Apparatus of the present invention are to avoid above-mentioned the deficiencies in the prior art part and propose a kind of have injection, pressure buffer, and the pressure-discharging gas recovering device of dedusting and dehydration is so that reclaim pressure-discharging gas and better dedusting, save energy, decontamination as early as possible.
Apparatus of the present invention can reach by following measure: at the furnace roof tornado dust collector to the coal-gas recovering pipeline between the purified gas pipe network, remove former single injector, replace by injector venturi scrubber, the pressure retrieving arrangement-step-down tower of water trap three organic composition.In Venturi meter aditus laryngis front portion injection medium nozzle is set, constitutes the injector structure, water-jet is set at Venturi meter aditus laryngis place constitutes the venturi scrubber structure; Venturi meter inserts again in the bigger container and makes it to constitute water trap, and whole device is a sealed construction.The outer container of water trap is cylindrical, and upper and lower ends is taper shape, and Venturi meter is inserted by the center of top cone, and the bottom of bottom cone is provided with soot cleaning valve, and the grey water slurry of separating out from medium is discharged from here, and whole device is supported by several pillars.Reclaim coal gas and injection medium all from Venturi meter enter water trap and from it the cone sidepiece come out to enter the purified gas pipe network.The injection medium is low-pressure steam or adopts half purified gas.Can also in container, spray water by water trap top cone, to increase dust removing effects.
Embodiment is described in further detail apparatus of the present invention below in conjunction with accompanying drawing:
Fig. 1: pressure-discharging gas from top charging equipment 1 through purge valve 2, tornado dust collector 3, recovery valve 12, recovery channel 13 enter this device-step-down tower.This step-down tower is by Venturi meter 7, and injection medium nozzle 9, water-jet 8, tower shell 6, deashing slurry valve 18 and pillar 19 are formed.The injection medium is through injection valve 10, injection medium pipeline 11, by 9 ejections of injection medium nozzle.The dedusting bath water is through water valve 14, and water for cleaning pipe 15 is sprayed to Venturi meter aditus laryngis place by water-jet 8.After pressure-discharging gas enters the step-down tower, enter purified gas pipe network 17 through vent pipe 16.When loading device need all be pressed, all press coal gas through pressure-equalizing passageway 5, equalizing valve 4, tornado dust collector 3 enter loading device 1.When all pressing, all press coal gas that the dust blowback that deposits in the tornado dust collector is gone in the loading device, whole all pressures and pressure-discharging gas system and equipment are sealed construction.Step-down tower shell 6 is a right cylinder, upper and lower ends band cone structure formula sealed vessel.
Fig. 2 is the structure diagram of Venturi meter injector.7 is Venturi meter, and 8 is water-jet, and 9 is injection medium nozzle, and 10 is the injection valve, and 11 is the injection medium pipeline, and 13 is the pressure-discharging gas recovery tube, and 14 is water valve, and 15 is water pipe.Water-jet 8 is arranged at the aditus laryngis place of Venturi meter 7, and injection medium nozzle 9 is arranged at the front end of Venturi meter aditus laryngis.
In this step-down tower apparatus, injection medium nozzle 9 is arranged at Venturi meter 7 aditus laryngis front ends, constitutes the injector structure; Venturi meter 7 aditus laryngis places are provided with water-jet 8 makes it to constitute the venturi scrubber structure; Venturi meter 7 inserts step-down tower shell 6, makes it to constitute evaporator structure.
The working process of this device of brief description.Because of top charging equipment 1 is periodically to carry out material feeding, all pressure, discharge, row pressure work, therefore, this device is also periodically worked.During row pressure, the pressure in the top charging equipment 1 is about 0.25MPa, and the pressure in the purified gas pipe network 17 is~0.01MPa.Pressure-discharging gas enters tornado dust collector 3 through purge valve 2 and carries out thick dedusting, and again through recovery valve 12, recovery channel 13 enters the step-down tower apparatus, after step-down tower delivery line 16 enters purified gas pipe network 17.At the row pressure initial stage, batch can pressure is higher, and is bigger with the pressure reduction of purified gas pipe network, and pressure-discharging gas can be discharged with higher speed.At this moment, still have higher pressure and speed during the aditus laryngis of pressure-discharging gas process Venturi meter 7, therefore, spray water to Venturi meter 7 aditus laryngis places by water-jet 8 through water valve 14 and water pipe 15, decrease with the resistance that increases the aditus laryngis place, consume portion of energy, thereby reduce compression shock the purified gas pipe network.Simultaneously, the water of ejection produces turbulent flow with coal gas, and moistening dust is grown up its accumulation, thus after entering water trap because air flow divert, by inertia and gravity it is removed from air-flow, reach dust separating purpose.When the pressure of loading device 1 is reduced to 0.06~0.08MPa fast, reduce with purified gas pipe network pressure reduction, its pressure underspeeds and can reduce greatly.At this moment, for shortening the coal-gas recovering time, open injection valve 10, the injection medium is sprayed to Venturi meter 7 by nozzle 9 through pipeline 11, and injection coal gas impels the pressure in the loading device to reduce fast.Pressure was 0.3~1MPa when the injection medium adopted steam, and pressure is higher, and the beginning injection time during comparable coal gas injection, the injection effect was better in advance.After the high pressure steam ejection, pressure is sharply reduced to very low, causes bigger temperature to fall, and makes the steam cold junction after the ejection become water smoke, produces turbulent flow with the coal gas of injection, and the dust in the coal gas is had wetting action preferably, can play dust removing effects preferably.Vapor condenses Cheng Shuihou is discharged in coal gas in water trap, and the volume of unlikely increase coal gas has alleviated the impact to purified gas pipe network 17.Because steam ejection has had dust removing effects simultaneously, at this moment can turn off water valve 14 for save energy, but when adopting half purified gas injection, water valve 14 must be opened still, to guarantee dust separating continuation.In the water trap, for increasing its dust removing effects, also can continue the water spray washing on housing top, water in the water trap and mortar are discharged from soot cleaning valve 18.Water trap is a bigger container, after pressure-discharging gas enters, can fully expand, and gas flow rate slows down, and pressure reduces, and can reduce the impact to the purified gas pipe network greatly, and the whole recovery time was 20~30 seconds, and the time can be played shock absorption preferably than weak point.
Reduce to 0.01MPa when following when the pressure in the loading device 1, close injection valve 10, water valve 14, recovery valve 12, purge valve 2, the loading device row pressure finishes.Loading device 1 is feeded then, all presses, and all presses coal gas by equaler 5, through equalizing valve 4, fly-ash separator 3 the dust blowback is returned in the loading device 1.Carry out discharge after all pressing end, carry out row pressure then again, work periodically.
Apparatus of the present invention have the following advantages than prior art:
1. employing injector, venturi scrubber and dehydrator organically combine, and the structure that forms a whole has preferably dust removing effects, can make the gas recovery dustiness drop to 100mg/Nm3Below, the ash that has alleviated purified gas is loaded the unlikely chamber of hot-blast stove that has influence on, coke oven regenerator life-span.
2. water trap has bigger cavity, and being condensed into water after the ejection of the steam of injection separates out from air-flow, gas pressure is reduced, fully expanded, flow velocity slows down, the coal gas amount does not have unexpected bigger increase, has reduced the impact to the purified gas pipe network greatly, helps users' such as hot blast stove burning operation.
3. this apparatus structure compactness, simple, little, easy to maintenance, the reliable operation of volume.