CN106251035A - The data processing method calculated for the project indicator and device - Google Patents

The data processing method calculated for the project indicator and device Download PDF

Info

Publication number
CN106251035A
CN106251035A CN201610562576.6A CN201610562576A CN106251035A CN 106251035 A CN106251035 A CN 106251035A CN 201610562576 A CN201610562576 A CN 201610562576A CN 106251035 A CN106251035 A CN 106251035A
Authority
CN
China
Prior art keywords
project
destination item
target keyword
evaluation function
evaluation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610562576.6A
Other languages
Chinese (zh)
Inventor
宫玉
宫一玉
张凯
李雪男
张璞
孙昕
左向红
刘方蓝
余潇潇
郭思琪
陈晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610562576.6A priority Critical patent/CN106251035A/en
Publication of CN106251035A publication Critical patent/CN106251035A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of data processing method calculated for the project indicator and device.The method includes: obtain target keyword;In multiple projects to be selected, destination item is determined according to target keyword;Determine that the undetermined parameter of default evaluation model is to determine evaluation function according to target keyword;And by evaluation function, the project indicator of destination item is performed calculating.By the present invention, solve and correlation technique is difficult to the problem that the index to project carries out quantum chemical method.

Description

The data processing method calculated for the project indicator and device
Technical field
The present invention relates to data processing field, in particular to a kind of data process side calculated for the project indicator Method and device.
Background technology
The project indicator is calculated the one or more index being to remove to evaluate certain object according to the target evaluated, same to layer Can use many algorithms, but for the more abstract object of evaluation criterion, it is difficult to quantitatively it is evaluated.With electrical network As a example by project, the evaluation index that electrical network project relates to is more, and evaluative dimension diversification, due to the particularity of electrical network project, is led Electrical network project cannot be accurately evaluated by cause, the most just cannot judge exactly to invest whether this electrical network project can obtain bigger Income, can not effectively to multiple electrical network project arrangement investments order.
For correlation technique is difficult to the index to project carrying out the problem of quantum chemical method, effective solution is the most not yet proposed Certainly scheme.
Summary of the invention
Present invention is primarily targeted at and a kind of data processing method calculated for the project indicator and device are provided, to solve Certainly correlation technique is difficult to the problem that the index to project carries out quantum chemical method.
To achieve these goals, according to an aspect of the invention, it is provided a kind of for the project indicator calculate number According to processing method.The method includes: obtain target keyword;In multiple projects to be selected, target item is determined according to target keyword Mesh;Determine that the undetermined parameter of default evaluation model is to determine evaluation function according to target keyword;And by evaluation function pair The project indicator of destination item performs calculating.
Further, before obtaining target keyword, the method also includes: obtain multiple object to be selected and multiple keys The mapping relations storehouse of word;Wherein, obtain target keyword and include: in multiple key words, obtain target keyword, according to target Key word determines that destination item includes in multiple projects to be selected: inquire about treat corresponding with target keyword in mapping relations storehouse Option is as destination item.
Further, determine according to target keyword that the undetermined parameter of default evaluation model is to determine that evaluation function includes: Obtaining and preset evaluation model, wherein, default evaluation model includes that multiple level, multiple levels are weight equation;And according to Target keyword determines that in multiple level, the weight parameter of each level is to obtain evaluation function.
Further, destination item is electrical network project, by evaluation function, the project indicator of destination item is performed calculating Including: by evaluation function, the electrical network project implementation is calculated, obtain result of calculation;Determine the power supply area of electrical network project;Calculate The power supply parameter of power supply area;And according to power supply parameter, result of calculation is adjusted, obtain the project indicator.
Further, destination item is multiple destination item, is being held the project indicator of destination item by evaluation function After row calculates, the method also includes: the destination item that the project indicator in multiple destination items exceedes predetermined threshold value performs row Sequence.
To achieve these goals, according to an aspect of the invention, it is provided a kind of for the project indicator calculate number According to processing means.This device includes: the first acquiring unit, is used for obtaining target keyword;First determines unit, for according to mesh Mark key word determines destination item in multiple projects to be selected;Second determines unit, is used for and determines according to target keyword pre- If the undetermined parameter of evaluation model is to determine evaluation function;And computing unit, it is used for by evaluation function destination item The project indicator performs calculating.
Further, this device also includes: second acquisition unit, for obtaining multiple object to be selected and multiple key words Mapping relations storehouse;Wherein, the first acquiring unit includes: the first acquisition module, for obtaining target critical in multiple key words Word, first determines that unit includes: enquiry module, for inquiring about the to be selected project corresponding with target keyword in mapping relations storehouse As destination item.
