CN1062329C - 两阶段煤炭地下气化工艺 - Google Patents

两阶段煤炭地下气化工艺 Download PDF

Info

Publication number
CN1062329C
CN1062329C CN95103446A CN95103446A CN1062329C CN 1062329 C CN1062329 C CN 1062329C CN 95103446 A CN95103446 A CN 95103446A CN 95103446 A CN95103446 A CN 95103446A CN 1062329 C CN1062329 C CN 1062329C
Authority
CN
China
Prior art keywords
stage
coal
water vapour
gasification
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN95103446A
Other languages
English (en)
Other versions
CN1183507A (zh
Inventor
余力
张维廉
梁杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN95103446A priority Critical patent/CN1062329C/zh
Priority to AU27314/95A priority patent/AU2731495A/en
Priority to PCT/CN1995/000050 priority patent/WO1996028637A1/zh
Publication of CN1183507A publication Critical patent/CN1183507A/zh
Application granted granted Critical
Publication of CN1062329C publication Critical patent/CN1062329C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/243Combustion in situ

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Industrial Gases (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

一种两阶段煤炭地下气化工艺,最适于矿井报废煤炭资源的地下气化,在矿井煤层中建立长通道的大断面地下气化炉,向地下气化炉循环供给空气和水蒸,第一阶段鼓入空气,第二阶段鼓入水蒸汽,气化炉的进排气孔设在煤层底板,沿煤层打倾斜孔,将气化炉上的测温孔、蒸汽孔、进气孔、排气孔顺序连通,构成气化通道。能生产出两种热值不同的煤气,可作为工业燃料或发电用,也可作为城市民用和化工原料气,提高了气化效率,大大降低了煤气成本,具有广泛的实用性。

Description

两阶段煤炭地下气化工艺
本发明涉及两阶段煤炭地下气化工艺,尤其适用于利用矿井报废煤炭资源的地下气化。
长期以来,国内外都采用连续供给固定组份的气化剂来进行煤炭地下气化技术的研究和开发利用,这些气化剂大部分是空气或富氧空气及添加水蒸汽,而采用空气或低浓度的富氧空气作气化剂时,由于气化剂中N2含量高,使得出口煤气中也含有较大组份(50%以上)的N2,因此煤气中可燃组份的含量及发热量都较低,从而限制了产品煤气的使用;采用高浓度的富氧空气作气化剂时,由于受制氧技术水平的限制,其制氧成本较高,因而使煤气成本大幅度增加。美国专利US3,734,184公开了一种煤炭地下气化的方法,气化炉仅有进、排气井,气化通道用高压液体压裂形成渗流通道,其炉费用高、供风阻力大;由进气井鼓入空气,其炉内形成的高温区范围小,温度低,水蒸汽会在低温进气井凝结,其分解率低,建炉费用高,供风阻力大,故煤气成本很高。
鉴于已有技术存在的问题,本发明的目的是提供一种使炉内形成高温区范围大、温度高,产品煤气使用范围扩大,降低煤气成本的两阶段煤炭地下气化工艺。
本发明的目的是这样完成的:在矿井煤层中建立长通道的大断面地下气化炉,向地下气化炉交替循环供给空气和水蒸汽,每个循环由两个阶段组成,第一阶段鼓入空气,第二阶段鼓入水蒸汽,气化炉的进排气孔设在煤层底板,沿煤层打倾斜孔,将气化炉上的测温孔、蒸汽孔、进气孔、排气孔顺序连通,构成气化通道。第一阶段鼓入空气是从进气孔和相邻一个或一个以上的辅助孔同时鼓入空气,为蓄热阶段,生产低热值鼓风煤气,当CO和CO2的百分比含量之和达到26%以上时,停止鼓风,改鼓水蒸汽,进入第二阶段。第二阶段鼓入水蒸汽是从蒸汽孔鼓入水蒸汽,为生产高热值地下水煤气阶段,当出口煤气中CO含量低于5%时,停止鼓入水蒸汽,由进气孔重新鼓入空气,实现一个循环。
本发明两阶段煤炭地下气化工艺,最适用于矿井报废煤炭资源的地下气化,将气化炉的进排气孔设在煤层底板,沿煤层打倾斜孔,将气化炉上的测温孔、蒸汽孔、进气孔、排气孔顺序连通,构成气化通道。与已有技术相比:第一阶段形成的高温区范围大、温度高,可生产热值在4.18MJ/m3左右的煤气,可作为工业燃料或发电;第二阶段水蒸汽分解率提高,不仅不会凝结,而且会进一步被加热,提高水蒸汽的温度,可生产热值在2.56MJ/m3以上的煤气,可燃组份的含量在80%以上,而且消除了N2对煤气热值的影响,N2含量低于4%,可作为城市民用或生产醇的原料气。由于能生产两种热值不同的煤气,可供区别或混合使用,即提高了气化效率,又能在第二阶段获得热值在10m3/Nm3以上的高热值煤气,使煤炭大幅度增值,降低了煤气成本,具有广泛的实用性。本发明两阶段煤炭地下气化工艺,在矿井煤层中建立长通道的大断面地下气化炉,向地下气化炉交替循环供给空气和水蒸汽,每个循环分两个阶段,第一阶段为鼓入空气蓄热阶段,生产低热值鼓风煤气;第二阶段为鼓入水蒸汽阶段,生产高热值地下水煤气。将气化炉的进排气孔设在煤层底板,沿煤层打倾斜孔,将气化炉上的测温孔、蒸汽孔、进气孔、排气孔顺序连通,构成气化通道。第一阶段鼓入空气是从进气孔和相邻一个或一个以上的辅助孔同时鼓入空气,随时观测煤气组份及热值,当CO和CO2的百分比含量之和达到26%以上时,则立即停止鼓风,改鼓水蒸汽,进入第二阶段。第二阶段从蒸汽孔鼓入水蒸汽,并随时测量出口煤气的组份及热值,当出口煤气中CO含量低于5%时,则停止鼓入水蒸汽,进气孔重新鼓入空气,实现一个循环。当第一阶段鼓风量为3600m3/h,第一阶段和第二阶段的时间比为1∶1,第二阶段高热值地下水煤气的组份及热值见附表。
  表2新河二号井煤炭地下气化半工业性试验两阶段气化工艺试验结果
                 1994年(第二阶段)
Figure 9510344600051

Claims (3)

1.一种两阶段煤炭地下气化工艺,在矿井煤层中建立长通道的大断面地下气化炉,向地下气化炉循环供给空气和水蒸汽,每个循环由两个由阶段组成,第一阶段鼓入空气,第二分阶段鼓入水蒸汽,其特征在于:气化炉的进排气孔设在煤层底板,沿煤层打倾斜孔,将气化炉上的测温孔、蒸汽孔、进气孔、排气孔顺序连通,构成气化通道。
2.根据权利要求1所述的一种两阶段煤炭地下气化工艺,其特征在于:所述的第一阶段鼓入空气是从进气孔和相邻一个或一个以上的辅助孔同时鼓入空气,当CO和CO2的百分比含量之和达到26%以上时,停止鼓风,改鼓水蒸汽,进入第二阶段。
3.根据权利要求1或2所述的一种两阶段煤炭地下气化工艺,其特征在于:所述的第二阶段鼓入水蒸汽是从蒸汽孔鼓入水蒸汽,当出口煤气中CO含量低于5%时,停止鼓入水蒸汽,改供空气,完成一个循环。
CN95103446A 1995-03-14 1995-03-14 两阶段煤炭地下气化工艺 Expired - Fee Related CN1062329C (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN95103446A CN1062329C (zh) 1995-03-14 1995-03-14 两阶段煤炭地下气化工艺
AU27314/95A AU2731495A (en) 1995-03-14 1995-06-14 A two-stage of method for gasificating undergrounds coal in situ
PCT/CN1995/000050 WO1996028637A1 (fr) 1995-03-14 1995-06-14 Procede a deux etapes pour la gazeification in situ du charbon souterrain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN95103446A CN1062329C (zh) 1995-03-14 1995-03-14 两阶段煤炭地下气化工艺

Publications (2)

Publication Number Publication Date
CN1183507A CN1183507A (zh) 1998-06-03
CN1062329C true CN1062329C (zh) 2001-02-21

Family

ID=5074724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN95103446A Expired - Fee Related CN1062329C (zh) 1995-03-14 1995-03-14 两阶段煤炭地下气化工艺

Country Status (3)

Country Link
CN (1) CN1062329C (zh)
AU (1) AU2731495A (zh)
WO (1) WO1996028637A1 (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101382065B (zh) * 2008-09-04 2012-05-02 乌兰察布新奥气化采煤技术有限公司 无井式地下气化工艺
US9435184B2 (en) 2012-06-28 2016-09-06 Carbon Energy Limited Sacrificial liner linkages for auto-shortening an injection pipe for underground coal gasification
US9428978B2 (en) * 2012-06-28 2016-08-30 Carbon Energy Limited Method for shortening an injection pipe for underground coal gasification
AU2017274582B2 (en) * 2016-06-03 2021-01-28 Wildfire Energy Pty Ltd Production of a gas and methods therefor
CN111101942B (zh) * 2018-10-29 2021-08-06 西安科技大学 倾斜特厚煤层放顶煤开采下盘残留煤炭回收方法及系统
CN109252842B (zh) * 2018-10-29 2024-04-12 邓晓亮 超临界煤炭地下气化产出混合气体三联供发电系统
CN110749522B (zh) * 2019-11-13 2020-09-22 扎鲁特旗扎哈淖尔煤业有限公司 一种粉碎式煤品质鉴别装置
CN114856525B (zh) * 2021-02-04 2024-03-01 中国石油天然气集团有限公司 模拟煤炭地下气化产出粗煤气集输的实验系统及方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US426357A (en) * 1890-04-22 Attachment for saw-mills
US3734184A (en) * 1971-06-18 1973-05-22 Cities Service Oil Co Method of in situ coal gasification
US4269809A (en) * 1979-12-19 1981-05-26 Uop Inc. Recovery in titanium metal values by solvent extraction
US4299285A (en) * 1980-07-21 1981-11-10 Gulf Research & Development Company Underground gasification of bituminous coal

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US429285A (en) * 1890-06-03 Artificial tooth
US4026357A (en) * 1974-06-26 1977-05-31 Texaco Exploration Canada Ltd. In situ gasification of solid hydrocarbon materials in a subterranean formation
US4296809A (en) * 1980-07-21 1981-10-27 Gulf Research & Development Company In situ gasification of bituminous coal
SU1726739A1 (ru) * 1989-02-13 1992-04-15 Ташкентский Политехнический Институт Им.А.Р.Бируни Способ подземной газификации углей

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US426357A (en) * 1890-04-22 Attachment for saw-mills
US3734184A (en) * 1971-06-18 1973-05-22 Cities Service Oil Co Method of in situ coal gasification
US4269809A (en) * 1979-12-19 1981-05-26 Uop Inc. Recovery in titanium metal values by solvent extraction
US4299285A (en) * 1980-07-21 1981-11-10 Gulf Research & Development Company Underground gasification of bituminous coal

Also Published As

Publication number Publication date
WO1996028637A1 (fr) 1996-09-19
AU2731495A (en) 1996-10-02
CN1183507A (zh) 1998-06-03

Similar Documents

Publication Publication Date Title
CN105889949B (zh) 一种有机废水焚烧气化系统及焚烧气化方法
CN1062329C (zh) 两阶段煤炭地下气化工艺
GB1408832A (en) Non-polluting steam generator system
CN207247926U (zh) 一种纯氧管式加热炉
CN104101225B (zh) 用于提高电石炉尾气综合利用率的系统和方法
US1345905A (en) Process of and apparatus for producing hydrogen
CN103711471A (zh) 地下气化炉与地面配套系统的开车方法
US3525218A (en) Economic energy recovery from available feed gas line pressure
CN2506879Y (zh) 天然气气化烧嘴
CN216572397U (zh) 一种炼焦和烟气处理系统
US4368182A (en) Carbon black production
CN214654500U (zh) 全封闭多窑串联氧气烧制石灰并副产co2的装置
US4005986A (en) Device for making high temperature reformed gas
CN104357092A (zh) 煤气化、热解联合生产活性炭系统及工艺
SU1726739A1 (ru) Способ подземной газификации углей
CN211120695U (zh) 一种利用烧结环冷机余热及高炉煤气资源的余热发电系统
CN202852836U (zh) 一种完全熄灭黄磷电炉放散火炬的装置
US20100035193A1 (en) Method and system for fuel gas combustion, and burner for use therein
CN1050213A (zh) 半干馏煤气发生炉及制气法
CN107781828A (zh) 黄磷尾气综合利用系统
CN101538041B (zh) CO燃烧复用式SiC冶炼炉
CN1058286C (zh) 一种固定层间歇式半水煤气生产方法
CN108893127A (zh) 一种常规内热式低温干馏炉改造为富氧干馏炉的方法
CN103965967A (zh) 富氢燃气生产设备及其生产工艺和太阳能聚光集热煤气化炉
CN202989076U (zh) 一种富氢燃气发生炉

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee