cable
external diameter
sheath
target
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610738020.8A
Other languages
Chinese (zh)
Other versions
CN106273307B (en
Inventor
何林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUTONG OPTICAL FIBER AND CABLE (CHENGDU) Co.,Ltd.
Tianjin Futong Information Technology Co.,Ltd.
Original Assignee
Fortis Fiber Cable (chengdu) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fortis Fiber Cable (chengdu) Co Ltd filed Critical Fortis Fiber Cable (chengdu) Co Ltd
Priority to CN201610738020.8A priority Critical patent/CN106273307B/en
Publication of CN106273307A publication Critical patent/CN106273307A/en
Application granted granted Critical
Publication of CN106273307B publication Critical patent/CN106273307B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/25Component parts, details or accessories; Auxiliary operations
    • B29C48/92Measuring, controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/15Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor incorporating preformed parts or layers, e.g. extrusion moulding around inserts
    • B29C48/154Coating solid articles, i.e. non-hollow articles
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B13/00Apparatus or processes specially adapted for manufacturing conductors or cables
    • H01B13/22Sheathing; Armouring; Screening; Applying other protective layers
    • H01B13/24Sheathing; Armouring; Screening; Applying other protective layers by extrusion
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2948/00Indexing scheme relating to extrusion moulding
    • B29C2948/92Measuring, controlling or regulating
    • B29C2948/92009Measured parameter
    • B29C2948/92114Dimensions
    • B29C2948/92123Diameter or circumference
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2948/00Indexing scheme relating to extrusion moulding
    • B29C2948/92Measuring, controlling or regulating
    • B29C2948/92504Controlled parameter
    • B29C2948/92609Dimensions
    • B29C2948/92619Diameter or circumference

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Extrusion Moulding Of Plastics Or The Like (AREA)
  • Manufacturing Of Electric Cables (AREA)

Abstract

The invention discloses a kind of cable jacket external diameter method of adjustment, including step: obtain sheath internal diameter R3, set sheath target external diameter R2;Measure sheath current external diameter R1;Calculate screw rod rotating speed of target and control screw rod and rotates by described screw rod rotating speed of target, or calculating cable target translational speed control cable and move by making described cable target translational speed, described N0For the current rotating speed of screw rod, described V0For the current translational speed of cable.Use the method, by screw speed or cable migration velocity are accurately revised, the side-play amount of outer diameter sheath can be effectively eliminated, it is to avoid the outer diameter sheath side-play amount of cable is bigger, and then the cable jacket external diameter uniform problem of very difficult control can be efficiently solved.The invention also discloses and use the cable jacket external diameter of said method to adjust system.

