CN106227267B - A kind of intelligent construction energy-consumption monitoring system - Google Patents

A kind of intelligent construction energy-consumption monitoring system Download PDF

Info

Publication number
CN106227267B
CN106227267B CN201610798689.6A CN201610798689A CN106227267B CN 106227267 B CN106227267 B CN 106227267B CN 201610798689 A CN201610798689 A CN 201610798689A CN 106227267 B CN106227267 B CN 106227267B
Authority
CN
China
Prior art keywords
cassette
supplying
rotating shaft
block
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610798689.6A
Other languages
Chinese (zh)
Other versions
CN106227267A (en
Inventor
林兴斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Lihao Electromechanical Technology Co ltd
Original Assignee
Guangdong Zhong Xin Energy Conservation And Environmental Protection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhong Xin Energy Conservation And Environmental Protection Co Ltd filed Critical Guangdong Zhong Xin Energy Conservation And Environmental Protection Co Ltd
Priority to CN201610798689.6A priority Critical patent/CN106227267B/en
Publication of CN106227267A publication Critical patent/CN106227267A/en
Application granted granted Critical
Publication of CN106227267B publication Critical patent/CN106227267B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D23/00Control of temperature
    • G05D23/19Control of temperature characterised by the use of electric means
    • G05D23/30Automatic controllers with an auxiliary heating device affecting the sensing element, e.g. for anticipating change of temperature

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)
  • Control Of Resistance Heating (AREA)

Abstract

The present invention relates to a kind of monitoring system, more particularly to a kind of intelligent construction energy-consumption monitoring system.The technical problem to be solved in the present invention is to provide a kind of high intelligent construction energy-consumption monitoring system of intelligence degree.In order to solve the above-mentioned technical problem, the invention provides such a intelligent construction energy-consumption monitoring system, include support, bronze gong, the first flexible member, cassette for supplying, bull stick, first rotating shaft, the first reel, first strike block, tap, oscillating rod, connecting rod etc.;First flexible member is located at cassette for supplying left, and the first flexible member upper end is provided with bronze gong, and tap is provided with the right side of cassette for supplying, is provided with connecting rod on the left of cassette for supplying, connecting rod left end is hingedly connected with oscillating rod, and block is struck in oscillating rod bottom provided with first.Invention achieves the high effect simple to operate with device of intelligence degree, and controller can automatically adjust the volume and temperature of water in cassette for supplying, and the automaticity of device is high, saves human resources.

Description

A kind of intelligent construction energy-consumption monitoring system
Technical field
The present invention relates to a kind of monitoring system, more particularly to a kind of intelligent construction energy-consumption monitoring system.
Background technology
Intellectuality refers to be converged by modern communicationses and information technology, computer networking technology, industry technology, intelligent control technology Collect form be directed to some in terms of application.
Energy consumption is to reflect the leading indicator of the horizontal and energy-saving situation of energy-consuming, primary energy total supply and the country The ratio of total output value, it is an efficiency of energy utilization index.The index illustrates in a national economy activity to the profit of the energy With degree, reflect the change of economic structure and efficiency of energy utilization.
Monitoring is the technical performance index specified with method verification test certain object specified.Suitable for various industries model The performance rating on farmland, such as civil construction project, water conservancy, food, chemistry, environment, machinery, machine.
At present there is the shortcomings that intelligence degree is low in building energy consumption detecting system, therefore need a kind of intelligence degree of design badly High intelligent construction energy-consumption monitoring system.
The content of the invention
(1) technical problems to be solved
The present invention in order to overcome current building energy consumption detecting system intelligence degree low the shortcomings that, the invention solves skill Art problem is to provide a kind of high intelligent construction energy-consumption monitoring system of intelligence degree.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a intelligent construction energy-consumption monitoring system, including There are support, bronze gong, the first flexible member, cassette for supplying, bull stick, first rotating shaft, the first reel, first to strike block, tap, swing Bar, connecting rod, strike bar, the first drawstring, fixed pulley, push pedal, cam, gear, the second rotating shaft, electric rotating machine, the second reel, second Drawstring, slide rail, sliding block, rack, the second flexible member, the first pole, bearing block, piston, the 3rd flexible member, the second pole, Water tank, electrically-controlled valve, stereoplasm tube and heater;Support inner bottom part is provided with the first flexible member and cassette for supplying, the first flexible member position In cassette for supplying left, the first flexible member upper end is provided with bronze gong, and tap is provided with the right side of cassette for supplying, and cassette for supplying left side, which is provided with, to be connected Bar, connecting rod left end are hingedly connected with oscillating rod, and block is struck in oscillating rod bottom provided with first, and cassette for supplying inner bottom part is provided with heater, branch Frame inner top is sequentially provided with the second flexible member, the first pole and the second pole from left to right, and the first pole bottom is provided with bearing , the second rotating shaft is installed on bearing block, the second rotating shaft is provided with gear and cam, and cam is located at gear rear, the second pole Bottom is provided with water tank, is provided with piston in water tank, the 3rd flexible member is respectively connected between piston and water tank inner left wall upper and lower, living Plug left end is provided with push pedal, and push pedal coordinates with cam contact, and water tank bottom is provided with fixed pulley and stereoplasm tube, and fixed pulley is located at stereoplasm tube Left, stereoplasm tube are provided with electrically-controlled valve, and stereoplasm tube bottom passes through cassette for supplying left wall, and support inner left wall is provided with slide rail and electric rotating Machine, slide rail are located above electric rotating machine, and slide rail is provided with sliding block, and rack, rack top and the second elasticity member are provided with the right side of sliding block Part connects, rack and pinion engagement, is provided with first rotating shaft on the right side of electric rotating machine, second is sequentially provided with from left to right in first rotating shaft Reel, bull stick and the first reel, the second drawstring is wound with the second reel, the second drawstring end is connected with rack bottom, Bull stick is provided with and strikes bar, strikes bar and is located at directly over bronze gong, the first drawstring is wound with the first reel, the first drawstring is around fixed sliding Wheel, the first drawstring end is connected with oscillating rod crown center.
Preferably, controller is also included, support inner bottom part is provided with controller, and controller is located at the first flexible member and confession Between answering case, the connected mode of controller and support inner bottom part is is fixedly connected with, controller and electric rotating machine, heater and automatically controlled Valve connects.
Preferably, also include range sensor, be provided with range sensor among cassette for supplying inner top, range sensor and For connected mode between cassette for supplying inner top to be fixedly connected, range sensor is horizontally disposed, range sensor and controller Connection.
Preferably, temperature sensor is also included, cassette for supplying inner left wall is provided with temperature sensor, and temperature sensor, which is located at, to be added Above hot device, the connected mode between temperature sensor and cassette for supplying inner left wall is is fixedly connected with, temperature sensor and controller Connection.
Preferably, rubber blanket is also included, first, which strikes block right side, is provided with rubber blanket, between rubber blanket and first are struck on the right side of block Connected mode to be fixedly connected, the material of rubber blanket is natural rubber, the three-dimensional shape cuboid of rubber blanket, a left side for rubber blanket It is equal in magnitude that block right flank with first is struck in side.
Preferably, also include second and strike block, strike bar end and strike block provided with second, the second material for striking block is natural rubber Glue, second strikes block with striking the connected mode of bar end to be fixedly connected, and the second three-dimensional shape for striking block is hemisphere, and second strikes block A diameter of 3.5cm.
Preferably, also include reinforcement, reinforcement is provided between support inner bottom part and support inner left wall, reinforcement is in incline Ramp-like, the angle between the lower surface of reinforcement and support inner bottom part is 30 °, and the material of reinforcement is Q235 steel.
Preferably, the material of support is Q235 steel, and the left wall shape of cross section of support is rectangle, support left wall cross section Length be 125cm, the width of support left wall cross section is 5cm, and the height of support is 200cm, and the surface of support is processing table Face.
Preferably, first rotating shaft and the material of the second rotating shaft are KTZ550-04, first rotating shaft and the second rotating shaft solid Shape is cylinder, and the diameter of first rotating shaft and the second rotating shaft is 3cm, the surface of first rotating shaft and the second rotating shaft be plus Work surface.
Operation principle:Water tank is being fetched water built with cold water, cassette for supplying built with hot water, people by tap hot water taking During hot water constantly reduce, when the volume of hot water is reduced to a certain amount, operating personnel open electrically-controlled valve, start heater work Make, manually boot electric rotating machine alternating rotating, first rotating shaft alternating rotating is driven, so that the second reel replaces folding and unfolding Second drawstring, so that rack alternately downwardly and upwardly moves, so that gear replaces rotating, cam is set to replace rotating, Push pedal finally is moved left and right, cold water is flowed into by stereoplasm tube in cassette for supplying, heater can heat to cold water, and first When rotating shaft replaces rotating, bar rotation is driven, so that striking bar intermittently taps bronze gong, so as to remind water intaking personnel It moisturizing, please don't fetch water, while first rotating shaft replaces rotating, drive the first reel alternating drawstring of folding and unfolding first, make swing Bar is swung, so that first strikes block percussion cassette for supplying left wall, rocks the cold water in cassette for supplying, so that cold water is heated evenly, So firing rate is faster, after the volume of water in cassette for supplying reaches a certain amount of, electrically-controlled valve is closed, when the heating of water in cassette for supplying After hours, electric rotating machine is stopped, and heater stops heating, afterwards in cassette for supplying during hot water deficiency, can press again Heating work is carried out according to above-mentioned principle.
Because also including controller, support inner bottom part is provided with controller, and controller is located at the first flexible member and supply Between case, controller is to be fixedly connected with the connected mode of support inner bottom part, controller and electric rotating machine, heater and electrically-controlled valve Connection, when the volume of hot water is reduced to a certain amount, controller opens electrically-controlled valve, starts heater and electric rotating machine, is added Thermal technology makees, it is possible to improves operating efficiency, saves the operating time.
Because also including range sensor, range sensor is provided among cassette for supplying inner top, range sensor is with supplying The connected mode between case inner top is answered to be fixedly connected, range sensor is horizontally disposed, and range sensor connects with controller Connect, when the distance of the water surface in range sensor and cassette for supplying is more than preset value, range sensor feeds back signal to controller, control Device processed opens electrically-controlled valve, starts heater and electric rotating machine, carries out heating work, it is possible to save the operating time.
Because also including temperature sensor, cassette for supplying inner left wall is provided with temperature sensor, and temperature sensor is positioned at heating Above device, to be fixedly connected, temperature sensor connects the connected mode between temperature sensor and cassette for supplying inner left wall with controller Connect, when water temperature is less than preset value in cassette for supplying, temperature sensor feedback signal starts heater work to controller, controller Make, it is possible to ensure that water temperature is constant.
Controller selection Xiamen sea is S24S0T type PLCs for the sea that Science and Technology Ltd. produces, outside main frame 24VDC powers, the input of 16 tunnels, the output of 8 tunnels.The definition of input/output port is:X0 is starts, and X1 is stops, X2 Distance-sensings Device, X3 are temperature sensor;Y0 is electric rotating machine, and Y1 is electrically-controlled valve, and Y2 is heater.Electrical control according to Fig. 6 is former Reason figure, those skilled in the art do not need performing creative labour, and controller can be achieved by programming and control each part to press Above-mentioned operation principle is acted, and the dependent instruction of programming is all prior art, be will not be repeated here.
(3) beneficial effect
Invention achieves the high effect simple to operate with device of intelligence degree, and controller can automatically adjust The volume and temperature of water in cassette for supplying, the automaticity of device is high, human resources is saved, so it is automatic to be easy to implement enterprise Change, the performance of enterprises can be improved.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Fig. 6 is the electric control theory figure of the present invention.
Mark in accompanying drawing for:1- supports, 2- bronze gongs, the flexible members of 3- first, 4- cassette for supplying, 5- bull sticks, first turn of 6- Axle, the reels of 7- first, 8- first strike block, 9- taps, 10- oscillating rods, 11- connecting rods, and 12- strikes bar, the drawstrings of 13- first, 14- Fixed pulley, 15- push pedals, 16- cams, 17- gears, the rotating shafts of 18- second, 19- electric rotating machines, the reels of 20- second, 21- second Drawstring, 22- slide rails, 23- sliding blocks, 24- racks, the flexible members of 25- second, the poles of 26- first, 27- bearing blocks, 28- pistons, The flexible members of 29- the 3rd, the poles of 30- second, 31- water tanks, 32- electrically-controlled valves, 33- stereoplasm tubes, 34- heaters, 35- controllers, 36- range sensors, 37- temperature sensors, 38- rubber blankets, 39- second strike block, 40- reinforcements.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of intelligent construction energy-consumption monitoring system, as shown in figures 1 to 6, include support 1, bronze gong 2, the first flexible member 3rd, cassette for supplying 4, bull stick 5, first rotating shaft 6, the first reel 7, first strike block 8, tap 9, oscillating rod 10, connecting rod 11, strike bar 12nd, the first drawstring 13, fixed pulley 14, push pedal 15, cam 16, gear 17, the second rotating shaft 18, electric rotating machine 19, the second reel 20th, the second drawstring 21, slide rail 22, sliding block 23, rack 24, the second flexible member 25, the first pole 26, bearing block 27, piston 28, 3rd flexible member 29, the second pole 30, water tank 31, electrically-controlled valve 32, stereoplasm tube 33 and heater 34;The inner bottom part of support 1 is provided with First flexible member 3 and cassette for supplying 4, the first flexible member 3 are located at the left of cassette for supplying 4, and the upper end of the first flexible member 3 is provided with bronze gong 2, the right side of cassette for supplying 4 is provided with tap 9, and the left side of cassette for supplying 4 is provided with connecting rod 11, and the left end of connecting rod 11 is hingedly connected with oscillating rod 10, Block 8 is struck in the bottom of oscillating rod 10 provided with first, and the inner bottom part of cassette for supplying 4 is provided with heater 34, and the inner top of support 1 is set successively from left to right There are the second flexible member 25, the first pole 26 and the second pole 30, the bottom of the first pole 26 is provided with bearing block 27, on bearing block 27 Second rotating shaft 18 is installed, the second rotating shaft 18 is provided with gear 17 and cam 16, and cam 16 is located at the rear of gear 17, the second pole 30 bottoms are provided with water tank 31, and piston 28 is provided with water tank 31, and the is respectively connected between piston 28 and the inner left wall upper and lower of water tank 31 Three flexible members 29, the left end of piston 28 are provided with push pedal 15, and push pedal 15 is engaged with cam 16, and the bottom of water tank 31 is provided with fixed pulley 14 and stereoplasm tube 33, fixed pulley 14 be located at the left of stereoplasm tube 33, stereoplasm tube 33 is provided with electrically-controlled valve 32, and the bottom of stereoplasm tube 33 passes through The left wall of cassette for supplying 4, the inner left wall of support 1 are provided with slide rail 22 and electric rotating machine 19, and slide rail 22 is located at the top of electric rotating machine 19, slide rail 22 Sliding block 23 is provided with, the right side of sliding block 23 is provided with rack 24, and the top of rack 24 is connected with the second flexible member 25, rack 24 and gear 17 engagements, the right side of electric rotating machine 19 are provided with first rotating shaft 6, are sequentially provided with the second reel 20 in first rotating shaft 6 from left to right, turn The reel 7 of bar 5 and first, the second drawstring 21 is wound with the second reel 20, the end of the second drawstring 21 is connected with the bottom of rack 24, Bull stick 5 is provided with and strikes bar 12, strikes bar 12 and is located at directly over bronze gong 2, the first drawstring 13, the first drawstring are wound with the first reel 7 13 bypass fixed pulley 14, and the end of the first drawstring 13 is connected with the crown center of oscillating rod 10.
Also include controller 35, the inner bottom part of support 1 is provided with controller 35, and controller 35 is located at the He of the first flexible member 3 Between cassette for supplying 4, controller 35, to be fixedly connected, controller 35 and electric rotating machine 19, adds with the connected mode of the inner bottom part of support 1 Hot device 34 and electrically-controlled valve 32 connect.
Also include range sensor 36, be provided with range sensor 36 among the inner top of cassette for supplying 4, range sensor 36 and For connected mode between the inner top of cassette for supplying 4 to be fixedly connected, range sensor 36 is horizontally disposed, range sensor 36 and control Device 35 processed connects.
Also include temperature sensor 37, the inner left wall of cassette for supplying 4 is provided with temperature sensor 37, and temperature sensor 37, which is located at, to be added The top of hot device 34, the connected mode between temperature sensor 37 and the inner left wall of cassette for supplying 4 to be fixedly connected, temperature sensor 37 with Controller 35 connects.
Also include rubber blanket 38, first, which strikes the right side of block 8, is provided with rubber blanket 38, and rubber blanket 38 and first strike the right side of block 8 Between connected mode to be fixedly connected, the material of rubber blanket 38 is natural rubber, the three-dimensional shape cuboid of rubber blanket 38, rubber It is equal in magnitude that the left surface of pad 38 with first strikes the right flank of block 8.
Also include second and strike block 39, strike the end of bar 12 and strike block 39 provided with second, the second material for striking block 39 is natural rubber Glue, second strikes block 39 with striking the connected mode of the end of bar 12 to be fixedly connected, and the second three-dimensional shape for striking block 39 is hemisphere, the Two strike a diameter of 3.5cm of block 39.
Also include reinforcement 40, reinforcement 40 is provided between the inner bottom part of support 1 and the inner left wall of support 1, reinforcement 40 is in Skewed, the angle between the lower surface of reinforcement 40 and the inner bottom part of support 1 is 30 °, and the material of reinforcement 40 is Q235 steel.
The material of support 1 is Q235 steel, and the left wall shape of cross section of support 1 is rectangle, the length of the left wall cross section of support 1 Spend for 125cm, the width of the left wall cross section of support 1 is 5cm, and the height of support 1 is 200cm, and the surface of support 1 is processing table Face.
The material of the rotating shaft 18 of first rotating shaft 6 and second is KTZ550-04, the solid of the rotating shaft 18 of first rotating shaft 6 and second Shape is cylinder, and the diameter of the rotating shaft 18 of first rotating shaft 6 and second is 3cm, the surface of the rotating shaft 18 of first rotating shaft 6 and second It is finished surface.
Operation principle:Water tank 31 built with cold water, cassette for supplying 4 built with hot water, people by the hot water taking of tap 9, Hot water is constantly reduced during water intaking, and when the volume of hot water is reduced to a certain amount, operating personnel open electrically-controlled valve 32, start and add Hot device 34 works, manually boot electric rotating machine 19 replace rotating, drive first rotating shaft 6 replace rotating so that second around Line wheel 20 replaces folding and unfolding the second drawstring 21 so that rack 24 alternately downwardly and upwardly moves so that gear 17 replace it is positive and negative Turn, cam 16 is replaced rotating, finally move left and right push pedal 15, cold water is flowed into by stereoplasm tube 33 in cassette for supplying 4, add Hot device 34 can heat to cold water, when first rotating shaft 6 replaces rotating, drive bull stick 5 to rotate, so that striking the interval of bar 12 Property tap bronze gong 2, so as to remind water intaking personnel just in moisturizing, please don't fetch water, first rotating shaft 6 replace rotating while, band The first drawstring of dynamic first reel 7 alternating folding and unfolding 13, swings oscillating rod 10, so that first strikes the left side of the percussion of block 8 cassette for supplying 4 Wall, rock the cold water in cassette for supplying 4, so that cold water is heated evenly, so firing rate is faster, when water in cassette for supplying 4 After volume arrival is a certain amount of, electrically-controlled valve 32 is closed, after the heating work of water in cassette for supplying 4, electric rotating machine 19 stops work Make, heater 34 stops heating, afterwards in cassette for supplying 4 during hot water deficiency, can carry out heating work again according to above-mentioned principle.
Because also including controller 35, the inner bottom part of support 1 is provided with controller 35, and controller 35 is located at the first flexible member Between 3 and cassette for supplying 4, controller 35 is to be fixedly connected with the connected mode of the inner bottom part of support 1, controller 35 and electric rotating machine 19th, heater 34 and electrically-controlled valve 32 connect, and when the volume of hot water is reduced to a certain amount, controller 35 is opened electrically-controlled valve 32, opened Dynamic heater 34 and electric rotating machine 19, carry out heating work, it is possible to improve operating efficiency, save the operating time.
Because also including range sensor 36, range sensor 36, range sensor are provided among the inner top of cassette for supplying 4 For connected mode between 36 and the inner top of cassette for supplying 4 to be fixedly connected, range sensor 36 is horizontally disposed, range sensor 36 It is connected with controller 35, when the distance of the water surface in range sensor 36 and cassette for supplying 4 is more than preset value, range sensor 36 is anti- Feedback signal to controller 35, open electrically-controlled valve 32, start heater 34 and electric rotating machine 19, carries out heating work by controller 35, So the operating time can be saved.
Because also including temperature sensor 37, the inner left wall of cassette for supplying 4 is provided with temperature sensor 37, temperature sensor 37 Above heater 34, the connected mode between temperature sensor 37 and the inner left wall of cassette for supplying 4 is is fixedly connected with, temperature sensor 37 are connected with controller 35, and when water temperature is less than preset value in cassette for supplying 4, temperature sensor 37 feeds back signal to controller 35, Controller 35 starts heater 34 and worked, it is possible to ensures that water temperature is constant.
It for the sea that Science and Technology Ltd. produces is S24S0T types PLC 35 that controller 35, which selects Xiamen sea, outside main frame Portion 24VDC powers, the input of 16 tunnels, the output of 8 tunnels.The definition of input/output port is:X0 is starts, and to stop, X2 distances pass X1 Sensor 36, X3 are temperature sensor 37;Y0 is electric rotating machine 19, and Y1 is electrically-controlled valve 32, and Y2 is heater 34.According to Fig. 6 Electric control theory figure, those skilled in the art do not need performing creative labour, passes through programming and controller can be achieved 35 each parts of control are acted by above-mentioned operation principle, and the dependent instruction of programming is all prior art, be will not be repeated here.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (9)

1. a kind of intelligent construction energy-consumption monitoring system, it is characterised in that include support (1), bronze gong (2), the first elasticity member Part (3), cassette for supplying (4), bull stick (5), first rotating shaft (6), the first reel (7), first strike block (8), tap (9), swung Bar (10), connecting rod (11), strike bar (12), the first drawstring (13), fixed pulley (14), push pedal (15), cam (16), gear (17), Second rotating shaft (18), electric rotating machine (19), the second reel (20), the second drawstring (21), slide rail (22), sliding block (23), rack (24), the second flexible member (25), the first pole (26), bearing block (27), piston (28), the 3rd flexible member (29), second Pole (30), water tank (31), electrically-controlled valve (32), stereoplasm tube (33) and heater (34);Support (1) inner bottom part is provided with the first elasticity Element (3) and cassette for supplying (4), the first flexible member (3) are located at cassette for supplying (4) left, and the first flexible member (3) upper end is provided with copper Gong (2), cassette for supplying (4) right side are provided with tap (9), and connecting rod (11) is provided with the left of cassette for supplying (4), and connecting rod (11) left end is be hinged to be connected Oscillating rod (10) is connected to, block (8) is struck in oscillating rod (10) bottom provided with first, and cassette for supplying (4) inner bottom part is provided with heater (34), branch Frame (1) inner top is sequentially provided with the second flexible member (25), the first pole (26) and the second pole (30) from left to right, first Bar (26) bottom is provided with bearing block (27), is provided with the second rotating shaft (18) on bearing block (27), the second rotating shaft (18) is provided with tooth Wheel (17) and cam (16), cam (16) are located at gear (17) rear, and the second pole (30) bottom is provided with water tank (31), water tank (31) be provided with piston (28) in, above and below piston (28) and water tank (31) inner left wall between to be respectively connected with the 3rd elastic first Part (29), piston (28) left end are provided with push pedal (15), and push pedal (15) is engaged with cam (16), and water tank (31) bottom is provided with fixed Pulley (14) and stereoplasm tube (33), fixed pulley (14) are located at stereoplasm tube (33) left, and stereoplasm tube (33) is provided with electrically-controlled valve (32), Stereoplasm tube (33) bottom passes through cassette for supplying (4) left wall, and support (1) inner left wall is provided with slide rail (22) and electric rotating machine (19), slide rail (22) above electric rotating machine (19), slide rail (22) is provided with sliding block (23), and rack (24), rack are provided with the right side of sliding block (23) (24) top be connected with the second flexible member (25), and rack (24) engages with gear (17), and electric rotating machine (19) right side is provided with the One rotating shaft (6), the second reel (20), bull stick (5) and the first reel (7) are sequentially provided with from left to right in first rotating shaft (6), The second drawstring (21) is wound with second reel (20), the second drawstring (21) end is connected with rack (24) bottom, on bull stick (5) Provided with bar (12) is struck, strike bar (12) and be located at directly over bronze gong (2), the first drawstring (13) is wound with the first reel (7), first draws Rope (13) bypasses fixed pulley (14), the middle connection of the first drawstring (13) end and oscillating rod (10).
2. a kind of intelligent construction energy-consumption monitoring system according to claim 1, it is characterised in that also include controller (35), support (1) inner bottom part is provided with controller (35), controller (35) be located at the first flexible member (3) and cassette for supplying (4) it Between, controller (35), to be fixedly connected, controller (35) and electric rotating machine (19), adds with the connected mode of support (1) inner bottom part Hot device (34) and electrically-controlled valve (32) connection.
3. a kind of intelligent construction energy-consumption monitoring system according to claim 2, it is characterised in that also include distance and pass Sensor (36), cassette for supplying (4) inner top centre are provided with range sensor (36), and range sensor (36) in cassette for supplying (4) with pushing up For connected mode between portion to be fixedly connected, range sensor (36) is horizontally disposed, range sensor (36) and controller (35) connect.
4. a kind of intelligent construction energy-consumption monitoring system according to claim 3, it is characterised in that also include temperature biography Sensor (37), cassette for supplying (4) inner left wall are provided with temperature sensor (37), and temperature sensor (37) is located above heater (34), Connected mode between temperature sensor (37) and cassette for supplying (4) inner left wall is is fixedly connected with, temperature sensor (37) and control Device (35) connects.
5. a kind of intelligent construction energy-consumption monitoring system according to claim 4, it is characterised in that also include rubber blanket (38), first strike and be provided with rubber blanket (38) on the right side of block (8), rubber blanket (38) and first strike the connected mode between block (8) right side To be fixedly connected, the material of rubber blanket (38) is natural rubber, and the three-dimensional shape of rubber blanket (38) is cuboid, rubber blanket (38) Left surface with first to strike block (8) right flank equal in magnitude.
6. a kind of intelligent construction energy-consumption monitoring system according to claim 5, it is characterised in that also include second and strike Block (39), strike bar (12) end and strike block (39) provided with second, the second material for striking block (39) is natural rubber, and second strikes block (39) With striking the connected mode of bar (12) end to be fixedly connected, the second three-dimensional shape for striking block (39) is hemisphere, and second strikes block (39) a diameter of 3.5cm.
7. a kind of intelligent construction energy-consumption monitoring system according to claim 6, it is characterised in that also include reinforcement (40), be provided with reinforcement (40) between support (1) inner bottom part and support (1) inner left wall, reinforcement (40) obliquely, reinforcement (40) angle between lower surface and support (1) inner bottom part is 30 °, and the material of reinforcement (40) is Q235 steel.
A kind of 8. intelligent construction energy-consumption monitoring system according to claim 7, it is characterised in that the material of support (1) For Q235 steel, the left wall shape of cross section of support (1) is rectangle, and the length of support (1) left wall cross section is 125cm, support (1) width of left wall cross section is 5cm, and the height of support (1) is 200cm, and the surface of support (1) is finished surface.
A kind of 9. intelligent construction energy-consumption monitoring system according to claim 8, it is characterised in that first rotating shaft (6) and The material of second rotating shaft (18) is KTZ550-04, and the three-dimensional shape of first rotating shaft (6) and the second rotating shaft (18) is cylinder The diameter of body, first rotating shaft (6) and the second rotating shaft (18) is 3cm, and the surface of first rotating shaft (6) and the second rotating shaft (18) is Finished surface.
CN201610798689.6A 2016-08-31 2016-08-31 A kind of intelligent construction energy-consumption monitoring system Active CN106227267B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610798689.6A CN106227267B (en) 2016-08-31 2016-08-31 A kind of intelligent construction energy-consumption monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610798689.6A CN106227267B (en) 2016-08-31 2016-08-31 A kind of intelligent construction energy-consumption monitoring system

Publications (2)

Publication Number Publication Date
CN106227267A CN106227267A (en) 2016-12-14
CN106227267B true CN106227267B (en) 2018-02-06

Family

ID=58074150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610798689.6A Active CN106227267B (en) 2016-08-31 2016-08-31 A kind of intelligent construction energy-consumption monitoring system

Country Status (1)

Country Link
CN (1) CN106227267B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107442057A (en) * 2017-09-26 2017-12-08 戚华军 A kind of dumper lubricating maintenance lubricating oil Preparation equipment
CN108179748B (en) * 2017-12-29 2020-09-25 绍兴兰卡智能科技有限公司 Hydraulic engineering uses high-efficient pile extractor
CN108980580B (en) * 2018-08-14 2021-02-02 无锡天舜科技有限公司 Video monitoring equipment based on Internet of things

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI100823B (en) * 1995-12-04 1998-02-27 Perander Jorma Method and arrangement of operation of the storage heater
CN2408396Y (en) * 1999-12-29 2000-11-29 朱殿臣 Electric water heater
CN2722135Y (en) * 2004-08-25 2005-08-31 应洪昌 Automatic water level controller of solar water heater
CN201443902U (en) * 2009-06-13 2010-04-28 张海波 Water supply control device of solar water heater
CN201610569U (en) * 2009-09-17 2010-10-20 刘富强 Double liquid level automatic switch valve control filling system
CN102987922A (en) * 2012-12-18 2013-03-27 宁波美侬咖啡机有限公司 Coffee machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI100823B (en) * 1995-12-04 1998-02-27 Perander Jorma Method and arrangement of operation of the storage heater
CN2408396Y (en) * 1999-12-29 2000-11-29 朱殿臣 Electric water heater
CN2722135Y (en) * 2004-08-25 2005-08-31 应洪昌 Automatic water level controller of solar water heater
CN201443902U (en) * 2009-06-13 2010-04-28 张海波 Water supply control device of solar water heater
CN201610569U (en) * 2009-09-17 2010-10-20 刘富强 Double liquid level automatic switch valve control filling system
CN102987922A (en) * 2012-12-18 2013-03-27 宁波美侬咖啡机有限公司 Coffee machine

Also Published As

Publication number Publication date
CN106227267A (en) 2016-12-14

Similar Documents

Publication Publication Date Title
CN106227267B (en) A kind of intelligent construction energy-consumption monitoring system
CN202311094U (en) Energy-saving efficient tea steaming device
CN203302063U (en) Mobile opening-closing solar energy expanded utilization greenhouse
CN204052401U (en) A kind of blank surface clearing apparatus
CN106142315A (en) Assembling die conduction oil maintenance technology
CN206433375U (en) A kind of liquid manure gas of the superior irrigation of crops is thermally integrated control system
CN205401017U (en) Stationary flow pressurized -water well
CN209617633U (en) The fold mechanism of case unpacker
CN208346064U (en) A kind of solar energy organic fertilizer fermentation pond heating device
CN202116566U (en) Stainless steel pressure drum for leather-making process
Jin et al. Impacts of 20-year socio-economic development on the trend of aquatic environment of the Taihu basin
CN203812110U (en) Wine spirits cellar temperature control device
CN205222660U (en) Fragrant oil filling machine
CN205980300U (en) Solar energy combines water system that heats of air ability
CN206925701U (en) A kind of automatic polishing device
CN203647112U (en) Barrel adjusting device in automatic barrel changing device of water dispenser
CN206547513U (en) A kind of agricultural irrigation device of automatically taking water
CN108618588A (en) Multifunctional steam steamed bun making machine
CN205847179U (en) A kind of solar panel that can move with light
CN205200527U (en) Smelt thick liquid transfer robot
CN203100988U (en) Semi-automatic water test leak detection device for gas meter
CN202470463U (en) Remote monitoring solar system
CN204374717U (en) The online wobbler electric control system of GQZY-30 type PU
CN210795795U (en) Calcining device for calcium carbonate production
CN201527112U (en) Integrated two-bucket solar energy heater

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lin Xingbin

Inventor before: Xie Haiting

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171227

Address after: Room 2408, room No. 2408, No. 2408, No. 1, No. 1, No. 1, Dongguan Avenue, Nancheng street, Dongguan, Guangdong

Applicant after: Guangdong Zhong Xin energy conservation and environmental protection Co.,Ltd.

Address before: Liulin road in Luyang District of Hefei City, Anhui province 230000 No. 18 building 602 room 2 Seasons terrace

Applicant before: ANHUI RUI HONG MDT INFO TECH LTD.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230612

Address after: Unit 206, 208, Floor 2, Building 6, Guangdong Machinery Research Institute, No. 663, Tianhe North Road, Tianhe District, Guangzhou, Guangdong 510000

Patentee after: Guangzhou Lihao Electromechanical Technology Co.,Ltd.

Address before: Room 2408, Building 3, International Workingmen's Association, No. 200, Dongguan Avenue, Nancheng Street, Dongguan, Guangdong 523000

Patentee before: Guangdong Zhong Xin energy conservation and environmental protection Co.,Ltd.