CN106249044B - A kind of transformer replacement saving unilateral measurement method of quantity of electricity based on root mean square - Google Patents

A kind of transformer replacement saving unilateral measurement method of quantity of electricity based on root mean square Download PDF

Info

Publication number
CN106249044B
CN106249044B CN201610786877.7A CN201610786877A CN106249044B CN 106249044 B CN106249044 B CN 106249044B CN 201610786877 A CN201610786877 A CN 201610786877A CN 106249044 B CN106249044 B CN 106249044B
Authority
CN
China
Prior art keywords
transformer
electricity
voltage
replacement
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610786877.7A
Other languages
Chinese (zh)
Other versions
CN106249044A (en
Inventor
曾江
蔡东阳
胡锡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201610786877.7A priority Critical patent/CN106249044B/en
Publication of CN106249044A publication Critical patent/CN106249044A/en
Application granted granted Critical
Publication of CN106249044B publication Critical patent/CN106249044B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of, and the unilateral measurement method of quantity of electricity is saved in the transformer replacement based on root mean square, comprising the following steps: 1, determining energy conservation replacement item boundaries, project base period, statistical report phase and representative calculating time;2, the dedicated meter of voltage transformer, current transformer and settable parameter and calculated savings quantity of electricity is installed in transformer side;3, before the transformer replacement project implementation, the parameters such as transformer current voltage, no-load loss, load loss, rated capacity, maximum load power in representative calculating time in base period are measured;4, transformer current voltage, no-load loss, load loss, rated capacity, maximum load power parameter in representative calculating time statistical report phase are measured;5, persistently calculating rms voltage influences coefficient, rms current influence coefficient;6, calculated savings quantity of electricity.The present invention has many advantages, such as to simplify measurement procedure, saved measurement cost and measurement result is accurate.