Further, second determines that unit includes: the second acquisition module, is used for obtaining default evaluation model, wherein, presets Evaluation model includes that multiple level, multiple levels are weight equation;And first determine module, for according to target keyword Determine that in multiple level, the weight parameter of each level is to obtain evaluation function.
Further, destination item is electrical network project, and computing unit includes: computing module, for by evaluation function pair The electrical network project implementation calculates, and obtains result of calculation;Second determines module, for determining the power supply area of electrical network project;Calculate mould Block is additionally operable to calculate the power supply parameter of power supply area, and is adjusted result of calculation according to power supply parameter, obtains the project indicator.
Further, destination item is multiple destination item, and this device also includes: sequencing unit, for multiple targets In project, the project indicator exceedes the destination item of predetermined threshold value and performs sequence.
The present invention is by obtaining target keyword;In multiple projects to be selected, destination item is determined according to target keyword; Determine that the undetermined parameter of default evaluation model is to determine evaluation function according to target keyword;And by evaluation function to target The project indicator of project performs calculating, solves and is difficult to the index to project in correlation technique and carries out the problem of quantum chemical method, enters And reached effectively project to be carried out the effect of quantum chemical method.
Accompanying drawing explanation
The accompanying drawing of the part constituting the application is used for providing a further understanding of the present invention, and the present invention's is schematic real Execute example and illustrate for explaining the present invention, being not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the data processing method calculated for the project indicator according to embodiments of the present invention;And
Fig. 2 is the schematic diagram of the data processing equipment calculated for the project indicator according to embodiments of the present invention.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can phases Combination mutually.Describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
In order to make those skilled in the art be more fully understood that the application scheme, below in conjunction with in the embodiment of the present application Accompanying drawing, is clearly and completely described the technical scheme in the embodiment of the present application, it is clear that described embodiment is only The embodiment of the application part rather than whole embodiments.Based on the embodiment in the application, ordinary skill people The every other embodiment that member is obtained under not making creative work premise, all should belong to the model of the application protection Enclose.
It should be noted that term " first " in the description and claims of this application and above-mentioned accompanying drawing, " Two " it is etc. for distinguishing similar object, without being used for describing specific order or precedence.Should be appreciated that so use Data can exchange in the appropriate case, in order to embodiments herein described herein.Additionally, term " includes " and " tool Have " and their any deformation, it is intended that cover non-exclusive comprising, such as, contain series of steps or unit Process, method, system, product or equipment are not necessarily limited to those steps or the unit clearly listed, but can include the most clear That list to Chu or for intrinsic other step of these processes, method, product or equipment or unit.
The embodiment provides a kind of data processing method calculated for the project indicator.
Fig. 1 is the flow chart of the data processing method calculated for the project indicator according to embodiments of the present invention.Such as Fig. 1 institute Showing, the method comprises the following steps:
Step S101, obtains target keyword.
Step S102, determines destination item according to target keyword in multiple projects to be selected.
According to target keyword, step S103, determines that the undetermined parameter of default evaluation model is to determine evaluation function.
Step S104, performs calculating by evaluation function to the project indicator of destination item.
Target keyword is the key word of the target being evaluated project.Target keyword can be word, it is also possible to It is the forms such as code.
Destination item is multiple constraint term purpose subsets, is included among multiple project to be selected, can be according to target critical Word determines destination item in multiple projects to be selected.
For example, it is possible to calculate project the highest with target keyword matching degree in multiple project to be selected by genetic algorithm As destination item.
Or, each project to be selected in multiple projects to be selected both corresponds to one or more key word, searches multiple treating In key word corresponding in option, the project to be selected containing target keyword is as destination item.
Destination item can be one or more.
Obtaining after target keyword, it is also possible to according to target keyword determine the undetermined parameter of default evaluation model with Determine evaluation function.
Default evaluation model can be existing evaluation model, presets in evaluation model containing undetermined parameter.According to target Key word may determine that the undetermined parameter of default evaluation model.
Such as, default evaluation model is weight equation, it is contemplated that the fault rate of electrical network and line loss per unit, target keyword is Reduce line loss per unit, determine that in default evaluation model, the weight coefficient of fault rate is 0.1 according to ratio set in advance, line loss per unit Weight coefficient be 0.9.
After the undetermined parameter determining default evaluation model, evaluation function determines the most therewith.
Evaluation function according to determining performs calculating to destination item, obtains the project indicator of destination item.Project refers to Mark namely the degree being consistent with the target evaluated.
The data processing method calculated for the project indicator that this embodiment provides, by obtaining target keyword;According to Target keyword determines destination item in multiple projects to be selected;The ginseng undetermined of default evaluation model is determined according to target keyword Number is to determine evaluation function;And by evaluation function, the project indicator of destination item is performed calculating, solve correlation technique In be difficult to the index to project and carry out the problem of quantum chemical method, and then reached effectively project to be carried out the effect of quantum chemical method.
Determine that the undetermined parameter of default evaluation model is to determine that evaluation function can use following step according to target keyword Rapid: obtaining and preset evaluation model, wherein, default evaluation model includes that multiple level, multiple levels are weight equation;And root Determine that in multiple level, the weight parameter of each level is to obtain evaluation function according to target keyword.
Preferably, before obtaining target keyword, the method can also include: obtains multiple object to be selected and multiple passes The mapping relations storehouse of keyword;Wherein, obtain target keyword and include: in multiple key words, obtain target keyword, according to mesh Mark key word determines that destination item includes in multiple projects to be selected: inquire about corresponding with target keyword in mapping relations storehouse Project to be selected is as destination item.
Destination item can be electrical network project, as a preferred embodiment of above-described embodiment, by evaluation function pair The project indicator of destination item performs calculating and may is that by evaluation function electrical network project implementation calculating, obtains result of calculation; Determine the power supply area of electrical network project;Calculate the power supply parameter of power supply area;And according to power supply parameter, result of calculation is carried out Adjust, obtain the project indicator.That is, power supply parameter may produce impact to the project indicator, default adjustment formula can be used According to power supply parameter, result of calculation is adjusted, obtains the project indicator.
Destination item can be multiple destination item, alternatively, by the evaluation function project indicator to destination item After performing to calculate, it is also possible to the destination item that the project indicator in multiple destination items exceedes predetermined threshold value performs sequence.
As a example by the index to electrical network project calculates, a kind of optional application scenarios of above-described embodiment is described such as Under:
A series of power system reform file has in succession been put into effect, to the examination & approval of the investment project of Utilities Electric Co. more due to country Add strict, and 2015~the year two thousand twenty national regulation be not less than 2 trillion yuan in power distribution network investment, therefore, electrical network project is not only wanted Guarantee company, electrical network, the objective demand of each side of society coordinated development, also to pursue higher input-output efficiency.
Electrical network project is set up the quantitative model of scientific and reasonable electrical network project investment, obtains evaluating the model of electrical network project Framework.The evaluation model framework of electrical network project is divided into three levels, and each level is weight equation, including multinomial weight it With, weight parameter is parameter to be determined.First level includes that multiple evaluation of orientations, the second level include multiple evaluative dimension, Third layer level is bottom level, including multiple evaluation indexes.Any one in each level can include multinomial sub-level.
Such as, the first level can include that quantity of operation, returns of investment, the people's livelihood ensure three evaluation of orientations.
Three general orientation are respectively containing some subitems, wherein, quantity of operation primary evaluation project to improve electrical network power supplying efficiency and The contribution of benefit, comprises grid structure, equipment and intelligent three evaluative dimensions.The multiple evaluations included below of each dimension Index.
Returns of investment primary evaluation project, to promoting development of company, promotes the contribution of company management benefit, can include throwing Money ability and benefit promote two evaluative dimensions.
The people's livelihood ensures that primary evaluation project, to meeting social development demand, ensures the contribution of the social benefits such as people's livelihood construction, Access and two dimensions of social benefit including distributed energy.
The dimension that power network development is contributed by the second level reflection project construction, including grid structure, equipment, intelligence Change, the investment capacity, benefit lifting, distributed power source access and seven evaluative dimensions of social benefit.
Seven evaluative dimensions comprise some subitems respectively, as grid structure dimension contains cable system structure, built on stilts web frame, turns For the nineteen evaluation index, i.e. third layer level altogether such as ability, radius of electricity supply.Evaluation index is the bottom level of project scoring, can With according to development of company target and power grid construction principle, the differentiation of point power supply area determines the occurrence of each evaluation index.
After setting up the model framework evaluating electrical network project, determine this evaluation objective evaluated.Evaluation objective is permissible It is the file of the electrical network project demands that country issues, determines evaluation key word according to evaluation objective.Evaluate key word can be Determining according to evaluation objective in multiple key words, specifically, multiple key words can be any one in multiple level The all items that level comprises, determines evaluation key word in predetermined multiple key words.
Such as, multiple key words are the multiple evaluative dimensions comprised in the second level, determine according to evaluation objective, comment Valency key word is equipment, intellectuality, benefit lifting and four evaluative dimensions of social benefit.Determine evaluation key word it After, the weight coefficient of these four evaluative dimensions can be determined according to evaluation objective, obtain evaluation weight formula.
After determining evaluation key word, it is also possible to determine objective appraisal according to evaluating key word in multiple evaluation objects Object.Multiple evaluation objects are multiple electrical network projects, determine objective appraisal object namely at multiple electricity in multiple evaluation objects Net project determines electrical network project to be evaluated.
After determining electrical network project to be evaluated and evaluation weight formula, according to evaluation weight formula to be evaluated The electrical network project implementation calculates, and obtains last evaluation result.
It should be noted that can be at such as one group of computer executable instructions in the step shown in the flow chart of accompanying drawing Computer system performs, and, although show logical order in flow charts, but in some cases, can be with not It is same as the step shown or described by order execution herein.
Embodiments of the invention additionally provide a kind of data processing equipment calculated for the project indicator.Need explanation It is that the data processing equipment for project indicator calculating of the embodiment of the present invention may be used for performing referring to for project of the present invention The data processing method that mark calculates.
Fig. 2 is the schematic diagram of the data processing equipment calculated for the project indicator according to embodiments of the present invention.Such as Fig. 2 institute Showing, this device includes the first acquiring unit 10, and first determines unit 20, and second determines unit 30 and computing unit 40.
First acquiring unit 10 is used for obtaining target keyword;First determine unit 20 for according to target keyword many Individual project to be selected determines destination item;Second determine unit 30 for and determine default evaluation model according to target keyword Undetermined parameter is to determine evaluation function;Computing unit 40 is based on performing the project indicator of destination item by evaluation function Calculate.
The data processing equipment calculated for the project indicator that this embodiment provides, by obtaining target keyword;According to Target keyword determines destination item in multiple projects to be selected;The ginseng undetermined of default evaluation model is determined according to target keyword Number is to determine evaluation function;And by evaluation function, the project indicator of destination item is performed calculating, solve correlation technique In be difficult to the index to project and carry out the problem of quantum chemical method, and then reached effectively project to be carried out the effect of quantum chemical method.
Preferably, this device can also include: second acquisition unit, is used for obtaining multiple object to be selected and multiple key words Mapping relations storehouse;Wherein, the first acquiring unit includes: the first acquisition module, closes for obtaining target in multiple key words Keyword, first determines that unit includes: enquiry module, for inquiring about the constraint term corresponding with target keyword in mapping relations storehouse Mesh is as destination item.
Second determines that unit may include that the second acquisition module, is used for obtaining default evaluation model, wherein, presets and evaluate Model includes that multiple level, multiple levels are weight equation;And first determine module, for determining according to target keyword In multiple levels, the weight parameter of each level is to obtain evaluation function.
Destination item is electrical network project, and computing unit may include that computing module, is used for by evaluation function electrical network item Mesh performs calculating, obtains result of calculation;Second determines module, for determining the power supply area of electrical network project;Computing module is also used In the power supply parameter of calculating power supply area, and according to power supply parameter, result of calculation is adjusted, obtains the project indicator.
Destination item is multiple destination item, it is preferable that this device can also include: sequencing unit, for multiple mesh In mark project, the project indicator exceedes the destination item of predetermined threshold value and performs sequence.
Obviously, those skilled in the art should be understood that each module of the above-mentioned present invention or each step can be with general Calculating device realize, they can concentrate on single calculating device, or be distributed in multiple calculating device and formed Network on, alternatively, they can with calculate the executable program code of device realize, it is thus possible to by they store Performed by calculating device in the storage device, or they are fabricated to respectively each integrated circuit modules, or by them In multiple modules or step be fabricated to single integrated circuit module and realize.So, the present invention be not restricted to any specifically Hardware and software combines.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, that is made any repaiies Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (10)

1. the data processing method calculated for the project indicator, it is characterised in that including:
Obtain target keyword;
In multiple projects to be selected, destination item is determined according to described target keyword;
Determine that the undetermined parameter of default evaluation model is to determine evaluation function according to described target keyword;And
By described evaluation function, the project indicator of described destination item is performed calculating.
Method the most according to claim 1, it is characterised in that before obtaining target keyword, described method also includes:
Obtain the mapping relations storehouse of the plurality of object to be selected and multiple key words;
Wherein, obtain target keyword and include: in the plurality of key word, obtain described target keyword,
In multiple projects to be selected, determine that destination item includes according to described target keyword: inquire about in described mapping relations storehouse The to be selected project corresponding with described target keyword is as destination item.
Method the most according to claim 1, it is characterised in that determine default evaluation model according to described target keyword Undetermined parameter is to determine that evaluation function includes:
Obtaining described default evaluation model, wherein, described default evaluation model includes that multiple level, the plurality of level are power Weight formula;And
Determine that in the plurality of level, the weight parameter of each level is to obtain described evaluation function according to described target keyword.
Method the most according to claim 1, it is characterised in that described destination item is electrical network project, by described evaluation Function performs calculating to the project indicator of described destination item and includes:
By described evaluation function, the described electrical network project implementation is calculated, obtain result of calculation;
Determine the power supply area of described electrical network project;
Calculate the power supply parameter of described power supply area;And
According to described power supply parameter, described result of calculation is adjusted, obtains the described project indicator.
Method the most according to claim 1, it is characterised in that described destination item is multiple destination item, passing through Stating after the project indicator of described destination item performs to calculate by evaluation function, described method also includes:
The destination item that the project indicator in the plurality of destination item exceedes predetermined threshold value performs sequence.
6. the data processing equipment calculated for the project indicator, it is characterised in that including:
First acquiring unit, is used for obtaining target keyword;
First determines unit, for determining destination item according to described target keyword in multiple projects to be selected;
Second determines unit, is used for and determines that the undetermined parameter of default evaluation model is to determine evaluation according to described target keyword Function;And
Computing unit, for performing calculating by described evaluation function to the project indicator of described destination item.
Device the most according to claim 6, it is characterised in that described device also includes:
Second acquisition unit, for obtaining the mapping relations storehouse of the plurality of object to be selected and multiple key words;
Wherein, described first acquiring unit includes: the first acquisition module, for obtaining described target in the plurality of key word Key word,
Described first determines that unit includes: enquiry module, for inquiry in described mapping relations storehouse and described target keyword Corresponding project to be selected is as destination item.
Device the most according to claim 6, it is characterised in that described second determines that unit includes:
Second acquisition module, is used for obtaining described default evaluation model, and wherein, described default evaluation model includes multiple level, The plurality of level is weight equation;And
First determines module, for according to described target keyword determine in the plurality of level the weight parameter of each level with Obtain described evaluation function.
Device the most according to claim 6, it is characterised in that described destination item is electrical network project, described computing unit Including:
Computing module, for being calculated the described electrical network project implementation by described evaluation function, obtains result of calculation;
Second determines module, for determining the power supply area of described electrical network project;
Described computing module is additionally operable to calculate the power supply parameter of described power supply area, and according to described power supply parameter to described calculating Result is adjusted, and obtains the described project indicator.
Device the most according to claim 6, it is characterised in that described destination item is multiple destination item, described device Also include:
Sequencing unit, performs sequence for the project indicator in the plurality of destination item exceedes the destination item of predetermined threshold value.
CN201610562576.6A 2016-07-15 2016-07-15 The data processing method calculated for the project indicator and device Pending CN106251035A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610562576.6A CN106251035A (en) 2016-07-15 2016-07-15 The data processing method calculated for the project indicator and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610562576.6A CN106251035A (en) 2016-07-15 2016-07-15 The data processing method calculated for the project indicator and device

Publications (1)

Publication Number Publication Date
CN106251035A true CN106251035A (en) 2016-12-21

Family

ID=57614039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610562576.6A Pending CN106251035A (en) 2016-07-15 2016-07-15 The data processing method calculated for the project indicator and device

Country Status (1)

Country Link
CN (1) CN106251035A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110717209A (en) * 2018-06-27 2020-01-21 西安海平方网络科技有限公司 Design scheme quantization result obtaining method, device, equipment and storage medium
CN112988914A (en) * 2021-05-18 2021-06-18 常州纺织服装职业技术学院 Block chain-based textile detection method and device and network side server
CN117196394A (en) * 2023-09-14 2023-12-08 上海鱼尔网络科技有限公司 Evaluation index processing method, device, computer equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102298576A (en) * 2010-06-25 2011-12-28 株式会社理光 Method and device for generating document keywords
CN103714413A (en) * 2013-11-21 2014-04-09 清华大学 Position information-based competence model construction system and method
CN104008143A (en) * 2014-05-09 2014-08-27 启秀科技(北京)有限公司 Vocational ability index system establishment method based on data mining
CN105469204A (en) * 2015-11-20 2016-04-06 天津贝德曼科技有限公司 Reassembling manufacturing enterprise integrated evaluation system based on deeply integrated big data analysis technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102298576A (en) * 2010-06-25 2011-12-28 株式会社理光 Method and device for generating document keywords
CN103714413A (en) * 2013-11-21 2014-04-09 清华大学 Position information-based competence model construction system and method
CN104008143A (en) * 2014-05-09 2014-08-27 启秀科技(北京)有限公司 Vocational ability index system establishment method based on data mining
CN105469204A (en) * 2015-11-20 2016-04-06 天津贝德曼科技有限公司 Reassembling manufacturing enterprise integrated evaluation system based on deeply integrated big data analysis technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王庆等: ""基于词共现矩阵的项目关键词词库和关键词语义网络"", 《计算机应用》 *
甘德一等: ""电网建设项目投资优化方法研究"", 《改革与战略》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110717209A (en) * 2018-06-27 2020-01-21 西安海平方网络科技有限公司 Design scheme quantization result obtaining method, device, equipment and storage medium
CN112988914A (en) * 2021-05-18 2021-06-18 常州纺织服装职业技术学院 Block chain-based textile detection method and device and network side server
CN117196394A (en) * 2023-09-14 2023-12-08 上海鱼尔网络科技有限公司 Evaluation index processing method, device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
Chen et al. Applications of multi-objective dimension-based firefly algorithm to optimize the power losses, emission, and cost in power systems
Yi et al. A multi-time-scale economic scheduling strategy for virtual power plant based on deferrable loads aggregation and disaggregation
Maghouli et al. A scenario-based multi-objective model for multi-stage transmission expansion planning
Ghadimi et al. PSO based fuzzy stochastic long-term model for deployment of distributed energy resources in distribution systems with several objectives
CN107579518B (en) Power system environment economic load dispatching method and apparatus based on MHBA
CN109145957A (en) The identification and processing method and processing device of power distribution network abnormal index based on big data
Lu et al. Bi-population based discrete bat algorithm for the low-carbon job shop scheduling problem
CN105226651B (en) A kind of system of Transmission Expansion Planning in Electric containing large-scale wind power for considering risk
CN107368961A (en) A kind of regional power grid carbon emission management method under the access background suitable for new energy
Florez et al. Multi-objective transmission expansion planning considering multiple generation scenarios
Valipour et al. Using a new modified harmony search algorithm to solve multi-objective reactive power dispatch in deterministic and stochastic models
CN105512783A (en) Comprehensive evaluation method used for loop-opening scheme of electromagnetic looped network
CN105488589A (en) Genetic simulated annealing algorithm based power grid line loss management evaluation method
Huang et al. An efficient probabilistic approach based on area grey incidence decision making for optimal distributed generation planning
CN106251035A (en) The data processing method calculated for the project indicator and device
CN108039731A (en) A kind of three stage of multiple target dispatching method based on solution space analysis and containing wind-powered electricity generation
CN113887809A (en) Power distribution network supply and demand balance method, system, medium and computing equipment under double-carbon target
Herbadji et al. Biogeography based optimization approach for solving optimal power flow problem
Sheng et al. Improved multiobjective harmony search algorithm with application to placement and sizing of distributed generation
CN106384307A (en) Differentiated evaluation method for county-area power distribution network plan
CN115994612A (en) Power distribution network operation optimization method and device based on business expansion planning and storage medium
CN106897771B (en) New energy sample board machine selection method and system based on chaotic genetic algorithm
CN108181503A (en) Electric power metering device O&M plan acquisition methods, device, storage medium and equipment
Senyigit et al. Transmission expansion planning under different uncertainties
Gao et al. Difference-genetic co-evolutionary algorithm for nonlinear mixed integer programming problems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221