CN106268017A - A kind of sewage primary filter cleaning system - Google Patents
A kind of sewage primary filter cleaning system Download PDFInfo
- Publication number
- CN106268017A CN106268017A CN201610809436.4A CN201610809436A CN106268017A CN 106268017 A CN106268017 A CN 106268017A CN 201610809436 A CN201610809436 A CN 201610809436A CN 106268017 A CN106268017 A CN 106268017A
- Authority
- CN
- China
- Prior art keywords
- framework
- fixing
- support
- cross bar
- transverse slat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D36/00—Filter circuits or combinations of filters with other separating devices
- B01D36/04—Combinations of filters with settling tanks
Abstract
nullA kind of sewage primary filter cleaning system,Including water plug (1)、First framework (2)、Retaining device (3)、Settler (4)、Roller devices (5)、First defecator (6)、Attachment means (7) and the second defecator (8),Water plug (1) includes the first pipeline (11)、First water pump (13),First framework (2) is provided with the first through hole (21)、Second through hole (22)、Third through-hole (23)、First locating piece (24)、4th bristle (25),Retaining device (3) includes the first cross bar (31)、First brace (32)、Elastic rod (33)、Baffle plate (34)、First spring (35),Settler (4) includes the first montant、First fixed block、Precipitation frame、First drainage screen、Second spring、Balancing weight,Filter type of the present invention variation,And filter effect is preferable,Disclosure satisfy that the needs of sewage disposal.
Description
Technical field
The present invention relates to technical field of sewage, particularly relate to a kind of sewage primary filter cleaning system.
Background technology
Wastewater treatment in China industry is advanced by leaps and bounds, and overall development is in the fast-growing period, is mainly manifested in sewage disposal energy
The aspects such as power is expanded rapidly, wastewater treatment rate steadily improves, sewage load quickly growth.Town sewage waste treatment facility is built
If having promoted environmental protection industry development, 90% will be not less than to the year two thousand twenty treatment rate of domestic sewage, wastewater treatment in China Service Market
Space is wide, additionally, China encourages to utilize the policy of recycled water, the dirty water decontamination handles business also will provide wide market sky
Between.
Chinese patent CN205269172U discloses a kind of sewage-treatment plant, and it includes that casing, described casing are provided with
Water inlet pipe, water purification outlet pipe, the first residue outlet, the second residue outlet and sewage outlet pipe, be provided with in described casing and lead to respectively
Crossing pipeline and connect the left pretreatment box of water inlet pipe and right pretreatment box, described left pretreatment box and right pretreatment box pass through respectively
Pipeline connects left filter and right filter, and described left filter and right filter connect the first residue outlet and second respectively and go out
Slag pipe, described left filter and right filter connect left detection case and right detection case, described left detection by pipeline respectively
Case connects right pretreatment box by pipeline, and described right detection case connects sewage outlet pipe, described left detection case and right detection
Case connects clear water tanks by pipeline respectively, and described clear water tanks and water purification outlet pipe connect, its have the beneficial effect that can arrange double
Defecator, can filter raising efficiency simultaneously, also can ensure water quality by secondary filter.But, it cannot utilize the effect of precipitation
Sewage is carried out pretreatment, it is impossible to the effective impurity removed in sewage;And filter type is single, filter effect is limited;And
And be only capable of carrying out substance filtration, filtration the most thorough;Simultaneously when the filter damage of side, integral filter will be affected
It is smoothed out.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
Summary of the invention
The problem to be solved in the present invention is to provide a kind of sewage primary filter cleaning system, including water plug, the first frame
Body, retaining device, settler, roller devices, the first defecator, attachment means and the second defecator, water plug bag
Include the first pipeline, the first water pump, the first framework be provided with the first through hole, the second through hole, third through-hole, the first locating piece, the 4th
Bristle, retaining device includes the first cross bar, the first brace, elastic rod, baffle plate, the first spring, settler include the first montant,
First fixed block, precipitation frame, the first drainage screen, the second spring, balancing weight, filter type of the present invention variation, and filter effect
Fruit is preferably, it is possible to meet the needs of sewage disposal.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
A kind of sewage primary filter cleaning system, including water plug, be positioned at the first framework below described water plug,
It is arranged at the retaining device in described first framework, the settler being contained in described first framework, is positioned at described precipitation dress
Put the roller devices of top, be positioned at the first defecator below described settler, be positioned at the company below described first framework
Connection device and be positioned at the second defecator below described attachment means, described water plug includes the first pipeline, is arranged at institute
State the first water pump on the first pipeline, be positioned at the first support on the left of described first water pump and be arranged on described first pipeline
First valve, described first framework is provided with the first through hole being positioned at its upper surface, the second through hole of being positioned at its lower surface, be positioned at
The third through-hole on its right surface, be arranged at the first locating piece of described first framework inner surface, to be positioned at described first locating piece right
4th bristle of side, described retaining device include the first cross bar, be positioned at the first brace above described first cross bar, be positioned at described
Elastic rod below first cross bar, it is positioned at the baffle plate on the left of described elastic rod, the first spring of being arranged on described elastic rod, sets
The first sealing ring being placed on described baffle plate, described settler includes the first montant, is positioned at below described first montant
One fixed block, be positioned at below described first fixed block precipitation frame, the first drainage screen being arranged on described precipitation frame, be contained in
The second spring in described precipitation frame, it is positioned at the balancing weight below described second spring, is positioned at second above described precipitation frame
Drainage screen and be positioned at the second support on the left of described first montant, described roller devices includes the 3rd support, is positioned at the described 3rd
The 4th support above support, the first roller being arranged on described 4th support, be arranged on described first roller first
Bristle and be positioned at the second cross bar on the left of described 4th support, described first defecator includes the first support bar, is arranged at institute
State the second roller of the first post upper, the second bristle being arranged on described second roller, be positioned at described first bracer
Left side concentrate block, be positioned at the 5th support on the right side of described first support bar, be positioned at the first transverse slat above described 5th support,
It is positioned at the 3rd drainage screen above described first transverse slat, is positioned at the stop block above described first transverse slat, is positioned at described 5th
The first bent stick below frame and be positioned at the 3rd cross bar on the right side of described first bent stick, described attachment means includes the second support
Bar, it is positioned at the 6th support on the right side of described second support bar, the 4th cross bar being arranged on described 6th support, is positioned at institute
State the second brace on the right side of the 6th support, be positioned at the 7th support on the left of described second support bar, be positioned on described 7th support
Side the 3rd brace, be positioned at the second pipe on the right side of described 7th support and the second valve being arranged on described second pipe,
Described second defecator includes the second framework, the sponge ring being contained in described second framework, is positioned on the right side of described sponge ring
The 3rd spring, be positioned at the second transverse slat below described sponge ring, be positioned at the 4th brace below described second transverse slat, be positioned at institute
State the 3rd support bar on the left of the 4th brace, the third bristle being arranged on described second framework inner surface, be positioned at described second
The 3rd pipeline, the 3rd valve being arranged on described 3rd pipeline below framework and be arranged on described second framework inner surface
The 4th drainage screen.