Description

A kind of transformer replacement saving unilateral measurement method of quantity of electricity based on root mean square
Technical field
The present invention relates to transformer quantity measuring methods, and in particular to a kind of transformer replacement saving electricity based on root mean square The unilateral measurement method of power electricity, the measurement method belong to transformer field of measuring techniques.
Background technique
In the power system, distribution transformer is as the capital equipment for undertaking voltage, electric current and power conversion, quantity ten It is point huge, and in rising year by year trend.Although the loss of every transformer is smaller, due to its huge radix and long-time It is in operating status, so total losses caused by distribution transformer is annual are very surprising.Meanwhile some areas still use model Older transformer, loss are apparently higher than novel transformer, therefore, whole to improve power grid by replacement new distribution transformer Physical efficiency effect is horizontal, reduces energy loss becomes inevitable choice.And in order to orderly, reasonable progress transformer replacement, analysis The economic benefit of replacement project, while the planning and designing for instructing power transformer to replace, need to replace transformer the section of front and back About electricity is measured, is calculated.
The measurement that quantity of electricity is saved in transformer replacement there is no unified reference standard at present.Application publication number is The Chinese invention patent application of CN103018584A discloses a kind of measurement that electric power and electricity are saved for electric power boosting and transformation With verification method, the patent of invention is by installing metering device, the operation ginseng of measuring transformer transformation front and back in transformer two sides Number, calculated savings quantity of electricity.Application publication number is that the Chinese invention patent application of CN104698269A discloses a kind of transformation Quantity of electricity measuring and calculating device and measuring method are saved in device transformation front and back, and the patent of invention is by installing measurement dress in transformer unilateral side It sets, forward backward averaging electric current, voltage is replaced come calculated savings quantity of electricity by calculating transformer.
Due to generally using single-ended measurement method in power grid, the method measured using both ends is needed to install in the other side and be surveyed Device is measured, high to measurement accuracy requirement since the measurement error of both ends measuring device can be superimposed, the practicability is poor.It uses The method of single-ended measurement is conducive to simplify measurement procedure, saves measurement cost.But it while using single-ended measurement method, need to examine The accuracy for considering result calculates quantity of electricity using the parameter based on average value, in transformer from the angle analysis of Energy Equivalent It may cause large error when peak-valley difference is larger, be not suitable for the energy conservation for needing accurate amount of energy saving assessed value as clearing foundation Transformation project.
Summary of the invention
The purpose of the present invention is to overcome the shortcomings of the existing technology with it is insufficient, propose a kind of transformer based on root mean square more It changes and saves the unilateral measurement method of quantity of electricity, which only needs to install metering device in transformer side can be real It is existing.
The purpose of the present invention is achieved through the following technical solutions: a kind of transformer replacement saving electric power electricity based on root mean square Measure unilateral measurement method, comprising the following steps:
S1. energy conservation replacement item boundaries, project base period, statistical report phase and T representative calculating time are determined;
S2. voltage transformer, current transformer and settable parameter and calculated savings electricity only are installed in transformer side The dedicated meter of power electricity;
S3. before the transformer replacement project implementation, transformer current voltage, no-load loss in representative calculating time in base period are measured P0, load loss Pk, rated capacity SN, maximum load power SIMEtc. parameters;
S4. after the transformer replacement project implementation, transformer current voltage, sky in representative calculating time statistical report phase are measured Load-loss P '0, load loss P 'k, rated capacity S 'N, maximum load power S 'IMEtc. parameters;
S5. dedicated meter, which starts, continues computing module, and calculating rms voltage according to measurement the data obtained influences COEFFICIENT Ku And rms current influences COEFFICIENT Ki
Calculating rms voltage influences COEFFICIENT Ku:
Wherein, u is the transformer voltage of real-time measurement, and T is transformer representative calculating time, UNFor the specified electricity of transformer Pressure, t is the time;
Calculating rms current influences COEFFICIENT Ki:
Wherein, i is the transformer current of real-time measurement, INFor transformer rated current;
S6. dedicated meter influences COEFFICIENT K according to resulting transformer current i, voltage u, rms voltage is measureduIt is square Root electric current influences COEFFICIENT Ki, calculated savings electric power and save electricity, then have:
Electric power is saved in calculating transformer replacement:
Wherein, Δ (Δ P), which represents, saves electric power, P0、Pk、SIM、SNRespectively refer to transformer rated no-load loss function before replacing Rate, nominal load loss power, maximum load power, rated capacity;P′0、P′k、S′IM、S′NRespectively refer to transformer volume after replacing Determine no-load loss power, nominal load loss power, maximum load power, rated capacity;
Electricity is saved in calculating transformer replacement:
Wherein, Δ (Δ E), which represents, saves electricity, P0、PkIt is transformer rated no-load loss power before respectively referring to replace, specified Load loss power, Ku、KiRespectively referring to rms voltage influences coefficient, rms current influence coefficient, P '0、P′kIt respectively refers to more Rear transformer rated no-load loss power, nominal load loss power are changed, T refers to transformer representative calculating time.
