CN106238207A - A kind of electro dust removing method of high temperature height innage dust and gas body - Google Patents

A kind of electro dust removing method of high temperature height innage dust and gas body Download PDF

Info

Publication number
CN106238207A
CN106238207A CN201610773862.7A CN201610773862A CN106238207A CN 106238207 A CN106238207 A CN 106238207A CN 201610773862 A CN201610773862 A CN 201610773862A CN 106238207 A CN106238207 A CN 106238207A
Authority
CN
China
Prior art keywords
dust
high temperature
temperature height
gas body
removing equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610773862.7A
Other languages
Chinese (zh)
Inventor
朱书成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Longcheng Coal Efficient Technology Application Co Ltd
Original Assignee
Henan Longcheng Coal Efficient Technology Application Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Longcheng Coal Efficient Technology Application Co Ltd filed Critical Henan Longcheng Coal Efficient Technology Application Co Ltd
Priority to CN201610773862.7A priority Critical patent/CN106238207A/en
Publication of CN106238207A publication Critical patent/CN106238207A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03CMAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03C3/00Separating dispersed particles from gases or vapour, e.g. air, by electrostatic effect
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03CMAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03C3/00Separating dispersed particles from gases or vapour, e.g. air, by electrostatic effect
    • B03C3/34Constructional details or accessories or operation thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03CMAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03C3/00Separating dispersed particles from gases or vapour, e.g. air, by electrostatic effect
    • B03C3/34Constructional details or accessories or operation thereof
    • B03C3/74Cleaning the electrodes
    • B03C3/76Cleaning the electrodes by using a mechanical vibrator, e.g. rapping gear ; by using impact

Abstract

The invention belongs to dedusting technical field, be specifically related to the electro dust removing method of a kind of high temperature height innage dust and gas body.Described electro dust removing method comprises the following steps: first high temperature height innage dust and gas body is passed through electric dust-removing equipment, starts dust pelletizing system;Carrying out along with dedusting, temperature in electric dust-removing equipment is gradually consistent with high temperature height innage dust and gas temperature, and the putty cake on collecting polar plate is more and more thicker, when collecting polar plate can not meet dust removal requirement, close dust pelletizing system, high temperature height innage dust and gas body is passed through another electric dust-removing equipment;By regenerating unit, the collecting polar plate of out-of-work electric dust-removing equipment is regenerated, when the collecting polar plate of the electric dust-removing equipment in work can not normally work, electric dust-removing equipment after high temperature height innage dust and gas body is switched to regeneration again works on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.Electro dust removing method dedusting amount of the present invention is big, and efficiency is high, and step is simple, operates safety, low cost.

Description

A kind of electro dust removing method of high temperature height innage dust and gas body
Technical field
The invention belongs to dedusting technical field, be specifically related to the electro dust removing method of a kind of high temperature height innage dust and gas body.
Background technology
High temperature height innage dust and gas body is often produced in chemical industry, oil, metallurgy, building materials, oil shale, biological pyrolysis art, Containing materials such as substantial amounts of high temperature tar, class bituminous material and dust, and in mixed gas containing carbons easily separate out material such as tar, Class bituminous material only can exist with gaseous state in the environment of high temperature, and temperature is the most too low or environment once changes, just Easily separating out from gaseous mixture and be attached on filter mechanism, precipitate dust in dedusting gas is combined rapidly generation filter cake, causes Make filter mechanism lose filtering function, make production to continue.
In recent years, first high temperature height innage dust and gas body carries out preheating cleaner before being passed through cleaner, makes dedusting set Standby inner chamber preheating temperature is close to entering Temperature numerical during cleaner with high temperature height innage dust and gas body, reduces and easily analyses containing carbons Go out material such as tar, the precipitation of class bituminous material, improve the filtering function of cleaner, such as: Chinese patent CN104226028A discloses a kind of filtering dust method of high-temperature oil gas, steam, gaseous mixture containing the easy precipitate of carbons, logical Cross and separation gaseous mixture is connected with two or more filter plants and disconnects, can the filtration in a filter plant easily Mechanism works after a period of time, filter mechanism filter capacity because in surface and pore containing carbons easy precipitate such as tar Jiao, The combination of class bituminous material and coal ash attachment, thickeies and declines to a great extent so that can not meet when normally work, switching Go in another filter plant, it is ensured that separation process is uninterrupted;And out-of-work filter plant by with slow transit through Fertile absorber such as oxygen-containing gas, carbon dioxide containing gas, steam reaction, gradually adhere to the filter mechanism that Main Ingredients and Appearance is carbon Thing reacts away, and becomes the gases such as carbon monoxide and leaves in filter mechanism surface and pore, it is achieved filter mechanism filter capacity Regeneration.But, during industrialized production, cleaner is the hugest, the volume of the most hundreds of, thousands of cubes, the inside Parts more, inlet chamber and outlet chamber i.e. dedusting environment to whole system carry out high temperature preheating, can produce bigger warp Ji cost;Even more important property is, uses high-temperature gas or other modes to heat whole dedusting cavity and generally to introduce A large amount of high-temperature gases, and the high-temperature gas introduced easily is mixed into and treats in dedusting high temperature height innage dust and gas body, changes pyrolysis gas Composition, reduce its economy, the gas separating treatment in later stage is the most more complicated;The most general high temperature height innage dust and gas body is all easy Fire explosive, with the heat form such as high-temperature gas, electric heating, whole cavity is preheating to the behavior that the condition of high temperature is a kind of danger, also Its warm, the safety of dust removal process and reliable can be reduced because increasing electrothermal mechanism, the switching operation such as high-temperature gas Property.
Electric precipitation is the one of dedusting method, and dusty gas is electrically isolated through high-voltage electrostatic field, and grit is with negative On ions binding band after negative electricity, tend to anode surface electric discharge and deposit.In order to purify gas or to return in the industry such as metallurgical, chemical Receive useful grit, utilize electrostatic field to make gas ionization so that dust particles is adsorbed onto the collecting method on electrode.At highfield Middle air molecule is ionized as cation and electronics, and electronics marches on towards and runs into grit in anode process, makes that grit is electronegative to be adsorbed onto Positive pole is collected, and is usually used in the factory with coal as fuel, power station, collects the coal ash in flue gas and dust, is used for collecting in metallurgy The oxide of stannum, zinc, lead, aluminum etc..
Chinese patent CN105413871A discloses a kind of hot electrostatic precipitator subregion spray coupling moisture film and rinses ashman Skill and device, device final stage electric field purge mode is that subregion spray coupling continues the efficient deashing of moisture film, without anode and cathode vibration dust-cleaning System;Anode uses the composite material anode plate that surface moisture film film forming characteristics is good;Moisture film rinse-system water source quoted from filtered water tank, Moisture film flushing water supervisor and many anode water distributor firm welding composition independent pipe networks;Spray irrigation system water source is quoted from clear water Case, several arms are welded according to fishbone form in every spray irrigation supervisor both sides;Moisture film flushing liquid is by the bottom of anode water distributor Portion's apopore flows through composite material electrode plate surface, flows into sewage after the dust particles being deposited on positive plate surface being rinsed well Case;Foul water tank liquid is after horizontal screw centrifuge separates, and clear liquid pumps into filtered water tank, body refuse recycling;Spray irrigation pipe network sprays Pouring amount and startup frequency setting principle are changed to 0.5~2% for controlling moment smoke moisture.But, this patent is limited only to gas Measure less high temperature height innage dust and gas body, and the dust of oil-containing not easily pass through again and beats the dust removing on collecting polar plate, Still there are part tar and dust to be attached to collecting polar plate surface, affect collecting polar plate adsorption of dust ability.
Summary of the invention
For overcoming drawbacks described above, it is an object of the invention to provide the electro dust removing method of a kind of high temperature height innage dust and gas body, Dedusting amount is big, and efficiency is high, and step is simple, operates safety, low cost.
For achieving the above object, the present invention adopts the following technical scheme that
The electro dust removing method of a kind of high temperature height innage dust and gas body, comprises the following steps:
(1) n platform electric dust-removing equipment first in parallel, is passed through wherein m platform electric dust-removing equipment, n >=2, m < by high temperature height innage dust and gas body N, starts dust pelletizing system, is adsorbed by collecting polar plate after dust is charged, and tar separates out in mixed gas, and absorption is at collecting polar plate On, high temperature cleaning gaseous mixture is discharged in electric dust-removing equipment;
(2) along with the carrying out of dedusting, the temperature in electric dust-removing equipment is gradually consistent with high temperature height innage dust and gas temperature, dust collecting electrode Putty cake on plate is more and more thicker, when collecting polar plate can not meet dust removal requirement, closes dust pelletizing system, disconnects high temperature height innage dirt Gas and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket and discharges, When the collecting polar plate of the electric dust-removing equipment in work can not normally work, after high temperature height innage dust and gas body is switched to regeneration again Electric dust-removing equipment work on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
Preferably, described high temperature height innage dust and gas temperature is 250-750 DEG C, and flow is 5-30m3/min。
Preferably, described high temperature height innage dust and gas body tar content is 100-3000g/m3, it is 100-containing Dust Capacity 2000g/m3
Preferably, described regenerating unit is physics regenerating unit and/or chemical regeneration device.
Preferably, described physics regenerating unit be scrape mechanism, beat in mechanism and spraying and blowing organ one or more.
Preferably, scrape mechanism described in include being arranged on the first track of electric dust-removing equipment inwall vertical direction and with described The scraper being slidably connected on first track, the blade of described scraper contacts with described collecting polar plate surface.
Preferably, scrape mechanism described in and also include being arranged on the second track of electric dust-removing equipment inwall vertical direction and described The scraper plate being slidably connected on second track, described scraper plate arranges through hole, the cylindrical that the inner periphery of described through hole is excellent with corona discharge electrode Week matches.
Preferably, described chemical regeneration device is oxygen-containing gas input mechanism.
Preferably, described oxygen-containing gas is that air forms through the dilution of carbon dioxide, nitrogen or steam, carrier of oxygen Long-pending content is 0.1-2%.
Preferably, described oxygen-containing gas is that air forms through steam dilution.
The positive beneficial effect of the present invention:
1. the present invention is directly passed through atm number (5-30 m in electric dust-removing equipment3/ min) high temperature height innage dust and gas body, do not have Electric dust-removing equipment is preheated, reduces cost, and be not mixed into other compositions and be easy to later separation, operate also safety;This Invention is not under conditions of preheating electric dust-removing equipment, and a large amount of tar separate out, simultaneously along with the carrying out of dedusting, electric precipitation Temperature in equipment is gradually consistent, by regenerating unit to out-of-work electric dust-removing equipment with high temperature height innage dust and gas temperature Collecting polar plate regeneration, continue afterwards to be passed through high temperature height innage dust and gas body, due to the temperature in now electric dust-removing equipment and high temperature High innage dust and gas temperature is the most basically identical, and therefore, subsequent high temperature height innage dirt tar in gas is difficult to separate out, and dust more holds Easily absorption, oil removing efficiency of dust collection is high.
2. the present invention uses n platform electric dust-removing equipment in parallel, it is possible to realizes high temperature height innage dust and gas body and sets at multiple electric precipitations Standby upper switching, multiple electric dust-removing equipments will not interfere with each other, and both can use simultaneously, it is also possible to is used alone one, electric precipitation Equipment does not stop production alternate run, it is achieved dedusting tolerance double;The tar content of high temperature height innage dust and gas body of the present invention is 100-3000g/m3, it is 100-2000g/m containing Dust Capacity3, the treatment effeciency of tar and dust is all reached more than 80%, dedusting amount Greatly, efficiency is high.
Regenerating unit the most of the present invention is physics regenerating unit and/or chemical regeneration device, and described physics regenerating unit is for scraping Motivation structure, one or more beaten in mechanism and spraying and blowing organ, described in scrape mechanism and include being arranged on electric dust-removing equipment inwall First track of vertical direction and with the scraper that is slidably connected on described first track, the blade of described scraper and described dust collecting electrode Plate surface contacts, described in scrape mechanism and also include being arranged on second track and described second of electric dust-removing equipment inwall vertical direction The scraper plate being slidably connected on track, described scraper plate arranges through hole, the cylindrical phase that the inner periphery of described through hole is excellent with corona discharge electrode Coupling, of the present invention scrape mechanism and collecting polar plate and corona discharge electrode rod contact fully, collecting polar plate and corona discharge electrode rod regenerate Effective;Described chemical regeneration device is oxygen-containing gas input mechanism, and oxygen-containing gas sinks with collecting polar plate and corona discharge electrode rod surface Long-pending oxidable granule generation oxidation reaction, the function of the absorption dust of recovery collecting polar plate, and chemical regeneration device and thing Reason regenerating unit shares, and dedusting is thorough, favorable regeneration effect.Therefore, regenerating unit of the present invention is good to the cleaning effect of collecting polar plate, Easy to operate, low cost.
Oxygen-containing gas the most of the present invention is that air forms through steam dilution, and wherein oxygen and steam all can mix with high temperature Close the tar in gas, class bituminous material, coal ash attachment generation oxidation reaction, it is achieved the regeneration of filter mechanism, favorable regeneration effect.
The electro dust removing method dedusting amount of high temperature height innage dust and gas body the most of the present invention is big, and efficiency is high, and step is simple, operation peace Entirely, low cost.
Accompanying drawing explanation
Fig. 1 is one of electric dust-removing equipment structural representation scraping mechanism of the present invention;
Fig. 2 is that electric dust-removing equipment of the present invention scrapes the two of the structural representation of mechanism;
In figure: 1-electric dust-removing equipment, 21-the first track, 22-the second track, 3-scraper, 4-collecting polar plate, 5-scraper plate, 6-corona Extremely rod, 7-ash bucket.
Detailed description of the invention
Below in conjunction with some specific embodiments, the present invention is further described.
Embodiment 1
See Fig. 1 and Fig. 2, the electro dust removing method of a kind of high temperature height innage dust and gas body, comprise the following steps:
(1) first and ter platform electric dust-removing equipment, by temperature be 500 DEG C, flow be 5m3/ min, containing tar 3000g/m3, containing powder Dirt 2000g/m3High temperature height innage dust and gas body be passed through a wherein electric dust-removing equipment, start dust pelletizing system, the charged rear quilt of dust Collecting polar plate 4 adsorbs, and tar separates out in mixed gas, and absorption is on collecting polar plate 4, and high temperature cleaning gaseous mixture sets from electric precipitation Standby interior discharge;
(2) along with the carrying out of dedusting, electric dust-removing equipment internal temperature reaches 390 DEG C, and the temperature of inner components is 180 DEG C, collection Putty cake on dirt pole plate 4 is more and more thicker, and now collecting polar plate can not meet dust removal requirement, closes dust pelletizing system, disconnects high temperature High innage dust and gas body and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket 7 and arranges Going out, when the collecting polar plate 4 of the electric dust-removing equipment in work can not normally work, high temperature height innage dust and gas body is switched to again again Electric dust-removing equipment after life works on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
Described regenerating unit for scraping mechanism, described in scrape mechanism and include being arranged on electric dust-removing equipment 1 inwall vertical direction The first track 21 and with the scraper 3 that is slidably connected on described first track 21, the blade of described scraper 3 and described collecting polar plate 4 surface contacts;The described mechanism that scrapes also includes being arranged on second track 22 and described of electric dust-removing equipment 1 inwall vertical direction The scraper plate 5 being slidably connected on two tracks 22, described scraper plate 5 arranges through hole, outside the inner periphery of described through hole is with corona discharge electrode rod 6 Circumference matches.
Embodiment 2
See Fig. 1 and Fig. 2, the electro dust removing method of a kind of high temperature height innage dust and gas body, comprise the following steps:
(1) first and quarter platform electric dust-removing equipment, by temperature be 700 DEG C, flow be 25m3/ min, containing tar 3000g/m3, contain Dust 2000g/m3High temperature height innage dust and gas body be passed through wherein two electric dust-removing equipments, start dust pelletizing system, after dust is charged Being adsorbed by collecting polar plate 4, tar separates out in mixed gas, and absorption is on collecting polar plate 4, and high temperature cleaning gaseous mixture is from electric precipitation Discharge in equipment;
(2) along with the carrying out of dedusting, electric dust-removing equipment internal temperature reaches 680 DEG C, and the temperature of inner components is 660 DEG C, collection Putty cake on dirt pole plate is more and more thicker, and now collecting polar plate 4 can not meet dust removal requirement, closes dust pelletizing system, disconnects high temperature High innage dust and gas body and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket 7 and arranges Going out, when the collecting polar plate 4 of the electric dust-removing equipment in work can not normally work, high temperature height innage dust and gas body is switched to again again Electric dust-removing equipment after life works on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
Described regenerating unit for scraping mechanism, described in scrape mechanism and include being arranged on electric dust-removing equipment 1 inwall vertical direction The first track 21 and with the scraper 3 that is slidably connected on described first track 21, the blade of described scraper 3 and described collecting polar plate 4 surface contacts;The described mechanism that scrapes also includes being arranged on second track 22 and described of electric dust-removing equipment 1 inwall vertical direction The scraper plate 5 being slidably connected on two tracks 22, described scraper plate 5 arranges through hole, outside the inner periphery of described through hole is with corona discharge electrode rod 6 Circumference matches.
Embodiment 3
See Fig. 1 and Fig. 2, the electro dust removing method of a kind of high temperature height innage dust and gas body, comprise the following steps:
(1) first and ter platform electric dust-removing equipment, by temperature be 750 DEG C, flow be 15m3/ min, containing tar 3000g/m3, contain Dust 2000g/m3High temperature height innage dust and gas body be passed through a wherein electric dust-removing equipment, start dust pelletizing system, after dust is charged Being adsorbed by collecting polar plate 4, tar separates out in mixed gas, and absorption is on collecting polar plate 4, and high temperature cleaning gaseous mixture is from electric precipitation Discharge in equipment;
(2) along with the carrying out of dedusting, electric dust-removing equipment internal temperature reaches 680 DEG C, and the temperature of inner components reaches 680 DEG C, Putty cake on collecting polar plate is more and more thicker, and now collecting polar plate 4 can not meet dust removal requirement, closes dust pelletizing system, disconnects height The high innage dust and gas body of temperature and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket 7 and arranges Going out, when the collecting polar plate 4 of the electric dust-removing equipment in work can not normally work, high temperature height innage dust and gas body is switched to again again Electric dust-removing equipment after life works on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
Described regenerating unit for scraping mechanism, described in scrape mechanism and include being arranged on electric dust-removing equipment 1 inwall vertical direction The first track 21 and with the scraper 3 that is slidably connected on described first track 21, the blade of described scraper 3 and described collecting polar plate 4 surface contacts;The described mechanism that scrapes also includes being arranged on second track 22 and described of electric dust-removing equipment 1 inwall vertical direction The scraper plate 5 being slidably connected on two tracks 22, described scraper plate 5 arranges through hole, outside the inner periphery of described through hole is with corona discharge electrode rod 6 Circumference matches.
Embodiment 4
See Fig. 1 and Fig. 2, the electro dust removing method of a kind of high temperature height innage dust and gas body, comprise the following steps:
(1) first and quarter platform electric dust-removing equipment, by temperature be 750 DEG C, flow be 30m3/ min, containing tar 3000g/m3, contain Dust 2000g/m3High temperature height innage dust and gas body be passed through wherein two electric dust-removing equipments, start dust pelletizing system, after dust is charged Being adsorbed by collecting polar plate 4, tar separates out in mixed gas, and absorption is on collecting polar plate 4, and high temperature cleaning gaseous mixture is from electric precipitation Discharge in equipment;
(2) along with the carrying out of dedusting, electric dust-removing equipment internal temperature reaches 710 DEG C, and the temperature of inner components reaches 680 DEG C, Putty cake on collecting polar plate 4 is more and more thicker, and now collecting polar plate 4 can not meet dust removal requirement, closes dust pelletizing system, disconnects height The high innage dust and gas body of temperature and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket 7 and arranges Going out, when the collecting polar plate 4 of the electric dust-removing equipment in work can not normally work, high temperature height innage dust and gas body is switched to again again Electric dust-removing equipment after life works on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
Described regenerating unit is physics regenerating unit, and described physics regenerating unit is for scraping mechanism and beating mechanism, described Scrape mechanism include being arranged on the first track 21 of electric dust-removing equipment 1 inwall vertical direction and slide on described first track 21 The scraper 3 connected, the blade of described scraper 3 contacts with described collecting polar plate 4 surface;The described mechanism that scrapes also includes being arranged on electricity The scraper plate 5 being slidably connected on second track 22 of cleaner 1 inwall vertical direction and described second track 22, described scraper plate 5 On through hole is set, the inner periphery of described through hole matches with the excircle of corona discharge electrode rod 6;Described regenerating unit using method is first Beat after scraping.
Embodiment 5
The electro dust removing method of a kind of high temperature height innage dust and gas body, comprises the following steps:
(1) first and ter platform electric dust-removing equipment, by temperature be 600 DEG C, flow be 20m3/ min, containing tar 3000g/m3, contain Dust 2000g/m3High temperature height innage dust and gas body be passed through a wherein electric dust-removing equipment, start dust pelletizing system, after dust is charged Being adsorbed by collecting polar plate, tar separates out in mixed gas, and absorption is on collecting polar plate, and high temperature cleaning gaseous mixture sets from electric precipitation Standby interior discharge;
(2) along with the carrying out of dedusting, electric dust-removing equipment internal temperature reaches 560 DEG C, and the temperature of inner components reaches 510 DEG C, Putty cake on collecting polar plate is more and more thicker, and now collecting polar plate can not meet dust removal requirement, closes dust pelletizing system, disconnects high temperature High innage dust and gas body and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket and discharges, When the collecting polar plate of the electric dust-removing equipment in work can not normally work, after high temperature height innage dust and gas body is switched to regeneration again Electric dust-removing equipment work on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
Described chemical regeneration device is oxygen-containing gas input mechanism, and described oxygen-containing gas is that air is through steam dilution Becoming, oxygen volume content is 1%.
Embodiment 6
The electro dust removing method of a kind of high temperature height innage dust and gas body, comprises the following steps:
(1) first and ter platform electric dust-removing equipment, by temperature be 250 DEG C, flow be 10m3/ min, containing tar 3000g/m3, contain Dust 2000g/m3High temperature height innage dust and gas body be passed through a wherein electric dust-removing equipment, start dust pelletizing system, after dust is charged Being adsorbed by collecting polar plate, tar separates out in mixed gas, and absorption is on collecting polar plate, and high temperature cleaning gaseous mixture sets from electric precipitation Standby interior discharge;
(2) along with the carrying out of dedusting, electric dust-removing equipment internal temperature reaches 230 DEG C, and the temperature of inner components reaches 230 DEG C, Putty cake on collecting polar plate is more and more thicker, and now collecting polar plate can not meet dust removal requirement, closes dust pelletizing system, disconnects high temperature High innage dust and gas body and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket and discharges, When the collecting polar plate of the electric dust-removing equipment in work can not normally work, after high temperature height innage dust and gas body is switched to regeneration again Electric dust-removing equipment work on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
Described chemical regeneration device is oxygen-containing gas input mechanism, and described oxygen-containing gas is that air forms through nitrogen dilution, Oxygen volume content is 1%.
Embodiment 7
The electro dust removing method of a kind of high temperature height innage dust and gas body, comprises the following steps:
(1) first and ter platform electric dust-removing equipment, by temperature be 700 DEG C, flow be 30m3/ min, containing tar 3000g/m3, contain Dust 2000g/m3High temperature height innage dust and gas body be passed through wherein two electric dust-removing equipments, start dust pelletizing system, after dust is charged Being adsorbed by collecting polar plate, tar separates out in mixed gas, and absorption is on collecting polar plate, and high temperature cleaning gaseous mixture sets from electric precipitation Standby interior discharge;
(2) along with the carrying out of dedusting, electric dust-removing equipment internal temperature reaches 690 DEG C, and the temperature of inner components reaches 650 DEG C, Putty cake on collecting polar plate is more and more thicker, and now collecting polar plate can not meet dust removal requirement, closes dust pelletizing system, disconnects high temperature High innage dust and gas body and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket and discharges, When the collecting polar plate of the electric dust-removing equipment in work can not normally work, after high temperature height innage dust and gas body is switched to regeneration again Electric dust-removing equipment work on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
Described chemical regeneration device is oxygen-containing gas input mechanism, and described oxygen-containing gas is that air is dilute through carbon dioxide Releasing and form, oxygen volume content is 2%.
Embodiment 8
See Fig. 1 and Fig. 2, the electro dust removing method of a kind of high temperature height innage dust and gas body, comprise the following steps:
(1) first and quarter platform electric dust-removing equipment, by temperature be 700 DEG C, flow be 20m3/ min, containing tar 3000g/m3, contain Dust 2000g/m3High temperature height innage dust and gas body be passed through wherein two electric dust-removing equipments, start dust pelletizing system, after dust is charged Being adsorbed by collecting polar plate 4, tar separates out in mixed gas, and absorption is on collecting polar plate 4, and high temperature cleaning gaseous mixture is from electric precipitation Discharge in equipment;
(2) along with the carrying out of dedusting, electric dust-removing equipment internal temperature reaches 660 DEG C, and the temperature of inner components reaches 660 DEG C, Putty cake on collecting polar plate is more and more thicker, and now collecting polar plate 4 can not meet dust removal requirement, closes dust pelletizing system, disconnects height The high innage dust and gas body of temperature and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate 4 of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket 7 and arranges Going out, when the collecting polar plate 4 of the electric dust-removing equipment in work can not normally work, high temperature height innage dust and gas body is switched to again again Electric dust-removing equipment after life works on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
Described regenerating unit for scraping mechanism and chemical regeneration device, described in scrape mechanism and include being arranged on electric dust-removing equipment First track 21 of 1 inwall vertical direction and with the scraper 3 that is slidably connected on described first track 21, the blade of described scraper 3 Contact with described collecting polar plate 4 surface;The described mechanism that scrapes also includes being arranged on the second of electric dust-removing equipment 1 inwall vertical direction The scraper plate 5 being slidably connected on track 22 and described second track 22, described scraper plate 5 arranges through hole, the inner periphery of described through hole Match with the excircle of corona discharge electrode rod 6;Described chemical regeneration device is oxygen-containing gas input mechanism, and described oxygen-containing gas is empty Gas forms through steam dilution, and oxygen volume content is 1%, when regenerating unit uses, first by physics regenerating unit, quickly Remove the putty of attachment or floating ash, with scraper or scraping blade mechanical ashing, for removing the most thorough and comprehensive tiny piece Putty, realize removing with chemical regeneration device comprehensively thoroughly.
Embodiment 9
See Fig. 1 and Fig. 2, the electro dust removing method of a kind of high temperature height innage dust and gas body, comprise the following steps:
(1) first and ter platform electric dust-removing equipment, by temperature be 750 DEG C, flow be 15m3/ min, containing tar 3000g/m3, contain Dust 2000g/m3High temperature height innage dust and gas body be passed through a wherein electric dust-removing equipment, start dust pelletizing system, after dust is charged Being adsorbed by collecting polar plate 4, tar separates out in mixed gas, and absorption is on collecting polar plate 4, and high temperature cleaning gaseous mixture is from electric precipitation Discharge in equipment;
(2) along with the carrying out of dedusting, electric dust-removing equipment internal temperature reaches 690 DEG C, and the temperature of inner components reaches 580 DEG C, Putty cake on collecting polar plate 4 is more and more thicker, and now collecting polar plate 4 can not meet dust removal requirement, closes dust pelletizing system, disconnects height The high innage dust and gas body of temperature and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket 7 and arranges Going out, when the collecting polar plate 4 of the electric dust-removing equipment in work can not normally work, high temperature height innage dust and gas body is switched to again again Electric dust-removing equipment after life works on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
Described regenerating unit for scraping mechanism and spraying and blowing organ, described in scrape mechanism and include being arranged in electric dust-removing equipment 1 First track 21 of wall vertical direction and with the scraper 3 that is slidably connected on described first track 21, the blade of described scraper 3 and institute State the contact of collecting polar plate 4 surface;The described mechanism that scrapes also includes being arranged on the second track of electric dust-removing equipment 1 inwall vertical direction 22 and described second track 22 on the scraper plate 5 that is slidably connected, described scraper plate 5 arranges through hole, the inner periphery of described through hole and electricity The excircle of dizzy extremely rod 6 matches;When regenerating unit uses, use spraying and blowing organ first by after scraping mechanism.
Embodiment 10
See Fig. 1 and Fig. 2, the electro dust removing method of a kind of high temperature height innage dust and gas body, comprise the following steps:
(1) first and quarter platform electric dust-removing equipment, by temperature be 600 DEG C, flow be 30m3/ min, containing tar 3000g/m3, contain Dust 2000g/m3High temperature height innage dust and gas body be passed through wherein two electric dust-removing equipments, start dust pelletizing system, after dust is charged Being adsorbed by collecting polar plate 4, tar separates out in mixed gas, and absorption is on collecting polar plate 4, and high temperature cleaning gaseous mixture is from electric precipitation Discharge in equipment;
(2) along with the carrying out of dedusting, electric dust-removing equipment internal temperature reaches 560 DEG C, and the temperature of inner components reaches 560 DEG C, Putty cake on collecting polar plate 4 is more and more thicker, and now collecting polar plate 4 can not meet dust removal requirement, closes dust pelletizing system, disconnects height The high innage dust and gas body of temperature and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket 7 and arranges Going out, when the collecting polar plate 4 of the electric dust-removing equipment in work can not normally work, high temperature height innage dust and gas body is switched to again again Electric dust-removing equipment after life works on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
Described regenerating unit for scraping mechanism and chemical regeneration device, described in scrape mechanism and include being arranged on electric dust-removing equipment First track 21 of 1 inwall vertical direction and with the scraper 3 that is slidably connected on described first track 21, the blade of described scraper 3 Contact with described collecting polar plate 4 surface;The described mechanism that scrapes also includes being arranged on the second of electric dust-removing equipment 1 inwall vertical direction The scraper plate 5 being slidably connected on track 22 and described second track 22, described scraper plate 5 arranges through hole, the inner periphery of described through hole Match with the excircle of corona discharge electrode rod 6;Described chemical regeneration device is oxygen-containing gas input mechanism, and described oxygen-containing gas is empty Gas forms through steam dilution, and oxygen volume content is 0.1%, when regenerating unit uses, first by physics regenerating unit, soon Speed removes the putty of attachment or floating ash, with scraper or scraping blade mechanical ashing, the most thorough and comprehensive tiny for removing The putty of block, realizes the most thoroughly removing with chemical regeneration device.
Comparative example 1
Electro dust removing method of the present invention is similar to Example 8, and something in common does not repeats, somewhat different: be passed through high temperature height oil First electric dust-removing equipment is preheated before high dust and gas body, make electric dust-removing equipment internal temperature uniformity, reach 660 DEG C, then It is passed through high temperature height innage dust and gas body again, opens dust pelletizing system.
Comparative example 2
Electro dust removing method of the present invention is similar to Example 8, and something in common does not repeats, somewhat different: high temperature height innage dust and gas Body flow is 4.5m3/ min, electric dust-removing equipment internal temperature reaches 550 DEG C, when the temperature of inner components reaches 420 DEG C, cuts Shift to another electric dust-removing equipment.
Application test
The filter method using embodiment of the present invention 1-10 and comparative example 1-2 processes Henan dragon coal-forming high efficiency technical and applies limited public affairs The high temperature height innage dust and gas body of department, runs one week, the results are shown in Table 1.
Table 1 embodiment of the present invention 1-10 and comparative example 1-2 result
As shown in Table 1, electro dust removing method of the present invention is compared to comparative example's 1-2 dust collection method, embodiment of the present invention 1-10 Directly in electric dust-removing equipment, it is passed through atm number (5-30m3/ min) high temperature height innage dust and gas body, by regenerating unit of the present invention In time to attached ash parts regeneration, pass through with comparative example 1 through whole cyclic process, tar removing of the present invention and chalk dust removing efficiency The electric dust-removing equipment treatment effect of preheating is close, but, hence it is evident that it is better than comparative example 2, illustrates that electric dust-removing equipment of the present invention exists In the case of not preheating, still can high efficiency dedusting oil removing, and embodiment 8 uses and scrapes mechanism and oxygen-containing gas is defeated Entering mechanism when sharing, described oxygen-containing gas is that air forms, when oxygen volume content is 1%, to tar and powder through steam dilution The treatment effect of dirt is best.
Finally illustrating, above example is only in order to illustrate technical scheme and unrestricted, and this area is common Other amendment or equivalents that technical scheme is made by technical staff, without departing from technical solution of the present invention Spirit and scope, all should contain in the middle of scope of the presently claimed invention.

Claims (10)

1. the electro dust removing method of a high temperature height innage dust and gas body, it is characterised in that comprise the following steps:
(1) n platform electric dust-removing equipment first in parallel, is passed through wherein m platform electric dust-removing equipment, n >=2, m < by high temperature height innage dust and gas body N, starts dust pelletizing system, is adsorbed by collecting polar plate after dust is charged, and tar separates out in mixed gas, and absorption is at collecting polar plate On, high temperature cleaning gaseous mixture is discharged in electric dust-removing equipment;
(2) along with the carrying out of dedusting, the temperature in electric dust-removing equipment is gradually consistent with high temperature height innage dust and gas temperature, dust collecting electrode Putty cake on plate is more and more thicker, when collecting polar plate can not meet dust removal requirement, closes dust pelletizing system, disconnects high temperature height innage dirt Gas and the connection of described electric dust-removing equipment, be passed through another electric dust-removing equipment by high temperature height innage dust and gas body;
(3) being regenerated the collecting polar plate of out-of-work electric dust-removing equipment by regenerating unit, putty cake falls in ash bucket and discharges, When the collecting polar plate of the electric dust-removing equipment in work can not normally work, after high temperature height innage dust and gas body is switched to regeneration again Electric dust-removing equipment work on, the like, it is achieved the periodicity alternation of multiple electric dust-removing equipments and regeneration.
The electro dust removing method of high temperature height innage dust and gas body the most according to claim 1, it is characterised in that described high temperature height oil High dust and gas temperature is 250-750 DEG C, and flow is 5-30m3/min。
The electro dust removing method of high temperature height innage dust and gas body the most according to claim 1, it is characterised in that described high temperature height oil High dust and gas body tar content is 100-3000g/m3, it is 100-2000g/m containing Dust Capacity3
The electro dust removing method of high temperature height innage dust and gas body the most according to claim 1, it is characterised in that described regenerating unit For physics regenerating unit and/or chemical regeneration device.
The electro dust removing method of high temperature height innage dust and gas body the most according to claim 4, it is characterised in that described physics regenerates Device be scrape mechanism, beat in mechanism and spraying and blowing organ one or more share.
The electro dust removing method of high temperature height innage dust and gas body the most according to claim 5, it is characterised in that described in scrape mechanism Including be arranged on electric dust-removing equipment inwall vertical direction the first track and with the scraper that is slidably connected on described first track, institute The blade stating scraper contacts with described collecting polar plate surface.
The electro dust removing method of high temperature height innage dust and gas body the most according to claim 6, it is characterised in that described in scrape mechanism Also include the scraper plate being slidably connected on the second track being arranged on electric dust-removing equipment inwall vertical direction and described second track, institute Stating and arrange through hole on scraper plate, the inner periphery of described through hole matches with the excircle of corona discharge electrode rod.
8. according to the electro dust removing method of the high temperature height innage dust and gas body described in any one of claim 4-7, it is characterised in that described Chemical regeneration device is oxygen-containing gas input mechanism.
The electro dust removing method of high temperature height innage dust and gas body the most according to claim 8, it is characterised in that described oxygen-containing gas Forming through the dilution of carbon dioxide, nitrogen or steam for air, oxygen volume content is 0.1-2%.
The electro dust removing method of high temperature height innage dust and gas body the most according to claim 9, it is characterised in that described oxygenous Body is that air forms through steam dilution.
CN201610773862.7A 2016-08-31 2016-08-31 A kind of electro dust removing method of high temperature height innage dust and gas body Pending CN106238207A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610773862.7A CN106238207A (en) 2016-08-31 2016-08-31 A kind of electro dust removing method of high temperature height innage dust and gas body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610773862.7A CN106238207A (en) 2016-08-31 2016-08-31 A kind of electro dust removing method of high temperature height innage dust and gas body

Publications (1)

Publication Number Publication Date
CN106238207A true CN106238207A (en) 2016-12-21

Family

ID=58080754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610773862.7A Pending CN106238207A (en) 2016-08-31 2016-08-31 A kind of electro dust removing method of high temperature height innage dust and gas body

Country Status (1)

Country Link
CN (1) CN106238207A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108355451A (en) * 2018-05-03 2018-08-03 宿州冬宇环保科技有限公司 A kind of flue dust desulfurization and denitrification integral deduster
CN111185302A (en) * 2020-03-05 2020-05-22 广州欧享科技有限公司 Electrostatic precipitator formula air purification device
WO2020187305A1 (en) * 2019-03-20 2020-09-24 上海必修福企业管理有限公司 Low specific resistance substance treatment method and treatment device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2710754Y (en) * 2003-05-11 2005-07-20 任梅 Off-line pulsation static dust-remover for removing ash
US20090218145A1 (en) * 2007-05-09 2009-09-03 Branch James A Method and apparatus for removing metal cuttings from an oil well drilling mud stream
CN201454688U (en) * 2009-08-27 2010-05-12 李爱军 Highly-effective electric dust catcher capable of achieving off-line deashing
CN201609674U (en) * 2010-02-11 2010-10-20 河南中材环保有限公司 Electrostatic dust collection system
CN203565195U (en) * 2013-11-05 2014-04-30 福建龙净环保股份有限公司 Electric dust precipitator
CN203694784U (en) * 2014-01-13 2014-07-09 河南龙成煤高效技术应用有限公司 Ash scraping device for filter elements of dust collector
CN104226028A (en) * 2014-08-14 2014-12-24 河南龙成煤高效技术应用有限公司 Dust filter method of mixed gas of high-temperature oil gas, vapor and carbon-containing precipitates
CN204122253U (en) * 2014-09-02 2015-01-28 中国人民解放军总后勤部建筑工程研究所 A kind of automatic cleaning apparatus for electrostatic precipitation case
DE202016000886U1 (en) * 2016-02-11 2016-03-02 Institut für Energieverfahrenstechnik & Fluidmechanik GmbH Automatic brush cleaning for precipitation electrodes of plate electrostatic precipitators

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2710754Y (en) * 2003-05-11 2005-07-20 任梅 Off-line pulsation static dust-remover for removing ash
US20090218145A1 (en) * 2007-05-09 2009-09-03 Branch James A Method and apparatus for removing metal cuttings from an oil well drilling mud stream
CN201454688U (en) * 2009-08-27 2010-05-12 李爱军 Highly-effective electric dust catcher capable of achieving off-line deashing
CN201609674U (en) * 2010-02-11 2010-10-20 河南中材环保有限公司 Electrostatic dust collection system
CN203565195U (en) * 2013-11-05 2014-04-30 福建龙净环保股份有限公司 Electric dust precipitator
CN203694784U (en) * 2014-01-13 2014-07-09 河南龙成煤高效技术应用有限公司 Ash scraping device for filter elements of dust collector
CN104226028A (en) * 2014-08-14 2014-12-24 河南龙成煤高效技术应用有限公司 Dust filter method of mixed gas of high-temperature oil gas, vapor and carbon-containing precipitates
CN204122253U (en) * 2014-09-02 2015-01-28 中国人民解放军总后勤部建筑工程研究所 A kind of automatic cleaning apparatus for electrostatic precipitation case
DE202016000886U1 (en) * 2016-02-11 2016-03-02 Institut für Energieverfahrenstechnik & Fluidmechanik GmbH Automatic brush cleaning for precipitation electrodes of plate electrostatic precipitators

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108355451A (en) * 2018-05-03 2018-08-03 宿州冬宇环保科技有限公司 A kind of flue dust desulfurization and denitrification integral deduster
WO2020187305A1 (en) * 2019-03-20 2020-09-24 上海必修福企业管理有限公司 Low specific resistance substance treatment method and treatment device
CN111185302A (en) * 2020-03-05 2020-05-22 广州欧享科技有限公司 Electrostatic precipitator formula air purification device

Similar Documents

Publication Publication Date Title
CN203737050U (en) Asphalt waste gas purification device
CN102430478A (en) Device and method for removing PM 2.5 from smoke
CN104437046B (en) Catalytic cracking flue gas desulfurization and dust collecting process and device thereof
CN106238207A (en) A kind of electro dust removing method of high temperature height innage dust and gas body
CN101732963A (en) Multiphase flow smoke purifying process
CN105642080A (en) Device and method for purifying flue gases
CN103990364A (en) Incineration flue gas treatment system and incineration flue gas treatment method
CN206325351U (en) A kind of smoke dust filter in petrochemical industry process
CN106621661A (en) Process method and device for ultra-clean discharge treatment of dust-containing steam in steel slag rolling region
CN105999962A (en) Asphalt flue gas purification treatment equipment
CN104437069A (en) Desulfurization and dust-removal device and desulfurization and dust-removal method of membrane separation circulating fluidized bed
CN105251300A (en) Waste gas dedusting device and method for tunnel kiln
CN201208539Y (en) Coking waste-gas combination purification apparatus
CN104492212A (en) Combined integrated photoelectric lampblack purification process
CN104107613A (en) Asphalt flue gas processing system and processing technology
CN213492812U (en) Flue gas treatment system
US1413877A (en) Process and apparatus for collecting suspended material from furnace gases
CN101429579B (en) Purification method and apparatus for blast furnace gas
CN203737099U (en) Corrugated packing type staged water-film smoke suppression and desulphurization dust precipitator
CN203155019U (en) Exhaust gas purifier
CN206414910U (en) A kind of device that ultra-clean emission treatment is carried out to slag rolling area dust-laden steam
CN211726167U (en) Coal tar hydrogenation tar sediment cooling VOCs gas cleaning device
CN205699958U (en) Purification dust removal system
CN2582724Y (en) Twing cyclone impact type cyclone plate exhaust gas purifying device
CN106255541A (en) For purifying the method and apparatus of the gas containing pollutant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221