Described first support is L-shaped, and the upper end of described first support is fixing with described first water pump to be connected, described first
The lower end of frame is vertical shape.
First through hole described in the lower end aligned of described first pipeline and fixing with the upper surface of described first framework being connected, institute
State that the upper surface of the lower end of the first support and described first framework is fixing to be connected, the left surface of described first locating piece and described the
The inner surface of one framework is fixing to be connected, the right surface shape in curved surface of described first locating piece, and described 4th bristle is provided with several,
Described 4th bristle horizontal positioned, the right-hand member of described 4th bristle is fixing with the inner surface of described first framework to be connected.
Described first cross bar is cuboid and horizontal positioned, the left end of described first cross bar and the right table of described first framework
Face is fixing to be connected, the described first inclined shape of brace, and the right surface of the upper end of described first brace and described first framework is fixed
Connecting, the lower end of described first brace is fixing with the upper surface of described first cross bar to be connected, and the upper end of described elastic rod is with described
The lower surface of the first cross bar is fixing to be connected, and the lower end of described elastic rod is fixing with the right surface of described baffle plate to be connected, and described first
The upper end of spring is fixing with the lower surface of described first cross bar to be connected, and the lower end of described first spring is fixing with described elastic rod even
Connecing, described baffle plate is cuboid and vertically places, described first sealing ring in the form of a ring, the inner surface of described first sealing ring and institute
State the fixing connection of outer surface of baffle plate.
Described first montant is cuboid and vertically places, the upper end of described first montant and the interior table of described first framework
Face is fixing to be connected, and the lower surface of described first fixed block is fixing with described precipitation frame to be connected, described first fixed block and described the
The lower end axle of one montant turns connection, the described inclined shape of precipitation frame, and described precipitation frame is provided with the first groove, is positioned at described first
The first cavity below groove and fourth hole, the upper surface of described first drainage screen is fixing with described precipitation frame to be connected, described
First drainage screen is positioned at the lower section of described fourth hole, and the upper end of described second spring is fixing with the inner surface of described precipitation frame to be connected
Connecing, the lower end of described second spring and described balancing weight are fixing to be connected, and described balancing weight is cuboid, described second drainage screen in
Cuboid, the lower surface of described second drainage screen is fixing with the upper surface of described precipitation frame to be connected, and described second support is L-shaped,
The inner surface of one end of described second support and described first framework is fixing to be connected, the other end of described second support and described the
The left surface of one montant is fixing to be connected.
Described 3rd support is L-shaped, and the upper end of described 3rd support is fixing with the right surface of described first montant to be connected, institute
The lower end stating the 3rd support acts against on described precipitation frame, and described 4th support is L-shaped, and the upper end of described 4th support is with described
The inner surface of the first framework is fixing to be connected, and the lower end of described 4th support is horizontal and is positioned at the lower section of described first through hole,
The lower end of described 4th support is provided with the second groove, and described first roller is cylinder and horizontal positioned, and described first roller is received
In being dissolved in described second groove and turning with described 4th support shaft and be connected, described first bristle is provided with several, described first brush
Hair is evenly distributed on described first roller and is secured to connect, and described second cross bar is cuboid and horizontal positioned, described
The right-hand member of the second cross bar is fixing with described 4th support to be connected, the left end of described second cross bar and the right surface of described first montant
Fixing connection.
Described first support bar is cuboid and vertically places, the lower end of described first support bar and described first framework
Inner surface is fixing to be connected, described first support bar be provided be positioned at the 3rd groove of its upper end and be disposed below the 4th recessed
Groove, described second roller is cylinder, described second roller be contained in described 3rd groove and with described first support bar axle
Turning and connect, described second bristle is provided with several, and described second bristle is evenly distributed on described second roller and is secured to
Connect, the rectangular triangle of cross section of described concentration block, the lower surface of described concentration block and left surface thereof and described first frame
The inner surface of body is fixing to be connected, and described 5th support is L-shaped, one end of described 5th support and the inner surface of described first framework
Fixing connection, the other end of described 5th support is fixing with the lower surface of described first transverse slat to be connected, and described first transverse slat is length
Cube and horizontal positioned, the right-hand member of described first transverse slat is fixing with the inner surface of described first framework to be connected, and described first seals
The left surface of ring acts against on the right surface of described first transverse slat, and described 3rd drainage screen is cuboid and vertically places, described
The lower surface of the 3rd drainage screen is fixing with the upper surface of described first transverse slat to be connected, and described stop block is cuboid and vertically puts
Putting, the lower surface of described stop block is fixing with the upper surface of described first transverse slat to be connected, and the right surface of described stop block is with described
The left surface contact of baffle plate, described first bent stick is bending, the upper end of described first bent stick and described 5th support
Lower surface is fixing to be connected, and the lower end of described first bent stick is fixing with the inner surface of described first framework to be connected, and the described 3rd is horizontal
Bar is horizontal, and the right-hand member of described 3rd cross bar is fixing with the inner surface of described first framework to be connected, a left side for described 3rd cross bar
Hold be connected fixing with described first bent stick.