Description

A kind of cable jacket external diameter method of adjustment and system
Technical field
The present invention relates to cable manufacturing technical field, more particularly, it relates to a kind of cable jacket external diameter method of adjustment, also A kind of cable jacket external diameter using said method is set and adjusts system.
Background technology
The sheath of cable is during extrusion molding, and typically all cable core passes extruding machine, and extruding machine extrudes on cable core and protects Set.After sheath after extrusion molding entered tank, fast cooling is shaped.Wherein extruding machine is typically all screw rod quick rotation, by fluid The material of shape is extruded onto in die sleeve, under the endoporus of die sleeve is spacing, makes material be enclosed in the outside of cable core uniformly.
But study for a long period of time discovery through inventor, can be through certain expansion, shadow from the external diameter of die sleeve sheath out The factor ringing swell increment is a lot, and the uniform external diameter then causing sheath is bad, and is easy to there is deviation with desired value, not only shadow Ring outward appearance, and serviceability can be affected, and cause production cost to increase.
In sum, how to efficiently solve cable jacket external diameter and be difficult to control uniform problem, be current this area skill Art personnel's urgent problem.
Summary of the invention
In view of this, first purpose of the present invention is to provide a kind of cable jacket external diameter method of adjustment, and this cable protects Set external diameter method of adjustment can efficiently solve cable jacket external diameter and be difficult to control uniform problem, second object of the present invention It is to provide a kind of cable jacket external diameter including using above-mentioned cable jacket external diameter method of adjustment and adjusts system.
In order to reach above-mentioned first purpose, the present invention provides following technical scheme:
A kind of cable jacket external diameter method of adjustment, including step: obtain sheath internal diameter R3, set sheath target external diameter R2;Survey Amount sheath current external diameter R1;Calculate screw rod rotating speed of targetAnd control screw rod and turn by described screw rod target Speed rotates, or calculates cable target translational speedAnd control cable and move by making described cable target Speed moves, described N0For the current rotating speed of screw rod, described V0For the current translational speed of cable.
According to above-mentioned technical scheme, it is recognised that when outside cable core, extrusion molding moulds set, can be obtained by said method Obtain R1、R2、R3Afterwards, when needs are adjusted, side-play amount can be effectively eliminated by the adjustment of screw speed, it is possible to Side-play amount is effectively eliminated, after screw speed after concrete adjustment, or adjustment with the translational speed by adjusting cable Cable migration rate can be obtained by above-mentioned formula.In sum, it is recognised that use the method, by screw rod is turned Speed or cable migration velocity are accurately revised, and can effectively eliminate the side-play amount of outer diameter sheath, it is to avoid outside the sheath of cable Footpath side-play amount is bigger, and then can efficiently solve the cable jacket external diameter uniform problem of very difficult control.
Preferably, described sheath current external diameter R1The diameter of tank rear end it is positioned at for sheath.
Preferably, after the scheduled duration of interval, the current external diameter of described sheath is remeasured;Work as according to the new described sheath obtained Front external diameter recalculates screw rod rotating speed of target and adjusts current screw speed to new screw rod rotating speed of target, or obtains according to new The current external diameter of described sheath recalculates cable target translational speed and adjusts present cable translational speed to new cable target Translational speed.
Preferably, described scheduled duration not less than cable out move from extruding machine to tank rear end process time Long.
Preferably, described N0For the product of the current setting speed of screw rod Yu correction coefficient, described V0Currently set for cable and move Move the product of speed and correction coefficient.
In order to reach above-mentioned second purpose, present invention also offers a kind of cable jacket external diameter and adjust system, including: use In the extruding machine of extrusion molding sheath outside cable, described extruding machine is provided with screw rod;For drawing the traction machine that cable moves;With In measuring sheath current external diameter R1External diameter measurer;Controller, described controller is used for calculating screw rod rotating speed of targetAnd control screw rod and rotate by described screw rod rotating speed of target, or it is used for calculating cable target translational speedAnd control described traction machine by make described cable target translational speed migrate cable move, wherein R3For sheath internal diameter R2For the sheath target external diameter set, N0For the current rotating speed of screw rod, V0For the current translational speed of cable.
Owing to system that employs above-mentioned method of adjustment, so effective being referred to of being had of this adjustment system State method.
Preferably, including the tank for sheath is cooled down, after described external diameter measurer is arranged on described tank End.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to Other accompanying drawing is obtained according to these accompanying drawings.
The flow chart of the cable jacket external diameter method of adjustment that Fig. 1 provides for the embodiment of the present invention;
Fig. 2 adjusts the structural representation of system for the cable jacket external diameter that the embodiment of the present invention provides.
Detailed description of the invention
The embodiment of the invention discloses a kind of cable jacket external diameter method of adjustment, to efficiently solve cable jacket external diameter very The uniform problem of difficult control.The embodiment of the invention also discloses a kind of cable jacket external diameter and adjust system.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
Refer to the flow chart of the cable jacket external diameter method of adjustment that Fig. 1, Fig. 1 provide for the embodiment of the present invention, need Bright, the step 100 in Fig. 1 represents precedence relationship with step 200, it is also possible to be inverted or arranged side by side.
In a kind of specific embodiment, present embodiments provide a kind of cable jacket external diameter method of adjustment, i.e. pass through the party Method, the extrusion molding set diameter that the adjustment later stage extrudes.Concrete, the method comprises the steps:
100: obtain sheath internal diameter R3, set sheath target external diameter R2
Wherein R3The internal diameter of cable jacket referred to, and the outside of the inner side of cable jacket and cable core fits, so R3Should Equal with the external diameter of cable core, because conductor assembly outer diameter is changeless, so one-shot measurement or directly obtained by other approach Take.Wherein R2Should determine according to being actually needed of jacket thickness.Internal diameter and external diameter refer to diameter herein, so R2 R should be equal to3Target thickness plus twice sheath.
200: measure sheath current external diameter R1
Wherein R1Refer to the external diameter that sheath is current, need to use survey tool to measure acquisition.Metering system has Multiple, can be with hand dipping, it is also possible to measurement equipment is measured automatically.The position of concrete measurement can be attached at extrusion molding die sleeve Closely, it is contemplated that, shape the most completely from extrusion molding die sleeve sheath out, it is generally required to carry out cooling and shaping through tank, So the most preferably measure the diameter of sheath in tank rear end, even if sheath current external diameter R1For being positioned at tank rear end on sheath The diameter at place.Wherein tank rear end refers to the one end on tank away from extrusion molding die sleeve, and is front near one end of extrusion molding die sleeve End.It should be noted that work as R1With R2Equal, the most then without adjusting external diameter, then should be adjusted when both are unequal.Need It is noted that this step can also perform after step 100 has performed.
300: calculate screw rod rotating speed of targetAnd control screw rod and turn by described screw rod rotating speed of target Dynamic, or calculate cable target translational speedAnd control cable by making described cable target translational speed Mobile, described N0For the current rotating speed of screw rod, described V0For the current translational speed of cable.
Typically when obtaining for the first time, N0、V0It is all setting speed, causes existing between extrusion molding amount and rotating speed certain inclined Difference, therefore realizes data according to repetitive measurement and is corrected, and to obtain correction coefficient, in order to ensure the precision controlled, can make N0For the product of the current setting speed of screw rod Yu correction coefficient, described V0Migration velocity and correction coefficient is currently set for cable Product.
Concrete, obtaining R1、R2、R3Afterwards, it is possible to obtain the target cross section of sheath: And obtain the departure of the sheath of sheathIf now screw speed being modified, then screw rod The correction of rotating speedShould be by adjustment of rotational speed current for screw rod then If now cable hauling speed being modified, then correctionThen the hauling speed of cable should be adjusted toN0For the current rotating speed of screw rod, it should be noted that the current rotating speed of screw rod can be actual Setting value, it is also possible to be measured value;Similarly for V0Can be actual setpoint, it is also possible to be measured value.From the aforegoing it can be seen that The most above-mentioned both of which is by being adjusted the key factor affecting cable jacket external diameter, so both is based on same Individual inventive concept.
In the present embodiment, when extrusion molding moulds set outside cable core, R can be obtained by said method1、R2、R3Afterwards, When needs are adjusted, side-play amount can be effectively eliminated by the adjustment of screw speed, it is also possible to by adjusting cable Translational speed effectively eliminate side-play amount, screw speed after concrete adjustment, or the cable migration rate after adjusting is all Can be obtained by above-mentioned formula.In sum, it is recognised that use the method, by screw speed or cable are migrated speed Degree is accurately revised, and can effectively eliminate the side-play amount of outer diameter sheath, it is to avoid the outer diameter sheath side-play amount of cable is bigger, And then the cable jacket external diameter uniform problem of very difficult control can be efficiently solved.
In view of a volume length of cable typically more than hundred meters, the most longer, in order in order to ensure precision, outside performing After step 300, it is also possible to after the scheduled duration of interval, remeasure the current external diameter of above-mentioned sheath, i.e. obtain new R2.Obtaining After taking the current external diameter of new sheath, according to this row measured value, recalculate screw rod rotating speed of target, and adjust current screw speed extremely New screw rod rotating speed of target, or, recalculate cable target translational speed, and adjust present cable translational speed to new Cable target translational speed.Herein it should be noted that recalculate, it should according to formulaOr FormulaCalculate, wherein R2、R3The most constant, also should use and be originally taken value.It should be noted that predetermined Duration should be different according to the frequency surveyed, and different.But it should be recognized that after in order to ensure that the second measured value is for adjusting Value, when tank rear end measure external diameter time, it should make scheduled duration be not less than cable and out move to tank from extruding machine Rear end the duration of process, to ensure that cable adjusts rear portion and is divided into the part of current measurement.
Refer to Fig. 1, Fig. 1 and adjust the structural representation of system for the cable jacket external diameter that the embodiment of the present invention provides.
In another kind of specific embodiment, present embodiments provide a kind of cable jacket external diameter and adjust system, concrete, should Cable jacket external diameter adjusts system and includes extruding machine 1, traction machine 2, external diameter measurer 3 and controller 4.Wherein extruding machine 1 is used for At the outside extrusion molding sheath of cable, extruding machine 1 mainly carries out extrusion molding by extrusion screw.Wherein traction machine 2 is used for drawing Cable at the uniform velocity moves.Wherein external diameter measurer 3 is used for measuring sheath current external diameter R1.Controller 4 therein is then used for calculating Screw rod rotating speed of targetThen control screw rod to rotate by this screw rod rotating speed of target;Or this controller 4 is used for Calculate cable target translational speedThen control described traction machine 2 and move speed by making described cable target Degree migrates cable and moves, it should be noted that wherein R3For sheath internal diameter, R2For the sheath target external diameter set, N0Work as screw rod Front rotating speed, V0For the current translational speed of cable.Owing to the cable jacket external diameter of the present embodiment adjusts the method for adjustment that system uses For cable outer diameter sheath method of adjustment in a upper embodiment, so the beneficial effect that this cable jacket external diameter adjusts system can be joined Examine above-described embodiment.
Further, in order to make the R of acquisition3More stable, after the most preferably external diameter measurer being arranged on tank 5 End, measures with the cable to tank 5 rear end.
In this specification, each embodiment uses the mode gone forward one by one to describe, and what each embodiment stressed is and other The difference of embodiment, between each embodiment, identical similar portion sees mutually.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses the present invention. Multiple amendment to these embodiments will be apparent from for those skilled in the art, as defined herein General Principle can realize without departing from the spirit or scope of the present invention in other embodiments.Therefore, the present invention It is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein and features of novelty phase one The widest scope caused.

Claims (7)

1. a cable jacket external diameter method of adjustment, it is characterised in that include step:
Obtain sheath internal diameter R3, set sheath target external diameter R2
Measure sheath current external diameter R1
Calculate screw rod rotating speed of targetAnd control screw rod and rotate by described screw rod rotating speed of target, or calculate Cable target translational speedAnd control cable and move by making described cable target translational speed, described N0For the current rotating speed of screw rod, described V0For the current translational speed of cable.
Cable jacket external diameter method of adjustment the most according to claim 1, it is characterised in that described sheath current external diameter R1For Sheath is positioned at the diameter of tank rear end.
Cable jacket external diameter method of adjustment the most according to claim 2, it is characterised in that after the scheduled duration of interval, again Measure the current external diameter of described sheath;Recalculate screw rod rotating speed of target according to the new current external diameter of described sheath obtained and adjustment is worked as Front screw rotating speed is to new described screw rod rotating speed of target, or recalculates new institute according to the new current external diameter of described sheath obtained State cable target translational speed and adjust present cable translational speed to new described cable target translational speed.
Cable jacket external diameter method of adjustment the most according to claim 3, it is characterised in that described scheduled duration is not less than line Cable out move from extruding machine to tank rear end the duration of process.
Cable jacket external diameter method of adjustment the most according to claim 4, it is characterised in that described N0Currently set for screw rod Rotating speed and the product of correction coefficient, described V0The product of migration velocity and correction coefficient is currently set for cable.
6. a cable jacket external diameter adjusts system, it is characterised in that including:
For the extruding machine (1) of extrusion molding sheath outside cable, described extruding machine is provided with screw rod;
For drawing the traction machine (2) that cable moves;
For measuring sheath current external diameter R1External diameter measurer (3);
Controller (4), described controller is used for calculating screw rod rotating speed of targetAnd control screw rod by described spiral shell Bar rotating speed of target rotates, or is used for calculating cable target translational speedAnd control described traction machine (2) and press Make described cable target translational speed migration cable to move, wherein R3For sheath internal diameter, R2For the sheath target external diameter set, N0 For the current rotating speed of screw rod, V0For the current translational speed of cable.
Cable jacket external diameter the most according to claim 6 adjusts system, it is characterised in that include for carrying out cold to sheath But tank (5), described external diameter measurer is arranged on the rear end of described tank (5).
CN201610738020.8A 2016-08-26 2016-08-26 A kind of cable jacket outer diameter method of adjustment and system Active CN106273307B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610738020.8A CN106273307B (en) 2016-08-26 2016-08-26 A kind of cable jacket outer diameter method of adjustment and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610738020.8A CN106273307B (en) 2016-08-26 2016-08-26 A kind of cable jacket outer diameter method of adjustment and system

Publications (2)

Publication Number Publication Date
CN106273307A true CN106273307A (en) 2017-01-04
CN106273307B CN106273307B (en) 2019-04-30

Family

ID=57676916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610738020.8A Active CN106273307B (en) 2016-08-26 2016-08-26 A kind of cable jacket outer diameter method of adjustment and system

Country Status (1)

Country Link
CN (1) CN106273307B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112556535A (en) * 2020-12-10 2021-03-26 安徽鑫鸿电缆有限责任公司 Cable sheath extrusion thickness measuring method
CN113835392A (en) * 2021-09-10 2021-12-24 江苏盈科通信科技有限公司 Optical cable sheath outer diameter control system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5828689B2 (en) * 1975-11-13 1983-06-17 三菱電線工業株式会社 Oshidashi Koutei Niokeru
JPH0737456A (en) * 1993-07-19 1995-02-07 Yazaki Corp Control system of outer diameter of electric wire by fuzzy control
CN202753419U (en) * 2012-08-03 2013-02-27 杭州临安光大线缆有限公司 External diameter monitoring device of jacket extrusion molding production line
CN105383037A (en) * 2015-11-09 2016-03-09 浙江万马专用线缆科技有限公司 Automatic cable diameter feedback control system for cable extrusion machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5828689B2 (en) * 1975-11-13 1983-06-17 三菱電線工業株式会社 Oshidashi Koutei Niokeru
JPH0737456A (en) * 1993-07-19 1995-02-07 Yazaki Corp Control system of outer diameter of electric wire by fuzzy control
CN202753419U (en) * 2012-08-03 2013-02-27 杭州临安光大线缆有限公司 External diameter monitoring device of jacket extrusion molding production line
CN105383037A (en) * 2015-11-09 2016-03-09 浙江万马专用线缆科技有限公司 Automatic cable diameter feedback control system for cable extrusion machine

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
吴其晔: "《高分子材料流变学》", 31 October 2002 *
张治国: "《塑料挤出成型技术问答》", 31 March 2012 *
柳云骐等: "《材料化学》", 28 February 2013 *
金关泰等: "《热塑性弹性体》", 30 June 1983 *
雷文等: "《高分子材料加工工艺学》", 31 August 2013 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112556535A (en) * 2020-12-10 2021-03-26 安徽鑫鸿电缆有限责任公司 Cable sheath extrusion thickness measuring method
CN112556535B (en) * 2020-12-10 2024-05-03 安徽鑫鸿电缆有限责任公司 Cable sheath extrusion thickness measuring method
CN113835392A (en) * 2021-09-10 2021-12-24 江苏盈科通信科技有限公司 Optical cable sheath outer diameter control system and method
CN113835392B (en) * 2021-09-10 2024-06-18 江苏盈科通信科技有限公司 Optical cable sheath outer diameter control system and method

Also Published As

Publication number Publication date
CN106273307B (en) 2019-04-30

Similar Documents

Publication Publication Date Title
FI82413B (en) FOERFARANDE OCH ANORDNING FOER EXTRUDERING AV ETT PLASTROER OCH STYRNING AV VAEGGTJOCKLEKEN FOER DET EXTRUDERADE ROERET.
CN106273307A (en) A kind of cable jacket external diameter method of adjustment and system
CN104439062B (en) Mould and the manufacture method thereof of temperature is measured in casting process
CN109454850B (en) Automatic matching control system and control method for operating parameters of extruding machine
CN108447618A (en) A kind of cable making apparatus and cable manufacture craft
CN112044964A (en) Resistance matching die of high-speed fine copper wire drawing machine and application thereof
CN204687330U (en) Extrude longitudinal thickness uniformity adjusting device of composite membrane
CN108284583B (en) The automatic of glue, which is covered, suitable for large-scale rubber roller covers adhesive process
CN103645550A (en) Skeleton type optical fiber ribbon cabling machine and cabling method using cabling machine
JPS5971844A (en) Manufacture of rubber roller
CN204054601U (en) A kind of intelligent die
CN207952575U (en) Molten steel liquid level caliberating device in improved continuous casting sizing casting crystallizer
CN105034306A (en) High-strength heat-resistant double-layer thin-wall PE soft tube for irrigation and production method thereof
CN210939814U (en) Die oil brushing component capable of being automatically adjusted
CN210346927U (en) Roller centrifugal layer inner circle temperature measuring device
CN107225746A (en) A kind of cable extrusion apparatus mould
CN109657280B (en) Size design method of large thin-wall ball valve
CN109387301B (en) Remote temperature measurement method for material
CN208833374U (en) Molten steel continuous temperature measuring pipe
CN112519184A (en) Method and device for realizing closed-loop control of outer diameter of cable sheath
JP2001062941A (en) Belt-shaped rubber material take-up control method
CN110539470A (en) Device and method for measuring rubber viscosity in metering section of rubber extruder on line
CN112556535B (en) Cable sheath extrusion thickness measuring method
CN205668838U (en) A kind of line footpath limited diameter device on 3D consumptive material production line
CN204526188U (en) For the preparation of the equipment of fluorine-containing layer composite polyimide material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191012

Address after: 611731 No. 1577 West Avenue, Chengdu High-tech Industrial Development Zone, Sichuan Province

Co-patentee after: Tianjin Futong Xinmao Science and Technology Co., Ltd.

Patentee after: Fortis fiber cable (Chengdu) Co. Ltd.

Address before: 610097 Chengdu province high and New Technology Industrial Development Zone (West), West Avenue, No. 77, No.

Patentee before: Fortis fiber cable (Chengdu) Co. Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 611731 No. 1577 West Avenue, Chengdu High-tech Industrial Development Zone, Sichuan Province

Patentee after: FUTONG OPTICAL FIBER AND CABLE (CHENGDU) Co.,Ltd.

Patentee after: Tianjin Futong Information Technology Co.,Ltd.

Address before: 611731 No. 1577 West Avenue, Chengdu High-tech Industrial Development Zone, Sichuan Province

Patentee before: FUTONG OPTICAL FIBER AND CABLE (CHENGDU) Co.,Ltd.

Patentee before: TIANJIN FUTONG XINMAO SCIENCE & TECHNOLOGY Co.,Ltd.