CN106238261B - Colored Dacroment steel guard rail coating production line and operating procedure - Google Patents

Colored Dacroment steel guard rail coating production line and operating procedure Download PDF

Info

Publication number
CN106238261B
CN106238261B CN201610650635.5A CN201610650635A CN106238261B CN 106238261 B CN106238261 B CN 106238261B CN 201610650635 A CN201610650635 A CN 201610650635A CN 106238261 B CN106238261 B CN 106238261B
Authority
CN
China
Prior art keywords
sintering furnace
temperature sintering
track
low
dacroment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610650635.5A
Other languages
Chinese (zh)
Other versions
CN106238261A (en
Inventor
耿雷
张景平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yuanda Transportation Technology Co.,Ltd.
Original Assignee
Weifang Yuanda Metal Surface Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Yuanda Metal Surface Technology Co Ltd filed Critical Weifang Yuanda Metal Surface Technology Co Ltd
Priority to CN201610650635.5A priority Critical patent/CN106238261B/en
Publication of CN106238261A publication Critical patent/CN106238261A/en
Application granted granted Critical
Publication of CN106238261B publication Critical patent/CN106238261B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/90Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth
    • B05B16/95Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth the objects or other work to be sprayed lying on, or being held above the conveying means, i.e. not hanging from the conveying means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0221Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/20Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/40Construction elements specially adapted therefor, e.g. floors, walls or ceilings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/60Ventilation arrangements specially adapted therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/04Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases
    • B05D3/0406Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases the gas being air
    • B05D3/0413Heating with air
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/04Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases
    • B05D3/0406Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases the gas being air
    • B05D3/0426Cooling with air

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)
  • Coating Apparatus (AREA)

Abstract

The invention discloses a kind of colored Dacroment steel guard rail coating production line and operating procedures.Including annular workpieces track, according to annular workpieces track running direction, the first spray booth, high temperature sintering furnace, the second spray booth and low-temperature sintering furnace are disposed on annular workpieces track, the track before the first spray booth is piece uploading region, and the track after low-temperature sintering furnace is lower part area.Design of Production Line can sufficiently save space, technique through the invention, improve the uniformity of coating coating, the corrosion resistance for increasing workpiece, can substantially improve the coating performance of colored Dacroment steel guard rail, and in process of production, the solvent that coating cloud can be fully absorbed and evaporated, saving color reduces harm of the coating to human body, environmental protection.

Description

Colored Dacroment steel guard rail coating production line and operating procedure
Technical field
The invention belongs to colored Dacroment steel guard rail coating technology field, specially colored Dacroment steel guard rail coating production Line and operating procedure.
Background technique
Dacromet/steel is referred to as " Green Electroplating ", and because of its good corrosion-resistant, heat and corrosion resistant performance, no hydrogen embrittlement is raw Outstanding advantages of process cleans are pollution-free is produced, plating heat, galvanizing by dipping, cadmium plating, zinc-containing alloy coating and phosphorus are deemed to be The substitute products of the seriously polluted conventional metals anticorrosion techniques such as change.Dacroment masking liquid is sprayed on workpiece surface, leads to after draining Overbaking solidification, forms Dacromet/steel after cooling.
Existing Dacromet/steel will appear that spraying is uneven, is easy to fall off the problem of causing workpiece to be easily corroded, especially It is guardrail class outdoor facility, it should be noted that how the uniformity and corrosion resistance of coating, improve existing colored Dacroment steel guard rail Coating production line and operating procedure enhance the uniformity of coating and improve the binding performance of coating and guardrail, are that the present invention needs It solves the problems, such as.
Summary of the invention
A kind of colored Dacroment steel guard rail coating production is provided the purpose of the present invention is to above-mentioned defect Line and operating procedure.The colour Dacroment steel guard rail coating production line and operating procedure use circulating production line, and workpiece is carried out Secondary spraying, Design of Production Line can sufficiently save space, and technique through the invention improves the uniformity of coating coating, increase The corrosion resistance of workpiece can substantially improve the coating performance of colored Dacroment steel guard rail, and in process of production, Neng Gouchong Divide the solvent for absorbing coating cloud and evaporating, saving color reduces harm of the coating to human body, environmental protection.
Colored Dacroment steel guard rail coating production line of the invention and operating procedure technical solution are a kind of colour Dacroment Steel guard rail coating production line, including closed annular workpieces track, according to annular workpieces track running direction, in annular workpieces rail The first spray booth, high temperature sintering furnace, the second spray booth and low-temperature sintering furnace, the track before the first spray booth are disposed on road For piece uploading region, the track after low-temperature sintering furnace is lower part area, and piece uploading region front end is connect with lower part area tail end.
The annular workpieces track is coupling type slideway.
The annular workpieces trade shape is one of circle, semicircle, L-type, rectangle, triangle.
High temperature sintering furnace is made of three regions that are adjacent and being spaced apart from each other, and the escapement between three regions can be automatic Lifting, high temperature sintering furnace are divided into preliminary drying area, sintering zone, high temperature sintering furnace cooling zone along annular workpieces track running direction, Setting one or more hot wind combustor below preliminary drying area workpiece track, sintering zone workpiece track lower section setting two or more hot winds combustion Burning machine.
High temperature sintering furnace cooling zone bottom is provided with sink, sink is connected to air-introduced machine, and high temperature sintering furnace is cooling More than one air blower is provided at the top of area, air-introduced machine is connected to exhaust chimney.
Low-temperature sintering furnace is made of two regions that are adjacent and being spaced apart from each other, and the escapement between two regions can be automatic Lifting (such as by the time limit or by before escapement weight induction device come control lifting, can all pass through existing skill Art realizes escapement automatic lifting), low-temperature sintering furnace is divided into low-temperature sintering baking oven along annular workpieces track running direction Dry area, low-temperature sintering furnace cooling zone, low-temperature sintering furnace baking zone workpiece track lower section setting one or more hot wind combustor.
Low-temperature sintering furnace cooling zone bottom is provided with sink, and sink is connected to air-introduced machine, low-temperature sintering furnace cooling zone Top is provided with more than one air blower, and air-introduced machine is connected to exhaust chimney.
First spray booth and the second spray booth, respectively includes spray room, and spray room bottom is provided with sink, washing Slot is connected to air-introduced machine, and suspension type spray gun device is provided at the top of spray room, and annular workpieces track runs through spray room;Setting at the top of spray room There is more than one air blower, the air blower at the top of spray room is uniformly distributed in around suspension type spray gun device, air-introduced machine and exhaust Chimney connection.
High temperature sintering furnace cooling zone temperature is 40 DEG C, and sintering zone temperature is 360 DEG C, and preliminary drying area temperature is 320-360 DEG C.
Low-temperature sintering furnace cooling zone temperature is 40 DEG C, and low-temperature sintering furnace baking zone temperature is 40-60 DEG C.
Workpiece through blasting treatment is linked into coating line from piece uploading region, carries out first layer coating, warp through the first spray booth High temperature sintering furnace sintering curing, then second layer coating is carried out through the second spray booth, after dry through low-temperature sintering baking oven, cooling, under Part area takes, and is packed, is stored.
Colored Dacroment steel guard rail coating production line of the invention and operating procedure have the beneficial effect that the colour Dacroment steel Guardrail coating production line and operating procedure use circulating production line, workpiece are carried out secondary spraying, Design of Production Line can be abundant Space is saved, technique through the invention improves the uniformity of coating coating, increases the corrosion resistance of workpiece, can change significantly The coating performance of kind colour Dacroment steel guard rail, and in process of production, the solvent that coating cloud can be fully absorbed and evaporated, Saving color reduces harm of the coating to human body, environmental protection.
Detailed description of the invention:
Fig. 1 show basic structure schematic diagram of the invention;
Fig. 2 show the structural schematic diagram of the first spray booth or the second spray booth;
Fig. 3 show the structural schematic diagram of high temperature sintering furnace;
Fig. 4 show the structural schematic diagram of low-temperature sintering furnace.
In figure, 1. first spray booths, 2. preliminary drying areas, 3. sintering zones, 4. high temperature sintering furnace cooling zones, 5. second spray booths, 6. hot wind combustor, 7. low-temperature sintering furnace baking zones, 9. low-temperature sintering furnace cooling zones, 9. lower part areas, 10. piece uploading regions, 11. annulars Workpiece track, 12. spray rooms, 13. air-introduced machines, 14. sinks, 15. air blowers, 16. exhaust chimneys, 17. suspension type spray gun devices, 18. sink, 19. sinks, 20. escapements.
Specific embodiment:
For a better understanding of the present invention, below with specific example come the technical solution that the present invention will be described in detail, but this Invention is not limited thereto.
Embodiment 1
As shown in Figure of description Fig. 1, a kind of colour Dacroment steel guard rail coating production line, including closed annular workpieces Track 11 is disposed with the first spray booth 1, height according to 11 traffic direction of annular workpieces track on annular workpieces track 11 Warm sintering furnace, the second spray booth 5 and low-temperature sintering furnace, the track before the first spray booth 1 are piece uploading region 10, after low-temperature sintering furnace Track is lower part area 9, and 10 front end of piece uploading region is connect with 9 area's tail end of lower part.
The annular workpieces track 11 is coupling type slideway.
11 shape of annular workpieces track is L-type.
High temperature sintering furnace is made of three regions that are adjacent and being spaced apart from each other, 20 basis of escapement between three regions Time setting automatic lifting (such as by the time limit or by before escapement weight induction device come control lifting, all Escapement automatic lifting can be achieved by the prior art), high temperature sintering furnace successively divides along 11 traffic direction of annular workpieces track For preliminary drying area 2, sintering zone 3, high temperature sintering furnace cooling zone 4, a hot wind combustor 6, the setting of sintering zone 3 two is arranged in preliminary drying area 2 Platform hot wind combustor 6.
4 bottom of high temperature sintering furnace cooling zone is provided with sink 18, sink 18 is connected to air-introduced machine 13, high temperature sintering There are two air blowers 15, air-introduced machine 13 to be connected to exhaust chimney 16 for setting at the top of furnace cooling zone 4.
Low-temperature sintering furnace is made of two regions that are adjacent and being spaced apart from each other, and the escapement 20 between two regions can be certainly Dynamic lifting, low-temperature sintering furnace are divided into low-temperature sintering furnace baking zone 7, low-temperature sintering furnace along 11 traffic direction of annular workpieces track Two hot wind combustors 6 are arranged in cooling zone 8, low-temperature sintering furnace baking zone 7.
9 bottom of low-temperature sintering furnace cooling zone is provided with sink 19, and sink 19 is connected to air-introduced machine 13, low-temperature sintering furnace There are two air blowers 15, air-introduced machine 13 to be connected to exhaust chimney 16 for setting at the top of cooling zone 9.