Described second support bar is vertical shape, and the lower surface of the upper end of described second support bar and described first framework is fixed
Connecting, described 6th support is L-shaped, and the upper end of described 6th support is fixing with the lower surface of described first framework to be connected, described
The lower end of the 6th support is horizontal, and described 4th cross bar is cuboid and horizontal positioned, the right-hand member of described 4th cross bar and institute
Stating that the 6th support is fixing to be connected, the left end of described 4th cross bar is fixed with the right surface of described second support bar and is connected, and described the
The two inclined shapes of brace, the upper end of described second brace is fixing with the lower surface of described first framework to be connected, described second brace
Lower end and described 6th support fixing is connected, described 7th support is concave shape, the upper end of described 7th support and described the
The left surface of one framework is fixing to be connected, the described 3rd inclined shape of brace, the upper end of described 3rd brace and described first framework
Left surface fixing connect, the lower end of described 3rd brace is fixing with the upper surface of described 7th support to be connected, and described second manages
Road is vertical shape, and the upper end of described second pipe is directed at described second through hole and the lower surface with described first framework is fixed even
Connect.
Described second framework is hollow cylinder, described second framework horizontal positioned, and described second framework is provided with
Five through holes and clematis stem hole, fifth hole described in the lower end aligned of described second pipe and solid with the outer surface of described second framework
Fixed connection, the lower end of described second support bar is fixing with described second framework to be connected, under described 6th support and the 7th support
Holding be connected fixing with described second framework, described second transverse slat is cuboid and horizontal positioned, and described 3rd support bar is in vertically
Shape, the lower end of described 3rd support bar and the inner surface of described second framework are fixing to be connected, the upper end of described 3rd support bar and
The lower surface of described second transverse slat is fixing to be connected, and the lower end of described 3rd support bar is provided with the 5th groove, described 4th brace in
Skewed, the lower end of described 4th brace and the side of described 3rd support bar are fixing to be connected, the upper end of described 4th brace and
The lower surface of described second transverse slat is fixing to be connected, described sponge ring be cross section be the cylinder of annulus, described sponge ring level is put
Putting, described sponge ring is positioned at the lower section of described fifth hole, described sponge ring act against on the inner surface of described second framework with
And on the upper surface of described second transverse slat, described 3rd spring is horizontal, the right-hand member of described 3rd spring and described second frame
The inner surface of body is fixing to be connected, and the left end of described 3rd spring is fixing with described sponge ring to be connected, if described third bristle is provided with
Dry and lay respectively at the left and right sides in described second framework, described third bristle is horizontal and its one end and described second
The inner surface of framework is fixing to be connected, and described 3rd pipeline is vertical shape, and the upper end of described 3rd pipeline is directed at described clematis stem hole
And fixing with the outer surface of described second framework be connected, described 3rd pipeline is provided with fixed mount, and described fixed mount is L-shaped, institute
State that one end of fixed mount is fixing with described second framework to be connected, the other end of described fixed mount company fixing with described 3rd pipeline
Connecing, described 4th drainage screen is provided with two and lays respectively at the left and right sides in described clematis stem hole, and described 4th drainage screen is curved
Curved, the lower end of described 4th drainage screen is fixing with the inner surface of described second framework to be connected.
After using technique scheme, sewage primary filter cleaning system of the present invention has the advantage that
Sewage primary filter cleaning system simple in construction of the present invention, easy to use, it is possible to sewage is carried out multi-filtering side
Formula, filter effect is preferable;First it can carry out precipitation to sewage, is settled out impurity therein, then fills it
The filtration divided, the effective impurity removed in sewage;And drainage screen can be carried out cleaning effect, dispose and occupy on it
Dust impurity;Can collect with mud simultaneously and process, and convenient removing;And so that sewage is through sponge ring
Filtration, then sewage separation is processed, eventually passes and discharge after the filtration of drainage screen.Filter type variation,
And filter effect is preferable, it is possible to meet the needs of sewage disposal.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings the detailed description of the invention of sewage primary filter cleaning system of the present invention is described further:
Fig. 1 is the structural representation of sewage primary filter cleaning system of the present invention;
In figure: 1-water plug;11-the first pipeline;12-the first support;13-the first water pump;14-the first valve;2-
One framework;21-the first through hole;22-the second through hole;23-third through-hole;24-the first locating piece;25-the 4th bristle;3-baffle plate fills
Put;31-the first cross bar;32-the first brace;33-elastic rod;34-baffle plate;35-the first spring;36-the first sealing ring;4-precipitates
Device;41-the first montant;42-the first fixed block;43-precipitates frame;431-the first groove;432-the first cavity;433-four-way
Hole;44-the first drainage screen;45-the second spring;46-balancing weight;47-the second drainage screen;48-the second support;5-roller devices;
51-the 3rd support;52-the 4th support;53-the first roller;54-the first bristle;55-the second cross bar;6-the first defecator;
61-the first support bar;611-the 4th groove;612-the 3rd groove;62-the second roller;63-the second bristle;64-concentrates block;65-
5th support;66-the first transverse slat;67-the 3rd drainage screen;68-stop block;69-the first bent stick;60-the 3rd cross bar;7-connects
Device;71-the second support bar;72-the 6th support;73-the 4th cross bar;74-the second brace;75-the 7th support;76-the 3rd is oblique
Bar;77-second pipe;78-the second valve;8-the second defecator;81-the second framework;811-fifth hole;812-clematis stem
Hole;82-sponge ring;83-the 3rd spring;84-the second transverse slat;85-the 4th brace;86-the 3rd support bar;861-the 5th groove;
87-third bristle;88-the 3rd pipeline;89-the 3rd valve;80-the 4th drainage screen.
Detailed description of the invention
As it is shown in figure 1, sewage primary filter cleaning system of the present invention includes water plug 1, is positioned at described water plug 1 time
Side the first framework 2, the retaining device 3 being arranged in described first framework 2, be contained in described first framework 2 precipitation dress
Put 4, be positioned at the roller devices 5 above described settler 4, be positioned at the first defecator 6 below described settler 4, position
Attachment means 7 below described first framework 2 and be positioned at the second defecator 8 below described attachment means 7.