Boundary condition described in step S1 only refers to transformer body, that is, transformer body loss is reduced and saved after replacing Quantity of electricity, including no-load loss and load loss ignore coupled power grid and reduction amount are lost accordingly.The base period Before referring to the transformer replacement project implementation, for determining the period of replacement project energy consumption benchmark.The statistical report phase refers to use In the period for determining transformer replacement project saving quantity of electricity.It is true to refer to reflection transformer the representative calculating time The period of positive activity situation and calculating transformer operating parameter.
The instruments such as voltage transformer and current transformer described in step S2 should meet JJG 313-2010 measurement electricity consumption Current transformer vertification regulation and JJG 314-2010 the measurement relevant regulations of voltage ct calibrating regulation.Reasonable control at Under the premise of this, measurement accuracy is improved as far as possible.Use condition should meet national standard " current transformer ", related in " voltage transformer " Regulation, daily maximum temperature are no more than 40 DEG C, and Daily minimum temperature is not less than -25 DEG C, and daily mean temperature is no more than 30 DEG C;Place to use Height above sea level is lower than 1000m;It should be without serious pollution in atmosphere.
Dedicated meter described in step S2 should have the computing capability of root-mean-square value.Simultaneously comprising receive voltage transformer, Current transformer measurement data function, the base period, statistical report phase, representative calculating time set-up function, save quantity of electricity Computing function, wherein and data storage function.
Step S3, in S4, before and after transformer replacement, dedicated ammeter is by receiving voltage transformer, current transformer survey Transformer voltage, current data, carry out the parameters such as no-load loss, load loss, rated capacity and maximum load power It calculates, and is stored.
Rms voltage described in step S5 influences COEFFICIENT KuRefer to rms voltage and voltage in T representative calculating time The ratio of rated value characterizes the degree of voltage deviation voltage rating in actual motion, can be according to formulaCalculate and ?;The rms current influences COEFFICIENT KiRefer to the ratio of RMS current and current rating in T representative calculating time, table The degree that electric current in actual motion deviates rated current is levied, it can be according to formulaIt calculates and obtains;Dedicated meter tool There is the function of seeking root mean square, above-mentioned parameter can be calculated according to the data that mutual inductor measuring obtains, and can be according to time of measuring Passage, persistently parameter is calculated.
The replacement of transformer described in step S6 saves quantity of electricity and refers to that transformer replacement front and back body dissipation is reduced and saved Quantity of electricity about only considers no-load loss PFeWith load loss PCu, other stray losses, such as lead, shell, fan etc. Caused loss ratio is relatively small, therefore does not consider.The electric power of saving refers to that the economize on electricity power after transformer replacement refers to Replacement front and back, when transformer load maximum, difference is lost in transformer efficiency.The saving electricity refers to than in situation, economizes on electricity After measure implementation compared with before implementation, the quantity of electric energy reduction is consumed.
The dedicated meter can calculate maximum load power S according to the current and voltage data that mutual inductor measuring obtainsIM, specified appearance Measure SN, rated no-load loss power P0, nominal load loss power PkIf not having on-the-spot test condition, P0、Pk、SNParameter Also it can be obtained on transformer nameplate.Electric power is saved in the transformer replacement can be according to formulaIt calculates and obtains.
It includes no-load loss electricity Δ E that electricity is saved in the transformer replacementFeAnd load loss electricity Δ ECuTwo Point, no-load loss electricity can be according to formulaIt calculates and obtains, load loss of electricity It can be according to formulaIt calculates and obtains, electricity is saved in transformer replacement can be according to public affairs FormulaIt calculates and obtains.
In view of transformer station high-voltage side bus voltage fluctuates near voltage rating substantially, therefore rms voltage shadow can be approximately considered Ring COEFFICIENT Ku=1, no-load loss electricity can be reduced to Δ EFe=P0T.In this case, transformer replacement saving electricity can table It is shown as
Transformer replacement based on root mean square of the invention saves the unilateral measurement method of quantity of electricity and specifically includes that determining item Mesh boundary, base period, statistical report phase, representative calculating time;Voltage transformer, current transformer are installed in transformer side, with And dedicated meter;Professional meter has the advanced computing function for seeking root-mean-square value, operating parameter, quantity of electricity;Pass through mutual inductance Device measurement, dedicated meter calculate no-load loss, load loss, rated capacity, maximum before and after obtaining transformer replacement and meet function The operating parameters such as rate, and stored;By the data being collected into, dedicated meter persistently calculate rms voltage influence coefficient, Rms current influences the operating parameters such as coefficient;According to every operating parameter, what dedicated meter calculating transformer replacement was saved Quantity of electricity.Method of the invention only need to install measuring device in transformer side, simplify measurement procedure, save measurement cost; Coefficient is influenced by voltage rms current and calculates quantity of electricity, and measurement result is accurate, is applicable to accurate amount of energy saving and comments Reducing energy consumption project of the valuation as clearing foundation.
The present invention has the following advantages and benefits compared with the existing technology:
(1) present invention proposes that the unilateral measurement method of quantity of electricity is saved in a kind of transformer replacement based on root mean square, it is only necessary to Measuring device is installed in the side of transformer, universal single-ended metering method, is conducive to save the cost suitable for power grid, simplifies Measurement procedure, with good economic efficiency and practical value.
(2) the unilateral measurement method of quantity of electricity is saved in a kind of transformer replacement based on root mean square proposed by the present invention, is led to Crossing rms voltage influences COEFFICIENT Ku, rms current influence COEFFICIENT KiCalculated savings quantity of electricity, from the angle of Energy Equivalent point Analysis, using the method based on root mean square relative to the method based on average value, theory deduction is rigorous, and measuring accuracy is higher, is applicable in In the occasion for needing accurate calculating transformer energy consumption.
Detailed description of the invention
Fig. 1 is the flow chart that the unilateral measurement method of quantity of electricity is saved in the transformer replacement based on root mean square.
Fig. 2 is that power transformer of the invention replaces item boundaries schematic diagram.
Fig. 3 is wiring schematic diagram of the invention.
Specific embodiment
The following describes the present invention in detail with reference to the accompanying drawings and embodiments:
Embodiment one
(1) embodiment overview;
Transformer replacement project is divided into the replacement of the capacity such as highly effective transformer and highly effective transformer increase-volume replacement in the present embodiment, To solve the problems, such as that the loss of transformer height and transformer capacity are insufficient.Become with S15, S13 type transformer replacement S7 type of equal capacity For depressor, the quantity of electricity saved after the replacement of the capacity such as calculating transformer, Central Plains S7 type transformer is transported with 0.5 load factor Row, transformer replacement afterload is constant, and transformer important technological parameters are shown in Table 1.
Table 1
(2) power system calculation is saved;
For step as shown in Figure 1, identifying project first boundary (as shown in Figure 2), base period, project statistics phase, exemplary operation are all Phase takes 720 hours.The equipment (as shown in Figure 3) such as mutual inductor, dedicated ammeter are installed.In view of working voltage is generally in specified electricity Near pressure, therefore rms voltage influences COEFFICIENT KuApproximation is taken as 1, utilizes transformer loss calculation formula are as follows:
In formula, rated no-load loss power P0With load loss PkIt can be obtained from transformer nameplate data or in-site measurement. According to the load condition of transformer, count rms current influence coefficient be 0.6.Due to the appearances replacement such as being, it is assumed that replacement front and back Apparent energy S under peak loadIM=189kW is calculated according to unilateral measurement economize on electricity power formula:
After calculating, the S7 type transformer for obtaining 315kVA capacity is changed to the S13 type transformer of equal capacity, the electric power of saving Are as follows:
Equally, the S7 type transformer of 315kVA capacity is changed to the S15 type transformer of equal capacity, the electric power of saving are as follows:
(3) electricity is saved to calculate;
According to amount of electricity saving calculation formula:
After calculating, the S7 type transformer for obtaining 315kVA capacity is changed to the S13 type transformer of equal capacity, the electricity of saving Are as follows:
Equally, the S7 type transformer of 315kVA capacity is changed to the S15 transformer of equal capacity, the electricity of saving are as follows:
(4) quantity of electricity is saved to summarize;
The present embodiment saving quantity of electricity summarizes as shown in table 2, and table 2 is that 315KVA S7 type transformer is changed to equal capacity The quantity of electricity table of S13 or S15 transformer saving.
Table 2
Embodiment two
(1) embodiment overview;
Transformer replacement project is the replacement of the capacity such as highly effective transformer in the present embodiment, to wait S13 type transformer of capacity S7 type transformer is replaced, to solve the problems, such as that transformer height is lost.Transformer important technological parameters are shown in Table 1.Respectively using based on flat The method based on root mean square saves electricity after calculating replacement in the method and the present invention of equal electric current.Transformer station high-voltage side bus voltage is in volume Near constant voltage, electric current per unit value is as shown in table 3 in one day, table 3 is transformer one day electric current per unit value table for 24 hours.
Time/h 0 1 2 3 4 5 6 7
Electric current/p.u. 0.35 0.2 0.15 0.14 0.15 0.18 0.25 0.5
Time/h 8 9 10 11 12 13 14 15
Electric current/p.u. 0.59 0.68 0.71 0.61 0.6 0.65 0.68 0.68
Time/h 16 17 18 19 20 21 22 23
Electric current/p.u. 0.63 0.53 0.52 0.5 0.49 0.49 0.45 0.4
Table 3
(2) electricity is saved to calculate;
Taking the statistical report phase is 720 hours, and according to the method based on average current, the value for obtaining average current is
According to the saving electricity calculation formula based on average current
Saving electricity is calculated are as follows:
Δ (Δ E)=(0.862-0.34) × 720+ (4.97-3.65) × 0.462× 720=576.94kWh,
Root mean square method is based on according to the present invention, obtaining rms current influences COEFFICIENT KiFor
Saving electricity is calculated are as follows:
Δ (Δ E)=(0.862-0.34) × 720+ (4.97-3.65) × 0.502× 720=613.71kWh,
Saving quantity of electricity method due to the transformer replacement in the present invention based on root mean square is on the basis of Energy Equivalent On, it is obtained according to the formula direct derivation of transformer noload losses electricity and load loss electricity, ignores the measurement of measuring device When error, it is believed that calculated result is exact value, and calculated result based on average current 36.77kWh on the low side.By above-mentioned point Analysis can be seen that the calculation method meeting based on average current, and there is a certain error, when transformer peak-valley difference further increases, Error can also increase therewith.
The above, only the invention patent preferred embodiment, but the scope of protection of the patent of the present invention is not limited to This, anyone skilled in the art is in the range disclosed in the invention patent, according to the present invention the skill of patent Art scheme and its inventive concept are subject to equivalent substitution or change, belong to the scope of protection of the patent of the present invention.

Claims (5)

1. the unilateral measurement method of quantity of electricity is saved in a kind of transformer replacement based on root mean square, which is characterized in that including following Step:
1) energy conservation replacement item boundaries, project base period, statistical report phase and representative calculating time are determined;
2) voltage transformer, current transformer and settable parameter and calculated savings quantity of electricity only are installed in transformer side Dedicated meter;
3) before the transformer replacement project implementation, transformer current voltage, no-load loss, load in representative calculating time in base period are measured Loss, rated capacity, maximum load power parameter;
4) after the transformer replacement project implementation, transformer current voltage in representative calculating time statistical report phase, unloaded damage are measured Consumption, load loss, rated capacity, maximum load power parameter;
5) dedicated meter, which starts, continues computing module, and calculating rms voltage according to measurement the data obtained influences COEFFICIENT KuAnd Square current influences COEFFICIENT Ki
Calculating rms voltage influences COEFFICIENT Ku:
Wherein, u is the transformer voltage of real-time measurement, and T is transformer representative calculating time, UNFor transformer voltage rating, t is Time;
Calculating rms current influences COEFFICIENT Ki:
Wherein, i is the transformer current of real-time measurement, INFor transformer rated current;
6) dedicated meter influences COEFFICIENT K according to resulting transformer current i, voltage u, rms voltage is measureduAnd rms current Influence COEFFICIENT Ki, calculated savings electric power and save electricity, then have:
Electric power is saved in calculating transformer replacement:
Wherein, Δ (Δ P), which represents, saves electric power, P0、Pk、SIM、SNRespectively refer to transformer rated no-load loss power, volume before replacing Fixed load loss power, maximum load power, rated capacity;P′0、P′k、S′IM、S′NRespectively refer to transformer rated no-load after replacing Loss power, nominal load loss power, maximum load power, rated capacity;
Electricity is saved in calculating transformer replacement:
Wherein, Δ (Δ E), which represents, saves electricity, P0、PkRespectively refer to transformer rated no-load loss power, nominal load before replacing Loss power, Ku、KiRespectively referring to rms voltage influences coefficient, rms current influence coefficient, P '0、P′kAfter respectively referring to replacement Transformer rated no-load loss power, nominal load loss power, T refer to transformer representative calculating time.
2. the unilateral measurement method of quantity of electricity is saved in the transformer replacement according to claim 1 based on root mean square, special Sign is that in step 2, Measured Boundary only includes the no-load loss and load loss of transformer.
3. the unilateral measurement method of quantity of electricity is saved in the transformer replacement according to claim 2 based on root mean square, special Sign is that the dedicated meter is for seeking root mean square, for receiving voltage transformer, current transformer measurement data, being used for Base period, statistical report phase, the setting of representative calculating time, the calculating for saving quantity of electricity and for every calculated result Storage.
4. the unilateral measurement method of quantity of electricity is saved in the transformer replacement according to claim 3 based on root mean square, special Sign is, while doing lasting calculating according to the passage of time of measuring.
5. the unilateral measurement method of quantity of electricity is saved in the transformer replacement according to claim 4 based on root mean square, special Sign is, it is contemplated that transformer station high-voltage side bus voltage fluctuates near voltage rating substantially, it is believed that rms voltage influences COEFFICIENT Ku= 1, according to formula:
In formula, Δ (Δ E), which represents, saves electricity, P0、PkRespectively refer to transformer rated no-load loss power, nominal load before replacing Loss power, KiRefer to that rms current influences coefficient, P '0、P′kRespectively refer to transformer rated no-load loss power, specified after replacement Load loss power, T refer to transformer representative calculating time, calculate saving electricity.
CN201610786877.7A 2016-08-31 2016-08-31 A kind of transformer replacement saving unilateral measurement method of quantity of electricity based on root mean square Active CN106249044B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610786877.7A CN106249044B (en) 2016-08-31 2016-08-31 A kind of transformer replacement saving unilateral measurement method of quantity of electricity based on root mean square

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610786877.7A CN106249044B (en) 2016-08-31 2016-08-31 A kind of transformer replacement saving unilateral measurement method of quantity of electricity based on root mean square

Publications (2)

Publication Number Publication Date
CN106249044A CN106249044A (en) 2016-12-21
CN106249044B true CN106249044B (en) 2019-01-18

Family

ID=58080305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610786877.7A Active CN106249044B (en) 2016-08-31 2016-08-31 A kind of transformer replacement saving unilateral measurement method of quantity of electricity based on root mean square

Country Status (1)

Country Link
CN (1) CN106249044B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107589330B (en) * 2017-10-12 2024-01-30 海南电网有限责任公司电力科学研究院 Live detection system and method for loss of power transformer
CN108718088B (en) * 2018-07-06 2024-04-30 广东电网有限责任公司广州供电局 On-load voltage and capacity regulating distribution transformer replacement judgment method and decision system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102621422A (en) * 2012-03-29 2012-08-01 中国电力科学研究院 Measuring and verifying method for energy saving amounts of power supply and distribution lines
CN103018584A (en) * 2012-11-05 2013-04-03 中国电力科学研究院 Measuring and verifying method for electric power and electric quantity conservation of electric power boost reconstruction
CN104375035A (en) * 2014-11-11 2015-02-25 国家电网公司 Method for testing energy efficiency of energy-saving device
CN104698269A (en) * 2015-03-12 2015-06-10 国家电网公司 Device and method for measuring electricity of saved electric power before and after modification of transformer
US20150280418A1 (en) * 2013-06-11 2015-10-01 Electrical Materials Company Low fault current isolator system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102621422A (en) * 2012-03-29 2012-08-01 中国电力科学研究院 Measuring and verifying method for energy saving amounts of power supply and distribution lines
CN103018584A (en) * 2012-11-05 2013-04-03 中国电力科学研究院 Measuring and verifying method for electric power and electric quantity conservation of electric power boost reconstruction
US20150280418A1 (en) * 2013-06-11 2015-10-01 Electrical Materials Company Low fault current isolator system
CN104375035A (en) * 2014-11-11 2015-02-25 国家电网公司 Method for testing energy efficiency of energy-saving device
CN104698269A (en) * 2015-03-12 2015-06-10 国家电网公司 Device and method for measuring electricity of saved electric power before and after modification of transformer

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
变压器损耗计算方法的研究;周先哲等;《电力需求侧管理》;20131130;第15卷(第6期);28-31
地区电网采用高效变压器的节电潜力分析;石怡理等;《电力需求侧管理》;20140930;第16卷(第5期);11-14

Also Published As

Publication number Publication date
CN106249044A (en) 2016-12-21

Similar Documents

Publication Publication Date Title
CN110648249B (en) Annual power balance measuring and calculating method, device and equipment
WO2015090090A1 (en) Method for determining integrated network loss rate in ultra-high voltage alternating current cross-regional energy trade
CN107688958B (en) User energy anomaly analysis method based on multi-table centralized reading data
CN104239692A (en) Energy meter data accuracy compensation algorithm-based line loss abnormality judging method
CN106249044B (en) A kind of transformer replacement saving unilateral measurement method of quantity of electricity based on root mean square
CN113267699B (en) Power supply line electricity stealing judgment method and application thereof
CN113484819B (en) Method for diagnosing metering faults of electric energy meter in limited range based on high-frequency current sampling
CN110011423A (en) Realize that family becomes the system and method for the online dynamic and intelligent monitoring function of relationship based on big data
CN107844896B (en) Wind power confidence capacity evaluation method suitable for high wind power permeability power system
CN107944680A (en) A kind of substation's electric energy balance monitoring method based on intelligent electric energy meter
CN106339830A (en) Line loss factor control method based on power grid information data platform
CN107977898A (en) A kind of generated energy Insurance Pricing appraisal procedure of photovoltaic plant
CN103557117B (en) Power curves of wind-driven generator sets acquisition device
CN108490285A (en) A kind of low-voltage platform area line loss per unit computational methods based on fall of potential method
CN104517242A (en) Big customer charge calculating terminal
CN103501003A (en) Line loss control system
CN201594113U (en) Single-phase electric energy meter with power line carrier communication and remote power on/off control
CN103324859B (en) Module-combination-based device and method for estimating substation electric secondary cable use amount
CN105488342A (en) Method for accounting carbon emission reduction of power distribution network boosting operation project
CN111080135A (en) Dynamic incremental energy consumption data processing method and device and readable storage medium
CN104698269B (en) A kind of transformer transformation is front and rear to save quantity of electricity measuring and calculating device and measuring method
CN115115470A (en) Green data center carbon emission management method based on emission factor method
CN201654125U (en) Low voltage line loss meter
CN111273109B (en) Energy conversion efficiency testing method and device and power utilization system
CN112966886A (en) Method for constructing greenhouse gas emission reduction model of west-east power transmission extra-high voltage transmission system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant