CN106245743A - Building sewer bifurcated pipe prosthetic device and construction method thereof - Google Patents
Building sewer bifurcated pipe prosthetic device and construction method thereof Download PDFInfo
- Publication number
- CN106245743A CN106245743A CN201610618778.8A CN201610618778A CN106245743A CN 106245743 A CN106245743 A CN 106245743A CN 201610618778 A CN201610618778 A CN 201610618778A CN 106245743 A CN106245743 A CN 106245743A
- Authority
- CN
- China
- Prior art keywords
- pipe
- flexible pipe
- thermosetting resin
- connecting tube
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/16—Devices for covering leaks in pipes or hoses, e.g. hose-menders
- F16L55/162—Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
- E03F2003/065—Refurbishing of sewer pipes, e.g. by coating, lining
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Pipe Accessories (AREA)
- Sewage (AREA)
Abstract
Building sewer bifurcated pipe prosthetic device, it is characterized in that: including that tube rolling device, air compressor one, connecting tube and base plate, described tube rolling device upper plate have thermosetting resin flexible pipe, fixed support is arranged on described substrate, described connecting tube passes fixed support, and its one end is movably installed with elbow;Being also equipped with motor on described base plate, the turbine and worm elevating lever lifted by driven by motor is arranged on base plate, and described turbine and worm elevating lever top is provided with rubber blanket;Being communicated with flexible pipe gas tube edge on described air compressor one and reach the elbow end of connecting tube, the elbow end of described connecting tube is provided with steam pipe, and described steam pipe is connected to above tube rolling device.Compared with prior art, the invention have the advantage that this device sleeve technology excavation is little, repair speed soon, efficiency is high;Meanwhile, not welding, do not affect road traffic and pass through, be suitable for promoting the use of.
Description
Technical field
The invention belongs to municipal works technical field, be specifically related to a kind of building sewer bifurcated pipe prosthetic device and execute
Work method.
Background technology
Urban drainage pipe network is the indispensable important infrastructure of modern city, is to have urban economy development entirely
Office property, the basic industry of guiding impact, be water pollution control in urban areas and Urban Waterlogging, the backbone of flood control, is to weigh modernization
The important symbol of city level.At present, in China most cities, the reparation of drainage pipeline is all to use pipe laying again after excavation
Method, along with the progress of urbanization, City Buried Pipeline is intricate, and the load of urban road is increasingly severe so that ground
Substantial amounts of technical problem is there is in underground pipelines during repairing.
Public announcement of a patent application CN104405998A discloses the restorative procedure that a kind of underground piping is lined, including step
Rapid: 1) needing the pipe ends excavation operation carrying out repairing to cheat;2) at position, operation hole pipe disconnected to former pipeline;3) external diameter is chosen
The newest pipeline, and on the outer wall of new pipeline, coat bonding agent;4) new pipeline is penetrated in former pipeline as liner;5) viscous
Connect agent solidification, make new pipeline outer wall bond with former inner-walls of duct.This kind of method does not affect the logical of road traffic and river man-hour
Boat, without environmental disruption, short construction period, effective cost saving;Additionally, due to before new pipeline is penetrated former pipeline
It is coated with bonding agent on the outer wall of new pipeline, and after new pipeline penetrates former pipeline, needs to carry out the solidification of bonding agent, make new
The inwall close adhesion of the outer wall of pipeline and former pipeline, this allows for new and old pipeline and is connected as a single entity, and the new pipeline of whole piece achieves all
Even pressure-bearing, is effectively increased the bearing capacity of new pipeline while completing pipeline rehabilitation.
The most perfect along with urban construction, it is provided that a kind of trenchless pipelaying, repair pipe and change after Manifold technology do not affects with it
Traffic, pipelaying rate is fast, efficiency is high, without environmental disruption, the pipe of a series of advantage such as normal work, life of not affecting people
Road restorative procedure is increasingly favored by underground piping Industry regulatory bodies.
Summary of the invention
The shortcoming that the present invention is directed to prior art, it is proposed that a kind of building sewer bifurcated pipe prosthetic device and construction party thereof
Method, this device and method simple in construction, easy to operate, it is suitable for promoting the use of.
For realizing the purpose of the present invention, the technical solution used in the present invention is:
Building sewer bifurcated pipe prosthetic device, it is characterised in that: include tube rolling device, air compressor one, connecting tube and base plate,
Described tube rolling device upper plate has thermosetting resin flexible pipe, and fixed support is arranged on described substrate, and described connecting tube is through solid
Fixed rack, its one end is movably installed with elbow;It is also equipped with motor, the turbine and worm lifted by driven by motor on described base plate
Elevating lever is arranged on base plate, and described turbine and worm elevating lever top is provided with rubber blanket;Connect on described air compressor one
Having flexible pipe gas tube edge to reach the elbow end of connecting tube, the elbow end of described connecting tube is provided with steam pipe, and described steam pipe is even
It is connected on above tube rolling device.
Preferentially, described turbine and worm elevating lever quantity is four, and in rectangular layout, transversal stretching device is arranged on turbine
Between worm screw elevating lever.
Preferentially, described transversal stretching device being provided with air bag, air bag connects airbag inflation pipe, air compressor two
It is connected with described airbag inflation pipe.
Preferentially, described fixed support is provided with retainer ring and clasps airbag inflation pipe and flexible pipe gas tube.
Based on said apparatus, the present invention also proposes a kind of building sewer bifurcated pipe restorative procedure, it is characterised in that include
Following steps:
1) excavate vertical channel at bifurcated pipe side in advance, and make vertical channel connect main sewer pipe;
2) preset measure required repair pipeline length and on tube rolling device, intercept the thermosetting resin flexible pipe of corresponding length, will
Intercept thermosetting resin flexible pipe and arrive elbow end through connecting tube, will turn in thermosetting resin hose end, and turn in place upper
Side draw 4 is fixed on rubber blanket;
3) drive turbine and worm elevating lever and fixed support to advance in main sewer pipe by base plate, make the elbow end of connecting tube
Alignment bifurcated pipe arrival end;
4) start driven by motor turbine and worm elevating lever to rise, 4 tops of thermosetting resin flexible pipe that will be fixed on rubber blanket
At main sewer pipe, now thermosetting resin hose end is fixed;
5) start to blow to air bag qi of chong channel ascending adversely pipe by air compressor two, make airbag inflation block connection tube bend ends;
6) connecting flexible pipe gas tube by air compressor one to start to blow, tube rolling device is constantly defeated to the elbow end of connecting tube simultaneously
Sending thermosetting resin flexible pipe, thermosetting resin flexible pipe is constantly blowed and turns over by gas, makes thermosetting resin flexible pipe be covered with bifurcated pipe
Inwall;
7) steam pipe is connected heating furnace, start steam pipe is carried steam, make to be fitted in the thermosetting tree of bifurcated pipe internal face
Fat flexible pipe solidify to form new pipeline;
8) base plate and connecting tube being removed main sewer pipe, construction completes.
Compared with prior art, the invention have the advantage that this device repaiies Manifold technology excavation little, repair speed soon, efficiency
High;Meanwhile, not welding, do not affect road traffic and pass through, be suitable for promoting the use of.
Accompanying drawing explanation
The most next the accompanying drawing by means of embodiment carries out brief description to the present invention.
Fig. 1 shows that the present invention builds the structure layout schematic diagram of sewer bifurcated pipe prosthetic device;
Fig. 2 shows that Fig. 1's disassembles schematic diagram further;
Fig. 3 shows principle schematic time the present invention constructs.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.Following example will assist in the technology of this area
Personnel are further appreciated by the present invention, but limit the present invention the most in any form.It should be pointed out that, the ordinary skill to this area
For personnel, without departing from the inventive concept of the premise, it is also possible to make some deformation and improvement.These broadly fall into the present invention
Protection domain.
Embodiment 1
As it can be seen, building sewer bifurcated pipe prosthetic device, including tube rolling device 3, air compressor 1, connecting tube 7 and base plate
61, described tube rolling device 1 upper plate has thermosetting resin flexible pipe 1, fixed support 8 to be arranged on above described base plate 61, described connection
Pipe 7 is through fixed support 8, and its one end is movably installed with elbow.Elbow is arranged on above connecting tube 7 by screw thread rotation, and it can
Movable dismounting, and adjustable-angle, tube rolling device 3 is electronic tube rolling device.
Being also equipped with motor 11 on base plate 61, motor 11 controls motor for PLC, is connected with external power source by circuit group,
The turbine and worm elevating lever 12 being driven lifting by motor 11 is arranged on base plate 61, and described turbine and worm elevating lever 12 top is pacified
Equipped with rubber blanket 16;Flexible pipe gas tube 4 it is communicated with along reaching the elbow end of connecting tube 7, described company on described air compressor 1
The elbow end of adapter 7 is provided with steam pipe (not shown), and described steam pipe is connected to above tube rolling device 3.
Steam pipe turbine and worm elevating lever 12 quantity is four, and in rectangular layout, transversal stretching device 17 is arranged on turbine
Between worm screw elevating lever 12.Transversal stretching device 17 can laterally drive turbine and worm elevating lever 12 to do lateral displacement, expands turbine
Spacing between worm screw elevating lever 12, so can meet the main sewer pipe of different bore.Install on transversal stretching device 17
Having air bag 15, air bag 15 connects has airbag inflation pipe 6, air compressor 25 to be connected with described airbag inflation pipe 6, and air bag 15 fills
The elbow terminal block of connecting tube 7 can be lived by gas, so when flexible pipe gas tube 4 is blown, can be blocked by air-flow, makes air-flow to dividing
Breeches pipe 10 direction is blown away.Retainer ring 9 is installed on fixed support 8 and clasps airbag inflation pipe 6 and flexible pipe gas tube 4.
Based on said apparatus, the present invention also proposes a kind of building sewer bifurcated pipe restorative procedure, it is characterised in that include
Following steps: 1) excavate vertical channel at bifurcated pipe 10 side in advance, and make vertical channel connect main sewer pipe, digging diameter
At 600mm-700mm, excavation connects with main sewer pipe, it is simple to device enters;
2) preset measure required repair pipeline length and on tube rolling device 1, intercept the thermosetting resin flexible pipe 1 of corresponding length,
Intercepting thermosetting resin flexible pipe 1 is arrived elbow end through connecting tube 7, will turn on thermosetting resin flexible pipe 1 end, and turn over upper
In place, side draw 4 is fixed on rubber blanket 16;Meanwhile, base plate 61 is pre-installed fixed support 8 and turbine and worm elevating lever 12 and
Motor 11, connecting tube 7 segment section bends, it is simple to connecting tube 7 connects outside (asking emphasis refering to Fig. 1).
3) drive turbine and worm elevating lever 12 and fixed support 8 to advance in main sewer pipe by base plate 61, make connection
Elbow end alignment bifurcated pipe 10 arrival end of pipe 7;
4) starting motor 11 drives turbine and worm elevating lever 12 to rise, the thermosetting resin flexible pipe 1 that will be fixed on rubber blanket 16
4 withstand on main sewer pipe, now fixed (please emphasis refering to Fig. 3) in thermosetting resin flexible pipe 1 end;
5) start to blow by 25 pairs of air bag qi of chong channel ascending adversely pipes 6 of air compressor, make air bag 15 expand and block connecting tube 7 elbow end;
6) connecting flexible pipe gas tube 4 by air compressor 1 to start to blow, tube rolling device 3 is constantly to the elbow of connecting tube 7 simultaneously
End conveying thermosetting resin flexible pipe 1, thermosetting resin flexible pipe 1 is constantly blowed and turns over, makes thermosetting resin flexible pipe 1 be covered with by gas
Bifurcated pipe 10 inwall;
7) steam pipe being connected heating furnace, start steam pipe is carried steam, thermosetting resin flexible pipe 1 heat solidifies automatically, makes
The thermosetting resin flexible pipe 1 being fitted in bifurcated pipe 10 internal face solidify to form new pipeline;
8) equipment and the connecting tube 7 by base plate 61 and being mounted above removes main sewer pipe, and construction completes.
Claims (1)
1. building sewer bifurcated pipe restorative procedure, it is characterised in that comprise the following steps:
1) excavate vertical channel at bifurcated pipe (10) side in advance, and make vertical channel connect main sewer pipe;
2) preset measure required repair pipeline length and at the upper thermosetting resin flexible pipe intercepting corresponding length of tube rolling device (1)
(1), thermosetting resin flexible pipe (1) will be intercepted and arrive elbow end through connecting tube (7), by thermosetting resin flexible pipe (1) end
Turn over, and side draw 4 is fixed on rubber blanket (16) in the upper place of turning over;
3) turbine and worm elevating lever (12) and fixed support (8) is driven to advance in main sewer pipe by base plate (61), the company of making
Elbow end alignment bifurcated pipe (10) arrival end of adapter (7);
4) starting motor (11) drives turbine and worm elevating lever (12) to rise, and will be fixed on the thermosetting resin on rubber blanket (16)
4 of flexible pipe (1) withstand on main sewer pipe, and now thermosetting resin flexible pipe (1) end is fixed;
5) start air bag qi of chong channel ascending adversely pipe (6) to blow by air compressor two (5), make air bag (15) expand and block connecting tube (7)
Elbow end;
6) connecting flexible pipe gas tube (4) by air compressor one (2) to start to blow, tube rolling device (3) is constantly to connecting tube simultaneously
(7) elbow end conveying thermosetting resin flexible pipe (1), thermosetting resin flexible pipe (1) is constantly blowed and turns over, makes thermosetting by gas
Resin hose (1) is covered with bifurcated pipe (10) inwall;
7) steam pipe is connected heating furnace, start steam pipe is carried steam, make to be fitted in the thermosetting of bifurcated pipe (10) internal face
Property resin hose (1) solidify to form new pipeline;
8) base plate (61) and connecting tube (7) being removed main sewer pipe, construction completes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610618778.8A CN106245743A (en) | 2015-07-31 | 2015-07-31 | Building sewer bifurcated pipe prosthetic device and construction method thereof |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610618778.8A CN106245743A (en) | 2015-07-31 | 2015-07-31 | Building sewer bifurcated pipe prosthetic device and construction method thereof |
CN201510465992.XA CN105135149A (en) | 2015-07-31 | 2015-07-31 | Repairing device and construction method for building sewer bifurcated pipe |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510465992.XA Division CN105135149A (en) | 2015-07-31 | 2015-07-31 | Repairing device and construction method for building sewer bifurcated pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106245743A true CN106245743A (en) | 2016-12-21 |
Family
ID=54720615
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610618779.2A Pending CN106149844A (en) | 2015-07-31 | 2015-07-31 | Building sewer bifurcated pipe prosthetic device and construction method thereof |
CN201510465992.XA Pending CN105135149A (en) | 2015-07-31 | 2015-07-31 | Repairing device and construction method for building sewer bifurcated pipe |
CN201610618778.8A Pending CN106245743A (en) | 2015-07-31 | 2015-07-31 | Building sewer bifurcated pipe prosthetic device and construction method thereof |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610618779.2A Pending CN106149844A (en) | 2015-07-31 | 2015-07-31 | Building sewer bifurcated pipe prosthetic device and construction method thereof |
CN201510465992.XA Pending CN105135149A (en) | 2015-07-31 | 2015-07-31 | Repairing device and construction method for building sewer bifurcated pipe |
Country Status (1)
Country | Link |
---|---|
CN (3) | CN106149844A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109751476A (en) * | 2019-03-15 | 2019-05-14 | 江苏爱索新材料科技有限公司 | A kind of pipeline rehabilitation equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3221857B2 (en) * | 1998-06-16 | 2001-10-22 | 管水工業株式会社 | Branch pipe lining device |
CN104421569A (en) * | 2013-08-20 | 2015-03-18 | 曹晶晶 | Pipeline overturn lining repair method |
CN104500907A (en) * | 2014-12-26 | 2015-04-08 | 湖南大麓管道工程有限公司 | Trenchless pipeline repairing device and trenchless pipeline repairing method |
CN104747860A (en) * | 2015-03-25 | 2015-07-01 | 武汉圣禹排水系统有限公司 | Pipeline inner liner repairing device |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6539979B1 (en) * | 2001-08-10 | 2003-04-01 | Insituform (Netherlands) B.V. | Pressurized bladder canister for installation of cured in place pipe |
JP4682105B2 (en) * | 2006-08-03 | 2011-05-11 | 株式会社湘南合成樹脂製作所 | Branch pipe lining material and branch pipe lining method |
JP5714870B2 (en) * | 2010-11-02 | 2015-05-07 | 株式会社湘南合成樹脂製作所 | Branch pipe lining method and branch pipe lining apparatus |
US9074720B2 (en) * | 2012-02-26 | 2015-07-07 | Perma-Liner Industries, Llc | Apparatus and method for repairing pipes |
-
2015
- 2015-07-31 CN CN201610618779.2A patent/CN106149844A/en active Pending
- 2015-07-31 CN CN201510465992.XA patent/CN105135149A/en active Pending
- 2015-07-31 CN CN201610618778.8A patent/CN106245743A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3221857B2 (en) * | 1998-06-16 | 2001-10-22 | 管水工業株式会社 | Branch pipe lining device |
CN104421569A (en) * | 2013-08-20 | 2015-03-18 | 曹晶晶 | Pipeline overturn lining repair method |
CN104500907A (en) * | 2014-12-26 | 2015-04-08 | 湖南大麓管道工程有限公司 | Trenchless pipeline repairing device and trenchless pipeline repairing method |
CN104747860A (en) * | 2015-03-25 | 2015-07-01 | 武汉圣禹排水系统有限公司 | Pipeline inner liner repairing device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109751476A (en) * | 2019-03-15 | 2019-05-14 | 江苏爱索新材料科技有限公司 | A kind of pipeline rehabilitation equipment |
Also Published As
Publication number | Publication date |
---|---|
CN106149844A (en) | 2016-11-23 |
CN105135149A (en) | 2015-12-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106065981A (en) | Municipal sewer bifurcated pipe prosthetic device and construction method thereof | |
CN205013938U (en) | City tap water pipeline water connection pipe construction structures that does not stop | |
CN104278732A (en) | Temporary drainage facility for urban drainage pipeline rehabilitation | |
CN210179167U (en) | Pipeline structure deformation non-excavation prosthetic devices | |
CN106245743A (en) | Building sewer bifurcated pipe prosthetic device and construction method thereof | |
CN104196108B (en) | The servicing unit that a kind of pipeline is connected with manhole well seat | |
CN214563115U (en) | Glue pouring production line for trenchless hose repair | |
CN203383314U (en) | Temporary drainage device for municipal drainage pipeline repairing | |
CN106838464B (en) | A kind of long-distance transmission pipeline and π type compensator floating on water surface installation methods | |
CN111810718B (en) | Method for repairing large-diameter sewage main pipe | |
CN204829109U (en) | Municipal administration sewer bifurcated pipe prosthetic devices | |
CN205637048U (en) | Drainage pipe spraying restoration construction car | |
CN204826141U (en) | Highway sewer bifurcated pipe prosthetic devices | |
CN105064485B (en) | Highway sewer bifurcated pipe prosthetic device and construction method thereof | |
CN101852479B (en) | Segmental out-of-sequence installation method of pipeline | |
CN206123542U (en) | Erection equipment is connected to socket joint pipeline | |
CN105114754A (en) | Repairing device for bifurcated pipe of sewer and construction method thereof | |
CN203907111U (en) | Pipeline intercepting ball | |
CN107270010A (en) | A kind of water conservancy system connector | |
CN210128176U (en) | CIPP (cleaning in place) overturning method pipeline repair material turning auxiliary device | |
CN104251008B (en) | A kind of guiding gutter and restorative procedure repairing pipe duct and back drop with water | |
CN216078832U (en) | Non-excavation prosthetic devices of drainage pipe | |
CN110131480A (en) | A kind of bell and spigot pressure conduit abutting joint construction method | |
CN215826867U (en) | Be used for prosthetic pipeline transportation equipment of non-excavation of pipeline | |
CN105442631B (en) | The two-tube leak detection facility with plastic well of Collapsible Loess District plastics |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161221 |