As it is shown in figure 1, described water plug 1 includes the first pipeline 11, the first water being arranged on described first pipeline 11
Pump 13, it is positioned at the first support 12 on the left of described first water pump 13 and is arranged at the first valve 14 on described first pipeline 11.
The upper ends of described first pipeline 11 is in cesspool.Described first water pump 13 is electrically connected with the power supply.Described first support
12 is L-shaped, and the upper end of described first support 12 is fixing with described first water pump 13 to be connected, and the lower end of described first support 12 is in perpendicular
Straight shape.Described first valve 14 flow of water in controlling described first pipeline 11.
As it is shown in figure 1, described first framework 2 in hollow cuboid and is vertically placed, described first framework 2 is provided with position
Thereon surface the first through hole 21, be positioned at its lower surface the second through hole 22, be positioned at its right surface third through-hole 23, arrange
In described first framework 21 inner surface the first locating piece 24, be positioned at the 4th bristle 25 on the right side of described first locating piece 24.Institute
Stating the first through hole 21 and the second through hole 22 is rounded and communicates with the inside of described first framework 2, described third through-hole 23 is in length
Square and with described first framework 2 inside communicates, the first through hole 21 described in the lower end aligned of described first pipeline 11 and with institute
State that the upper surface of the first framework 2 is fixing to be connected so that the inside phase of the inside of described first pipeline 11 and described first framework 2
Logical, the lower end of described first support 12 is fixing with the upper surface of described first framework 2 to be connected.The left-handed watch of described first locating piece 24
Face is fixing with the inner surface of described first framework 2 to be connected, the right surface shape in curved surface of described first locating piece 24.Described 4th brush
Hair 25 is provided with several, and described 4th bristle 25 horizontal positioned, the right-hand member of described 4th bristle 25 is interior with described first framework 2
Surface is fixing to be connected.
As it is shown in figure 1, described retaining device 3 includes the first cross bar 31, to be positioned at first above described first cross bar 31 oblique
Bar 32, be positioned at the elastic rod 33 below described first cross bar 31, be positioned at the baffle plate 34 on the left of described elastic rod 33, be arranged at described
The first spring 35 on elastic rod 33, the first sealing ring 36 being arranged on described baffle plate 34.Described first cross bar 31 is in rectangular
Body and horizontal positioned, the left end of described first cross bar 31 is fixing with the right surface of described first framework 2 to be connected.Described first brace
32 inclined shapes, the upper end of described first brace 32 is fixing with the right surface of described first framework 2 to be connected, described first brace 32
The upper surface of lower end and described first cross bar 31 fixing be connected.The upper end of described elastic rod 33 and described first cross bar 31 times
Surface is fixing to be connected, and the lower end of described elastic rod 33 is fixing with the right surface of described baffle plate 34 to be connected.Described first spring 35
Upper end is fixing with the lower surface of described first cross bar 31 to be connected, and the lower end of described first spring 35 is fixing even with described elastic rod 33
Connecing, described first spring 35 is pressed downward against described elastic rod 33.Described baffle plate 34 in cuboid and is vertically placed.Described first seals
In the form of a ring, the inner surface of described first sealing ring 36 is fixing with the outer surface of described baffle plate 34 to be connected ring 36, and described first seals
In ring 36 is contained in described third through-hole 23 and contact with described first framework 21, such that it is able to by close for described baffle plate 34 and first
Seal ring 36 is taken out, and can play preferable sealing function simultaneously.
As it is shown in figure 1, described settler 4 includes the first montant 41, is positioned at first below described first montant 41 admittedly
Determine block 42, be positioned at below described first fixed block 42 precipitation frame 43, the first drainage screen 44 being arranged on described precipitation frame 43,
The second spring 45 of being contained in described precipitation frame 43, be positioned at the balancing weight 46 below described second spring 45, be positioned at described heavy
The second drainage screen 47 above shallow lake frame 41 and be positioned at the second support 48 on the left of described first montant 41.Described first montant 41 in
Cuboid and vertically placing, the upper end of described first montant 41 is fixing with the inner surface of described first framework 2 to be connected.Described first
The lower surface of fixed block 42 is fixing with described precipitation frame 43 to be connected, described first fixed block 42 and the lower end of described first montant 41
Axle turns connection so that described first fixed block 42 can rotate around the lower end of described first montant 41.Described precipitation frame 43 in
Skewed, described precipitation frame 43 is provided with the first groove 431, is positioned at the first cavity 432 below described first groove 431 and
Four through holes 433, described first groove 431 is formed from the upper surface concave downward of described precipitation frame 43, described first groove 431
Lower section in described first through hole 21 so that the sewage entered in described first framework 2 from described first through hole 21 can enter
Enter in described first groove 431, described first cavity 432 in rectangular-shaped, described fourth hole 433 and described first groove
431 communicate.The upper surface of described first drainage screen 44 is fixing with described precipitation frame 43 to be connected, and described first drainage screen 44 is positioned at institute
State the lower section of fourth hole 433.The upper end of described second spring 45 and the inner surface of described precipitation frame 43 are fixing to be connected, and described the
The lower end of two springs 45 is fixing with described balancing weight 46 to be connected, thus described balancing weight 46 is played fixation.Described counterweight
Block 46 is in cuboid, and the quality of described balancing weight 46 is relatively big, so that the left end of described precipitation frame 43 is below, when
When in described first groove 431, deposition has more water, the lower end that described precipitation frame 43 begins around described first montant 41 is suitable
Hour hands rotate so that the water in described first groove 431 flows out from the right-hand member of the first groove 431.Described second drainage screen 47 in
Cuboid, the lower surface of described second drainage screen 47 is fixing with the upper surface of described precipitation frame 43 to be connected, thus when sewage is from institute
State and can filter through described second drainage screen 47 when the first groove 431 flows out.Described second support 48 is L-shaped, and described second
One end of support 48 is fixing with the inner surface of described first framework 2 to be connected, the other end and described first of described second support 48
The left surface of montant 41 is fixing to be connected.When described precipitation frame 43 rotates, the left end of described precipitation frame 43 and described first locating piece
The right surface of 24 is slidably connected.
As it is shown in figure 1, described roller devices 5 includes the 3rd support 51, is positioned at the 4th above described 3rd support 51
Frame 52, the first roller 53 being arranged on described 4th support 52, the first bristle 54 being arranged on described first roller 53 and
It is positioned at the second cross bar 55 on the left of described 4th support 52.Described 3rd support 51 is L-shaped, the upper end of described 3rd support 51 with
The right surface of described first montant 41 is fixing to be connected, and the lower end of described 3rd support 51 acts against on described precipitation frame 43, prevents
The right-hand member of described precipitation frame 43 excessively moves up.Described 4th support 52 is L-shaped, and the upper end of described 4th support 52 is with described
The inner surface of the first framework 2 is fixing to be connected, and the lower end of described 4th support 52 is horizontal and is positioned at described first through hole 21
Lower section, the lower end of described 4th support 52 is provided with the second groove, and described second groove is rectangular-shaped.Described first roller 53 in
Cylinder and horizontal positioned, turn even in described first roller 53 is contained in described second groove and with described 4th support 52 axle
Connect so that described first roller 53 can rotate in described second groove, and described first roller 53 is connected with motor, drive institute
State the first roller 53 to rotate.Described first bristle 54 is provided with several, and described first bristle 54 is evenly distributed on described first rolling
Taking turns on 53 and be secured to connect, described first roller 53 can be in the lower section of described first through hole 21.Described second cross bar 55
In cuboid and horizontal positioned, the right-hand member of described second cross bar 55 is fixing with described 4th support 52 to be connected, described second cross bar
The left end of 55 is fixing with the right surface of described first montant 41 to be connected.
As it is shown in figure 1, described first defecator 6 includes the first support bar 61, is arranged on described first support bar 61
End the second roller 62, the second bristle 63 being arranged on described second roller 62, be positioned on the left of described first bracer 61
Concentrate block 64, be positioned at the 5th support 65 on the right side of described first support bar 61, to be positioned at first above described 5th support 65 horizontal
Plate 66, it is positioned at the 3rd drainage screen 67 above described first transverse slat 66, is positioned at the stop block 68 above described first transverse slat 66, position
The first bent stick 69 below described 5th support 65 and be positioned at the 3rd cross bar 60 on the right side of described first bent stick 69.Described
First support bar 61 in cuboid and is vertically placed, the lower end of described first support bar 61 and the inner surface of described first framework 2
Fixing connection, described first support bar 61 is provided with the 3rd groove 612 being positioned at its upper end and the 4th groove being disposed below
611, described 3rd groove 612 and the 4th groove 611 are in cuboid and run through the surface, left and right of described first support bar 61.Described
Second roller 62 in cylinder, in described second roller 62 is contained in described 3rd groove 612 and with described first support bar 61
Axle turns connection so that described second roller 62 can rotate in described 3rd groove 612.Described second bristle 63 is provided with some
Individual, described second bristle 63 is evenly distributed on described second roller 62 and is secured to connect, when the right side of described precipitation frame 43
When end moves down, described first drainage screen 44 contacts with described second bristle 63, such that it is able to described first drainage screen 44
Playing scrubbing action, described second roller 62 is connected with motor, drives described second roller 62 to rotate.The horizontal stroke of described concentration block 64
The rectangular triangle in cross section, the lower surface of described concentration block 64 and left surface thereof are fixing with the inner surface of described first framework 2 to be connected
Connecing, sewage can be focused on the right side of it by described concentration block 64.Described 5th support 65 is L-shaped, the one of described 5th support 65
End is fixing with the inner surface of described first framework 2 to be connected, the other end of described 5th support 65 and described first transverse slat 66 times
Surface is fixing to be connected.Described first transverse slat 66 is in cuboid and horizontal positioned, the right-hand member and described first of described first transverse slat 66
The inner surface of framework 2 is fixing to be connected, and the left surface of described first sealing ring 36 acts against on the right surface of described first transverse slat 66.
Described 3rd drainage screen 67 in cuboid and is vertically placed, the lower surface of described 3rd drainage screen 67 and described first transverse slat 66
Upper surface is fixing to be connected, such that it is able to filter the sewage above described first transverse slat 66.Described stop block 68 is in rectangular
Body and vertically placing, the lower surface of described stop block 68 is fixing with the upper surface of described first transverse slat 66 to be connected, described stop block
The right surface of 68 contacts with the left surface of described baffle plate 34, is possible to prevent described baffle plate 34 to be excessively moved to the left.Described first curved
Curved bar 69 is in bending, and the upper end of described first bent stick 69 and the lower surface of described 5th support 65 are fixing to be connected, and described the
The lower end of one bent stick 69 is fixing with the inner surface of described first framework 2 to be connected.Described 3rd cross bar 60 is horizontal, and described
The right-hand member of three cross bars 60 is fixing with the inner surface of described first framework 2 to be connected, the left end and described first of described 3rd cross bar 60
Bent stick 69 is fixing to be connected.
As it is shown in figure 1, described attachment means 7 includes the second support bar 71, is positioned on the right side of described second support bar 71
The 6th support 72, the 4th cross bar 73 being arranged on described 6th support 72, be positioned at second on the right side of described 6th support 72
Brace 74, it is positioned at the 7th support 75 on the left of described second support bar 71, is positioned at the 3rd brace above described 7th support 75
76, the second pipe 77 on the right side of described 7th support 75 and the second valve 78 being arranged on described second pipe 77 it are positioned at.Institute
Stating the second support bar 71 in vertical shape, the upper end of described second support bar 71 is fixing with the lower surface of described first framework 2 to be connected.
Described 6th support 72 is L-shaped, and the upper end of described 6th support 72 is fixing with the lower surface of described first framework 2 to be connected, described
The lower end of the 6th support 72 is horizontal.Described 4th cross bar 73 is in cuboid and horizontal positioned, the right side of described 4th cross bar 73
End is fixed with described 6th support 72 and is connected, and the right surface of the left end of described 4th cross bar 73 and described second support bar 71 is fixed
Connect.The described second inclined shape of brace 74, the upper end of described second brace 74 is fixing with the lower surface of described first framework 2 to be connected
Connecing, the lower end of described second brace 74 is fixing with described 6th support 72 to be connected.Described 7th support 75 in concave shape, described
The upper end of seven supports 75 is fixing with the left surface of described first framework 2 to be connected.The described 3rd inclined shape of brace 76, the described 3rd
The upper end of brace 76 is fixing with the left surface of described first framework 2 to be connected, the lower end of described 3rd brace 76 and described 7th
The upper surface of frame 75 is fixing to be connected.Described second pipe 77 is in vertical shape, and the upper end of described second pipe 77 is directed at described second
Through hole 22 and fixing with the lower surface of described first framework 2 is connected so that the inside of described second pipe 77 and described first frame
The inside of body 2 communicates.Described second valve 78 flow of water in controlling described second pipe 77.
As it is shown in figure 1, described second defecator 8 includes the second framework 81, the sea being contained in described second framework 81
Continuous ring 82, it is positioned at the 3rd spring 83 on the right side of described sponge ring 82, is positioned at the second transverse slat 84 below described sponge ring 82, is positioned at
The 4th brace 85 below described second transverse slat 84, it is positioned at the 3rd support bar 86 on the left of described 4th brace 85, is arranged at institute
State the third bristle 87 on the second framework 81 inner surface, be positioned at the 3rd pipeline 88 below described second framework 81, be arranged at institute
State the 3rd valve 89 on the 3rd pipeline 88 and be arranged at the 4th drainage screen 80 on described second framework 81 inner surface.Described
Two frameworks 81 are in hollow cylinder, and described second framework 81 horizontal positioned, described second framework 81 is provided with fifth hole 811
And clematis stem hole 812, described fifth hole 811 and clematis stem hole 812 is rounded and communicates with the inside of described second framework 81,
Fifth hole 811 described in the lower end aligned of described second pipe 77 and fixing with the outer surface of described second framework 81 be connected, makes
The inside obtaining described second pipe 77 communicates with the inside of described second framework 81, and the lower end of described second support bar 71 is with described
Second framework 81 is fixing to be connected, and the lower end of described 6th support 72 and the 7th support 75 is fixing with described second framework 81 to be connected.
Described second transverse slat 84 is in cuboid and horizontal positioned, and described second transverse slat 84 makes the dirt flowed into from described fifth hole 811
Water flows to below from both sides around respectively.Described 3rd support bar 86 in vertical shape, the lower end of described 3rd support bar 86
Fix with the inner surface of described second framework 81 and be connected, the upper end of described 3rd support bar 86 and the following table of described second transverse slat 84
Face is fixing to be connected, and the lower end of described 3rd support bar 86 is provided with the 5th groove 861, and described 5th groove 861 runs through the described 3rd
The surface, left and right of support bar 86.The described 4th inclined shape of brace 85, the lower end of described 4th brace 85 supports with the described 3rd
The side of bar 86 is fixing to be connected, and the upper end of described 4th brace 85 is fixing with the lower surface of described second transverse slat 84 to be connected.Described
Sponge ring 82 is the cylinder of annulus in cross section, described sponge ring 82 horizontal positioned, and described sponge ring 82 is positioned at described five-way
The lower section in hole 811, described sponge ring 82 acts against on the inner surface of described second framework 81 and described second transverse slat 84 upper
On surface.Described 3rd spring 83 is horizontal, and the right-hand member of described 3rd spring 83 is solid with the inner surface of described second framework 81
Fixed connection, the left end of described 3rd spring 83 is fixing with described sponge ring 82 to be connected, thus described sponge ring 82 is played support
Effect.Described third bristle 87 is provided with several and lays respectively at the left and right sides in described second framework 81, described 3rd brush
Hair 87 is horizontal and its one end is fixing with the inner surface of described second framework 81 is connected, such that it is able to from described second transverse slat
The sewage that 84 left and right sides are flowed out filters.Described 3rd pipeline 88 is in vertical shape, and the upper end of described 3rd pipeline 88 is directed at
Described clematis stem hole 812 and fixing with the outer surface of described second framework 81 is connected so that the inside of described 3rd pipeline 88 and
The inside of described second framework 81 communicates, and described 3rd pipeline 88 is provided with fixed mount 881, and described fixed mount 881 is L-shaped, institute
State that one end of fixed mount 881 is fixing with described second framework 81 to be connected, the other end of described fixed mount 881 and described 3rd pipeline
88 fixing connections.Described 3rd valve 89 flow of water in controlling described 3rd pipeline 88.Described 4th drainage screen 80 sets
Have two and lay respectively at the left and right sides in described clematis stem hole 812, described 4th drainage screen 80 in bending, described 4th mistake
Filter screen 80 is staggered relatively, and the lower end of described 4th drainage screen 80 is fixing with the inner surface of described second framework 81 to be connected.
During as it is shown in figure 1, described sewage primary filter cleaning system of the present invention uses, first by the upper end of the first pipeline 11
It is connected in cesspool by external connection pipeline, then starts the first water pump 13 so that the water in cesspool is drawn into institute
State in the first pipeline 11, open the first valve 14 so that the water in the first pipeline 11 enters in described first framework 2.Start
The motor being connected with the first roller 53 so that described first roller 53 rotates, and then drive described first bristle 54 to rotate with,
When sewage enters in described first framework 2 from described first through hole 21, sewage contacts with the first bristle 54 of rotation, and first
Bristle 54 can with in absorption effluent part impurity and mud.Then in sewage enters into described first groove 431, then by
Gradually deposit in described first groove 431, and sewage can be precipitated during deposition so that miscellaneous in sewage
Matter is precipitated out.When sewage reaches at described fourth hole 433, sewage gradually flow in described fourth hole 433, so
After after the filtration of the first drainage screen 44, enter into the lower section of described precipitation frame 43, sewage is constantly described first recessed simultaneously
Deposition in groove 431, due to the setting of balancing weight 46 so that described precipitation frame 43 will not rotate, when in described first groove 431
When sewage reaches a certain amount of, described precipitation frame 43 begins around the lower end of described first montant 41 and turns clockwise so that described
Sewage in first groove 431 flows out from the right side of precipitation frame 43, and when flowing out, sewage needs the mistake through the second drainage screen 47
Filter, then sewage contacts with described 4th bristle 25, and sewage can be played certain filtration by described 4th bristle 25, and
And the impurity in absorption effluent and mud, start the motor being connected with the second roller 62 so that described second roller 62 revolves simultaneously
Turn, and then drive described second bristle 63 to rotate, thus when it contacts with the first drainage screen 44, can filter described first
Net 44 cleans.Then sewage enters into the top of described first transverse slat 66.Then sewage is heavy on described first transverse slat 66
Forming sediment, and sewage enters into the lower section of precipitation frame 43 after the filtration of the 3rd drainage screen 67, impurity, mud in sewage are then stayed
On described first transverse slat 66, conveniently clear up.Then the sewage after filtering enters into described second through the 4th groove 611 and leads to
In hole 22, then in described second pipe 77.Open the second valve 78 so that sewage enters into described second framework 81
In, enter into after being then passed through the filtration of sponge ring 82 on described second transverse slat 84, and from the left and right of described second transverse slat 84
Both sides are flowed out, and then contact with third bristle 87, and sewage can be filtered by described third bristle 87, miscellaneous in absorption effluent
Matter.Then sewage enters in described 3rd pipeline 88 after the filtration of the 4th drainage screen 80, opens the 3rd valve 89 so that
Sewage is discharged, and when sewage is all discharged, holds elastic rod 33 and described baffle plate 34 and the first sealing ring 36 is taken out, then by the
Impurity and mud on one transverse slat 66 are cleaned out.So far, sewage primary filter cleaning system of the present invention uses process to retouch
State complete.
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is not limited thereto, and any
Those skilled in the art, in the technical scope that the invention discloses, can readily occur in change or replace, should contain
Within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with described scope of the claims.
Claims (8)
1. a sewage primary filter cleaning system, including water plug (1), is positioned at the first of described water plug (1) lower section
Framework (2), the retaining device (3) being arranged on described first framework (2), be contained in described first framework (2) precipitation dress
Put (4), be positioned at described settler (4) top roller devices (5), be positioned at described settler (4) lower section first filtration
Device (6), be positioned at described first framework (2) lower section attachment means (7) and be positioned at described attachment means (7) lower section the second mistake
Filter device (8), it is characterised in that: described water plug (1) includes the first pipeline (11), is arranged on described first pipeline (11)
The first water pump (13), be positioned at described first water pump (13) left side the first support (12) and be arranged at described first pipeline (11)
On the first valve (14), described retaining device (3) includes the first cross bar (31), is positioned at the of described first cross bar (31) top
One brace (32), be positioned at described first cross bar (31) lower section elastic rod (33), be positioned at described elastic rod (33) left side baffle plate
(34) the first spring (35), being arranged on described elastic rod (33), the first sealing ring being arranged on described baffle plate (34)
(36), described first defecator (6) includes the first support bar (61), is arranged at the second of described first support bar (61) upper end
Roller (62), the second bristle (63) being arranged on described second roller (62), it is positioned at described first bracer (61) left side
Concentrate block (64), be positioned at described first support bar (61) right side the 5th support (65), be positioned at described 5th support (65) top
The first transverse slat (66), be positioned at described first transverse slat (66) top the 3rd drainage screen (67), be positioned at described first transverse slat (66)
Top stop block (68), be positioned at described 5th support (65) lower section the first bent stick (69) and be positioned at described first bent stick
(69) the 3rd cross bar (60) on right side.
Sewage primary filter cleaning system the most according to claim 1, it is characterised in that: described second defecator (8)
The sponge ring (82) that including the second framework (81), is contained in described second framework (81), it is positioned at described sponge ring (82) right side
The 3rd spring (83), be positioned at described sponge ring (82) lower section the second transverse slat (84), be positioned at described second transverse slat (84) lower section
The 4th brace (85), be positioned at described 4th brace (85) left side the 3rd support bar (86), be arranged at described second framework
(81) third bristle on inner surface (87), be positioned at described second framework (81) lower section the 3rd pipeline (88), be arranged at described
The 3rd valve (89) on 3rd pipeline (88) and be arranged at the 4th drainage screen (80) on described second framework (81) inner surface.
Sewage primary filter cleaning system the most according to claim 1, it is characterised in that: described first cross bar (31) is in length
Cube and horizontal positioned, the right surface of the left end of described first cross bar (31) and described first framework (2) is fixing to be connected, and described the
One brace (32) inclined shape, the upper end of described first brace (32) is fixing with the right surface of described first framework (2) to be connected, institute
The upper surface of the lower end and described first cross bar (31) of stating the first brace (32) is fixed and is connected.
Sewage primary filter cleaning system the most according to claim 1, it is characterised in that: the upper end of described elastic rod (33)
Fix with the lower surface of described first cross bar (31) and be connected, the lower end of described elastic rod (33) and the right surface of described baffle plate (34)
Fixing connection, the upper end of described first spring (35) is fixing with the lower surface of described first cross bar (31) to be connected, described first bullet
The lower end of spring (35) is fixing with described elastic rod (33) to be connected, and described baffle plate (34) in cuboid and is vertically placed, and described first
In the form of a ring, the inner surface of described first sealing ring (36) is fixing with the outer surface of described baffle plate (34) to be connected sealing ring (36).
Sewage primary filter cleaning system the most according to claim 1, it is characterised in that: described first support bar (61) in
Cuboid and vertically placing, the lower end of described first support bar (61) is fixing with the inner surface of described first framework (2) to be connected, institute
State the first support bar (61) and be provided with the 3rd groove (612) being positioned at its upper end and the 4th groove (611) being disposed below, institute
State the second roller (62) in cylinder, in described second roller (62) is contained in described 3rd groove (612) and with described first
Support bar (61) axle turns connection.
Sewage primary filter cleaning system the most according to claim 1, it is characterised in that: described second bristle (63) is provided with
Several, described second bristle (63) is evenly distributed on described second roller (62) and above and is secured to connect, described concentration block
(64) the rectangular triangle of cross section, the lower surface of described concentration block (64) and left surface thereof and described first framework (2)
Inner surface is fixing to be connected, and described 5th support (65) is L-shaped, one end of described 5th support (65) and described first framework (2)
Inner surface fixing connect, the other end of described 5th support (65) is fixed with the lower surface of described first transverse slat (66) and is connected.
Sewage primary filter cleaning system the most according to claim 1, it is characterised in that: described first transverse slat (66) is in length
Cube and horizontal positioned, the inner surface of the right-hand member of described first transverse slat (66) and described first framework (2) is fixing to be connected, and described the
The left surface of one sealing ring (36) acts against on the right surface of described first transverse slat (66), and described 3rd drainage screen (67) is in rectangular
Body and vertically placing, the lower surface of described 3rd drainage screen (67) is fixing with the upper surface of described first transverse slat (66) to be connected, institute
State stop block (68) in cuboid and vertically to place, the lower surface of described stop block (68) and the upper table of described first transverse slat (66)
Face is fixing to be connected, and the right surface of described stop block (68) contacts with the left surface of described baffle plate (34).
Sewage primary filter cleaning system the most according to claim 1, it is characterised in that: described first bent stick (69) in
Bending, the lower surface of the upper end of described first bent stick (69) and described 5th support (65) is fixing to be connected, described first curved
The lower end of curved bar (69) is fixing with the inner surface of described first framework (2) to be connected, and described 3rd cross bar (60) is horizontal, described
The inner surface of the right-hand member of the 3rd cross bar (60) and described first framework (2) is fixing to be connected, the left end of described 3rd cross bar (60) and
Described first bent stick (69) is fixing to be connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610809436.4A CN106268017A (en) | 2016-09-08 | 2016-09-08 | A kind of sewage primary filter cleaning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610809436.4A CN106268017A (en) | 2016-09-08 | 2016-09-08 | A kind of sewage primary filter cleaning system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106268017A true CN106268017A (en) | 2017-01-04 |
Family
ID=57710491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610809436.4A Withdrawn CN106268017A (en) | 2016-09-08 | 2016-09-08 | A kind of sewage primary filter cleaning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106268017A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107754529A (en) * | 2017-11-07 | 2018-03-06 | 成都恒力达科技有限公司 | A kind of circulating air cleaning facility based on water cyclone |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104876382A (en) * | 2015-06-11 | 2015-09-02 | 王杨 | Device for purifying domestic sewage |
CN105289096A (en) * | 2015-10-21 | 2016-02-03 | 王杨 | Petroleum drilling sewage treatment equipment |
CN105642063A (en) * | 2016-03-07 | 2016-06-08 | 刘湘静 | Vehicular haze eliminating apparatus |
CN105888049A (en) * | 2016-06-14 | 2016-08-24 | 周末 | Rainwater collecting and retreating device |
CN105879491A (en) * | 2016-06-12 | 2016-08-24 | 周末 | Sewage purification treatment equipment for ore production |
CN205501023U (en) * | 2016-04-15 | 2016-08-24 | 龙江汇 | Ore dressing sewage treatment cyclic utilization device |
CN105920917A (en) * | 2016-07-08 | 2016-09-07 | 黄斌 | Sewage treatment equipment |
-
2016
- 2016-09-08 CN CN201610809436.4A patent/CN106268017A/en not_active Withdrawn
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104876382A (en) * | 2015-06-11 | 2015-09-02 | 王杨 | Device for purifying domestic sewage |
CN105289096A (en) * | 2015-10-21 | 2016-02-03 | 王杨 | Petroleum drilling sewage treatment equipment |
CN105642063A (en) * | 2016-03-07 | 2016-06-08 | 刘湘静 | Vehicular haze eliminating apparatus |
CN205501023U (en) * | 2016-04-15 | 2016-08-24 | 龙江汇 | Ore dressing sewage treatment cyclic utilization device |
CN105879491A (en) * | 2016-06-12 | 2016-08-24 | 周末 | Sewage purification treatment equipment for ore production |
CN105888049A (en) * | 2016-06-14 | 2016-08-24 | 周末 | Rainwater collecting and retreating device |
CN105920917A (en) * | 2016-07-08 | 2016-09-07 | 黄斌 | Sewage treatment equipment |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107754529A (en) * | 2017-11-07 | 2018-03-06 | 成都恒力达科技有限公司 | A kind of circulating air cleaning facility based on water cyclone |
CN107754529B (en) * | 2017-11-07 | 2021-01-08 | 上海尚远建设工程有限公司 | Circulating air purification equipment based on water rotating device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105920917A (en) | Sewage treatment equipment | |
CN103787522A (en) | Combined filtering integrated water purifier, and water purifying method thereof | |
CN108079636A (en) | Suspended matter processor in a kind of online water | |
CN205516741U (en) | Backwash filter | |
CN206355715U (en) | A kind of anti-blocking filtering pond of multi-filtering | |
CN106268017A (en) | A kind of sewage primary filter cleaning system | |
CN106512545B (en) | A kind of purification filtering system for sewage disposal | |
CN106268015A (en) | A kind of efficient sewage water filtration purifying processing device | |
CN201529432U (en) | Security filter | |
CN208250052U (en) | A kind of circulation water closed operation zero discharge treatment equipment | |
CN106277461A (en) | A kind of sewage purification processing system | |
CN207918565U (en) | A kind of medical sewage treatment box | |
CN106186449A (en) | A kind of trade effluent filtration, purification system | |
CN107215976B (en) | Be used for high building domestic sewage purifier in city | |
CN206345688U (en) | Pottery art sewage-treatment plant | |
CN106268016A (en) | A kind of industrial sewage purification pretreatment system | |
CN205886336U (en) | Microfiltration machine | |
CN208292764U (en) | A kind of quality purifying device for water | |
CN208603892U (en) | A kind of city river, lake sewage cleaning equipment | |
CN209554941U (en) | A kind of filter structure of water purifier | |
CN206240169U (en) | A kind of sewage water filtration clarifier | |
CN208049486U (en) | The more filtering element self-cleaning filters of suctorial type | |
CN207950807U (en) | A kind of cycle water sand filtration system | |
CN106430680A (en) | Domestic sewage purification treatment system | |
CN207445758U (en) | A kind of building sewage disposal device of the environmental protection of building field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170104 |