas to its liquid phase
CN2494917Y (en) * 2001-08-09 2002-06-12 上海工程技术大学 Peak regulator for natural gas
JP2003277778A (en) * 2002-03-25 2003-10-02 Mitsui Eng & Shipbuild Co Ltd Method and apparatus for manufacturing natural gas hydrate
CN102954667A (en) * 2011-08-11 2013-03-06 林德股份公司 Method for compacting boil off gas
CN103225740A (en) * 2013-04-22 2013-07-31 中国海洋石油总公司 BOG processing system utilizing pressure energy of LNG receiving station
WO2016017973A1 (en) * 2014-07-31 2016-02-04 대우조선해양 주식회사 System and method for supplying fuel
CN205156507U (en) * 2015-11-23 2016-04-13 重庆耐德工业股份有限公司 BOG is equipment of liquefying again
CN206131510U (en) * 2016-09-28 2017-04-26 中国海洋石油总公司 A ejector that is used for normal atmospheric temperature natural gas to draw penetrating liquefied natural gas low temperature evaporation gas

Similar Documents

Publication Publication Date Title
CN106247660A (en) A kind of injector for liquefied natural gas injection low-temperature evaporation gas
US10704739B2 (en) Natural gas temperature and pressure regulating system based on recovering pressure energy and absorbing heat from ultralow temperature ambient environment
CN103225740B (en) A kind of LNG receiving station utilizes the BOG processing system of pressure energy
CN206131510U (en) A ejector that is used for normal atmospheric temperature natural gas to draw penetrating liquefied natural gas low temperature evaporation gas
CN104033727A (en) Technique and device for treating BOG by using recycled cold energy at LNG receiving station
CN103225739B (en) A kind of LNG receiving station boil-off gas energy-efficient treatment system
CN203248991U (en) BOG treatment system utilizing pressure energy of LNG receiving station
CN102913753B (en) Storage and gasification project output system of LNG (Liquefied Natural Gas) receiving terminal as well as method
CN108953988A (en) A kind of vaporization of liquid hydrogen and self-supercharging device
CN203248988U (en) Vapor zero discharge treatment system of LNG receiving station
CN206019152U (en) Reclaiming argon cold carries out oxygen liquefying plant
CN203893579U (en) Complete equipment for comprehensively utilizing pressure energy of natural gas
CN106288478A (en) A kind of injector for normal-temperature natural-gas injection LNG cold boil-off gas
CN103234117B (en) A kind of LNG receiving station low energy consumption boil-off gas zero-discharge treatment system
CN106287219A (en) A kind of natural gas liquefaction plant BOG recycling system
CN203322724U (en) LNG (Liquefied Natural Gas) skid-mounted gas filling device
CN206131511U (en) A ejector that is used for liquefied natural gas to draw penetrating low temperature evaporation gas
CN205784226U (en) Cryogenic liquefying system
CN108626568A (en) The LNG refueling systems and aerating method of the low energy consumption of function are recycled with BOG
CN208546752U (en) A kind of natural gas oxygen pipe network Collaborative Control management system
CN208237485U (en) Crystal industrial park safety and energy-saving ring-type ultralow pressure air supply system
CN204113231U (en) A kind of natural gas injection drainage tool
CN103983084A (en) Natural gas pressure energy comprehensive utilization complete equipment
CN203979877U (en) A kind of LNG receiving station reclaims cold for the treatment of the device of BOG
CN207439003U (en) A kind of cryogenic cold energy retracting device and air supply system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant after: CHINA NATIONAL OFFSHORE OIL Corp.

Applicant after: Cnooc Gas & Power Group

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant before: CHINA NATIONAL OFFSHORE OIL Corp.

Applicant before: CNOOC Gas & Power Group

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104