CN106226837A - A kind of submarine surface seeks the method for sand with a wide range of precise - Google Patents

A kind of submarine surface seeks the method for sand with a wide range of precise Download PDF

Info

Publication number
CN106226837A
CN106226837A CN201610522519.5A CN201610522519A CN106226837A CN 106226837 A CN106226837 A CN 106226837A CN 201610522519 A CN201610522519 A CN 201610522519A CN 106226837 A CN106226837 A CN 106226837A
Authority
CN
China
Prior art keywords
sand
ship
rake
submarine surface
precise
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610522519.5A
Other languages
Chinese (zh)
Inventor
高伟
李金峰
杨正军
唐达方
张德新
钟志生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
CCCC TDC Binhai Environmental Channel Dredging Co Ltd
CCCC Tianjin Port and Shipping Survey and Design Institute Co Ltd
CCCC TDC Yantai Environmental Protection Dredging Co Ltd
CCCC TDC Environmental Engineering Co Ltd
CCCC TDC Southern Communications Construction Co Ltd
Original Assignee
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
CCCC TDC Binhai Environmental Channel Dredging Co Ltd
CCCC Tianjin Port and Shipping Survey and Design Institute Co Ltd
CCCC TDC Yantai Environmental Protection Dredging Co Ltd
CCCC TDC Environmental Engineering Co Ltd
CCCC TDC Southern Communications Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tianjin Dredging Co Ltd, CCCC Tianjin Harbour Engineering Co Ltd, CCCC TDC Binhai Environmental Channel Dredging Co Ltd, CCCC Tianjin Port and Shipping Survey and Design Institute Co Ltd, CCCC TDC Yantai Environmental Protection Dredging Co Ltd, CCCC TDC Environmental Engineering Co Ltd, CCCC TDC Southern Communications Construction Co Ltd filed Critical CCCC Tianjin Dredging Co Ltd
Priority to CN201610522519.5A priority Critical patent/CN106226837A/en
Publication of CN106226837A publication Critical patent/CN106226837A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V9/00Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00
    • G01V9/007Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00 by detecting gases or particles representative of underground layers at or near the surface
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/02Devices for withdrawing samples
    • G01N1/04Devices for withdrawing samples in the solid state, e.g. by cutting
    • G01N1/08Devices for withdrawing samples in the solid state, e.g. by cutting involving an extracting tool, e.g. core bit
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Remote Sensing (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Geophysics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The present invention relates to a kind of method that submarine surface seeks sand with a wide range of precise.The invention belongs to geological mapping, Dredging Technology field.A kind of submarine surface seeks the method for sand with a wide range of precise, it is characterized in: it is to use rake to inhale ship to carry out submarine surface on a large scale, uninterruptedly dredge continuously that submarine surface seeks the method for sand with a wide range of precise, by construction parameter acquisition system statistical analysis associated construction parameter, judge sand source distribution by soil property sample analysis.The present invention has the advantages such as adaptable, simple, efficient, can find out the distribution in submarine surface sand source rapidly and accurately, and sand source is carried out optional position spot sampling.The method integrates submarine surface prospecting, submarine surface soil property two kinds of functions of sampling, and economical convenient, workable, range is wide.

Description

A kind of submarine surface seeks the method for sand with a wide range of precise
Technical field
The invention belongs to geological mapping, Dredging Technology field, particularly relate to a kind of submarine surface with a wide range of precise The method seeking sand.
Background technology
Submarine surface contains extremely rich in natural resources, such as building sand.While coastal area is flourish, building Huge by sand demand, the price that sea sand compares fluvial sand is more cheap, and construction costs can be greatly lowered.Offshore mining at present is built Build and have been developed as more ripe industry with sand.In addition to building sand, exploration exploitation seabed placer is increasingly becoming Chaoyang and produces Industry, deposit on marine-bottom surface usually contains mineralogical composition, such as gold, ilmenite, rutile, zircon, monazite, tourmaline and gold Hard rocks etc., have abundant extraction value.Additionally, off-lying sea islands and reefs land reclamation construction needs to need to look for sand near coral reef dish Source, reduces difficulty and the engineering cost of dredger excavation substrate, speeds up the work.
Above-mentioned engineer applied is required to carry out submarine surface engineering geologic investigation, finds sand source, the distribution of placer, And sand source, placer are carried out soil property sampling analysis.The investigative technique that research Marine Geology is most basic at present is marine geophysical prospecting technology, It with the difference of the physical propertys such as marine rock and the density of deposit, magnetic, elasticity, heat conductivity, electric conductivity and radioactivity is Foundation, mainly uses the methods such as gravity, magnetic force, earthquake and heat-flow measurement to carry out wire drag survey, but typically it is relatively costly, the later stage Need mass data to process and the work such as microcomputer modelling, and its range of application is surveyed mainly for the Marine Geology of layer deeper Look into, it is impossible to submarine surface carries out exploration analysis pointedly, and this type of method cannot complete to take the soil property of seabottom geology simultaneously Sample is analyzed.Marine Geology drilling technique needs the underwater drilling ship of specialty, can drill through the soil property sample of submarine surface, but it is easily subject to Wave effect, cannot normally work under complicated sea situation, its underwater sampling relatively inefficient, and it is sampled under water and does not connects Continuous, at a distance of hundreds of rice to several kms between general boring, the information that there is boring can not react real geological condition etc. completely Technical problem.
Summary of the invention
The present invention solves that technical problem present in known technology provides a kind of submarine surface to seek sand with a wide range of precise Method.
The present invention uses the trailing suction hopper dredger in dredging work, and the drag head connecting rake pipe is placed on submarine surface, at hull Pulling under realize the drag head movement in seabed, the soil property of submarine surface is drawn into spoil hopper and carries out soil property sampling, also by dredge pump Can carry out pinpointing soil property sampling at ad-hoc location, submarine surface geologic prospect is tied mutually by this method with the sampling of submarine surface soil property Close, solve that submarine surface geological prospecting cost height, sea situation bad adaptability, soil property sampling efficiency be low, soil property sampling discontinuously etc. Problem.
It is an object of the invention to provide a kind of submarine surface with the feature such as adaptable, simple, efficient the most smart The method really seeking sand.This method can find out the distribution in submarine surface sand source rapidly and accurately, and it is fixed that sand source carries out optional position Point sampling.The method integrates submarine surface prospecting, submarine surface soil property two kinds of functions of sampling, economical convenient, operability By force, range is wide.
Submarine surface of the present invention is sought the method for sand with a wide range of precise and is adopted the technical scheme that:
A kind of submarine surface seeks the method for sand with a wide range of precise, is characterized in: submarine surface seeks the side of sand with a wide range of precise Method is to use rake to inhale ship to carry out submarine surface on a large scale, uninterruptedly dredge continuously, by construction parameter acquisition system statistical Phase separation closes construction parameter, judges sand source distribution by soil property sample analysis.
Submarine surface of the present invention is sought the method for sand with a wide range of precise and can also be adopted the following technical scheme that
Described submarine surface seeks the method for sand with a wide range of precise, is characterized in: acquisition system acquisition parameter time interval 1-2s, construction parameter is for excavating density, propeller power and the speed of a ship or plane.
Described submarine surface seeks the method for sand with a wide range of precise, is characterized in: rake is inhaled ship and submarine surface is carried out big model Enclose, when uninterruptedly dredging continuously, sand source region depth of water 10-90m, soil layer thickness 0-3m during submarine surface exploration, it is thin for taking sand scope Flour sand is to gravelly sand.
Described submarine surface seeks the method for sand with a wide range of precise, is characterized in: ship's fix uses DGPS to position, Obtain meter level positioning precision sand source region.
Described submarine surface seeks the method for sand with a wide range of precise, is characterized in: rake is inhaled ship and submarine surface is carried out big model Enclose, uninterruptedly dredge continuously, it is judged that the process of sand source distribution is as follows:
(1) first step design of suction ship track line is harrowed: carry out rake suction ship track line according to the lineament in exploration marine site and set Meter, first designs a plurality of track line, spacing 200 to 1000 meters between track line along vertical water depth contour direction;
(2) construction parameter collection: open rake and inhale ship construction parameter acquisition system, records propeller propeller power, the speed of a ship or plane, digs Pick density, suction vacuum data parameter;
(3) soil property sampling: rake is inhaled ship and uninterruptedly sampled the substrate near track line and load rake suction ship spoil hopper, with Time can also inhale the soil property sample tap on ship mud line or stowage mouth carry out soil property sampling at rake, it is achieved near track line The spot sampling of anywhere;
(4) construction parameter scattergram: rake is inhaled ship and carried out cloth rake cabling according to the design of first step track line, receives after cabling Collection propeller propeller power, the speed of a ship or plane, excavation density, suction vacuum data parameter, analyze the construction parameter distribution with drag head coordinate Figure, tentatively judges sand source distribution region end points, each end points according to sand source region with the changes in distribution of construction parameter in other regions Line forms sand source distribution district scope for the first time;
(5) the second step design of ship track line inhaled by rake: according to construction parameter in test for the first time with drag head distribution plots Analysis result, to rake inhale ship carry out second time test track line design, second time test track line in first time sand source distribution In district, fork wiring worn by S type, and track line is as far as possible through the adjacent end points in first time sand source distribution district;
(6) second time test construction parameter is acquired, analyzes, make construction parameter scattergram, determine sand source distribution District's scope.
Described submarine surface seeks the method for sand with a wide range of precise, is characterized in: rake is inhaled ship and submarine surface is carried out big model Enclose, uninterruptedly dredge continuously, it is judged that during sand source distribution, proceed next time track line design cycle (2), (3), (4), (5), (6) step, until sand source distribution district range accuracy reaches to seek sand job requirements.
The present invention has the advantage that with good effect:
Submarine surface seeks the technical scheme that the method for sand is brand-new owing to have employed the present invention with a wide range of precise, with prior art Compare, the present invention use rake inhale ship to submarine surface on a large scale, uninterrupted geological prospecting sampling continuously and sand source find, have suitable Should be able to power be strong, simple, the advantage such as efficiently.Adaptable to sea situation of ship inhaled by rake, and ship inhaled by large-scale rake can in the case of unrestrained high 2m Normal work;Rake is inhaled ship maneuverability, is explored efficient, low cost, and ship inhaled by rake is self-propelled ship oceangoing ship, and Bian Zihang, limit exploration, limit take Sample, limit Parameter analysis, during exploration, the speed of a ship or plane is positively retained at 2 to 3kn, for the marine site of 10km × 10km, it is only necessary to about 24h can be complete The submarine surface becoming full wafer marine site is reconnoitred and is sampled with soil property;Ship inhaled by rake can carry out the most uninterrupted soil property on a large scale to submarine surface Sampling, can realize continuous sampling, and the optional position that sample position can also be chosen on rake trace simultaneously carries out spot sampling;This Method integrates submarine surface prospecting, submarine surface soil property two kinds of functions of sampling, simple and convenient, workable.
Accompanying drawing explanation
Fig. 1 is that rake is inhaled ship track line design for the first time and excavates density profile;
The time speed of a ship or plane, excavation density parameter curve chart when Fig. 2 is test for the first time;
Fig. 3 is that sand source distribution district and second time design flight path line chart for the first time;
Fig. 4 is second time sand source distribution district.
Detailed description of the invention
For the summary of the invention of the present invention, feature and effect can be further appreciated that, hereby enumerate following example, and coordinate accompanying drawing Describe in detail as follows:
Refering to accompanying drawing 1 to Fig. 4.
Embodiment 1
A kind of submarine surface seeks the method for sand with a wide range of precise, use rake inhale ship submarine surface is carried out on a large scale, not between Disconnection is continuous dredges, and by construction parameter acquisition system statistical analysis associated construction parameter, construction parameter is for excavating density, advancing merit The parameter such as rate and the speed of a ship or plane.Acquisition system acquisition parameter time interval 1-2s, ship's fix uses DGPS to position, obtains rice Level positioning precision sand source region, judges sand source distribution by soil property sample analysis.Sand source region depth of water 10-90m, submarine surface is surveyed Soil layer thickness 0-3m during spy, taking sand scope is that fine silt is to gravelly sand.
Submarine surface seeks the method for sand with a wide range of precise, uses rake to inhale ship and submarine surface is carried out on a large scale, uninterruptedly connected Continue and dredge, it is judged that the process of sand source distribution is as follows:
(1) first step design of suction ship track line is harrowed: carry out rake suction ship track line according to the lineament in exploration marine site and set Meter, first designs a plurality of track line, spacing 200 to 1000 meters between track line along vertical water depth contour direction;
(2) UC.Rake is inhaled ship DGPS precision verify, drag head is transferred the degree of depth and verifies;
(3) construction parameter collection: open rake and inhale ship construction parameter acquisition system, records propeller propeller power, the speed of a ship or plane, digs Pick density, suction vacuum data parameter;
(4) soil property sampling: rake is inhaled ship and uninterruptedly sampled the substrate near track line and load rake suction ship spoil hopper, with Time can also inhale the soil property sample tap on ship mud line or stowage mouth carry out soil property sampling at rake, it is achieved near track line The spot sampling of anywhere;
(5) construction parameter scattergram: rake is inhaled ship and carried out cloth rake cabling according to the design of first step track line, receives after cabling Collection propeller propeller power, the speed of a ship or plane, excavation density, suction vacuum data parameter, analyze the construction parameter distribution with drag head coordinate Figure, tentatively judges sand source distribution region end points, each end points according to sand source region with the changes in distribution of construction parameter in other regions Line forms sand source distribution district scope for the first time;
(6) the second step design of ship track line inhaled by rake: according to construction parameter in test for the first time with drag head distribution plots Analysis result, to rake inhale ship carry out second time test track line design, second time test track line in first time sand source distribution In district, fork wiring worn by S type, and track line is as far as possible through the adjacent end points in first time sand source distribution district;
(7) second time test construction parameter is acquired, analyzes, make construction parameter scattergram, on this basis may be used Optionally proceed track line design next time, circulate (3), (4), (5), (6), reach to seek to sand source distribution district range accuracy Sand job requirements.
Embodiment 2
A kind of submarine surface seeks the method for sand with a wide range of precise, use rake inhale ship submarine surface is carried out on a large scale, not between Disconnection is continuous dredges, and by construction parameter acquisition system statistical analysis associated construction parameter, judges sand source by soil property sample analysis Distribution.Process is with embodiment 1.
One's respective area is coral reef disk area, and coral reef substrate is hard, rake inhale ship excavate density low, the pilot region depth of water 10 to 60m.Being first according to be perpendicular to isobath planning track line for the first time, spacing about 200m between track line, rake inhales ship along every boat Trace dredge dig complete, gather relevant parameter, density, the speed of a ship or plane typical curve as in figure 2 it is shown, density parameter with rake trace distribution Situation is as it is shown in figure 1, pinpoint soil sampling 4 times, and wherein in A, D group soil sample, mud is limpid, sediment concentration is low, containing relatively in B, C group Many medium coarse sands.Sampling according to Parameter analysis facility soil property, primitive decision this sand source region is zonal distribution along isobath, and delimits the One Ci Sha source distribution district, planning second time designs track line S type in first time sand source distribution district and wears fork wiring, and track line passes The adjacent end points in the district of sand source distribution for the first time, as it is shown on figure 3, through testing identical process with first time, analyze and obtain second Ci Sha source distribution district end points, about 100 meters of the interval between adjacent end points, reach Liao Sha source distribution district's required precision, delimit accordingly Sand source distribution scope, is sampled analyzing by rake is inhaled the silt of precipitation in ship spoil hopper, in this sand source band predominantly in thick Sand, median particle diameter 0.3mm.
The present embodiment use rake inhale ship to submarine surface on a large scale, uninterrupted geological prospecting sampling continuously and sand source find, There is the advantages such as adaptable, simple, efficient.This method can find out the distribution in submarine surface sand source rapidly and accurately, and right Sand source carries out optional position spot sampling.The method integrates submarine surface prospecting, submarine surface soil property two kinds of functions of sampling, Economical convenient, workable, range is wide.

Claims (6)

1. the method that submarine surface seeks sand with a wide range of precise, is characterized in that: submarine surface seeks the method for sand with a wide range of precise It is to use rake to inhale ship submarine surface to be carried out on a large scale, uninterruptedly dredges continuously, by construction parameter acquisition system statistical analysis Associated construction parameter, judges sand source distribution by soil property sample analysis.
Submarine surface the most according to claim 1 seeks the method for sand with a wide range of precise, it is characterized in that: acquisition system collection is joined Number time interval 1-2s, construction parameter is for excavating density, propeller power and the speed of a ship or plane.
Submarine surface the most according to claim 1 seeks the method for sand with a wide range of precise, it is characterized in that: rake inhales ship to seabed table Layer carries out on a large scale, when uninterruptedly dredging continuously, sand source region depth of water 10-90m, soil layer thickness 0-3m during submarine surface exploration, take Sand scope is that fine silt is to gravelly sand.
Submarine surface the most according to claim 1 seeks the method for sand with a wide range of precise, it is characterized in that: ship's fix uses DGPS positions, and obtains meter level positioning precision sand source region.
5. the method seeking sand with a wide range of precise according to the submarine surface described in claim 1-4 any claim, its feature It is: rake is inhaled ship and carried out submarine surface on a large scale, uninterruptedly dredges continuously, it is judged that the process of sand source distribution is as follows:
(1) first step design of ship track line inhaled by rake: carries out rake according to the lineament in exploration marine site and inhales the design of ship track line, first A plurality of track line, spacing 200 to 1000 meters between track line are first designed along vertical water depth contour direction;
(2) construction parameter collection: open rake and inhale ship construction parameter acquisition system, record propeller propeller power, the speed of a ship or plane, excavation are close Degree, suction vacuum data parameter;
(3) soil property sampling: rake is inhaled ship and the substrate near track line uninterruptedly sampled and loads rake suction ship spoil hopper, the most also The soil property sample tap on ship mud line can be inhaled or stowage mouth carry out soil property sampling, it is achieved any near track line at rake The spot sampling in place;
(4) construction parameter scattergram: rake is inhaled ship and carried out cloth rake cabling according to the design of first step track line, collects spiral shell after cabling Rotation oar propeller power, the speed of a ship or plane, excavation density, suction vacuum data parameter, analyze the construction parameter scattergram with drag head coordinate, root Sand source distribution region end points, each end points line shape is tentatively judged with the changes in distribution of construction parameter in other regions according to sand source region Become sand source distribution district scope for the first time;
(5) the second step design of suction ship track line is harrowed: according to construction parameter dividing with drag head distribution plots in test for the first time Analysis result, inhales ship and carries out testing track line design for the second time rake, second time test track line S in first time sand source distribution district Fork wiring worn by type, and track line is as far as possible through the adjacent end points in first time sand source distribution district;
(6) second time test construction parameter is acquired, analyzes, make construction parameter scattergram, determine sand source distribution district model Enclose.
6. the method seeking sand with a wide range of precise according to the submarine surface described in claim .5, is characterized in that: rake inhales ship to seabed Top layer carries out on a large scale, uninterruptedly dredges continuously, it is judged that during sand source distribution, proceeds track line design next time and follows Ring (2), (3), (4), (5), (6) step, until sand source distribution district range accuracy reaches to seek sand job requirements.
CN201610522519.5A 2016-07-04 2016-07-04 A kind of submarine surface seeks the method for sand with a wide range of precise Pending CN106226837A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610522519.5A CN106226837A (en) 2016-07-04 2016-07-04 A kind of submarine surface seeks the method for sand with a wide range of precise

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610522519.5A CN106226837A (en) 2016-07-04 2016-07-04 A kind of submarine surface seeks the method for sand with a wide range of precise

Publications (1)

Publication Number Publication Date
CN106226837A true CN106226837A (en) 2016-12-14

Family

ID=57520326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610522519.5A Pending CN106226837A (en) 2016-07-04 2016-07-04 A kind of submarine surface seeks the method for sand with a wide range of precise

Country Status (1)

Country Link
CN (1) CN106226837A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343106A (en) * 2018-03-23 2018-07-31 中交天航港湾建设工程有限公司 A method of the rake with submersible pump inhales ship and excavates medium coarse sand
CN116482335A (en) * 2023-04-26 2023-07-25 中国冶金地质总局第二地质勘查院 Sea sand ore investigation method
CN117871182A (en) * 2024-03-13 2024-04-12 四川川核地质工程有限公司 Hydrologic engineering geology reconnaissance sampling device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3491205B2 (en) * 1994-08-11 2004-01-26 大和ハウス工業株式会社 Simple particle size test method by sedimentation analysis of soil
KR100734814B1 (en) * 2006-08-03 2007-07-03 디에스엠이 유텍 주식회사 Auto-piloting unmanned ship
US20140283420A1 (en) * 2011-10-03 2014-09-25 Marine Resources Exploration International B.V. Suction Mouth for a Subsea Mining Tool
CN105277993A (en) * 2015-11-21 2016-01-27 山东省第一地质矿产勘查院 Method for prospecting gold mine in sea area
CN105421286A (en) * 2015-10-27 2016-03-23 中交天航南方交通建设有限公司 Combined rock excavation construction method using backhoe dredger and drill ship

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3491205B2 (en) * 1994-08-11 2004-01-26 大和ハウス工業株式会社 Simple particle size test method by sedimentation analysis of soil
KR100734814B1 (en) * 2006-08-03 2007-07-03 디에스엠이 유텍 주식회사 Auto-piloting unmanned ship
US20140283420A1 (en) * 2011-10-03 2014-09-25 Marine Resources Exploration International B.V. Suction Mouth for a Subsea Mining Tool
CN105421286A (en) * 2015-10-27 2016-03-23 中交天航南方交通建设有限公司 Combined rock excavation construction method using backhoe dredger and drill ship
CN105277993A (en) * 2015-11-21 2016-01-27 山东省第一地质矿产勘查院 Method for prospecting gold mine in sea area

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘之祥: ""海底矿床开采"", 《有色金属(采矿部分)》 *
程志东: ""浅谈耙吸挖泥船施工工艺"", 《中国水运》 *
高伟: ""国内外疏浚挖泥设备的对比与分析"", 《中国港湾建设》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343106A (en) * 2018-03-23 2018-07-31 中交天航港湾建设工程有限公司 A method of the rake with submersible pump inhales ship and excavates medium coarse sand
CN108343106B (en) * 2018-03-23 2020-07-07 中交天航港湾建设工程有限公司 Method for excavating coarse sand by using drag suction ship with underwater pump
CN116482335A (en) * 2023-04-26 2023-07-25 中国冶金地质总局第二地质勘查院 Sea sand ore investigation method
CN116482335B (en) * 2023-04-26 2023-12-15 中国冶金地质总局第二地质勘查院 Sea sand ore investigation method
CN117871182A (en) * 2024-03-13 2024-04-12 四川川核地质工程有限公司 Hydrologic engineering geology reconnaissance sampling device
CN117871182B (en) * 2024-03-13 2024-05-07 四川川核地质工程有限公司 Hydrologic engineering geology reconnaissance sampling device

Similar Documents

Publication Publication Date Title
Steel et al. The Triassic—Early Jurassic succession in the northern North Sea: megasequence stratigraphy and intra-Triassic tectonics
Befus et al. Seismic constraints on critical zone architecture, Boulder Creek watershed, Front Range, Colorado
Bosworth et al. Late Quaternary reorientation of stress field and extension direction in the southern Gulf of Suez, Egypt: Evidence from uplifted coral terraces, mesoscopic fault arrays, and borehole breakouts
CN105277993B (en) Method for prospecting gold mine in sea area
Guo et al. Late-Quaternary strong earthquakes on the seismogenic fault of the 1976 M s 7.8 Tangshan earthquake, Hebei, as revealed by drilling and trenching
Algar et al. Mass-transport deposits of the deepwater Northwestern Borneo Margin—Characterization from seismic-reflection, borehole, and core data with implications for hydrocarbon exploration and exploitation
CN111179415A (en) Three-dimensional geological model construction method for calcium-bonded rock type uranium ore
CN106226837A (en) A kind of submarine surface seeks the method for sand with a wide range of precise
Villegas et al. Flow of Formation Waters in the Cretaceous--Miocene Succession of the Llanos Basin, Colombia
Myers Stratigraphy of the Frontier Formation (Upper Cretaceous), Kemmerer area, Lincoln County, Wyoming
Cassidy et al. GPR derived architecture of November 1996 jökulhlaup deposits, Skeiðarársandur, Iceland
O‘Byrne et al. High-resolution sequence stratigraphy of Cretaceous shallow marine sandstones, Book Cliffs outcrop, Utah, USA-application to reservoir modelling
Vosgerau et al. Reservoir architectures of interlava systems: a 3D photogrammetrical study of Eocene cliff sections, Faroe Islands
Harray et al. Beach erosion at Waihi Beach bay of plenty, New Zealand
CN106772637A (en) One kind is based on slot wave forward probe TVSP scan methods
Hayes et al. Using structure-from-motion photogrammetry to recognize lateral versus forward accretion bedforms in the Lower Cretaceous McMurray Formation, NE Alberta, Canada
Kaufman The Selection and Sizing of Tracts Comprisinq a Manganese Nodule Ore Body
Och et al. Sydney Metro-Site Investigation and Ground Characterisation for the Sydney Harbour Crossing
Lokho et al. Ichnofossils from the Miocene Middle Bhuban Formation, Mizoram, Northeast India and their paleoenvironmental significance
CN114329308A (en) Submarine cable buried protection method suitable for sea bed frequent scouring and silting sea area
Patyk-Kara Cenozoic placer deposits and fluvial channel systems on the Arctic shelf of Siberia
CN114114408A (en) Low-order fault identification method
Lejzerowicz et al. Sedimentary architecture and ground penetrating radar (GPR) analysis of sandy-gravel esker deposits in Kozlow, Central Poland
Costaras et al. The importance of bed material characterisation in planning dredging projects
Strange et al. Development of ‘rockhead’computer-generated geological models to assist geohazard prediction in London

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161214