CN106227141A - Primary processing shop leaf processing line cylinder kind equipment state control system - Google Patents

Primary processing shop leaf processing line cylinder kind equipment state control system Download PDF

Info

Publication number
CN106227141A
CN106227141A CN201610644463.0A CN201610644463A CN106227141A CN 106227141 A CN106227141 A CN 106227141A CN 201610644463 A CN201610644463 A CN 201610644463A CN 106227141 A CN106227141 A CN 106227141A
Authority
CN
China
Prior art keywords
state
equipment
control system
cylinder
state control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610644463.0A
Other languages
Chinese (zh)
Inventor
李春华
孙绍波
徐仁辉
杨燕平
魏永红
李斌
王永俊
李建松
叶正国
杨雄海
海相斌
张卫东
溥亚春
普存文
施旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongta Tobacco Group Co Ltd
Original Assignee
Hongta Tobacco Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongta Tobacco Group Co Ltd filed Critical Hongta Tobacco Group Co Ltd
Priority to CN201610644463.0A priority Critical patent/CN106227141A/en
Publication of CN106227141A publication Critical patent/CN106227141A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • G05B19/054Input/output
    • AHUMAN NECESSITIES
    • A24TOBACCO; CIGARS; CIGARETTES; SIMULATED SMOKING DEVICES; SMOKERS' REQUISITES
    • A24BMANUFACTURE OR PREPARATION OF TOBACCO FOR SMOKING OR CHEWING; TOBACCO; SNUFF
    • A24B3/00Preparing tobacco in the factory
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/10Plc systems
    • G05B2219/11Plc I-O input output
    • G05B2219/1103Special, intelligent I-O processor, also plc can only access via processor

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Programmable Controllers (AREA)

Abstract

The present invention provides a kind of Primary processing shop leaf processing line cylinder kind equipment state control system, the S7 GRAPH in the programming software of Siemens S7 300/400 series of PLC is used to carry out system design, realize Automated condtrol, replace ladder diagram and the statement list status control module to roller equipment;First the time arriving equipment according to material distinguishes roller equipment state with the stage residing for production, and then the corresponding actuator of utilization state control completes process function;Roller equipment process is divided into SBR, pre-Warm status, head material state, production status, tailing state, done state and seven basic process states of cleaning state.The present invention can reduce conditional jump relevant in control, enables the clear readability of whole system, and is prone to amendment and adjusts, uses simple and convenient, improve maintenance of equipment, system maintenance efficiency.

Description

Primary processing shop leaf processing line cylinder kind equipment state control system
Technical field
The invention belongs to the Primary processing shop leaf processing line cylinder kind equipment process status control field that Nicotiana tabacum L. is electric, be used for carrying The programmed readability of high Primary processing shop leaf processing line cylinder kind equipment, maintainability, it is simple to the maintenance of program and amendment/adjustment programme And fault diagnosis and maintenance of equipment.
Background technology
PLC programming standard (IEC ll31-3) announced based on IEC (International Electrotechnical Commission) specifically understand syntax, The semantic expression way with 5 kinds of programming languages, it may be assumed that SFC, ladder diagram, FBD, instruction catalogue and structure text.
Siemens Step7 is the programming tool of S7-300/400 series of PLC, and ladder diagram, statement list and FBD are marks 3 kinds of basic programmed methods of quasi-tool kit configuration.Meanwhile, STEP7 additionally provides and several meets the senior of IEC 6113l-3 standard Programming language is selected for user, wherein has SCL (structuring control), CFC (flow chart), GRAPH (graphical sequence) etc. optional Program is for different application environment.Engineers and technicians can select these senior languages cleverly according to the feature of project and requirement Speech programming is designed, and this can be greatly improved design efficiency.
Owing to Primary processing shop production and processing technology is complicated, equipment state switching is frequently.Leaf line roller equipment is raw as throwing Nucleus equipment in production. art, process status is various, and its logical relation controlling program is the most complex.Including SBR, Seven basic process states such as pre-Warm status, head material state, production status, tailing state, done state and cleaning state.Initially We use ladder diagram and statement list that the state control system of cylinder kind equipment carries out the programming of traditional approach, find to use this When two kinds of programming tools write sequence control program, relevant conditional jump is a lot, the clear not readability of whole program, and is difficult to Amendment and adjustment programme, use very inconvenient.Therefore determine in the programming software of employing S7-300/400 series of PLC S7-GRAPH language carries out program restructuring to the Process Control System of roller equipment, improves maintenance of equipment, system maintenance efficiency.
Summary of the invention
The present invention provides a kind of Primary processing shop leaf processing line cylinder kind equipment state control system, and it uses S7-300/400 S7-GRAPH language in series PLC Programming software, can more convenient, directly work out automated procedures;Secondly, S7-GRAPH The most clearly express process, facilitate maintenance and the demand of amendment/adjustment programme, finally, use integrated diagnosis merit Process failure diagnosis can be carried out, make debugging, attendant can judge halting problem place rapidly, shorten maintenance time.
Use S7-GRAPH to carry out in programming, first arrive time and the stage residing for production of equipment according to material Distinguishing equipment state, utilization state controls corresponding actuator and completes process function.Make program structure clear, easily real Existing.
The ultimate principle of state control system is: equipment is initially in normal condition SBR, without motor, electromagnetism Starting preheating under conditions of the fault alarm such as valve, safety door, system to enter pre-Warm status, Rolling motor, air-heater, circulation Fan starting, opens heating steam valve, and hot blast temperature controls closed loop and starts, and makes charger cylinder be heated to preheat temperature and sets Definite value;Before machine to be fed, electronic scale has sent material signal, after time delay a period of time, enters head material state, starts and add water and front end Charging electromagnetic valve and regulating loop;After time delay a period of time, material is full of whole cylinder again, and system enters production status, before startup Rear end charging electromagnetic valve and regulating loop, before treating damping machine, electronic scale sends fracture signal, if the fracture time is shorter, charger enters Entering head material state, if the fracture time is longer, then enter tailing state, front end charging stops, cylinder Accelerating running.Batch terminates After, equipment is automatically into preparing or the state of cleaning.
Preferably, the Automated condtrol part of roller equipment is carefully studied it appeared that its control has following Feature:
(1) substantial amounts of programming has all been intended to sequential control;
(2) under same state, there is multiple step;
(3) State Transferring have plenty of by combination condition conversion, have by the time conversion, have plenty of triggering conversion;
(4) keep in repair for convenience in running, need system to possess multiple operator scheme: manually, automatically or point Dynamic function, state can carry out manual switching as required.
Therefore select S7-GRAPH to realize cylinder state is automatically controlled and can greatly reduce time of programming, carry High development efficiency, meanwhile, control system has good readability in actual moving process, and adjustment and maintenance is simple and convenient.
The present invention is completed by following technical proposal:
A kind of Primary processing shop leaf processing line cylinder kind equipment state control system, it uses Siemens S7-300/400 series S7-GRAPH in the programming software of PLC carries out system design, it is achieved Automated condtrol, replaces ladder diagram and statement list to cylinder The status control module of equipment;
Using in S7-GRAPH design, the time first arriving equipment according to material distinguishes rolling with the stage residing for production Cylinder device state, then the corresponding actuator of utilization state control completes process function;
Roller equipment process is divided into SBR, pre-Warm status, head material state, production status, tailing state, end State and cleaning seven basic process states of state.
Further, comprise the steps:
Step1, prepares: equipment is initially in normal condition SBR, without material in cylinder, without motor, electromagnetic valve, Start preheating under conditions of safety door fault alarm, enter next step preheating step;
Step2, preheating: system enters pre-Warm status, Rolling motor, air-heater, circulating fan start, and open heating and steam Steam valve, hot blast temperature controls closed loop and starts, and makes charger cylinder be heated to preheat desired temperature;
Step3, head material: before machine to be fed, electronic scale has sent material signal, after the one setting period of time delay, enter head material shape State, starts and adds water and front end charging electromagnetic valve and regulating loop;
Step4, produces: after the one setting period of time delay, material is full of whole cylinder again, and system enters production status, starts Front and back end charging electromagnetic valve and regulating loop, before treating damping machine, electronic scale sends fracture signal, if the fracture time is shorter than setting Between, charger enters head material state and returns Step3, if the fracture time is longer than the setting time, enters next step Step5;
Step5, tailing: enter tailing state, front end charging stops, cylinder Accelerating running;
Step6, terminates: after batch terminates, and equipment is automatically into preparing or the state of cleaning.
Further, Step6 step is introduced into Step7 wash phase after terminating, and enters back into Step9 and prepare rank after terminating Section.
Further, use manual mode switching between each step, carry out next corresponding steps by manual pushbutton;Or/ With, using automated manner switching between each step, switching condition uses system to pre-set.
Further, when electronic scale instantaneous delivery is more than or equal to 500kg/h and more than time delay 50s, enter from preheating step Enter head material step.
Further, when electronic scale weight of material is more than or equal to 100kg and more than time delay 200s, from the beginning material step is entered Enter production stage.
Further, when electronic scale weight of material is less than or equal to the end weight pre-set, and electronic scale instantaneous delivery During less than 20kg/h, and during time delay 50s, enter end step.
Further, following a kind of scheme or combination in any are used:
Scheme 1: in preparation process, if detection preheating temperature reaches requirement, is directed across preheating step, enters head material step Suddenly;
Scheme 2: in preheating step, if in the setting time of time delay, material is introduced into cylinder, returns to preparation process.
Scheme 3: in cleaning step, has cleaned automatically, returns to preparation process and prepares to circulate next time;Or it is " clear Wash stopping " button is pressed, then return to preparation process;
Scheme 4: in preparation process, when there being material in cylinder, produces end or cleaning is suspended, enter cleaning step.
Further, also including suspending/resuming module, roller equipment needs pause function when entering normal production status, When equipment peripheral components break down need to suspend time, stop corresponding part automatically by pause button;Peripheral cell fault Being disposed, suspend and release, recover automatically to run, suspending/resuming module is by controlling the interlocking condition of each step Interlock realizes, if interlocking condition Interlock meets, then the instruction with interlocking conditional combination will be performed;If mutually Bolt part is unsatisfactory for, then the instruction with interlocking conditional combination will be not carried out, and interlocking rub-out signal will be 1 simultaneously.
Further, also include direct monitoring module: when calling concrete GRAPH module, corresponding program name with same The DB block of sample carries out correspondence, it is achieved can directly monitor during on-line monitoring.
The algorithm that a kind of Primary processing shop leaf processing line cylinder kind equipment state controls, it sets for throwing leaf making roller type In standby Process Control System, a large amount of programming are all to have needed sequential control;Equipment has multiple control in same state Step;State Transferring complicated various have plenty of by combination condition conversion, have by time conversion, have plenty of triggering conversion;In fortune Keep in repair for convenience during row, need system to possess multiple operator scheme: manual, automatic or inching function, state can Carry out the features such as manual switching as required.S7-GRAPH is used to carry out program update reconstruct, it is achieved automatic to cylinder state Control.By initially we use ladder diagram and statement list to be replaced the state control system of roller equipment, in minimizing program Relevant conditional jump, enables the clear readability of whole program, and is prone to amendment and adjustment programme, use simple side Just, maintenance of equipment, system maintenance efficiency are improved.
Further, the S7-GRAPH language in the programming software of described S7-300/400 series of PLC.Relative to The programming languages such as other LAD, FBD and the STL provided in STEP7Professional 2006, S7-GRAPH lays particular emphasis on order The control of process, is primarily adapted for use in sequence control program, the most clearly the whole service situation of order of representation process, Programming process is clear and intuitive as required, it is easy to grasp, and uses integrated diagnosis function to carry out process failure diagnosis, beneficially fault Diagnosis and maintenance.
Further, use the S7-GRAPH language used in S7-300/400 series PLC Programming software, can be more square Just, automated procedures are directly worked out;Secondly, S7-GRAPH the most clearly expresses process, facilitates maintenance and repaiies Change/the demand of adjustment programme, finally, use integrated diagnosis function to carry out process failure diagnosis, make the debugging, attendant can be fast The judgement halting problem place of speed, shortens maintenance time.
Further, the ultimate principle of state control system is: equipment is initially in normal condition SBR, without electricity Starting preheating under conditions of the fault alarms such as mechanical, electrical magnet valve, safety door, system to enter pre-Warm status, Rolling motor, hot blast wind Machine, circulating fan start, and open heating steam valve, and hot blast temperature controls closed loop and starts, and makes charger cylinder be heated to pre- Hot desired temperature;Before machine to be fed, electronic scale has sent material signal, after time delay a period of time, enters head material state, and startup adds Water and front end charging electromagnetic valve and regulating loop;After time delay a period of time, material is full of whole cylinder again, and system enters and produces shape State, starts front and back end charging electromagnetic valve and regulating loop, and before treating damping machine, electronic scale sends fracture signal, if the fracture time is relatively Short, charger enters head material state, if the fracture time is longer, then enters tailing state, and front end charging stops, and cylinder accelerates fortune OK.After batch terminates, equipment is automatically into preparing or the state of cleaning.
The mentality of designing of the present invention is:
1) for programming a large amount of in the Process Control System of throwing leaf making roller kind equipment be all needed suitable Sequence controls;Equipment has multiple rate-determining steps in same state;State Transferring is complicated various to be had plenty of by combination condition conversion, have By the time conversion, have plenty of triggering conversion;Running keeps in repair for convenience, needs system to possess multiple operation mould Formula: manual, automatic or inching function, state can carry out the features such as manual switching as required.S7-GRAPH is used to carry out Program update reconstructs, it is achieved automatically control cylinder state.By initially we use ladder diagram and statement list to roller equipment State control system be replaced.
2) ultimate principle of state control system is: equipment is initially in normal condition SBR, without motor, electromagnetism Starting preheating under conditions of the fault alarm such as valve, safety door, system to enter pre-Warm status, Rolling motor, air-heater, circulation Fan starting, opens heating steam valve, and hot blast temperature controls closed loop and starts, and makes charger cylinder be heated to preheat temperature and sets Definite value;Before machine to be fed, electronic scale has sent material signal, after time delay a period of time, enters head material state, starts and add water and front end Charging electromagnetic valve and regulating loop;After time delay a period of time, material is full of whole cylinder again, and system enters production status, before startup Rear end charging electromagnetic valve and regulating loop, before treating damping machine, electronic scale sends fracture signal, if the fracture time is shorter, charger enters Entering head material state, if the fracture time is longer, then enter tailing state, front end charging stops, cylinder Accelerating running.Batch terminates After, equipment is automatically into preparing or the state of cleaning.
3) the S7-GRAPH language used in S7-300/400 series PLC Programming software is used, can be more convenient, direct Establishment automated procedures;Secondly, S7-GRAPH the most clearly expresses process, facilitates maintenance and amendment/adjustment journey The demand of sequence, finally, uses integrated diagnosis function to carry out process failure diagnosis, makes debugging, attendant to judge rapidly Halting problem place, shortens maintenance time.
Accompanying drawing explanation
Fig. 1 is that the state of one embodiment of the present of invention controls schematic diagram;
Fig. 2 is that the branch of one embodiment of the present of invention uses practical programs sectional drawing;
Fig. 3 is that the Interlock of one embodiment of the present of invention interlocks condition practice program sectional drawing;
Fig. 4 is that the order of one embodiment of the present of invention controls practice sectional drawing;
Fig. 5 be the GRAPH source program of one embodiment of the present of invention call sectional drawing.
Detailed description of the invention
In conjunction with drawings and the specific embodiments, the present invention is explained as follows:
Such as Fig. 1, according to technological requirement, the function such as roller equipment to complete to preheat, adds water, feeds, cleaning.Damping machine is initial It is in normal condition SBR;Starting preheating under conditions of without fault alarms such as motor, electromagnetic valve, safety doors, system is entered Entering pre-Warm status, Rolling motor, air-heater, circulating fan, open heating steam valve, hot blast temperature controls closed loop and opens Dynamic, make charger cylinder be heated to preheat desired temperature;Before machine to be fed, electronic scale has sent material signal, time delay a period of time After, enter head material state, start and add water and front end charging electromagnetic valve and regulating loop;After time delay a period of time, material is full of whole again Individual cylinder, system enters production status, starts front and back end charging electromagnetic valve and regulating loop, and before treating damping machine, electronic scale sends disconnected Material signal, if the fracture time is shorter, charger enters head material state, if the fracture time is longer, then enters tailing state, and front end adds Material stops, cylinder Accelerating running.After batch terminates, damping machine is automatically into preparing or the state of cleaning.Can by the flow chart of Fig. 1 Relatively complicated to find out the State Transferring of cylinder, particularly at the State Transferring of SBR, can according to different conditions To be transformed into pre-Warm status, head material state and cleaning state.It is all according to different conditions that whole state controls process, selects one The sequential control of definite sequence action.
Such as Fig. 2, a part for actual control program sectional drawing.The thinking using branching step carrys out sequential control application, according to Different conditions selects different branches to carry out action executing, and the execution priority level of previous branch is higher than next branch.
Such as Fig. 3, roller equipment needs pause function, when equipment peripheral components breaks down when entering normal production status When (such as disconnecting switch disconnection, air switch tripping operation, motor loop operation irregularity etc.) need to suspend, can be stopped by pause button Live corresponding part automatically;Peripheral cell troubleshooting is complete, and suspend releasing is can to recover this auto-programming group at once Automatically, this function is that Interlock is often walked by controlling the Interlock of each step interlocking condition realization Individual condition able to programme, it affects the implementation status of each independent step.If interlocking condition (Interlock) meets, then with interlocking The instruction of conditional combination will be performed;If interlocking condition is unsatisfactory for, then the instruction with interlocking conditional combination will be not carried out, with Time interlocking rub-out signal will be 1.If interlocking condition is empty, the most not programming, system then thinks that interlocking condition meets.
Such as Fig. 4, equipment has needed to walk control command accordingly in each state, reaches under this state to equipment Other system controls accordingly, in S7-GRAPH, it is provided that following control command is for programming personnel.
(1) order S;When step is movable step, output set is made to be 1 state and keep.
(2) order R: when step is movable step, make output be reset to 0 state and keep.
(3) order NC: when step is movable step, output is set to 1;When this step becomes inertia step, output is reset to 0。
(4) order L: be used for producing the pulse of restricted width, be equivalent to pulse timer.
(5) order CALL: be used for calling block, when this step is movable step, calls the block specified.
(6) order D: making the execution time delay of a certain action, delay time is arranged in the bottom-right square frame of this order.
Order NC and order L is employed in a large number in super roller equipment state controls.
Such as Fig. 5, after the source program programming that the state of equipment controls program terminates, can be in other functions of STEP7 Or in functional device calling corresponding GRAPH program, call method is as the call method of other programs, such as figure institute Show.Must be noted that when calling concrete GRAPH program among these, must be corresponding for corresponding program name (such as FB100) same The DB block (such as DB100) of sample, so can directly monitor when on-line monitoring, otherwise, due to sequence number and the DB of GRAPH program name The sequence number of block is different, will need to check the name of DB block when monitoring every time.
In a specific embodiment, Primary processing shop leaf processing line cylinder kind equipment state control system, use Siemens S7-GRAPH in the programming software of S7-300/400 series of PLC carries out system design, it is achieved Automated condtrol, replaces ladder diagram With the statement list status control module to roller equipment;Use S7-GRAPH design in, first according to material arrive equipment time Between and stage residing for producing distinguish roller equipment state, then utilization state controls corresponding actuator and completes technique merit Energy;Roller equipment process is divided into SBR, pre-Warm status, head material state, production status, tailing state, done state With cleaning seven basic process states of state.
In a preferred embodiment, comprise the steps:
Step1, prepares: equipment is initially in normal condition SBR, without material in cylinder, without motor, electromagnetic valve, Start preheating under conditions of safety door fault alarm, enter next step preheating step;
Step2, preheating: system enters pre-Warm status, Rolling motor, air-heater, circulating fan start, and open heating and steam Steam valve, hot blast temperature controls closed loop and starts, and makes charger cylinder be heated to preheat desired temperature;
Step3, head material: before machine to be fed, electronic scale has sent material signal, after the one setting period of time delay, enter head material shape State, starts and adds water and front end charging electromagnetic valve and regulating loop;
Step4, produces: after the one setting period of time delay, material is full of whole cylinder again, and system enters production status, starts Front and back end charging electromagnetic valve and regulating loop, before treating damping machine, electronic scale sends fracture signal, if the fracture time is shorter than setting Between, charger enters head material state and returns Step3, if the fracture time is longer than the setting time, enters next step Step5;
Step5, tailing: enter tailing state, front end charging stops, cylinder Accelerating running;
Step6, terminates: after batch terminates, and equipment is automatically into preparing or the state of cleaning.
In a preferred embodiment, Step6 step is introduced into Step7 wash phase after terminating, enter back into after terminating The Step9 preparatory stage.
In a preferred embodiment, use manual mode switching between each step, carry out next phase by manual pushbutton Answer step;Or/and, using automated manner switching between each step, switching condition uses system to pre-set.
In a preferred embodiment, when electronic scale instantaneous delivery is more than or equal to 500kg/h and more than time delay 50s, from Preheating step enters head material step.
In a preferred embodiment, when electronic scale weight of material is more than or equal to 100kg and more than time delay 200s, from Head material step enters production stage.
In a preferred embodiment, when electronic scale weight of material is less than or equal to the end weight pre-set, and electronics When scale instantaneous delivery is less than 20kg/h, and during time delay 50s, enter end step.
In a preferred embodiment, in preparation process, if detection preheating temperature reaches requirement, it is directed across preheating step Suddenly, head material step is entered;
In a preferred embodiment, in preheating step, if in the setting time of time delay, material is introduced into cylinder, return Return to preparation process.
In a preferred embodiment, in cleaning step, automatically clean, returned to preparation process and prepare next Secondary circulation;Or " clean and stop " button to be pressed, then return to preparation process;
In a preferred embodiment, in preparation process, when there being material in cylinder, produce end or cleaning is suspended, enter Cleaning step.
In a preferred embodiment, also including suspending/resuming module, roller equipment needs when entering normal production status Pause function, when equipment peripheral components break down need to suspend time, stop corresponding part automatically by pause button;Peripheral Element fault is disposed, and suspends and releases, and recovers automatically to run, and suspending/resuming module is by controlling the mutual bolt of each step Part Interlock realizes, if interlocking condition Interlock meets, then the instruction with interlocking conditional combination will be performed;If Interlocking condition is unsatisfactory for, then the instruction with interlocking conditional combination will be not carried out, and interlocking rub-out signal will be 1 simultaneously.
In a preferred embodiment, also include direct monitoring module: when calling concrete GRAPH program, corresponding Program name with as DB block carry out corresponding, it is achieved can directly monitor during on-line monitoring.
Finally should be noted that: above example is only in order to illustrate that the technical scheme of this case is not intended to limit;Although Being described in detail this case with reference to preferred embodiment, those of ordinary skill in the field are it is understood that the most permissible The detailed description of the invention of this case is modified or portion of techniques feature is carried out equivalent;Without deviating from this case technical side The spirit of case, it all should be contained in the middle of the technical scheme scope that this case is claimed.

Claims (10)

1. a Primary processing shop leaf processing line cylinder kind equipment state control system, it is characterised in that
The S7-GRAPH in the programming software of Siemens's S7-300/400 series of PLC is used to carry out system design, it is achieved automatization Control, replace ladder diagram and the statement list status control module to roller equipment;
Use in S7-GRAPH design, first distinguish cylinder according to the time of material arrival equipment with the stage residing for production and set Standby state, then the corresponding actuator of utilization state control completes process function;
Roller equipment process is divided into SBR, pre-Warm status, head material state, production status, tailing state, done state With cleaning seven basic process states of state.
A kind of Primary processing shop leaf processing line cylinder kind equipment state control system the most according to claim 1, its feature exists In, comprise the steps:
Step1, prepares: equipment is initially in normal condition SBR, without material in cylinder, without motor, electromagnetic valve, safety Start preheating under conditions of door fault alarm, enter next step preheating step;
Step2, preheating: system enters pre-Warm status, Rolling motor, air-heater, circulating fan start, and open and add vapours Valve, hot blast temperature controls closed loop and starts, and makes charger cylinder be heated to preheat desired temperature;
Step3, head material: before machine to be fed, electronic scale has sent material signal, after the one setting period of time delay, enter head material state, Start and add water and front end charging electromagnetic valve and regulating loop;
Step4, produces: after the one setting period of time delay, material is full of whole cylinder again, and system enters production status, before and after startup End charging electromagnetic valve and regulating loop, before treating damping machine, electronic scale sends fracture signal, if the fracture time is shorter than the setting time, adds Material machine enters head material state and returns Step3, if the fracture time is longer than the setting time, enters next step Step5;
Step5, tailing: enter tailing state, front end charging stops, cylinder Accelerating running;
Step6, terminates: after batch terminates, and equipment is automatically into preparing or the state of cleaning.
A kind of Primary processing shop leaf processing line cylinder kind equipment state control system the most according to claim 2, its feature exists In, Step6 step is introduced into Step7 wash phase after terminating, enter back into the Step9 preparatory stage after terminating.
A kind of Primary processing shop leaf processing line cylinder kind equipment state control system the most according to claim 2, its feature exists In, use manual mode switching between each step, carry out next corresponding steps by manual pushbutton;Or/and, adopt between each step Switching with automated manner, switching condition uses system to pre-set.
A kind of Primary processing shop leaf processing line cylinder kind equipment state control system the most according to claim 2, its feature exists In, when electronic scale instantaneous delivery is more than or equal to 500kg/h and more than time delay 50s, enter head material step from preheating step.
A kind of Primary processing shop leaf processing line cylinder kind equipment state control system the most according to claim 2, its feature exists In, when electronic scale weight of material is more than or equal to 100kg and more than time delay 200s, from the beginning material step enters production stage.
A kind of Primary processing shop leaf processing line cylinder kind equipment state control system the most according to claim 2, its feature exists In, when electronic scale weight of material is less than or equal to the end weight pre-set, and when electronic scale instantaneous delivery is less than 20kg/h, and During time delay 50s, enter end step.
8. according to a kind of Primary processing shop leaf processing line cylinder kind equipment state control system described in any one of claim 2 to 7, It is characterized in that, use following a kind of scheme or combination in any:
Scheme 1: in preparation process, if detection preheating temperature reaches requirement, is directed across preheating step, enters head material step;
Scheme 2: in preheating step, if in the setting time of time delay, material is introduced into cylinder, returns to preparation process;
Scheme 3: in cleaning step, has cleaned automatically, returns to preparation process and prepares to circulate next time;Or " cleaning stops Only " button is pressed, then return to preparation process;
Scheme 4: in preparation process, when there being material in cylinder, produces end or cleaning is suspended, enter cleaning step.
9. according to a kind of Primary processing shop leaf processing line cylinder kind equipment state control system described in any one of claim 1 to 8, It is characterized in that, also including suspending/resuming module, roller equipment needs pause function when entering normal production status, works as equipment Peripheral components breaks down when needing to suspend, and stops corresponding part automatically by pause button;Peripheral cell troubleshooting is complete Finishing, suspend and release, recover automatically to run, suspending/resuming module is real by interlocking condition Interlock controlling each step Existing, if interlocking condition Interlock meets, then the instruction with interlocking conditional combination will be performed;If interlocking condition is discontented with Foot, then the instruction with interlocking conditional combination will be not carried out, and interlocking rub-out signal will be 1 simultaneously.
10. control system according to a kind of Primary processing shop leaf processing line cylinder kind equipment state described in any one of claim 1 to 8 System, it is characterised in that also include direct monitoring module: when calling concrete GRAPH module, corresponding module with as DB Block carries out correspondence, it is achieved can directly monitor during on-line monitoring.
CN201610644463.0A 2016-08-09 2016-08-09 Primary processing shop leaf processing line cylinder kind equipment state control system Pending CN106227141A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610644463.0A CN106227141A (en) 2016-08-09 2016-08-09 Primary processing shop leaf processing line cylinder kind equipment state control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610644463.0A CN106227141A (en) 2016-08-09 2016-08-09 Primary processing shop leaf processing line cylinder kind equipment state control system

Publications (1)

Publication Number Publication Date
CN106227141A true CN106227141A (en) 2016-12-14

Family

ID=57547673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610644463.0A Pending CN106227141A (en) 2016-08-09 2016-08-09 Primary processing shop leaf processing line cylinder kind equipment state control system

Country Status (1)

Country Link
CN (1) CN106227141A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109270912A (en) * 2018-11-06 2019-01-25 珠海格力智能装备有限公司 Sequence control method and device, the storage medium and processor of PLC system
CN109549241A (en) * 2018-12-29 2019-04-02 浙江中烟工业有限责任公司 A kind of steam computer heating control model, steam method for heating and controlling applied to throwing cartridge type smoke machine
CN109717502A (en) * 2019-02-20 2019-05-07 上海烟草集团有限责任公司 The pre-heating mean of cut tobacco drying equipment under cold turner condition
CN112051806A (en) * 2019-09-10 2020-12-08 南京邮电大学 RGV intelligent scheduling method in reciprocating type track under random fault
CN113721572A (en) * 2021-09-01 2021-11-30 四川中烟工业有限责任公司 Method for monitoring running state of cylinder equipment
CN115669990A (en) * 2022-11-23 2023-02-03 湖北中烟工业有限责任公司 Intelligent electricity-saving method and device for tobacco shred production line

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103616878A (en) * 2013-12-03 2014-03-05 山东中烟工业有限责任公司 System and method for detecting on-line state of feeding loop in tobacco processing process
CN204384391U (en) * 2015-01-08 2015-06-10 陕西中烟工业有限责任公司延安卷烟厂 A kind of inlet system of tobacco vacuum dampening machine

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103616878A (en) * 2013-12-03 2014-03-05 山东中烟工业有限责任公司 System and method for detecting on-line state of feeding loop in tobacco processing process
CN204384391U (en) * 2015-01-08 2015-06-10 陕西中烟工业有限责任公司延安卷烟厂 A kind of inlet system of tobacco vacuum dampening machine

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《烟叶制丝工专业知识》编写组: "《烟叶制丝工专业知识》", 31 December 2012 *
张喆: "基于分组加工工艺对滚筒式烘丝机的改造", 《中国烟草学会2010年学术年会论文集》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109270912A (en) * 2018-11-06 2019-01-25 珠海格力智能装备有限公司 Sequence control method and device, the storage medium and processor of PLC system
CN109549241A (en) * 2018-12-29 2019-04-02 浙江中烟工业有限责任公司 A kind of steam computer heating control model, steam method for heating and controlling applied to throwing cartridge type smoke machine
CN109549241B (en) * 2018-12-29 2021-04-20 浙江中烟工业有限责任公司 Steam heating control model and steam heating control method applied to tobacco shred manufacturing drum type cigarette making machine
CN109717502A (en) * 2019-02-20 2019-05-07 上海烟草集团有限责任公司 The pre-heating mean of cut tobacco drying equipment under cold turner condition
CN112051806A (en) * 2019-09-10 2020-12-08 南京邮电大学 RGV intelligent scheduling method in reciprocating type track under random fault
CN112051806B (en) * 2019-09-10 2022-01-28 南京邮电大学 RGV intelligent scheduling method in reciprocating type track under random fault
CN113721572A (en) * 2021-09-01 2021-11-30 四川中烟工业有限责任公司 Method for monitoring running state of cylinder equipment
CN115669990A (en) * 2022-11-23 2023-02-03 湖北中烟工业有限责任公司 Intelligent electricity-saving method and device for tobacco shred production line
CN115669990B (en) * 2022-11-23 2024-05-10 湖北中烟工业有限责任公司 Intelligent electricity-saving method and device for tobacco leaf shredding production line

Similar Documents

Publication Publication Date Title
CN106227141A (en) Primary processing shop leaf processing line cylinder kind equipment state control system
CN103616854B (en) Thermal power plant's monoblock is from the optimization implementation method of on off control logic
CN105739423A (en) Converter tilting quick start up and shut down stable furnace rocking control system and method
CN103165207A (en) Sequential control method and system suitable for nuclear power station
CN203275960U (en) Operation security control system for delay-coking coke tower
CN103970123A (en) PLC device control program electric test platform and method for flow industrial automatic system
CN105321585A (en) Semi-physical simulation system used for debugging nuclear power unit control system and method
CN109253041A (en) A kind of the head control system and method for hydrogenerator governor
CN103854708A (en) Nuclear power station rod-control and rod-position system for driving test
CN104836484A (en) Redundant backup-based rope driving system and control method thereof
CN105299905A (en) Air source water heater and control method and device of air source water heater
CN208294819U (en) A kind of charging pile cooling fan control circuit
CN105005211A (en) Delayed coking process sequence control simulation system and method thereof
CN103966462A (en) Pneumatic automatic control system of furnace pellet pneumatic filling and reducing slag pneumatic picking integrated machine
CN105756986B (en) Fan control method for glass factory
CN104385541A (en) Injection molding machine and novel intelligent injection method
CN107463502A (en) Interaction equipment, test method and system
CN100386700C (en) Bulk producing controlling method based on bulk producing controlling system
CN103894100B (en) The material of agitated kettle throws in autocontrol method and device
CN201334449Y (en) Automation control device for gelatin extraction in the gelatin production process
CN1986571A (en) Technological process of controlling yellowing of short viscose fiber by means of recipe program
CN111026184A (en) Intelligent preheating method for equipment
CN105603417B (en) A kind of man-machine interactive system for sensing pre- hot melt and applying integrating device
CN212566934U (en) Automatic control system of roller furnace without charging basket
CN101349913B (en) Automatic control system of glue-extracting working procedure in gelatine production course

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161214