CN106227655A - The method for testing pressure of a kind of information system and device - Google Patents

The method for testing pressure of a kind of information system and device Download PDF

Info

Publication number
CN106227655A
CN106227655A CN201610564949.3A CN201610564949A CN106227655A CN 106227655 A CN106227655 A CN 106227655A CN 201610564949 A CN201610564949 A CN 201610564949A CN 106227655 A CN106227655 A CN 106227655A
Authority
CN
China
Prior art keywords
test
information system
real world
information
testing result
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610564949.3A
Other languages
Chinese (zh)
Inventor
黄龙
张俊宇
杜礼锋
陈珊珊
唐俏丹
曾家杰
罗序良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201610564949.3A priority Critical patent/CN106227655A/en
Publication of CN106227655A publication Critical patent/CN106227655A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3664Environments for testing or debugging software

Abstract

The invention discloses method for testing pressure and the device of a kind of information system, wherein, the method includes: feature selecting system pressure spot based on business, and system pressure point is the concentration degree time period higher than preset value carrying out respective operations for business;Under true environment, information system is carried out stress test for system pressure point, obtain real world testing result;Judge whether real world testing result meets preset requirement, if it is, determine that this test is passed through.Thus, the system pressure point for information system carries out stress test under true environment, can not only improve testing efficiency, and can effectively reflect behavior pattern and the service bearer ability of information system, thus efficiently accomplish the test for information system.

Description

The method for testing pressure of a kind of information system and device
Technical field
The present invention relates to information systems technology field, more particularly, it relates to the method for testing pressure of a kind of information system And device.
Background technology
Along with the development of information technology, and Electric Power Enterprise Information degree is more and more higher, information system for power enterprise The construction of integration is also progressively being planned.Electric power enterprise information integral construction can effectively integrate and optimize scattered answering By system, promote the information system management of electric power enterprise.
Enterprise information system owing to having carried out in data set, the medium work of computing collection, only a small amount of in development process use Family uses simultaneously, normal program operation;But after really putting into operation, when there being a large number of users to use simultaneously, may go out The phenomenon of existing disabler, performance degradation, even system crash;Therefore, it should look forward to the most as early as possible The Load pressure test of industry level information system.But, there is not one in prior art can be effectively to enterprise-level information system System carries out the technical scheme of Load pressure test.
In sum, a kind of technical side that can effectively enterprise information system be carried out Load pressure test how is provided Case, is current those skilled in the art's problem demanding prompt solution.
Summary of the invention
It is an object of the invention to provide method for testing pressure and the device of a kind of information system, effectively information system to be entered Row Load pressure test.
To achieve these goals, the present invention provides following technical scheme:
The method for testing pressure of a kind of information system, it is characterised in that including:
Feature selecting system pressure spot based on business, described system pressure point is for carry out respective operations for described business Concentration degree higher than time period of preset value;
Under true environment, described information system is carried out stress test for described system pressure point, obtain true environment Test result;
Judge whether described real world testing result meets preset requirement, if it is, determine that this test is passed through.
Preferably, also include:
If described real world testing result does not meets preset requirement, then output error information, described mistake carries Show that information includes that described real world testing result and described real world testing result do not meet the reason of described preset requirement.
Preferably, output error information, including:
Described miscue information is sent to designated terminal.
Preferably, also include:
Utilize the test software write in advance that described information system is carried out stress test, obtain software test result, sentence Whether disconnected described software test result meets preset requirement, if it is, perform feature selecting system pressure spot based on business Step.
Preferably, determine that described test, by afterwards, also includes:
Based on described test result, the performance of described information system is graded, determine the performance of described information system Grade.
A kind of pressure test device of information system, including:
Choosing module, for feature selecting system pressure spot based on business, described system pressure point is for described industry Business carries out the concentration degree time period higher than preset value of respective operations;
First test module, for carrying out pressure to described information system for described system pressure point under true environment Test, obtains real world testing result;
Judge module, is used for judging whether described real world testing result meets preset requirement, if it is, determine this Test is passed through.
Preferably, also include:
Output module, if not meeting preset requirement for described real world testing result, then output error prompting letter Breath, described miscue information includes that described real world testing result and described real world testing result do not meet described pre- If the reason required.
Preferably, described output module includes:
Output unit, for sending described miscue information to designated terminal.
Preferably, also include:
Second test module, for utilizing the test software write in advance that described information system is carried out stress test, To software test result, it is judged that whether described software test result meets preset requirement, if it is, perform spy based on business Point chooses the step of system pressure point.
Preferably, also include:
Grading module, for grading the performance of described information system based on described test result, determines described The performance rate of information system.
The method for testing pressure of a kind of information system that the present invention provides and device, wherein, the method includes: based on business Feature selecting system pressure spot, described system pressure point is to carry out the concentration degree of respective operations higher than presetting for described business The time period of value;Under true environment, described information system is carried out stress test for described system pressure point, obtain true Environmental testing result;Judge whether described real world testing result meets preset requirement, if it is, determine that this test is led to Cross.By technique scheme disclosed in the present application, it is first determined the system pressure point of information system, and then in true environment For system pressure point, information system is carried out stress test, obtain the real world testing result of correspondence, and according to this test Result judges whether information system can be by test, and thus, the system pressure point for information system enters under true environment Row stress test, can not only improve testing efficiency, and can effectively reflect behavior pattern and the business of information system Bearing capacity, thus efficiently accomplish the test for information system.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to The accompanying drawing provided obtains other accompanying drawing.
The flow chart of the method for testing pressure of a kind of information system that Fig. 1 provides for the embodiment of the present invention;
The structural representation figure of the pressure test device of a kind of information system that Fig. 2 provides for the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
Refer to Fig. 1, it illustrates the flow process of the method for testing pressure of a kind of information system that the embodiment of the present invention provides Figure, may comprise steps of:
S11: feature selecting system pressure spot based on business, system pressure point is the collection carrying out respective operations for business Moderate is higher than the time period of preset value.
It should be noted that system pressure point be for business carry out the concentration degree of respective operations higher than preset value time Between section, wherein, carry out the concentration degree of respective operations may refer to carry out in certain period of time respective operations number of times or With carry out the corresponding data volume of respective operations etc., and the quantity carrying out respective operations that may refer to preset corresponding to preset value or Person be default with carry out the corresponding data volume of respective operations etc., concrete value can be determined according to actual needs.Citing Illustrating, the business in the application can be sales service, corresponding, information system can be sales service information system, therefore, System pressure point sales service can being likely to occur disassemble into following some:
The concentration that every day goes to work first 15 minutes logs in pressure, i.e. concentrates the pressure of log-on message system;The business number at the beginning of the month According to initializing pressure, i.e. the business datum in information system is carried out initialized pressure;Issue check meter the beginning of the month according to upper dress, lower dress Pressure, i.e. carries out upper dress, the pressure of lower dress to the table issue evidence of information system;The pressure of the centralized calculation electricity charge in the middle of the month, i.e. utilizes Information system carries out the pressure of electricity charge calculating;Concentrate the pressure that the electricity charge are issued the middle of the month, i.e. utilize information system to carry out electricity charge distribution Pressure;The pressure of counter charge in middle of the month peak period, i.e. utilizes information system to carry out the pressure charged;Work before receivable cut-off at the end of month Single pressure concentrating filing, i.e. utilizes information system to carry out the pressure of work order filing;Concentrate form initialized pressure the beginning of the month, i.e. Form in information system is carried out initialized pressure.
Wherein, the concentration that every day goes to work first 15 minutes logs in pressure and i.e. represents login times in first 15 minutes of going to work every day (carrying out the concentration degree of respective operations for business) is more than preset value (presetting login times), other system pressure spot principle one Cause, do not repeat them here.
S12: under true environment, information system is carried out stress test for system pressure point, obtain real world testing Result.
Utilize true environment that the system pressure point of information system is carried out stress test, i.e. under true environment, simulation letter The business that breath system each system pressure point need to be carried out, and then obtain the test result of correspondence.Still with above-mentioned example, i.e. business For illustrating as a example by sales service, the application emphasizes, under true environment, information system is carried out stress test, it is possible to Predetermined number (such as 19, specifically can be determined according to actual needs) office of districts and cities of tissue the whole province carries out same in the same time One business, carries out stress test with the performance to information system.Wherein, the portfolio that each business is corresponding all can be according to reality Needs are determined, and below relate to data and are in this example the data chosen.
One, 9:00-9:15 system login
Log-on message system detect the load-balanced server of information system, application server, database server and Whether offered load supports high concurrent login demand under the big hubbed mode of the whole province;Portfolio: 600 times.
Two, 9:30-9:45 job note filing
Realize job note filing and more new archive in high volume based on information system and detect the database service of information system Whether the execution efficiency of device meets large batch of business Archival requirements;Portfolio: at least 100 is single.
Three, 10:00-10:15 counter charge
Application server and the database server load of charge detection information system is concentrated on a large scale based on information system Whether support the billing needs of the big concentration of the whole province;Tester: 100 fee-collectors;Portfolio: 2000.
Four, 10:30-10:45 meter reading data is open
Carry out whether the open database server detecting information system of centralized automatic meter-reading data meets based on information system The open demand of high concurrent meter reading data under the big hubbed mode of the whole province;Portfolio: at least 27000 families.
Five, fill under 11:00-11:15 data
Realize dress under large-scale data based on information system and check the application server of information system, database service Whether device and metering automation interface meet fills demand under high concurrent data under the big hubbed mode of the whole province;Portfolio: at least 300 Individual section.
Six, fill in 11:30-11:45 data
Realize dress in intensive data based on information system and check application server and the database server of information system Whether meet and fill demand in high concurrent data under the big hubbed mode of the whole province;Portfolio: at least 300 sections.
Seven, the 14:00-14:15 electricity charge calculate
Realize high-volume based on information system and calculate whether the electricity charge test the calculation expense server of information system and data base Meet the high concurrent electricity charge under the big hubbed mode of the whole province and calculate demand;Portfolio: at least 17000 families.
Eight, 14:30-14:45 electricity charge distribution
Realize batch electricity charge distribution based on information system and check whether the database server of information system meets the whole province High concurrent electricity charge distribution demand under big hubbed mode;Portfolio: at least 15000 families.
Nine, 15:00-15:30 form initializes
Realize concentrating form to initialize based on information system and check whether the database server of information system meets complete Save high concurrent form initial reguirements under big hubbed mode;Portfolio: all power supply stations.
S13: judge whether real world testing result meets preset requirement, if it is, determine that this test is passed through.
It should be noted that preset requirement can be determined according to actual needs, can be a particular number, as The real world testing result of any system pressure spot is the load number that can realize, then preset requirement can be a preset negative More than or equal to presetting load number, the load number carrying quantity, i.e. this test result then proves that this test result meets default wanting Ask.It is still to illustrate, then in real world testing result as a example by sales service with above-mentioned example, i.e. business:
1, user logs in test
This omnidistance (9:00-15:30) the whole province of test user account login times altogether reaches 151851 times, single login scene Period (9:00-9:18) login system 53630 times, than the original plan more than 19258 times 34372 times;
2, job note filing
During this test job list filing scene, (9:50-10:10) the whole province amounts to finishing service flow process work order and (includes industry Expand, have a power failure, measure, line loss, all types of work orders such as customer service) file 4394 single, more single than original 1900 (each districts and cities at least 100 are single) Many 2595 is single;
3, counter charge
During this test counter charge scene, (10:15-10:26) the whole province completes stroke count 23494 of charging altogether, and ratio is former Fixed 19000 single (each districts and cities at least 1000) how 4494;
4, check meter initialization, lower dress and upper dress
During this pressure surveys initialization of checking meter, lower dress and upper dress scene, (12:00-14:00) the whole province completes to check meter altogether Data 1127660 family, than original 570000 families (each districts and cities at least 30000 family) many 557660 families;
5, the electricity charge calculate
During these test electricity charge calculate scene, (14:00-14:51) the whole province completes electricity charge calculating stroke count 1166540 altogether Family, than original 323000 families (each districts and cities at least 17000 family) many 843540;
6, electricity charge distribution
During this test electricity charge distribution scene, (14:30-14:50) the whole province completes electricity charge distribution stroke count 857558 altogether Family, than original 285000 families (each districts and cities at least 15000 family) many 572558;
7, form initializes
During this testing journal sheet initializes scene, (15:00-15:30) the whole province completes form initialization 6661 times altogether, than How 4761 times, original 1900 families (each districts and cities at least 100 times).
Wherein, quantity corresponding to the original plan is preset requirement, therefore, can be drawn by above-mentioned test result, each The quantity that business correspondence completes is all higher than the quantity of the original plan, and therefore, test result shows, Information System Function is complete, property Can be stable, meet the requirement that districts and cities of full company 19 sales service is applied simultaneously.Above-mentioned test fully examines the industry of information system Business enabling capabilities and technical performance, test result shows that information system meets single track application requirement, has possessed at pilot office single track The condition reached the standard grade, i.e. test are passed through.
Test it should be noted that the embodiment of the present invention is specially the load pressure to information system, wherein, information The load pressure of system refers to the flow that information system is born under certain designated software, hardware and network environment, the most also Hair amount, continuous working period, data volume etc., wherein concurrent user number is the important embodiment of load pressure, corresponding, load Stress test refer under certain constraints test information system can bear concurrent user's amount, the operation time, data volume, To determine the maximum load pressure that information system can bear.Load pressure test contributes to confirming that information measured system whether can Enough support performance requirement, and the intended growth of load etc..Load pressure test is more than paying close attention to the sound under different loads scene The index such as between Ying Shi, it also to find to there will be under different loads scene by test, such as, slow, internal memory is let out The reason of the problems such as leakage.
By technique scheme disclosed in the present application, it is first determined the system pressure point of information system, and then for being System pressure spot information system is carried out stress test in true environment, obtain correspondence real world testing result, and according to This test result judges that information system whether can be by test, thus, for the system pressure point of information system at true ring Carry out stress test under border, testing efficiency can not only be improved, and can effectively reflect the behavior pattern of information system With service bearer ability, thus efficiently accomplish the test for information system.
The method for testing pressure of a kind of information system that the embodiment of the present invention provides, it is also possible to including:
If real world testing result does not meets preset requirement, then output error information, miscue information bag Include real world testing result and real world testing result does not meets the reason of preset requirement.
It should be noted that when true environment test result does not meets preset requirement, output error information, its In, miscue information includes this real world testing result and does not meets the reason of preset requirement, and this reason can be true Real environment test result and the gap of preset requirement, data as corresponding with preset requirement in the data in real world testing result Difference, thus, staff can accurately know the survey not meeting preset requirement in this time test by miscue information Test result, and then determine the performance of information system according to the reason not meeting preset requirement, with further to this information system Improve.
It addition, output error information, may include that
Miscue information is sent to designated terminal.
Thus, staff can know test status in time by the miscue information that designated terminal obtains, certainly, Can also be directly displayed on corresponding display screen, it is also possible to carry out report etc. by voice, in a word, it is possible to make work people Member knows miscue information in time, and then improves information system.
The method for testing pressure of a kind of information system that the embodiment of the present invention provides, it is also possible to including:
Utilize the test software write in advance that information system is carried out stress test, obtain software test result, it is judged that soft Whether part test result meets preset requirement, if it is, perform the step of feature selecting system pressure spot based on business.
Wherein, test software be specifically as follows automatic test script, i.e. by run this test software can complete right The stress test of information system, and the testing procedure comprised in automatic test script, can be with step S11 to step S13 mono- Cause, differ only in, in true environment, do not carry out stress test, but by simulation true environment pair Information system is tested, and as logging in pressure 100 computers of preparation, every computer logs in 20 accounts simultaneously, simulation The situation that 2000 accounts log in simultaneously, i.e. by test software, information system being carried out stress test is that technological layer is carried out Stress test, owing to it is difficult to simulate real application scenarios, therefore, even if software test result meets preset requirement, also Confirmation system can not can keep required performance when applying in real application scenarios, so, if software is surveyed Test result meets preset requirement, can perform step S11 further to step S13, determine its performance, if software test result Do not meet preset requirement, then may determine that information system need improve, at this point it is possible to stop operation, it is of course also possible to export right The miscue information answered, wherein, this miscue information comprises software test result and software test result does not meets default The reason required.Thus improve work efficiency to a certain extent, it is ensured that the reliability of test.
The method for testing pressure of a kind of information system that the embodiment of the present invention provides, determines that test is by afterwards, it is also possible to Including:
Based on test result, the performance of information system is graded, determine the performance rate of information system.
Be analyzed according to test result, the performance of information system can be graded, as by test result with pre- If the gap and the different performance rate one_to_one corresponding that require, or direct by test result and different performance rate one a pair Should, above-mentioned corresponding relation can be predefined according to actual needs by staff, as in the above example, can being each industry The quantity that business correspondence completes is corresponding from different performance rates more than the gap quantity of the quantity of the original plan, this gap quantity The biggest, performance rate is the highest, shows that this information system is the best.Such that it is able to according to test result, determine the performance of information system Grade.
Furthermore it is also possible to according to test result, analyze the bottleneck of information system, analyze this information system existing soft, hard Supported business scale under part environment, the basis that compacting information system single track runs further.Wherein, in stress test, " bottleneck " this term is used for describing the factor of those restricted information system load pressures, in simple terms, is information system System causes the reason that information system performance declines to a great extent.
Corresponding with above-described embodiment, the embodiment of the present invention additionally provides the pressure test device of a kind of information system, as Shown in Fig. 2, may include that
Choosing module 11, for feature selecting system pressure spot based on business, system pressure point is for carry out for business The concentration degree of respective operations is higher than the time period of preset value;
First test module 12, for information system being carried out stress test for system pressure point under true environment, Obtain real world testing result;
Judge module 13, is used for judging whether real world testing result meets preset requirement, if it is, determine this survey Pinged.
The pressure test device of a kind of information system that the embodiment of the present invention provides, it is also possible to including:
Output module, if not meeting preset requirement for real world testing result, then output error information, wrong Information includes that real world testing result and real world testing result do not meet the reason of preset requirement by mistake.
The pressure test device of a kind of information system that the embodiment of the present invention provides, output module may include that
Output unit, for sending miscue information to designated terminal.
The pressure test device of a kind of information system that the embodiment of the present invention provides, it is also possible to including:
Second test module, for utilizing the test software write in advance that information system is carried out stress test, obtains soft Part test result, it is judged that whether software test result meets preset requirement, if it is, execution feature based on business is chosen and is The step of system pressure spot.
The pressure test device of a kind of information system that the embodiment of the present invention provides, it is also possible to including:
Grading module, for grading the performance of information system based on test result, determines the property of information system Can grade.
In the pressure test device of a kind of information system that the embodiment of the present invention provides, the explanation of relevant portion refers to this In the method for testing pressure of a kind of information system that inventive embodiments provides, the detailed description of corresponding part, does not repeats them here.
Described above to the disclosed embodiments, makes those skilled in the art be capable of or uses the present invention.To this The multiple amendment of a little embodiments will be apparent from for a person skilled in the art, and generic principles defined herein can With without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention will not be limited It is formed on the embodiments shown herein, and is to fit to consistent with principles disclosed herein and features of novelty the widest Scope.

Claims (10)

1. the method for testing pressure of an information system, it is characterised in that including:
Feature selecting system pressure spot based on business, described system pressure point is the collection carrying out respective operations for described business Moderate is higher than the time period of preset value;
Under true environment, described information system is carried out stress test for described system pressure point, obtain real world testing Result;
Judge whether described real world testing result meets preset requirement, if it is, determine that this test is passed through.
Method the most according to claim 1, it is characterised in that also include:
If described real world testing result does not meets preset requirement, then output error information, described miscue is believed Breath includes that described real world testing result and described real world testing result do not meet the reason of described preset requirement.
Method the most according to claim 2, it is characterised in that output error information, including:
Described miscue information is sent to designated terminal.
Method the most according to claim 1, it is characterised in that also include:
Utilize the test software write in advance that described information system is carried out stress test, obtain software test result, it is judged that institute State whether software test result meets preset requirement, if it is, perform the step of feature selecting system pressure spot based on business Suddenly.
Method the most according to claim 1, it is characterised in that determine that described test, by afterwards, also includes:
Based on described test result, the performance of described information system is graded, determine the performance etc. of described information system Level.
6. the pressure test device of an information system, it is characterised in that including:
Choosing module, for feature selecting system pressure spot based on business, described system pressure point is for enter for described business The concentration degree of row respective operations is higher than the time period of preset value;
First test module, for carrying out pressure survey to described information system for described system pressure point under true environment Examination, obtains real world testing result;
Judge module, is used for judging whether described real world testing result meets preset requirement, if it is, determine this test Pass through.
Device the most according to claim 6, it is characterised in that also include:
Output module, if not meeting preset requirement for described real world testing result, then output error information, institute State miscue information and include that described real world testing result and described real world testing result do not meet described presetting and want The reason asked.
Device the most according to claim 7, it is characterised in that described output module includes:
Output unit, for sending described miscue information to designated terminal.
Device the most according to claim 6, it is characterised in that also include:
Second test module, for utilizing the test software write in advance that described information system is carried out stress test, obtains soft Part test result, it is judged that whether described software test result meets preset requirement, if it is, perform feature based on business choosing Take the step of system pressure point.
Device the most according to claim 6, it is characterised in that also include:
Grading module, for grading the performance of described information system based on described test result, determines described information The performance rate of system.
CN201610564949.3A 2016-07-15 2016-07-15 The method for testing pressure of a kind of information system and device Pending CN106227655A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610564949.3A CN106227655A (en) 2016-07-15 2016-07-15 The method for testing pressure of a kind of information system and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610564949.3A CN106227655A (en) 2016-07-15 2016-07-15 The method for testing pressure of a kind of information system and device

Publications (1)

Publication Number Publication Date
CN106227655A true CN106227655A (en) 2016-12-14

Family

ID=57519217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610564949.3A Pending CN106227655A (en) 2016-07-15 2016-07-15 The method for testing pressure of a kind of information system and device

Country Status (1)

Country Link
CN (1) CN106227655A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106909508A (en) * 2017-02-28 2017-06-30 国家电网公司 A kind of information system testing results method and system
CN107329894A (en) * 2017-06-21 2017-11-07 广州华多网络科技有限公司 Application program system method of testing, device and electronic equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1842035A (en) * 2005-08-03 2006-10-04 中国移动通信集团公司 Data service performance testing method and apparatus based on mobile communication network
CN101211311A (en) * 2006-12-25 2008-07-02 中国电信股份有限公司 Performance prediction method for application software in manufacturing environment
US20130055028A1 (en) * 2011-08-31 2013-02-28 Ebay Inc. Methods and systems for creating software tests as executable resources
CN105405220A (en) * 2015-10-28 2016-03-16 深圳怡化电脑股份有限公司 Method and device for automated test

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1842035A (en) * 2005-08-03 2006-10-04 中国移动通信集团公司 Data service performance testing method and apparatus based on mobile communication network
CN101211311A (en) * 2006-12-25 2008-07-02 中国电信股份有限公司 Performance prediction method for application software in manufacturing environment
US20130055028A1 (en) * 2011-08-31 2013-02-28 Ebay Inc. Methods and systems for creating software tests as executable resources
CN105405220A (en) * 2015-10-28 2016-03-16 深圳怡化电脑股份有限公司 Method and device for automated test

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
曾建国: ""压力测试在真实环境下进行的意义"", 《中国传媒科技》 *
林秀明: ""压力测试在航标信息系统中的应用"", 《中国科技信息》 *
燕永田: "《工业控制计算机系统的设计与应用》", 31 December 1998, 中国铁道出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106909508A (en) * 2017-02-28 2017-06-30 国家电网公司 A kind of information system testing results method and system
CN107329894A (en) * 2017-06-21 2017-11-07 广州华多网络科技有限公司 Application program system method of testing, device and electronic equipment

Similar Documents

Publication Publication Date Title
CN109165168A (en) A kind of method for testing pressure, device, equipment and medium
CN112907305B (en) Customer full-period management system based on big data analysis
CN101102258B (en) Method, system for hosting an on-demand customer interaction center utility infrastructure
CN110445688A (en) Interface service function monitoring method and system based on data collection
CN105531689A (en) Client-selectable power source options for network-accessible service units
CN106487603A (en) A kind of response test method and device
CN109740155A (en) A kind of customer service system artificial intelligence quality inspection rule self concludes the method and system of model
Lepmets et al. A quality measurement framework for IT services
CN108255707A (en) Development roles creation method, device, equipment and the storage medium of test case
CN106227655A (en) The method for testing pressure of a kind of information system and device
CN101388036A (en) Data table summarizing method and device
CN109087199A (en) Account inquiries system, method and storage medium for bank
CN104504491A (en) Meter reading control method and system
CN111338825A (en) E-commerce interface docking platform
CN116385137A (en) Enterprise anti-fraud risk assessment method and system based on power information data
CN109800265A (en) Data load method, device, equipment and computer readable storage medium
CN212515891U (en) Shield machine service platform and framework based on WeChat public number
CN103823749A (en) Method for quickly constructing third-party software testing environment
Vrtal et al. Power grid and data network simulator
CN112001595A (en) Resource splitting method and device
Sheng et al. Risk bias externalization for offshore software outsourcing by conjoint analysis
CN109302305A (en) A kind of clustering performance test method based on industrial control system
Fadrinaldi et al. Application of microservice architecture in the development of website-based drainage system for Rumbai Area (Case Study: PUPR Service Pekanbaru)
CN102546284B (en) Online testing method for telecommunication value added service
CN112632153B (en) Illegal electricity consumption identification method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Guorui

Inventor after: Huang Long

Inventor after: Zhang Junyu

Inventor after: Du Lifeng

Inventor after: Chen Shanshan

Inventor after: Tang Qiaodan

Inventor after: Zeng Jiajie

Inventor after: Luo Xuliang

Inventor before: Huang Long

Inventor before: Zhang Junyu

Inventor before: Du Lifeng

Inventor before: Chen Shanshan

Inventor before: Tang Qiaodan

Inventor before: Zeng Jiajie

Inventor before: Luo Xuliang

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161214