CN106269871B - A kind of method for using increasing speed rolling technique productions thickness≤2.0mm low-intensity strips in CSP producing lines - Google Patents

A kind of method for using increasing speed rolling technique productions thickness≤2.0mm low-intensity strips in CSP producing lines Download PDF

Info

Publication number
CN106269871B
CN106269871B CN201610751652.8A CN201610751652A CN106269871B CN 106269871 B CN106269871 B CN 106269871B CN 201610751652 A CN201610751652 A CN 201610751652A CN 106269871 B CN106269871 B CN 106269871B
Authority
CN
China
Prior art keywords
speed
thickness
low
rolling
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610751652.8A
Other languages
Chinese (zh)
Other versions
CN106269871A (en
Inventor
张超
王成
宋波
胡超
丁茹
王春锋
赵敏
谭佳梅
陈宏涛
刘义滔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Co Ltd
Original Assignee
Wuhan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Co Ltd filed Critical Wuhan Iron and Steel Co Ltd
Priority to CN201610751652.8A priority Critical patent/CN106269871B/en
Publication of CN106269871A publication Critical patent/CN106269871A/en
Application granted granted Critical
Publication of CN106269871B publication Critical patent/CN106269871B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/46Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
    • B21B1/463Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a continuous process, i.e. the cast not being cut before rolling

Abstract

A kind of method for using increasing speed rolling technique productions thickness≤2.0mm low-intensity strips in CSP producing lines, its step:Conventional smelting, external refining are simultaneously casting continuously to form base;Soaking is carried out to strand;Enter mm finishing mill unit after high pressure descaling, rolled using increasing speed rolling pattern;Batched after conventional section cooling.The present invention solves the too fast threading speed that there is currently and throws steel speed, cause head to be rolled brokenly, afterbody whipping it is frequent, steel scrap, it is disconnected pour, the production such as roll marks and quality accident it is more, at the uniform velocity roll pure to roll the time longer, limit the buffer capacity of soaking pit and the raising of rhythm of production, it is serious to restrict the deficiency of roll line troubleshooting and the lifting of thin material yield, and the casting machine drop pulling rate time can be reduced, substantially reduce oven improvement.

Description

One kind uses increasing speed rolling technique productions thickness≤2.0mm low-intensity bands in CSP producing lines The method of steel
Technical field
The present invention relates to a kind of production method of low-intensity sheet metal, specifically belongs to one kind and uses raising speed in CSP producing lines The method that rolling mill practice produces thickness≤2.0mm low-intensity strips, it is special to be no more than 490MPa suitable for tensile strength, and thickness≤ The production method of 2.0mm steel plate.
Background technology
CSP is the sheet billet continuous casting and rolling production line of latest generation, and it has, and flow is short, cost is low, product grains are tiny, The advantages that intensity height and high dimensional accuracy.CSP productions thin material is more advantageous than conventional hot rolling in theory, but this advantage simply embodies Equipment arrangement and technological process on, the advantage is converted into product advantage true, then need technology research and development and Using as support.Following problem be present in CSP thin materials production at present:(1)Strip is respectively at machine during threading and throwing steel Without building and lose a stage between frame, strip not by the tension force effect of rolling direction, the problem of shape wave and sideslip be present, it is necessary to by Both sides roll gap is adjusted, when ensureing that rolling stability, particularly thin gauge strip roll, too fast threading speed and throwing steel speed Degree is unfavorable for the adjustment of plate shape, and head easily occurs and rolls broken and the situation of afterbody whipping, cause steel scrap, break pour, roll marks etc. it is a series of Production and quality problems;(2)CSP producing line mm finishing mill units are that seven frames at the uniform velocity roll, at the uniform velocity roll it is pure roll the time length, limit The buffer capacity of hot stove and the raising of rhythm of production, the raising of the serious processing and thin material yield for restricting roll line failure.
Mm finishing mill unit is using the pattern at the uniform velocity rolled at the beginning of CSP producing lines design, but is at the uniform velocity rolled when thin gauge strip rolls The drawbacks of molding formula, gradually shows, and strip steel head threading speed and afterbody throwing steel speed are too fast, and plate shape adjustment difficulty is big, and unfavorable In raising production efficiency.Increasing speed rolling refers to elder generation's low speed threading during rolled band steel, it is to be reeled sting steel after strip it is synchronous with coiling machine Raising speed carries out high-speed rolling, and reduction of speed carries out the method that low speed throws steel when being rolled to afterbody.Increasing speed rolling is in conventional hot rolling producing line application More, its method can effectively reduce strip head and tail temperature difference, improve rolling mill efficiency.
CSP producing lines are for conventional hot rolling producing line, and equipment arrangement and process conditions are entirely different, and conticaster passes through roller Bottom formula soaking pit is connected with mm finishing mill unit, and roller hearth soaking furnace plays the role of to buffer and adjusts rhythm of production, and slab is from equal Hot stove is directly entered mm finishing mill unit without roughing after coming out and rolled, and each frame roll-force of mm finishing mill unit is significantly increased. In addition, section cooling line is shorter, realize that control target temperature difficulty is very big on shorter cooling line.So it can not refer to conventional The increasing speed rolling of hot rolling producing line carries out the increasing speed rolling technological design of CSP producing lines, while increasing speed rolling technique is not also similar The precedent of CSP producing lines application.Therefore, it need to carry out accordingly to study and use increasing speed rolling work in CSP producing line to inquire into The method that skill produces thickness≤2.0mm low-intensity strips.
The content of the invention
The invention reside in provide a kind of solution at present in CSP producing lines production thickness≤2.0mm, tensile strength to be no more than During 490MPa strips, head is rolled brokenly and afterbody whipping is frequent, steel scrap, it is disconnected pour, the production such as roll marks and quality accident it is more, Soaking pit buffer capacity deficiency, the problem of rhythm of production anxiety, and casting machine can be reduced reduce the pulling rate time, and reduce oven improvement Method.
Realize the measure of above-mentioned purpose:
A kind of method for using increasing speed rolling technique productions thickness≤2.0mm low-intensity strips in CSP producing lines, its step:
1)Carry out conventional smelting, external refining and be casting continuously to form base, and control opening for continuous casting billet to pour thickness in 70mm, from second Block casting base starts, and the thickness for reducing strand is depressed to 55~60mm using wick-containing;
2)Soaking is carried out to strand, control strand tapping temperature is at 1150~1200 DEG C;
3)Enter mm finishing mill unit after high pressure descaling, rolled using increasing speed rolling pattern, i.e.,:Low speed threading → high speed Rolling → low speed throws steel;F1 ~ F3 interstand cooling water waters are set according to the 50-90% of specified water;Control finishing temperature At 840~880 DEG C;
In 9~10.5m/s, highest mill speed controls in 12~16m/s threading speed control, throws steel speed control 10 ~12m/s;
4)Batched after conventional section cooling, and control coiling temperature at 560~660 DEG C.
It is:The speed of high-speed rolling and coiling machine synchronous raising speed.
The effect of main technique and mechanism in the present invention
Why the present invention uses increasing speed rolling technique, is:The control strip steel head speed of service is entered under 9 ~ 10.5m/s Row threading, to reduce the risk that head folds and rolled brokenly;Control head threading after with coiling machine synchronous raising speed, highest mill speed In 12~16m/s, with reduce it is pure roll the time, increase soaking pit buffer time;Control is when being rolled to afterbody under strip speed It is down to 10 ~ 12m/s and carries out throwing steel, to give operating personnel's more plate shape regulation and control times, avoids whipping.
The present invention compared with prior art, solves the too fast threading speed that there is currently and throws steel speed, cause head Portion rolls brokenly, afterbody whipping is frequent, steel scrap, it is disconnected pour, the production such as roll marks and quality accident it is more, at the uniform velocity roll it is pure roll the time compared with It is long, the buffer capacity of soaking pit and the raising of rhythm of production are limited, serious restriction roll line troubleshooting and thin material yield carry The deficiency risen, and the casting machine drop pulling rate time can be reduced, substantially reduce oven improvement.
Embodiment
The present invention is described in detail below:
Embodiment 1
The present embodiment is produced into the steel grade that brand number is Q235B, rolling width 1000 mm, product thickness 1.4mm, tension Intensity is 480MPa;
Production stage:
1)Carry out conventional smelting, external refining and be casting continuously to form base, and control opening for continuous casting billet to pour thickness in 70mm, from second Block casting base starts, and the thickness for reducing strand is depressed to 55mm using wick-containing;
2)Soaking is carried out to strand, strand tapping temperature is at 1165 DEG C;
3)Slab is rolled after high pressure descaling, rolling is carried out using increasing speed rolling pattern, i.e.,:Low speed threading → head High-speed rolling → low speed is carried out with coiling machine synchronous raising speed throw steel after portion's threading, wherein, threading speed is 10.2m/s;Highest is rolled Speed processed is 15m/s, and it is synchronous with the holding of coiling machine speed;Steel speed is thrown in 10.8m/s;
F1 ~ F3 interstand cooling water waters are according to 80% setting of specified water, and finishing temperature is at 860 DEG C;
4)Batched after conventional section cooling, coiling temperature is at 560 DEG C.
Through inspection statistics, strip steel head unfolded and roll brokenly, afterbody without whipping phenomenon, there there is no casting machine in whole production process Pulling rate is dropped, also changes the original sentence to problem without generation quality, product is qualified.
Embodiment 2
It is SPHC-B steel grades that the present embodiment, which is produced into brand number, rolling width 1219 mm, product thickness 1.2mm, and tension is strong Spend for 370MPa;
Production stage:
1)Carry out conventional smelting, external refining and be casting continuously to form base, and control opening for continuous casting billet to pour thickness in 70mm, from second Block casting base starts, and the thickness for reducing strand is depressed to 55mm using wick-containing;
2)Soaking is carried out to strand, strand tapping temperature is at 1185 DEG C;
3)Slab is rolled after high pressure descaling, rolling is carried out using increasing speed rolling pattern, i.e.,:Low speed threading → head High-speed rolling → low speed is carried out with coiling machine synchronous raising speed throw steel after portion's threading, wherein, threading speed is 10.5m/s;Highest is rolled Speed processed is 15.5m/s, and it is synchronous with the holding of coiling machine speed;Steel speed is thrown in 11m/s;
F1 ~ F3 interstand cooling water waters are according to 90% setting of specified water, and finishing temperature is at 850 DEG C;
4)Batched after conventional section cooling, coiling temperature is at 620 DEG C.
Through inspection statistics, strip steel head unfolded and roll brokenly, afterbody without whipping phenomenon, there there is no casting machine in whole production process Pulling rate is dropped, also changes the original sentence to problem without generation quality, product is qualified.
Embodiment 3
The present embodiment is produced into the steel grade that brand number is SAE1006, rolling width 1212 mm, product thickness 1.8mm, resists Tensile strength is 360MPa;
Production stage:
1)Carry out conventional smelting, external refining and be casting continuously to form base, and control opening for continuous casting billet to pour thickness in 70mm, from second Block casting base starts, and the thickness for reducing strand is depressed to 60mm using wick-containing;
2)Soaking is carried out to strand, strand tapping temperature is at 1160 DEG C;
3)Slab is rolled after high pressure descaling, rolling is carried out using increasing speed rolling pattern, i.e.,:Low speed threading → head High-speed rolling → low speed is carried out with coiling machine synchronous raising speed throw steel after portion's threading, wherein, threading speed is 10m/s;Highest rolls Speed is 14m/s, and it is synchronous with the holding of coiling machine speed;Steel speed is thrown in 10.5m/s;
F1 ~ F3 interstand cooling water waters are according to 60% setting of specified water, and finishing temperature is at 873 DEG C;
4)Batched after conventional section cooling, coiling temperature is at 630 DEG C.
Through inspection statistics, strip steel head unfolded and roll brokenly, afterbody without whipping phenomenon, there there is no casting machine in whole production process Pulling rate is dropped, also changes the original sentence to problem without generation quality, product is qualified.
Embodiment 4
The present embodiment is produced into the steel grade that brand number is SAE1008, rolling width 1230mm, product thickness 2.0mm, tension Intensity is 350MPa;
Production stage:
1)Carry out conventional smelting, external refining and be casting continuously to form base, and control opening for continuous casting billet to pour thickness in 70mm, from second Block casting base starts, and the thickness for reducing strand is depressed to 60mm using wick-containing;
2)Soaking is carried out to strand, strand tapping temperature is at 1150 DEG C;
3)Slab is rolled after high pressure descaling, rolling is carried out using increasing speed rolling pattern, i.e.,:Low speed threading → head High-speed rolling → low speed is carried out with coiling machine synchronous raising speed throw steel after portion's threading, wherein, threading speed is 9.5m/s;Highest rolls Speed is 13m/s, and it is synchronous with the holding of coiling machine speed;Steel speed is thrown in 10m/s;
F1 ~ F3 interstand cooling water waters are according to 50% setting of specified water, and finishing temperature is at 880 DEG C;
4)Batched after conventional section cooling, coiling temperature is at 640 DEG C.
Through inspection statistics, strip steel head unfolded and roll brokenly, afterbody without whipping phenomenon, there there is no casting machine in whole production process Pulling rate is dropped, also changes the original sentence to problem without generation quality, product is qualified.
Embodiment 5
It is S235JR+AR steel grades that the present embodiment, which is produced into brand number, rolling width 1250 mm, product thickness 1.5mm, is resisted Tensile strength is 400MPa;
Production stage:
1)Carry out conventional smelting, external refining and be casting continuously to form base, and control opening for continuous casting billet to pour thickness in 70mm, from second Block casting base starts, and the thickness for reducing strand is depressed to 55mm using wick-containing;
2)Soaking is carried out to strand, strand tapping temperature is at 1175 DEG C;
3)Slab is rolled after high pressure descaling, rolling is carried out using increasing speed rolling pattern, i.e.,:Low speed threading → head High-speed rolling → low speed is carried out with coiling machine synchronous raising speed throw steel after portion's threading, wherein, threading speed is 10.3m/s;Highest is rolled Speed processed is 15.2m/s, and it is synchronous with the holding of coiling machine speed;Steel speed is thrown in 10.9m/s;
F1 ~ F3 interstand cooling water waters are according to 75% setting of specified water, and finishing temperature is at 868 DEG C;
4)Batched after conventional section cooling, coiling temperature is at 570 DEG C.
Through inspection statistics, strip steel head unfolded and roll brokenly, afterbody without whipping phenomenon, there there is no casting machine in whole production process Pulling rate is dropped, also changes the original sentence to problem without generation quality, product is qualified.
Present embodiment is only the best example, not to the restricted implementation of technical solution of the present invention.

Claims (2)

1. a kind of method for using increasing speed rolling technique productions thickness≤2.0mm low-intensity strips in CSP producing lines, its feature exist In:Its step:
1)Carry out conventional smelting, external refining and be casting continuously to form base, and control opening for continuous casting billet to pour thickness in 70mm, from the second block casting Base starts, and the thickness for reducing strand is depressed to 55~60mm using wick-containing;
2)Soaking is carried out to strand, control strand tapping temperature is at 1150~1200 DEG C;
3)Enter mm finishing mill unit after high pressure descaling, rolled using increasing speed rolling pattern, i.e.,:Low speed threading → high-speed rolling → low speed throws steel;F1 ~ F3 interstand cooling water waters are set according to the 50-90% of specified water;Control finishing temperature exists 840~880 DEG C;
Controlling the strip steel head speed of service, highest mill speed is controlled in 12~16m/s, throws steel speed control in 9~10.5m/s In 10~12m/s;
4)Batched after conventional section cooling, and control coiling temperature at 560~660 DEG C.
2. one kind as claimed in claim 1 uses increasing speed rolling technique productions thickness≤2.0mm low-intensity strips in CSP producing lines Method, it is characterised in that:The speed of high-speed rolling and coiling machine synchronous raising speed.
CN201610751652.8A 2016-08-30 2016-08-30 A kind of method for using increasing speed rolling technique productions thickness≤2.0mm low-intensity strips in CSP producing lines Active CN106269871B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610751652.8A CN106269871B (en) 2016-08-30 2016-08-30 A kind of method for using increasing speed rolling technique productions thickness≤2.0mm low-intensity strips in CSP producing lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610751652.8A CN106269871B (en) 2016-08-30 2016-08-30 A kind of method for using increasing speed rolling technique productions thickness≤2.0mm low-intensity strips in CSP producing lines

Publications (2)

Publication Number Publication Date
CN106269871A CN106269871A (en) 2017-01-04
CN106269871B true CN106269871B (en) 2017-12-08

Family

ID=57674231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610751652.8A Active CN106269871B (en) 2016-08-30 2016-08-30 A kind of method for using increasing speed rolling technique productions thickness≤2.0mm low-intensity strips in CSP producing lines

Country Status (1)

Country Link
CN (1) CN106269871B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107617647B (en) * 2017-09-13 2021-01-26 武汉钢铁有限公司 Method for producing hot-rolled strip steel with thickness less than or equal to 1.2mm by continuous casting and rolling of sheet billet
CN107828951B (en) * 2017-10-16 2019-12-03 首钢京唐钢铁联合有限责任公司 A kind of method and device manufacturing cold rolling high-strength steel
CN110317995B (en) * 2019-06-03 2020-08-25 武汉钢铁有限公司 Method for producing thin medium-carbon hot-rolled steel plate with good surface quality by using CSP (cast Steel plate)
CN113680818B (en) * 2021-06-22 2023-06-27 武汉钢铁有限公司 CSP flow-based SAE1006 thin material manufacturing method
CN114535316B (en) * 2022-02-08 2023-10-03 邯郸钢铁集团有限责任公司 Coiling temperature control method for hot-rolled high-strength dual-phase steel
CN114602977A (en) * 2022-02-14 2022-06-10 唐山钢铁集团有限责任公司 Control method for throwing steel and drifting of hot-rolled strip steel

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86108451A (en) * 1985-12-12 1987-07-22 川崎制铁株式会社 Production has improved the steel-sheet method of processing characteristics
EP0504999A2 (en) * 1991-03-22 1992-09-23 Hoogovens Groep B.V. Apparatus and method for the manufacture of hot-rolled steel
JPH0751243B2 (en) * 1988-02-05 1995-06-05 株式会社日立製作所 Strip passing method in continuous casting equipment
CN1483521A (en) * 2002-09-19 2004-03-24 鞍钢集团新钢铁有限责任公司 Method for continuous casting, continuoccs rolling intermediate and thin sheet blanket
CN1840252A (en) * 2005-03-28 2006-10-04 鞍钢集团新钢铁有限责任公司 Production process of continuous-casting tandem-rolling coiled sheet of medium thick plate
CN101181718A (en) * 2007-12-11 2008-05-21 武汉钢铁(集团)公司 Method for producing wide strip steel by bar strip continuous casting and rolling as well as system therefor
CN102240674A (en) * 2010-05-10 2011-11-16 丹尼尔和科菲森梅克尼齐有限公司 Method and plant for the production of flat rolled products
CN102839321A (en) * 2012-08-31 2012-12-26 武汉钢铁(集团)公司 Ultrathin hot-rolled sheet strip with yield strength more than or equal to 500MPa level and manufacturing method thereof
WO2013109570A1 (en) * 2012-01-19 2013-07-25 Siemens Vai Metals Technologies Gmbh Dual cascade control system for a long rolling mill
KR20140081048A (en) * 2012-12-21 2014-07-01 주식회사 포스코 Hot rolled with excellent hole expansion and variation of mechanical properties and method for manufacturing the same

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86108451A (en) * 1985-12-12 1987-07-22 川崎制铁株式会社 Production has improved the steel-sheet method of processing characteristics
JPH0751243B2 (en) * 1988-02-05 1995-06-05 株式会社日立製作所 Strip passing method in continuous casting equipment
EP0504999A2 (en) * 1991-03-22 1992-09-23 Hoogovens Groep B.V. Apparatus and method for the manufacture of hot-rolled steel
CN1483521A (en) * 2002-09-19 2004-03-24 鞍钢集团新钢铁有限责任公司 Method for continuous casting, continuoccs rolling intermediate and thin sheet blanket
CN1840252A (en) * 2005-03-28 2006-10-04 鞍钢集团新钢铁有限责任公司 Production process of continuous-casting tandem-rolling coiled sheet of medium thick plate
CN101181718A (en) * 2007-12-11 2008-05-21 武汉钢铁(集团)公司 Method for producing wide strip steel by bar strip continuous casting and rolling as well as system therefor
CN102240674A (en) * 2010-05-10 2011-11-16 丹尼尔和科菲森梅克尼齐有限公司 Method and plant for the production of flat rolled products
WO2013109570A1 (en) * 2012-01-19 2013-07-25 Siemens Vai Metals Technologies Gmbh Dual cascade control system for a long rolling mill
CN102839321A (en) * 2012-08-31 2012-12-26 武汉钢铁(集团)公司 Ultrathin hot-rolled sheet strip with yield strength more than or equal to 500MPa level and manufacturing method thereof
KR20140081048A (en) * 2012-12-21 2014-07-01 주식회사 포스코 Hot rolled with excellent hole expansion and variation of mechanical properties and method for manufacturing the same

Also Published As

Publication number Publication date
CN106269871A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106269871B (en) A kind of method for using increasing speed rolling technique productions thickness≤2.0mm low-intensity strips in CSP producing lines
CN1103647C (en) Method and arrangement for producing hot-rolled strip
CN107617647B (en) Method for producing hot-rolled strip steel with thickness less than or equal to 1.2mm by continuous casting and rolling of sheet billet
US8408035B2 (en) Method of and apparatus for hot rolling a thin silicon-steel workpiece into sheet steel
CN110116135B (en) Endless rolling production method for rod and wire products
US20220152674A1 (en) Endless hot-rolled strip production device and method for ferrite rolling
CN1972764A (en) Process and system for manufacturing metal strips and sheets without solution of continuity between continuous casting and rolling
KR101759915B1 (en) Method for producing a metal strip
CN103878178A (en) Method for producing ultrathin hot-rolled coils from sheet billets by continuous casting and rolling
CN109922904B (en) Casting-rolling-cladding plant and method for continuously producing hot-rolled finished strip
CN1085834A (en) The manufacturing installation of hot rolled metal strip and method
TWI615210B (en) Installation based on the csp concept and method for operating such an installation
CN109530646A (en) For reducing the control method of head and tail temperature difference before direct rolling process continuous casting billet rolls
CN105018842B (en) Method for producing steel belt for low-carbon niobium-microalloyed stamping through thin slab continuous casting and rolling
CN102069092B (en) Method for producing hot rolling strip steel of 0.6-0.8mm
CN107983771A (en) The high-strength chill volume hot-rolling method of building concrete fixing piece
CN103276286A (en) Production method of X80 pipeline steel strip with thickness of 6-10 mm
US3710841A (en) Method for casting and rolling of metal stands from the casting heat
CN113102504B (en) Method and apparatus for producing flat metal products
CN101011704A (en) New technique for producing hot rolling stainless steel strip
CN105382232A (en) Method for preventing generation of center line cracks in steel board continuous casting process
JP2020516466A (en) Plant and method for multimodal production of metal strips and plates
KR101442891B1 (en) Apparatus and method for roughing mill
JPS61206507A (en) Installation for manufacturing cold-rolled steel sheet
CN104438327B (en) A kind of method of the online Direct Rolling fine-grained steel of continuous casting billet

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170616

Address after: 430083 Qingshan District, Hubei, Wuhan factory before the door No. 2

Applicant after: Wuhan iron and Steel Company Limited

Address before: 430083 Qingshan District, Hubei, Wuhan factory before the door No. 2

Applicant before: WUHAN IRON AND STEEL CORPORATION

GR01 Patent grant