CN106227912A - Obtain and simplify the analysis method of maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault - Google Patents

Obtain and simplify the analysis method of maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault Download PDF

Info

Publication number
CN106227912A
CN106227912A CN201610523184.9A CN201610523184A CN106227912A CN 106227912 A CN106227912 A CN 106227912A CN 201610523184 A CN201610523184 A CN 201610523184A CN 106227912 A CN106227912 A CN 106227912A
Authority
CN
China
Prior art keywords
fault
cable
transient overvoltage
cable system
wind energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610523184.9A
Other languages
Chinese (zh)
Inventor
刘刚
郭亚勋
梁嘉浩
江晓锋
张景新
陈健宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201610523184.9A priority Critical patent/CN106227912A/en
Publication of CN106227912A publication Critical patent/CN106227912A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

本发明公开了一种获取简化风电场电缆系统不对称短路故障下最大暂态过电压的分析方法,属于电力系统过电压技术领域。该分析方法依据海上风电场大量使用电力电缆的特点,建立了基于PSCAD/EMTDC的简化风电场电缆系统仿真模型。本方法提出,针对影响不对称短路故障下暂态过电压的因素:电缆长度、故障点、故障时刻、故障类型,分别进行控制变量研究,分析以上因素对暂态过电压的影响规律,最终获取在短电缆、电缆首端、该相电压峰值发生故障、单相接地短路故障时的最大暂态过电压,从而对海上风电场电缆系统绝缘保护提出具有一定的参考价值的结论。

The invention discloses an analysis method for obtaining the maximum transient overvoltage under an asymmetric short-circuit fault of a cable system of a simplified wind farm, and belongs to the technical field of power system overvoltage. This analysis method is based on the characteristics of a large number of power cables used in offshore wind farms, and a simplified wind farm cable system simulation model based on PSCAD/EMTDC is established. This method proposes that, aiming at the factors that affect the transient overvoltage under asymmetric short-circuit faults: cable length, fault point, fault time, and fault type, the control variables are studied respectively, and the influence of the above factors on the transient overvoltage is analyzed, and finally obtained The maximum transient overvoltage when the short cable, the cable head, the peak voltage of the phase is faulty, and the single-phase grounding short circuit fault, so as to put forward a conclusion with certain reference value for the insulation protection of the cable system of the offshore wind farm.

Description

获取简化风电场电缆系统不对称短路故障下最大暂态过电压 的分析方法Obtaining the Maximum Transient Overvoltage of Simplified Wind Farm Cable System Under Unsymmetrical Short-Circuit Fault analysis method

技术领域technical field

本发明涉及电力系统过电压的技术领域,特别涉及一种获取简化风电场电缆系统不对称短路故障下最大暂态过电压的分析方法。The invention relates to the technical field of power system overvoltage, in particular to an analysis method for obtaining the maximum transient overvoltage under the asymmetrical short-circuit fault of a simplified wind farm cable system.

背景技术Background technique

近年来,大型风电场正从陆地走向海洋,根据规划,未来几年我国海上风电将会有跨越式的增长表现。In recent years, large-scale wind farms are moving from land to sea. According to the plan, my country's offshore wind power will grow by leaps and bounds in the next few years.

与此同时,关于风电场的运行维护问题也越来越受到重视,尤其是暂态过电压以及由它所引起的设备绝缘故障等问题。针对海上风电场的特点,海上风电的电力传输是通过海底电缆完成的,海上风电场电力系统较复杂,海底电缆较长,海底环境较为恶劣,可能由于不对称短路产生暂态过电压。过电压对电缆集电网系统及其连接的设备(如变压器、发电机等)都会产生危害。获取不对称短路故障下风电场电缆系统最大暂态过电压,有助于选用合适的保护设备和保护措施,对提高海上风电场运行的安全可靠性具有实际意义。At the same time, more and more attention has been paid to the operation and maintenance of wind farms, especially transient overvoltage and equipment insulation failures caused by it. According to the characteristics of offshore wind farms, the power transmission of offshore wind power is completed through submarine cables. The power system of offshore wind farms is complex, the submarine cables are long, and the submarine environment is relatively harsh. Transient overvoltages may be generated due to asymmetrical short circuits. Overvoltage will cause harm to the cable collection grid system and its connected equipment (such as transformers, generators, etc.). Obtaining the maximum transient overvoltage of the wind farm cable system under an asymmetric short-circuit fault is helpful for selecting appropriate protection equipment and protection measures, and has practical significance for improving the safety and reliability of offshore wind farm operation.

发明内容Contents of the invention

本发明的目的在于克服现有技术的缺点与不足,提供一种获取简化风电场电缆系统不对称短路故障下最大暂态过电压的分析方法。The purpose of the present invention is to overcome the shortcomings and deficiencies of the prior art, and provide an analysis method for obtaining the maximum transient overvoltage under the asymmetrical short-circuit fault of the simplified wind farm cable system.

本发明的目的通过下述技术方案实现:The object of the present invention is achieved through the following technical solutions:

一种获取简化风电场电缆系统不对称短路故障下最大暂态过电压的分析方法,包括以下步骤:An analysis method for obtaining the maximum transient overvoltage under an asymmetrical short-circuit fault of a simplified wind farm cable system, comprising the following steps:

S1、采用PSCAD/EMTDC电磁暂态仿真软件,建立简化风电场电缆系统,所述简化风电场电缆系统包括以下元件:理想电源、变压器、断路器、海底电缆、风电机组;S1, using PSCAD/EMTDC electromagnetic transient simulation software to establish a simplified wind farm cable system, the simplified wind farm cable system includes the following components: ideal power supply, transformer, circuit breaker, submarine cable, wind turbine;

S2、在仿真软件中设置各元件的参数,模拟单台风机的运行情况;S2. Set the parameters of each component in the simulation software to simulate the operation of a single fan;

S3、仿真所述简化风电场电缆系统不对称短路故障的不同影响因素影响下的暂态过电压波形和幅值,所述影响因素包括电缆长度、故障点、故障时刻、故障类型;S3. Simulating the transient overvoltage waveform and amplitude under the influence of different influencing factors of the asymmetrical short-circuit fault of the simplified wind farm cable system, the influencing factors including cable length, fault point, fault time, and fault type;

S4、根据所述步骤S3中所得结论的基础上,控制影响暂态过电压的影响因素,获取简化风电场电缆系统不对称短路故障下最大暂态过电压。S4. On the basis of the conclusion obtained in the step S3, control the influencing factors affecting the transient overvoltage, and obtain the maximum transient overvoltage under the asymmetrical short-circuit fault of the cable system of the simplified wind farm.

进一步地,所述步骤S3包括:Further, the step S3 includes:

仿真简化风电场电缆系统不对称短路故障的电缆长度影响下的暂态过电压波形和幅值,控制故障点、故障时刻、故障类型不变,通过合理改变电缆长度,获取电缆长度与暂态过电压的关系。Simulate and simplify the transient overvoltage waveform and amplitude under the influence of the cable length of the asymmetric short-circuit fault of the wind farm cable system, control the fault point, fault time, and fault type unchanged, and obtain the cable length and transient overvoltage by changing the cable length reasonably. voltage relationship.

进一步地,所述步骤S3包括:Further, the step S3 includes:

仿真简化风电场电缆系统不对称短路故障的故障点影响下的暂态过电压波形和幅值,控制总电缆长度、故障时刻、故障类型不变,通过在仿真软件PSCAD/EMTDC中设置两段或多段总长等于原电缆、除长度外其他参数维持不变的电缆,用于等效故障点出现在电缆的不同位置时的情况,获取电缆长度与暂态过电压的关系。Simulate and simplify the transient overvoltage waveform and amplitude under the influence of the fault point of the asymmetrical short-circuit fault of the cable system of the wind farm, and control the total cable length, fault time, and fault type unchanged. By setting two sections or The multi-section cable whose total length is equal to the original cable and whose parameters remain unchanged except the length is used when the equivalent fault point appears in different positions of the cable to obtain the relationship between the cable length and the transient overvoltage.

进一步地,所述步骤S3包括:Further, the step S3 includes:

仿真简化风电场电缆系统不对称短路故障的故障时刻影响下的暂态过电压波形和幅值,控制电缆长度、故障点、故障类型不变,考虑电压波形的特定点,调整故障时刻,获取电缆长度与暂态过电压的关系。Simulate and simplify the transient overvoltage waveform and amplitude under the influence of the fault moment of the asymmetrical short-circuit fault of the wind farm cable system, control the cable length, fault point, and fault type, consider the specific point of the voltage waveform, adjust the fault time, and obtain the cable The relationship between length and transient overvoltage.

进一步地,所述步骤S3包括:Further, the step S3 includes:

仿真简化风电场电缆系统不对称短路故障的故障类型影响下的暂态过电压波形和幅值,控制电缆长度、故障点、故障时刻不变,通过对比单相接地短路和两相接地短路,获取电缆长度与暂态过电压的关系。Simulate and simplify the transient overvoltage waveform and amplitude under the influence of the fault type of the asymmetrical short-circuit fault of the cable system of the wind farm, and control the cable length, fault point, and fault time unchanged. Obtain the relationship between cable length and transient overvoltage.

本发明相对于现有技术具有如下的优点及效果:Compared with the prior art, the present invention has the following advantages and effects:

1.风电场系统涉及设备较多,对可靠性和安全性要求较高,通过实验或实测风电场电缆系统不对称短路故障下过电压成本较高,可行性较差。本发明通过输入工程参数进行仿真,就能较方便得到对风电场电缆系统绝缘保护的相关结论;1. The wind farm system involves a lot of equipment and has high requirements for reliability and safety. Through experiments or actual measurements, the overvoltage cost of the wind farm cable system under asymmetrical short-circuit fault is relatively high, and the feasibility is poor. In the present invention, by inputting engineering parameters for simulation, relevant conclusions on the insulation protection of the cable system of the wind farm can be obtained more conveniently;

2.风电场电缆系统较为复杂,本发明对其进行科学简化、等效,搭建由理想电源、变压器、断路器、单段海底电缆、风电机组组成的模型,较为简便、清晰,同时也能方便得到风电场系统不对称短路故障下暂态过电压的相关规律;2. The cable system of the wind farm is relatively complicated. The present invention simplifies it scientifically and equivalently, and builds a model composed of an ideal power supply, a transformer, a circuit breaker, a single-section submarine cable, and a wind turbine, which is relatively simple and clear, and can also facilitate Obtain the relevant law of transient overvoltage under asymmetrical short-circuit fault of wind farm system;

3.本发明运用控制变量思想,分别研究电缆长度、故障点、故障时刻、故障类型四种主要因素对不对称短路故障下暂态过电压的影响,较为全面、科学;3. The present invention uses the idea of control variables to study the influence of the four main factors of cable length, fault point, fault time, and fault type on the transient overvoltage under asymmetrical short-circuit faults, which is relatively comprehensive and scientific;

4.综合分析以上四种因素对过电压的影响,就可以通过仿真得到某工程参数下风电场电缆系统不对称短路故障下最大暂态过电压标幺值为3.237,对风电场设备绝缘保护提供重要参考。4. By comprehensively analyzing the influence of the above four factors on the overvoltage, the maximum transient overvoltage per unit value under asymmetrical short-circuit fault of the wind farm cable system under certain engineering parameters can be obtained by simulation as 3.237, which provides protection for the insulation protection of wind farm equipment. Important reference.

附图说明Description of drawings

图1是简化风电场电缆系统的模型图;Figure 1 is a model diagram of a simplified wind farm cable system;

图2是等效三芯电缆参数示意图;Figure 2 is a schematic diagram of equivalent three-core cable parameters;

图3是电缆长度与暂态过电压关系图;Figure 3 is a diagram of the relationship between cable length and transient overvoltage;

图4是故障点等效设置示意图;Figure 4 is a schematic diagram of the equivalent setting of the fault point;

图5是故障点与暂态过电压关系图;Figure 5 is a diagram of the relationship between the fault point and the transient overvoltage;

图6是故障时刻与暂态过电压关系图;Figure 6 is a diagram of the relationship between fault time and transient overvoltage;

图7是某相电压峰值时刻附近发生单相接地短路波形图;Figure 7 is a waveform diagram of a single-phase ground short circuit occurring near the peak moment of a certain phase voltage;

图8是故障类型与暂态过电压关系图;Figure 8 is a diagram of the relationship between fault types and transient overvoltages;

图9是本发明中公开的最大暂态过电压的分析方法的流程步骤图。Fig. 9 is a flow chart of the analysis method of the maximum transient overvoltage disclosed in the present invention.

具体实施方式detailed description

为使本发明的目的、技术方案及优点更加清楚、明确,以下参照附图并举实施例对本发明进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention more clear and definite, the present invention will be further described in detail below with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

实施例Example

请参见图9,图9是本实施例中最大暂态过电压的分析方法的流程步骤图。下面结合附图对本发明进一步说明,本实施例公开的一种获取简化风电场电缆系统不对称短路故障下最大暂态过电压的分析方法,具体包括以下步骤:Please refer to FIG. 9 . FIG. 9 is a flowchart of a method for analyzing the maximum transient overvoltage in this embodiment. The present invention will be further described below in conjunction with the accompanying drawings. An analysis method for obtaining the maximum transient overvoltage under an asymmetrical short-circuit fault of a simplified wind farm cable system disclosed in this embodiment specifically includes the following steps:

S1、采用PSCAD/EMTDC电磁暂态仿真软件,建立具有且不少于以下元件的简化风电场电缆系统:理想电源、变压器、断路器、海底电缆、风电机组,如附图1所示。S1. Using PSCAD/EMTDC electromagnetic transient simulation software, establish a simplified wind farm cable system with not less than the following components: ideal power supply, transformer, circuit breaker, submarine cable, and wind turbine, as shown in Figure 1.

S2、在仿真软件中设置各元件的参数,模拟单台风机的运行情况。S2. Setting the parameters of each component in the simulation software to simulate the operation of a single fan.

其中,无穷大电网由理想电源等效,随后经220/35kV变压器进行降压;电缆部分采用了某公司3*400 26/35kV电缆结构参数,把三条单芯电缆呈品字形排列,来等效三芯电缆,如附图2。采用PSCAD/EMTDC中基于J.Marti提出的考虑频率特性的频率相关(相位)线路模型,如表1所示:Among them, the infinite power grid is equivalent to an ideal power supply, and then stepped down by a 220/35kV transformer; the cable part adopts the structural parameters of a 3*400 26/35kV cable from a certain company, and arranges three single-core cables in a zigzag shape to be equivalent to three core cable, as shown in Figure 2. The frequency-dependent (phase) line model based on the frequency characteristics proposed by J.Marti in PSCAD/EMTDC is used, as shown in Table 1:

表1.考虑频率特性的频率相关(相位)线路模型参数Table 1. Frequency-dependent (phase) line model parameters considering frequency characteristics

Travel Time Interpolation:Travel Time Interpolation: OnOn Curve Fitting Starting Frequency:Curve Fitting Starting Frequency: 0.5Hz0.5Hz Curve Fitting Starting Frequency:Curve Fitting Starting Frequency: 1.0E6Hz1.0E6Hz Total Number of Frequency Increments:Total Number of Frequency Increments: 100100 Maximum Order of Fitting for Yc:Maximum Order of Fitting for Yc: 2020 Maximum Fitting Error for Yc:Maximum Fitting Error for Yc: 0.2%0.2% Max.Order per Delay Grp.for Prop.Func.Max. Order per Delay Grp. for Prop. Func. 2020 Maximum Fitting Error for Prop.Func.Maximum Fitting Error for Prop.Func. 0.2%0.2% DC Correction:DC Correction: DisabledDisabled Passivity:Passivity: DisabledDisabled

最后经35/0.69kV再次降压后连接4MW风机,其中故障时的风电机组模型以电感性负载进行等效,电抗值的选择是根据变压器的额定电流得出来的,本例中为0.379mH。Finally, the 4MW fan is connected after stepping down again at 35/0.69kV. The model of the wind turbine in the event of a fault is equivalent to an inductive load. The choice of reactance is based on the rated current of the transformer, which is 0.379mH in this example.

S3、仿真简化风电场电缆系统不对称短路故障的电缆长度、故障点、故障时刻、故障类型四种因素影响下的暂态过电压波形和幅值;S3. Simulate and simplify the transient overvoltage waveform and amplitude under the influence of four factors: cable length, fault point, fault time, and fault type of asymmetrical short-circuit faults in the wind farm cable system;

工程上对电缆系统进行绝缘保护,需得到暂态过电压的相关数据。因此,本方法考虑,仿真简化风电场电缆系统不对称短路故障的电缆长度、故障点、故障时刻、故障类型四种因素影响下的暂态过电压波形和幅值。To carry out insulation protection on the cable system in engineering, it is necessary to obtain relevant data of transient overvoltage. Therefore, this method considers, simulates and simplifies the transient overvoltage waveform and amplitude under the influence of four factors of cable length, fault point, fault time, and fault type in the asymmetric short-circuit fault of the wind farm cable system.

为表述方便,把靠近理想电源侧的一端称为电缆首端,把靠近风电机组侧的一端称为电缆末端。For the convenience of expression, the end close to the ideal power supply side is called the cable head end, and the end close to the wind turbine side is called the cable end.

所述步骤S3包括:仿真简化风电场电缆系统不对称短路故障的电缆长度影响下的暂态过电压波形和幅值,需控制故障点、故障时刻、故障类型不变,通过合理改变电缆长度,获取电缆长度与暂态过电压的关系。The step S3 includes: simulating and simplifying the transient overvoltage waveform and amplitude under the influence of the cable length of the asymmetric short-circuit fault of the cable system of the wind farm. It is necessary to control the fault point, fault time, and fault type unchanged. By changing the cable length reasonably, Obtain the relationship between cable length and transient overvoltage.

具体应用中,控制故障点为电缆首端,故障时刻为0.0175s,故障类型为单相接地短路,通过合理调整电缆长度,得到在不同电缆长度下风电机组机端变压器高压侧的过电压值,结果如附图3所示。In the specific application, the control fault point is the first end of the cable, the fault time is 0.0175s, and the fault type is a single-phase ground short circuit. By adjusting the cable length reasonably, the overvoltage value of the high-voltage side of the transformer at the end of the wind turbine under different cable lengths is obtained. The results are shown in Figure 3.

所述步骤S3还包括:仿真简化风电场电缆系统不对称短路故障的故障点影响下的暂态过电压波形和幅值,需控制总电缆长度、故障时刻、故障类型不变,通过在仿真软件PSCAD/EMTDC中需设置两段或多段总长等于原电缆、除长度外其他参数维持不变的电缆,用于等效故障点出现在电缆的不同位置时的情况,获取电缆长度与暂态过电压的关系。The step S3 also includes: simulating and simplifying the transient overvoltage waveform and amplitude under the influence of the fault point of the asymmetrical short-circuit fault of the cable system of the wind farm. It is necessary to control the total cable length, fault time, and fault type. In PSCAD/EMTDC, it is necessary to set two or more sections of cables whose total length is equal to that of the original cable and whose parameters remain unchanged except for the length. This is used when the equivalent fault point appears in different positions of the cable, and the cable length and transient overvoltage can be obtained. Relationship.

具体应用中,仿真简化风电场电缆系统不对称短路故障的故障点影响下的暂态过电压波形和幅值,控制总电缆长度为3km,故障时刻为0.0175s,故障类型为单相接地短路,如附图4所示将一条3km电缆拆分成两段除长度外相同的电缆,通过不断改变两段电缆的长度来等效故障点出现在电缆的不同位置上的暂态过电压情况,得到在故障点与电缆首端不同距离下,风电机组机端变压器高压侧的过电压值,结果如附图5所示。In the specific application, the simulation simplified the transient overvoltage waveform and amplitude under the influence of the fault point of the asymmetric short-circuit fault of the cable system of the wind farm. The total cable length is controlled to be 3km, the fault time is 0.0175s, and the fault type is single-phase ground short circuit. As shown in Figure 4, a 3km cable is split into two sections of the same cable except for the length, and by continuously changing the length of the two sections of cable, the equivalent transient overvoltage situation where the fault point appears at different positions of the cable is obtained. At different distances from the fault point to the cable head end, the overvoltage value of the high-voltage side of the transformer at the end of the wind turbine is shown in Figure 5.

所述步骤S3还包括:仿真简化风电场电缆系统不对称短路故障的故障时刻影响下的暂态过电压波形和幅值,需控制电缆长度、故障点、故障类型不变,考虑电压波形的特定点,调整故障时刻,获取电缆长度与暂态过电压的关系。The step S3 also includes: simulating and simplifying the transient overvoltage waveform and amplitude under the influence of the fault moment of the asymmetrical short-circuit fault of the cable system of the wind farm. point, adjust the fault time, and obtain the relationship between cable length and transient overvoltage.

具体应用中,仿真简化风电场电缆系统不对称短路故障的故障时刻影响下的暂态过电压波形和幅值,控制电缆长度为3km,故障点为电缆首端,故障类型为单相接地短路。考虑电压波形中的特定点,调整故障发生时刻,并得到在不同故障时刻下风电机组机端变压器高压侧的过电压值,结果如附图6、附图7所示。In the specific application, the simulation simplified the transient overvoltage waveform and amplitude under the influence of the fault moment of the asymmetric short-circuit fault of the wind farm cable system. The length of the control cable is 3km, the fault point is the cable head end, and the fault type is single-phase ground short circuit. Considering a specific point in the voltage waveform, adjust the time of fault occurrence, and obtain the overvoltage value of the high-voltage side of the wind turbine terminal transformer at different fault times. The results are shown in Figure 6 and Figure 7.

所述步骤S3还包括:仿真简化风电场电缆系统不对称短路故障的故障类型影响下的暂态过电压波形和幅值,需控制电缆长度、故障点、故障时刻不变,通过对比单相接地短路和两相接地短路,获取电缆长度与暂态过电压的关系。The step S3 also includes: simulating and simplifying the transient overvoltage waveform and amplitude under the influence of the fault type of the asymmetrical short-circuit fault of the cable system of the wind farm. It is necessary to control the length of the cable, the fault point, and the fault time. Short-circuit and two-phase-to-ground short-circuit to obtain the relationship between cable length and transient overvoltage.

具体应用中,仿真简化风电场电缆系统不对称短路故障的故障类型影响下的暂态过电压波形和幅值,控制总电缆长度为3km,故障点为电缆首端,故障时刻为0.0175s,对比单相接地短路和两相接地短路两种不对称短路故障类型,并得到在不同故障类型下风电机组机端变压器高压侧的过电压值,结果如附图8。In the specific application, the simulation simplified the transient overvoltage waveform and amplitude under the influence of the fault type of the asymmetrical short-circuit fault of the wind farm cable system, the total cable length is controlled to 3km, the fault point is the cable head end, and the fault time is 0.0175s. Single-phase ground short circuit and two-phase ground short circuit are two types of asymmetric short circuit faults, and the overvoltage value of the high voltage side of the wind turbine terminal transformer under different fault types is obtained. The results are shown in Figure 8.

S4、根据所述步骤S3中所得的结论的基础上,控制影响暂态过电压的因素,获取简化风电场电缆系统不对称短路故障下最大暂态过电压。S4. On the basis of the conclusion obtained in the step S3, control the factors affecting the transient overvoltage, and obtain the maximum transient overvoltage under the asymmetrical short-circuit fault of the cable system of the simplified wind farm.

具体应用中,分析步骤S3中各个子步骤的具体结论,设置在控制总电缆长度为3km,故障点为电缆首端,故障时刻为0.0175s,单相接地短路下,最终获取简化风电场电缆系统最大暂态过电压标幺值为3.237。In a specific application, analyze the specific conclusions of each sub-step in step S3, and set the control total cable length to 3km, the fault point to the cable head end, the fault time to 0.0175s, and a single-phase ground short circuit to finally obtain a simplified wind farm cable system The maximum transient overvoltage per unit value is 3.237.

综上所述,本实施例公开了一种获取简化风电场电缆系统不对称短路故障下最大暂态过电压的分析方法,属于电力系统过电压技术领域。该分析方法依据海上风电场大量使用电力电缆的特点,建立了基于PSCAD/EMTDC的简化风电场电缆系统仿真模型。本方法提出,针对影响不对称短路故障下暂态过电压的因素:电缆长度、故障点、故障时刻、故障类型,分别进行控制变量研究,分析以上因素对暂态过电压的影响规律,最终获取在短电缆、电缆首端、该相电压峰值发生故障、单相接地短路故障时的最大暂态过电压,从而对海上风电场电缆系统绝缘保护提出具有一定的参考价值的结论。To sum up, this embodiment discloses an analysis method for obtaining the maximum transient overvoltage under an asymmetric short-circuit fault of a cable system of a simplified wind farm, which belongs to the technical field of overvoltage of a power system. This analysis method is based on the characteristics of a large number of power cables used in offshore wind farms, and a simplified wind farm cable system simulation model based on PSCAD/EMTDC is established. This method proposes that, aiming at the factors that affect the transient overvoltage under asymmetric short-circuit faults: cable length, fault point, fault time, and fault type, the control variables are studied respectively, and the influence of the above factors on the transient overvoltage is analyzed, and finally obtained The maximum transient overvoltage when the short cable, the cable head, the peak voltage of the phase is faulty, and the single-phase grounding short circuit fault, so as to put forward a conclusion with certain reference value for the insulation protection of the cable system of the offshore wind farm.

上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受上述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。The above-mentioned embodiment is a preferred embodiment of the present invention, but the embodiment of the present invention is not limited by the above-mentioned embodiment, and any other changes, modifications, substitutions, combinations, Simplifications should be equivalent replacement methods, and all are included in the protection scope of the present invention.

Claims (5)

1. obtaining and simplify an analysis method for maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault, it is special Levy and be, comprise the following steps:
S1, employing PSCAD/EMTDC electromagnetic transient simulation software, set up and simplify wind energy turbine set cable system, described simplification wind energy turbine set Cable system includes elements below: ideal source, transformator, chopper, submarine cable, Wind turbines;
S2, the parameter of each element is set in simulation software, the ruuning situation of simulation separate unit blower fan;
S3, to emulate the transient state under the influence of the different affecting factors of described simplification wind energy turbine set cable system asymmetry short circuit fault the most electric Corrugating and amplitude, described influence factor includes cable length, trouble point, fault moment, fault type;
S4, according to conclusion in described step S3 on the basis of, control affect the influence factor of transient overvoltage, obtain simplification Maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault.
The most according to claim 1 acquisition simplifies maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault Analysis method, it is characterised in that described step S3 includes:
Emulation simplifies the transient overvoltage waveform under the influence of the cable length of wind energy turbine set cable system asymmetry short circuit fault and width Value, controls trouble point, fault moment, fault type constant, by rationally changing cable length, obtains cable length and transient state mistake The relation of voltage.
The most according to claim 1 acquisition simplifies maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault Analysis method, it is characterised in that described step S3 includes:
Emulation simplifies the transient overvoltage waveform under the influence of the trouble point of wind energy turbine set cable system asymmetry short circuit fault and amplitude, Control joint current length, fault moment, fault type are constant, by arranging two sections or many in simulation software PSCAD/EMTDC The cable that Duan overall length remains unchanged equal to former cable, other parameters of being outside one's consideration except length, occurs in cable not for equivalent fault point Situation during co-located, obtains the relation of cable length and transient overvoltage.
The most according to claim 1 acquisition simplifies maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault Analysis method, it is characterised in that described step S3 includes:
Emulation simplifies the transient overvoltage waveform under the influence of the fault moment of wind energy turbine set cable system asymmetry short circuit fault and width Value, controls cable length, trouble point, fault type constant, it is considered to the specified point of voltage waveform, adjusts fault moment, obtain electricity Cable length and the relation of transient overvoltage.
The most according to claim 1 acquisition simplifies maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault Analysis method, it is characterised in that described step S3 includes:
Emulation simplifies the transient overvoltage waveform under the influence of the fault type of wind energy turbine set cable system asymmetry short circuit fault and width Value, controls cable length, trouble point, fault moment constant, by contrast single-line to ground fault and two-phase grounding fault, obtains electricity Cable length and the relation of transient overvoltage.
CN201610523184.9A 2016-07-04 2016-07-04 Obtain and simplify the analysis method of maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault Pending CN106227912A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610523184.9A CN106227912A (en) 2016-07-04 2016-07-04 Obtain and simplify the analysis method of maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610523184.9A CN106227912A (en) 2016-07-04 2016-07-04 Obtain and simplify the analysis method of maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault

Publications (1)

Publication Number Publication Date
CN106227912A true CN106227912A (en) 2016-12-14

Family

ID=57519909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610523184.9A Pending CN106227912A (en) 2016-07-04 2016-07-04 Obtain and simplify the analysis method of maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault

Country Status (1)

Country Link
CN (1) CN106227912A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107968434A (en) * 2017-12-08 2018-04-27 国网辽宁省电力有限公司电力科学研究院 Wind turbine transient overvoltage analysis method under a kind of high-capacity direct current power disturbance
CN111723684A (en) * 2020-05-29 2020-09-29 华南理工大学 A method for identifying transient overvoltage types in offshore wind farms
CN113569515A (en) * 2021-06-11 2021-10-29 国网内蒙古东部电力有限公司电力科学研究院 Wind power plant electromagnetic transient analysis method and system
CN115663881A (en) * 2022-09-07 2023-01-31 国网重庆市电力公司电力科学研究院 Current control method of power system under symmetrical short-circuit fault of alternating-current power grid
CN118889588A (en) * 2024-08-12 2024-11-01 华北电力大学 Transient overvoltage suppression method for safe and stable AC transmission system of new energy stations

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘欣: "海底高压电缆故障监测和电磁暂态分析研究", 《万方数据库学位论文库》 *
宣耀伟 等: "海底交流电缆暂态过电压仿真计算", 《高压电器》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107968434A (en) * 2017-12-08 2018-04-27 国网辽宁省电力有限公司电力科学研究院 Wind turbine transient overvoltage analysis method under a kind of high-capacity direct current power disturbance
CN111723684A (en) * 2020-05-29 2020-09-29 华南理工大学 A method for identifying transient overvoltage types in offshore wind farms
CN111723684B (en) * 2020-05-29 2023-07-21 华南理工大学 A method for identification of transient overvoltage types inside an offshore wind farm
CN113569515A (en) * 2021-06-11 2021-10-29 国网内蒙古东部电力有限公司电力科学研究院 Wind power plant electromagnetic transient analysis method and system
CN113569515B (en) * 2021-06-11 2024-10-18 国网内蒙古东部电力有限公司电力科学研究院 Wind farm electromagnetic transient analysis method and system
CN115663881A (en) * 2022-09-07 2023-01-31 国网重庆市电力公司电力科学研究院 Current control method of power system under symmetrical short-circuit fault of alternating-current power grid
CN115663881B (en) * 2022-09-07 2024-04-30 国网重庆市电力公司电力科学研究院 A current control method for power system under symmetrical short circuit fault of AC power grid
CN118889588A (en) * 2024-08-12 2024-11-01 华北电力大学 Transient overvoltage suppression method for safe and stable AC transmission system of new energy stations
CN118889588B (en) * 2024-08-12 2025-05-13 华北电力大学 Transient overvoltage suppression method for new energy station safety and stability alternating current sending-out system

Similar Documents

Publication Publication Date Title
CN105337304B (en) A kind of photovoltaic plant low voltage crossing data capture method
CN103454521B (en) A wind farm power grid operation simulation device
Brochu et al. Validation of single-and multiple-machine equivalents for modeling wind power plants
WO2018072427A1 (en) Maximum transient overvoltage analysis method and system for offshore wind plant electrical system
CN106227912A (en) Obtain and simplify the analysis method of maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault
CN105548741B (en) A detection method for low-voltage operation capability of reactive power compensation device in wind farm
CN109245044B (en) A Method for Equivalent Sequence Impedance Pilot Protection of Distribution Network
CN103577633B (en) A kind of transformer DC magnetic bias raised based on earth potential is simulated and suppressing method
Zhang et al. Study on switching overvoltage in off-shore wind farms
CN110880743B (en) A longitudinal protection method for outgoing lines of wind farms based on Kendall rank correlation
CN105116360A (en) ADPSS (advanced digital power system simulator) based test system for low current grounding line selector and test method of system
CN110137949A (en) A kind of method and device for the mains by harmonics characteristic obtaining the station containing new energy
CN105277773A (en) Method for completely calculating grounding short-circuit current of transformation station
CN104410159B (en) Power grid black start overall process checking method based on real-time digital simulation
CN110261719A (en) A kind of single-phase arc light high resistance earthing fault distance measuring method of wind power plant collection electric line
CN106406272A (en) Method of testing performance of controller of static var generator in wind power plant
CN106897514A (en) A kind of method for building up of the calculation of short-circuit current model of total power changing type new energy station
CN106528944A (en) Analysis method for obtaining maximum transient overvoltage of single feeder line of offshore wind power plant under asymmetric short circuit fault
CN110165644B (en) A new energy station longitudinal protection method based on transient current time-frequency characteristics
CN109659934B (en) Optimization method of new energy grid-connected planning based on short-circuit current margin
CN105608252B (en) Simulation method and device for power grid fault simulation test
Jiang et al. Low-voltage ride-through remote testing method for offshore wind turbines
CN105846408B (en) Power distribution network longitudinal protection method containing distributed DFIG types wind turbine
Elshahed Assessment of sudden voltage changes and flickering for a grid-connected photovoltaic plant
CN102957311A (en) Anti-electromagnetic interference system of megawatt-level wind power converter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161214

WD01 Invention patent application deemed withdrawn after publication