CN106245743A - Building sewer bifurcated pipe prosthetic device and construction method thereof - Google Patents

Building sewer bifurcated pipe prosthetic device and construction method thereof Download PDF

Info

Publication number
CN106245743A
CN106245743A CN201610618778.8A CN201610618778A CN106245743A CN 106245743 A CN106245743 A CN 106245743A CN 201610618778 A CN201610618778 A CN 201610618778A CN 106245743 A CN106245743 A CN 106245743A
Authority
CN
China
Prior art keywords
pipe
flexible pipe
thermosetting resin
connecting tube
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610618778.8A
Other languages
Chinese (zh)
Inventor
顾达容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610618778.8A priority Critical patent/CN106245743A/en
Publication of CN106245743A publication Critical patent/CN106245743A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/162Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • E03F2003/065Refurbishing of sewer pipes, e.g. by coating, lining

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Pipe Accessories (AREA)
  • Sewage (AREA)

Abstract

Building sewer bifurcated pipe prosthetic device, it is characterized in that: including that tube rolling device, air compressor one, connecting tube and base plate, described tube rolling device upper plate have thermosetting resin flexible pipe, fixed support is arranged on described substrate, described connecting tube passes fixed support, and its one end is movably installed with elbow;Being also equipped with motor on described base plate, the turbine and worm elevating lever lifted by driven by motor is arranged on base plate, and described turbine and worm elevating lever top is provided with rubber blanket;Being communicated with flexible pipe gas tube edge on described air compressor one and reach the elbow end of connecting tube, the elbow end of described connecting tube is provided with steam pipe, and described steam pipe is connected to above tube rolling device.Compared with prior art, the invention have the advantage that this device sleeve technology excavation is little, repair speed soon, efficiency is high;Meanwhile, not welding, do not affect road traffic and pass through, be suitable for promoting the use of.

Description

Building sewer bifurcated pipe prosthetic device and construction method thereof
Technical field
The invention belongs to municipal works technical field, be specifically related to a kind of building sewer bifurcated pipe prosthetic device and execute Work method.
Background technology
Urban drainage pipe network is the indispensable important infrastructure of modern city, is to have urban economy development entirely Office property, the basic industry of guiding impact, be water pollution control in urban areas and Urban Waterlogging, the backbone of flood control, is to weigh modernization The important symbol of city level.At present, in China most cities, the reparation of drainage pipeline is all to use pipe laying again after excavation Method, along with the progress of urbanization, City Buried Pipeline is intricate, and the load of urban road is increasingly severe so that ground Substantial amounts of technical problem is there is in underground pipelines during repairing.
Public announcement of a patent application CN104405998A discloses the restorative procedure that a kind of underground piping is lined, including step Rapid: 1) needing the pipe ends excavation operation carrying out repairing to cheat;2) at position, operation hole pipe disconnected to former pipeline;3) external diameter is chosen The newest pipeline, and on the outer wall of new pipeline, coat bonding agent;4) new pipeline is penetrated in former pipeline as liner;5) viscous Connect agent solidification, make new pipeline outer wall bond with former inner-walls of duct.This kind of method does not affect the logical of road traffic and river man-hour Boat, without environmental disruption, short construction period, effective cost saving;Additionally, due to before new pipeline is penetrated former pipeline It is coated with bonding agent on the outer wall of new pipeline, and after new pipeline penetrates former pipeline, needs to carry out the solidification of bonding agent, make new The inwall close adhesion of the outer wall of pipeline and former pipeline, this allows for new and old pipeline and is connected as a single entity, and the new pipeline of whole piece achieves all Even pressure-bearing, is effectively increased the bearing capacity of new pipeline while completing pipeline rehabilitation.
The most perfect along with urban construction, it is provided that a kind of trenchless pipelaying, repair pipe and change after Manifold technology do not affects with it Traffic, pipelaying rate is fast, efficiency is high, without environmental disruption, the pipe of a series of advantage such as normal work, life of not affecting people Road restorative procedure is increasingly favored by underground piping Industry regulatory bodies.
Summary of the invention
The shortcoming that the present invention is directed to prior art, it is proposed that a kind of building sewer bifurcated pipe prosthetic device and construction party thereof Method, this device and method simple in construction, easy to operate, it is suitable for promoting the use of.
For realizing the purpose of the present invention, the technical solution used in the present invention is:
Building sewer bifurcated pipe prosthetic device, it is characterised in that: include tube rolling device, air compressor one, connecting tube and base plate, Described tube rolling device upper plate has thermosetting resin flexible pipe, and fixed support is arranged on described substrate, and described connecting tube is through solid Fixed rack, its one end is movably installed with elbow;It is also equipped with motor, the turbine and worm lifted by driven by motor on described base plate Elevating lever is arranged on base plate, and described turbine and worm elevating lever top is provided with rubber blanket;Connect on described air compressor one Having flexible pipe gas tube edge to reach the elbow end of connecting tube, the elbow end of described connecting tube is provided with steam pipe, and described steam pipe is even It is connected on above tube rolling device.
Preferentially, described turbine and worm elevating lever quantity is four, and in rectangular layout, transversal stretching device is arranged on turbine Between worm screw elevating lever.
Preferentially, described transversal stretching device being provided with air bag, air bag connects airbag inflation pipe, air compressor two It is connected with described airbag inflation pipe.
Preferentially, described fixed support is provided with retainer ring and clasps airbag inflation pipe and flexible pipe gas tube.
Based on said apparatus, the present invention also proposes a kind of building sewer bifurcated pipe restorative procedure, it is characterised in that include Following steps:
1) excavate vertical channel at bifurcated pipe side in advance, and make vertical channel connect main sewer pipe;
2) preset measure required repair pipeline length and on tube rolling device, intercept the thermosetting resin flexible pipe of corresponding length, will Intercept thermosetting resin flexible pipe and arrive elbow end through connecting tube, will turn in thermosetting resin hose end, and turn in place upper Side draw 4 is fixed on rubber blanket;
3) drive turbine and worm elevating lever and fixed support to advance in main sewer pipe by base plate, make the elbow end of connecting tube Alignment bifurcated pipe arrival end;
4) start driven by motor turbine and worm elevating lever to rise, 4 tops of thermosetting resin flexible pipe that will be fixed on rubber blanket At main sewer pipe, now thermosetting resin hose end is fixed;
5) start to blow to air bag qi of chong channel ascending adversely pipe by air compressor two, make airbag inflation block connection tube bend ends;
6) connecting flexible pipe gas tube by air compressor one to start to blow, tube rolling device is constantly defeated to the elbow end of connecting tube simultaneously Sending thermosetting resin flexible pipe, thermosetting resin flexible pipe is constantly blowed and turns over by gas, makes thermosetting resin flexible pipe be covered with bifurcated pipe Inwall;
7) steam pipe is connected heating furnace, start steam pipe is carried steam, make to be fitted in the thermosetting tree of bifurcated pipe internal face Fat flexible pipe solidify to form new pipeline;
8) base plate and connecting tube being removed main sewer pipe, construction completes.
Compared with prior art, the invention have the advantage that this device repaiies Manifold technology excavation little, repair speed soon, efficiency High;Meanwhile, not welding, do not affect road traffic and pass through, be suitable for promoting the use of.
Accompanying drawing explanation
The most next the accompanying drawing by means of embodiment carries out brief description to the present invention.
Fig. 1 shows that the present invention builds the structure layout schematic diagram of sewer bifurcated pipe prosthetic device;
Fig. 2 shows that Fig. 1's disassembles schematic diagram further;
Fig. 3 shows principle schematic time the present invention constructs.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.Following example will assist in the technology of this area Personnel are further appreciated by the present invention, but limit the present invention the most in any form.It should be pointed out that, the ordinary skill to this area For personnel, without departing from the inventive concept of the premise, it is also possible to make some deformation and improvement.These broadly fall into the present invention Protection domain.
Embodiment 1
As it can be seen, building sewer bifurcated pipe prosthetic device, including tube rolling device 3, air compressor 1, connecting tube 7 and base plate 61, described tube rolling device 1 upper plate has thermosetting resin flexible pipe 1, fixed support 8 to be arranged on above described base plate 61, described connection Pipe 7 is through fixed support 8, and its one end is movably installed with elbow.Elbow is arranged on above connecting tube 7 by screw thread rotation, and it can Movable dismounting, and adjustable-angle, tube rolling device 3 is electronic tube rolling device.
Being also equipped with motor 11 on base plate 61, motor 11 controls motor for PLC, is connected with external power source by circuit group, The turbine and worm elevating lever 12 being driven lifting by motor 11 is arranged on base plate 61, and described turbine and worm elevating lever 12 top is pacified Equipped with rubber blanket 16;Flexible pipe gas tube 4 it is communicated with along reaching the elbow end of connecting tube 7, described company on described air compressor 1 The elbow end of adapter 7 is provided with steam pipe (not shown), and described steam pipe is connected to above tube rolling device 3.
Steam pipe turbine and worm elevating lever 12 quantity is four, and in rectangular layout, transversal stretching device 17 is arranged on turbine Between worm screw elevating lever 12.Transversal stretching device 17 can laterally drive turbine and worm elevating lever 12 to do lateral displacement, expands turbine Spacing between worm screw elevating lever 12, so can meet the main sewer pipe of different bore.Install on transversal stretching device 17 Having air bag 15, air bag 15 connects has airbag inflation pipe 6, air compressor 25 to be connected with described airbag inflation pipe 6, and air bag 15 fills The elbow terminal block of connecting tube 7 can be lived by gas, so when flexible pipe gas tube 4 is blown, can be blocked by air-flow, makes air-flow to dividing Breeches pipe 10 direction is blown away.Retainer ring 9 is installed on fixed support 8 and clasps airbag inflation pipe 6 and flexible pipe gas tube 4.
Based on said apparatus, the present invention also proposes a kind of building sewer bifurcated pipe restorative procedure, it is characterised in that include Following steps: 1) excavate vertical channel at bifurcated pipe 10 side in advance, and make vertical channel connect main sewer pipe, digging diameter At 600mm-700mm, excavation connects with main sewer pipe, it is simple to device enters;
2) preset measure required repair pipeline length and on tube rolling device 1, intercept the thermosetting resin flexible pipe 1 of corresponding length, Intercepting thermosetting resin flexible pipe 1 is arrived elbow end through connecting tube 7, will turn on thermosetting resin flexible pipe 1 end, and turn over upper In place, side draw 4 is fixed on rubber blanket 16;Meanwhile, base plate 61 is pre-installed fixed support 8 and turbine and worm elevating lever 12 and Motor 11, connecting tube 7 segment section bends, it is simple to connecting tube 7 connects outside (asking emphasis refering to Fig. 1).
3) drive turbine and worm elevating lever 12 and fixed support 8 to advance in main sewer pipe by base plate 61, make connection Elbow end alignment bifurcated pipe 10 arrival end of pipe 7;
4) starting motor 11 drives turbine and worm elevating lever 12 to rise, the thermosetting resin flexible pipe 1 that will be fixed on rubber blanket 16 4 withstand on main sewer pipe, now fixed (please emphasis refering to Fig. 3) in thermosetting resin flexible pipe 1 end;
5) start to blow by 25 pairs of air bag qi of chong channel ascending adversely pipes 6 of air compressor, make air bag 15 expand and block connecting tube 7 elbow end;
6) connecting flexible pipe gas tube 4 by air compressor 1 to start to blow, tube rolling device 3 is constantly to the elbow of connecting tube 7 simultaneously End conveying thermosetting resin flexible pipe 1, thermosetting resin flexible pipe 1 is constantly blowed and turns over, makes thermosetting resin flexible pipe 1 be covered with by gas Bifurcated pipe 10 inwall;
7) steam pipe being connected heating furnace, start steam pipe is carried steam, thermosetting resin flexible pipe 1 heat solidifies automatically, makes The thermosetting resin flexible pipe 1 being fitted in bifurcated pipe 10 internal face solidify to form new pipeline;
8) equipment and the connecting tube 7 by base plate 61 and being mounted above removes main sewer pipe, and construction completes.

Claims (1)

1. building sewer bifurcated pipe restorative procedure, it is characterised in that comprise the following steps:
1) excavate vertical channel at bifurcated pipe (10) side in advance, and make vertical channel connect main sewer pipe;
2) preset measure required repair pipeline length and at the upper thermosetting resin flexible pipe intercepting corresponding length of tube rolling device (1) (1), thermosetting resin flexible pipe (1) will be intercepted and arrive elbow end through connecting tube (7), by thermosetting resin flexible pipe (1) end Turn over, and side draw 4 is fixed on rubber blanket (16) in the upper place of turning over;
3) turbine and worm elevating lever (12) and fixed support (8) is driven to advance in main sewer pipe by base plate (61), the company of making Elbow end alignment bifurcated pipe (10) arrival end of adapter (7);
4) starting motor (11) drives turbine and worm elevating lever (12) to rise, and will be fixed on the thermosetting resin on rubber blanket (16) 4 of flexible pipe (1) withstand on main sewer pipe, and now thermosetting resin flexible pipe (1) end is fixed;
5) start air bag qi of chong channel ascending adversely pipe (6) to blow by air compressor two (5), make air bag (15) expand and block connecting tube (7) Elbow end;
6) connecting flexible pipe gas tube (4) by air compressor one (2) to start to blow, tube rolling device (3) is constantly to connecting tube simultaneously (7) elbow end conveying thermosetting resin flexible pipe (1), thermosetting resin flexible pipe (1) is constantly blowed and turns over, makes thermosetting by gas Resin hose (1) is covered with bifurcated pipe (10) inwall;
7) steam pipe is connected heating furnace, start steam pipe is carried steam, make to be fitted in the thermosetting of bifurcated pipe (10) internal face Property resin hose (1) solidify to form new pipeline;
8) base plate (61) and connecting tube (7) being removed main sewer pipe, construction completes.
CN201610618778.8A 2015-07-31 2015-07-31 Building sewer bifurcated pipe prosthetic device and construction method thereof Pending CN106245743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610618778.8A CN106245743A (en) 2015-07-31 2015-07-31 Building sewer bifurcated pipe prosthetic device and construction method thereof

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610618778.8A CN106245743A (en) 2015-07-31 2015-07-31 Building sewer bifurcated pipe prosthetic device and construction method thereof
CN201510465992.XA CN105135149A (en) 2015-07-31 2015-07-31 Repairing device and construction method for building sewer bifurcated pipe

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510465992.XA Division CN105135149A (en) 2015-07-31 2015-07-31 Repairing device and construction method for building sewer bifurcated pipe

Publications (1)

Publication Number Publication Date
CN106245743A true CN106245743A (en) 2016-12-21

Family

ID=54720615

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201610618779.2A Pending CN106149844A (en) 2015-07-31 2015-07-31 Building sewer bifurcated pipe prosthetic device and construction method thereof
CN201510465992.XA Pending CN105135149A (en) 2015-07-31 2015-07-31 Repairing device and construction method for building sewer bifurcated pipe
CN201610618778.8A Pending CN106245743A (en) 2015-07-31 2015-07-31 Building sewer bifurcated pipe prosthetic device and construction method thereof

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201610618779.2A Pending CN106149844A (en) 2015-07-31 2015-07-31 Building sewer bifurcated pipe prosthetic device and construction method thereof
CN201510465992.XA Pending CN105135149A (en) 2015-07-31 2015-07-31 Repairing device and construction method for building sewer bifurcated pipe

Country Status (1)

Country Link
CN (3) CN106149844A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109751476A (en) * 2019-03-15 2019-05-14 江苏爱索新材料科技有限公司 A kind of pipeline rehabilitation equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3221857B2 (en) * 1998-06-16 2001-10-22 管水工業株式会社 Branch pipe lining device
CN104421569A (en) * 2013-08-20 2015-03-18 曹晶晶 Pipeline overturn lining repair method
CN104500907A (en) * 2014-12-26 2015-04-08 湖南大麓管道工程有限公司 Trenchless pipeline repairing device and trenchless pipeline repairing method
CN104747860A (en) * 2015-03-25 2015-07-01 武汉圣禹排水系统有限公司 Pipeline inner liner repairing device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6539979B1 (en) * 2001-08-10 2003-04-01 Insituform (Netherlands) B.V. Pressurized bladder canister for installation of cured in place pipe
JP4682105B2 (en) * 2006-08-03 2011-05-11 株式会社湘南合成樹脂製作所 Branch pipe lining material and branch pipe lining method
JP5714870B2 (en) * 2010-11-02 2015-05-07 株式会社湘南合成樹脂製作所 Branch pipe lining method and branch pipe lining apparatus
US9074720B2 (en) * 2012-02-26 2015-07-07 Perma-Liner Industries, Llc Apparatus and method for repairing pipes

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3221857B2 (en) * 1998-06-16 2001-10-22 管水工業株式会社 Branch pipe lining device
CN104421569A (en) * 2013-08-20 2015-03-18 曹晶晶 Pipeline overturn lining repair method
CN104500907A (en) * 2014-12-26 2015-04-08 湖南大麓管道工程有限公司 Trenchless pipeline repairing device and trenchless pipeline repairing method
CN104747860A (en) * 2015-03-25 2015-07-01 武汉圣禹排水系统有限公司 Pipeline inner liner repairing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109751476A (en) * 2019-03-15 2019-05-14 江苏爱索新材料科技有限公司 A kind of pipeline rehabilitation equipment

Also Published As

Publication number Publication date
CN106149844A (en) 2016-11-23
CN105135149A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN106065981A (en) Municipal sewer bifurcated pipe prosthetic device and construction method thereof
CN205013938U (en) City tap water pipeline water connection pipe construction structures that does not stop
CN104278732A (en) Temporary drainage facility for urban drainage pipeline rehabilitation
CN210179167U (en) Pipeline structure deformation non-excavation prosthetic devices
CN106245743A (en) Building sewer bifurcated pipe prosthetic device and construction method thereof
CN104196108B (en) The servicing unit that a kind of pipeline is connected with manhole well seat
CN214563115U (en) Glue pouring production line for trenchless hose repair
CN203383314U (en) Temporary drainage device for municipal drainage pipeline repairing
CN106838464B (en) A kind of long-distance transmission pipeline and π type compensator floating on water surface installation methods
CN111810718B (en) Method for repairing large-diameter sewage main pipe
CN204829109U (en) Municipal administration sewer bifurcated pipe prosthetic devices
CN205637048U (en) Drainage pipe spraying restoration construction car
CN204826141U (en) Highway sewer bifurcated pipe prosthetic devices
CN105064485B (en) Highway sewer bifurcated pipe prosthetic device and construction method thereof
CN101852479B (en) Segmental out-of-sequence installation method of pipeline
CN206123542U (en) Erection equipment is connected to socket joint pipeline
CN105114754A (en) Repairing device for bifurcated pipe of sewer and construction method thereof
CN203907111U (en) Pipeline intercepting ball
CN107270010A (en) A kind of water conservancy system connector
CN210128176U (en) CIPP (cleaning in place) overturning method pipeline repair material turning auxiliary device
CN104251008B (en) A kind of guiding gutter and restorative procedure repairing pipe duct and back drop with water
CN216078832U (en) Non-excavation prosthetic devices of drainage pipe
CN110131480A (en) A kind of bell and spigot pressure conduit abutting joint construction method
CN215826867U (en) Be used for prosthetic pipeline transportation equipment of non-excavation of pipeline
CN105442631B (en) The two-tube leak detection facility with plastic well of Collapsible Loess District plastics

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161221