First spray booth 1 and the second spray booth 5, respectively includes spray room 12, and 12 bottom of spray room is provided with washing Slot 14, sink 14 are connected to air-introduced machine 13, and suspension type spray gun device 17 is provided at the top of spray room 12, and annular workpieces track 11 passes through Wear spray room 12.The air blower 15 of air blower 15 at the top of spray room 12 there are two settings, 12 top of spray room is uniformly distributed in suspension type Around spray gun device 17, air-introduced machine 13 is connected to exhaust chimney 16.
4 temperature of high temperature sintering furnace cooling zone is 40 DEG C, and 3 temperature of sintering zone is 360 DEG C, and 2 temperature of preliminary drying area is 320-360 ℃。
9 temperature of low-temperature sintering furnace cooling zone is 40 DEG C, and 7 temperature of low-temperature sintering furnace baking zone is 40-60 DEG C.
Workpiece through blasting treatment is linked into coating line from piece uploading region 10, carries out first layer coating through the first spray booth 1, Second layer coating is carried out through high temperature sintering furnace sintering curing, then through the second spray booth 5, after dry through low-temperature sintering baking oven, cooling, from Lower part area 9 takes, and is packed, is stored.
Embodiment 2
A kind of colour Dacroment steel guard rail coating production line, including closed annular workpieces track 11, according to annular workpieces 11 traffic direction of track is disposed with the first spray booth 1, high temperature sintering furnace, the second spray booth 5 on annular workpieces track 11 With low-temperature sintering furnace, the track before the first spray booth 1 is piece uploading region 10, and the track after low-temperature sintering furnace is lower part area 9, piece uploading region 10 front ends are connect with 9 area's tail end of lower part.
The annular workpieces track 11 is coupling type slideway.
11 shape of annular workpieces track is circle.
High temperature sintering furnace is made of three regions that are adjacent and being spaced apart from each other, 20 basis of escapement between three regions Time setting automatic lifting (such as by the time limit or by before escapement weight induction device come control lifting, all Escapement automatic lifting can be achieved by the prior art), high temperature sintering furnace successively divides along 11 traffic direction of annular workpieces track For preliminary drying area 2, sintering zone 3, high temperature sintering furnace cooling zone 4, preliminary drying area 2 is arranged one or more hot wind combustor 6, sintering zone 3 and sets Set two or more hot wind combustors 6.
4 bottom of high temperature sintering furnace cooling zone is provided with sink 18, sink 18 is connected to air-introduced machine 13, high temperature sintering More than one air blower 15 is provided at the top of furnace cooling zone 4, air-introduced machine 13 is connected to exhaust chimney 16.
Low-temperature sintering furnace is made of two regions that are adjacent and being spaced apart from each other, and the escapement 20 between two regions can be certainly Dynamic lifting, low-temperature sintering furnace are divided into low-temperature sintering furnace baking zone 7, low-temperature sintering furnace along 11 traffic direction of annular workpieces track One or more hot wind combustor 6 is arranged in cooling zone 8, low-temperature sintering furnace baking zone 7.
9 bottom of low-temperature sintering furnace cooling zone is provided with sink 19, and sink 19 is connected to air-introduced machine 13, low-temperature sintering furnace More than one air blower 15 is provided at the top of cooling zone 9, air-introduced machine 13 is connected to exhaust chimney 16.
First spray booth 1 and the second spray booth 5, respectively includes spray room 12, and 12 bottom of spray room is provided with washing Slot 14, sink 14 are connected to air-introduced machine 13, and suspension type spray gun device 17 is provided at the top of spray room 12, and annular workpieces track 11 passes through Wear spray room 12.More than two air blowers 15 are provided at the top of spray room 12, the air blower 15 at 12 top of spray room is uniformly distributed in suspension Around formula spray gun device 17, air-introduced machine 13 is connected to exhaust chimney 16.
4 temperature of high temperature sintering furnace cooling zone is 40 DEG C, and 3 temperature of sintering zone is 360 DEG C, and 2 temperature of preliminary drying area is 320-360 ℃。
9 temperature of low-temperature sintering furnace cooling zone is 40 DEG C, and 7 temperature of low-temperature sintering furnace baking zone is 40-60 DEG C.
Workpiece through blasting treatment is linked into coating line from piece uploading region 10, carries out first layer coating through the first spray booth 1, Second layer coating is carried out through high temperature sintering furnace sintering curing, then through the second spray booth 5, after dry through low-temperature sintering baking oven, cooling, from Lower part area 9 takes, and is packed, is stored.

Claims (9)

1. a kind of colour Dacroment steel guard rail coating production line, which is characterized in that including annular workpieces track, according to annular workpieces Track running direction is disposed with the first spray booth, high temperature sintering furnace, the second spray booth and low temperature on annular workpieces track Sintering furnace, the track before the first spray booth are piece uploading region, and the track after low-temperature sintering furnace is lower part area, piece uploading region front end and lower part The connection of area's tail end;
Low-temperature sintering furnace is made of two regions that are adjacent and being spaced apart from each other, and the escapement between two regions can rise automatically Drop, low-temperature sintering furnace are divided into low-temperature sintering furnace baking zone, low-temperature sintering furnace cooling zone along annular workpieces track running direction, Setting one or more hot wind combustor below annular workpieces track in low-temperature sintering furnace baking zone.
2. colour Dacroment steel guard rail coating production line according to claim 1, which is characterized in that the annular workpieces Track is coupling type slideway.
3. colour Dacroment steel guard rail coating production line according to claim 1, which is characterized in that the annular workpieces Trade shape is one of circle, semicircle, L-type, rectangle, triangle.
4. colour Dacroment steel guard rail coating production line according to claim 1, which is characterized in that high temperature sintering furnace is by three Region composition that is a adjacent and being spaced apart from each other, escapement between three regions can automatic lifting, high temperature sintering furnace is along annular Workpiece track running direction is divided into preliminary drying area, sintering zone, high temperature sintering furnace cooling zone, the annular workpieces in preliminary drying area Setting one or more hot wind combustor below track, annular workpieces track lower section setting two in sintering zone or more hot winds Combustor.
5. colour Dacroment steel guard rail coating production line according to claim 4, which is characterized in that cold in high temperature sintering furnace But area bottom is provided with sink, and sink is connected to air-introduced machine, is provided at the top of high temperature sintering furnace cooling zone more than one Air blower, air-introduced machine are connected to exhaust chimney.
6. colour Dacroment steel guard rail coating production line according to claim 1, which is characterized in that low-temperature sintering furnace is cooling Area bottom is provided with sink, and sink is connected to air-introduced machine, is provided with more than one drum at the top of low-temperature sintering furnace cooling zone Blower, air-introduced machine are connected to exhaust chimney.
7. colour Dacroment steel guard rail coating production line according to claim 1, which is characterized in that first spraying Room and the second spray booth, respectively include spray room, spray room bottom are provided with sink, sink is connected to air-introduced machine, spray room top Portion is provided with suspension type spray gun device, and annular workpieces track runs through spray room;It is provided with more than one air blower at the top of spray room, is sprayed The air blower in roof portion is uniformly distributed in around suspension type spray gun device, and air-introduced machine is connected to exhaust chimney.
8. colour Dacroment steel guard rail coating production line operating procedure as claimed in claim 4, which is characterized in that high temperature sintering Furnace cooling zone temperature is 40 DEG C, and sintering zone temperature is 360 DEG C, and preliminary drying area temperature is 320-360 DEG C.
9. colour Dacroment steel guard rail coating production line operating procedure as described in claim 1, which is characterized in that low-temperature sintering Furnace cooling zone temperature is 40 DEG C, and low-temperature sintering furnace baking zone temperature is 40-60 DEG C.
CN201610650635.5A 2016-08-10 2016-08-10 Colored Dacroment steel guard rail coating production line and operating procedure Active CN106238261B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610650635.5A CN106238261B (en) 2016-08-10 2016-08-10 Colored Dacroment steel guard rail coating production line and operating procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610650635.5A CN106238261B (en) 2016-08-10 2016-08-10 Colored Dacroment steel guard rail coating production line and operating procedure

Publications (2)

Publication Number Publication Date
CN106238261A CN106238261A (en) 2016-12-21
CN106238261B true CN106238261B (en) 2019-01-11

Family

ID=58078100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610650635.5A Active CN106238261B (en) 2016-08-10 2016-08-10 Colored Dacroment steel guard rail coating production line and operating procedure

Country Status (1)

Country Link
CN (1) CN106238261B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108339685B (en) * 2017-01-22 2023-05-12 黄翔鸥 Full-automatic spraying equipment for wind power bolts and working method of full-automatic spraying equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030136336A1 (en) * 2000-01-31 2003-07-24 Michel Fouvet Sprayer device for a motor vehicle body paint spray booth
CN101773901A (en) * 2009-12-09 2010-07-14 海洋王照明科技股份有限公司 Method for improving property of dacromet coating on surface of metal member
CN203470253U (en) * 2013-09-02 2014-03-12 中磁科技股份有限公司 Automatic Dacromet spraying curing system
CN104259040A (en) * 2014-10-30 2015-01-07 江苏诺升环保科技有限公司 Water curtain type coating production line paint spraying room
CN104289401A (en) * 2014-09-28 2015-01-21 合肥常菱汽车零部件有限公司 Dacromet treatment technological process
CN204583572U (en) * 2015-03-30 2015-08-26 湖北精诚钢结构股份有限公司 A kind of shaped steel automatic spraying production line

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030136336A1 (en) * 2000-01-31 2003-07-24 Michel Fouvet Sprayer device for a motor vehicle body paint spray booth
CN101773901A (en) * 2009-12-09 2010-07-14 海洋王照明科技股份有限公司 Method for improving property of dacromet coating on surface of metal member
CN203470253U (en) * 2013-09-02 2014-03-12 中磁科技股份有限公司 Automatic Dacromet spraying curing system
CN104289401A (en) * 2014-09-28 2015-01-21 合肥常菱汽车零部件有限公司 Dacromet treatment technological process
CN104259040A (en) * 2014-10-30 2015-01-07 江苏诺升环保科技有限公司 Water curtain type coating production line paint spraying room
CN204583572U (en) * 2015-03-30 2015-08-26 湖北精诚钢结构股份有限公司 A kind of shaped steel automatic spraying production line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
金属防腐新工艺—达克罗;魏计文;《武钢技术》;20021031;第40卷(第5期);P58-P60

Also Published As

Publication number Publication date
CN106238261A (en) 2016-12-21

Similar Documents

Publication Publication Date Title
CN204638439U (en) A kind of automatic coating ground path
CN105185950B (en) A kind of battery pole plates hot setting room and curing process
CN203470253U (en) Automatic Dacromet spraying curing system
CN101367072A (en) Automatic application product line for shock absorption noise silencing slice
CN204365522U (en) A kind of powder body coating production line
CN106238261B (en) Colored Dacroment steel guard rail coating production line and operating procedure
CN105666147B (en) The steel guardrail production line and production technology of epoxy zinc-base polyester composite coating
CN111085376A (en) Automobile wheel hub new paint UV solidification coating line
CN206262825U (en) A kind of strong cold house of automotive painting line
CN105834034A (en) Full-automatic paint spraying production line
CN205324026U (en) Solidification, dehydration stove integration heating system
CN102676974A (en) Thermal spraying galvanizing method of thin plate
CN205718515U (en) A kind of drying oven for spraying control system
CN204320624U (en) Automobile electric electrophoresis painting dressing prebake system
CN202893629U (en) Improved structure of baking oven for coating
CN204544581U (en) A kind of dual-purpose room of novel lacquering and stoving varnish
CN104140749B (en) Corrosion-inhibiting coating, the disconnecting switch spring part using this coating and preparation method thereof
CN203525932U (en) Local recirculating air utilizing device used on coating production line
CN206104222U (en) Automatic painting production line
CN215668081U (en) Device for cooling uneven high-temperature flue gas in tail end flue of converter
CN205572680U (en) A hot -air drying system for making plaster boards
CN204693809U (en) A kind of smokeless hot-blast stove
CN201711267U (en) Car bumper varnish spraying production line
CN205270074U (en) Curing oven is scribbled to coloured silk
CN208928444U (en) A kind of spray-painting production line of fuel injector and common rail

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 3188, Nanshou, Jizhou Road, Xishan Economic Development Zone, Weifang City, Shandong Province, 262513

Patentee after: Shandong Yuanda Transportation Technology Co.,Ltd.

Address before: No. 3188, Nanshou, Jizhou Road, Xishan Economic Development Zone, Weifang City, Shandong Province, 262513

Patentee before: WEIFANG YUANDA METAL SURFACE TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder