CN106223257A - 一种长距离输水明渠事故段上游应急响应闸门群控制方法 - Google Patents
一种长距离输水明渠事故段上游应急响应闸门群控制方法 Download PDFInfo
- Publication number
- CN106223257A CN106223257A CN201610585122.0A CN201610585122A CN106223257A CN 106223257 A CN106223257 A CN 106223257A CN 201610585122 A CN201610585122 A CN 201610585122A CN 106223257 A CN106223257 A CN 106223257A
- Authority
- CN
- China
- Prior art keywords
- canal
- gate
- pond
- water level
- canal pond
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B1/00—Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
- E02B7/26—Vertical-lift gates
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05D—SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G05D27/00—Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00
- G05D27/02—Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00 characterised by the use of electric means
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Barrages (AREA)
Abstract
本发明涉及一种长距离输水明渠事故段上游应急响应闸门群控制方法,包括:评定等体积运行可行性;确定等体积运行渠段范围;同步关闭节制闸;计算入流闸门流量调控目标值;计算蓄量调控目标值;计算回调时刻;回调入流闸门流量;监控并修正闸前水位。本发明通过评定事故段上游各渠池应急调控时采用等体积运行的可行性,在部分渠池引入等体积运行方式,实施同一渠道等体积与闸前常水位运行方式串接运行的闸门群调控方法,实现渠道由正常输水态向应急输水态安全、高效切换。本发明避免了应急过渡过程中蓄量的反复充泄,提高了调控效率,降低了运行成本。
Description
技术领域
本发明涉及一种长距离输水明渠事故段上游应急响应闸门群控制方法,是一种用于水工设施的自动控制方法,是一种适用于长距离明渠输水工程的水流自动控制方法。
背景技术
长距离明渠输水工程是由一系列节制闸串接明渠组成的串联系统,其中任一建筑物(或设施)的失效都将导致系统的失效。由于输水距离长,工程沿线地质条件复杂,地理环境和气象条件差异较大,因自然灾害、交通事故或其它突发事件导致的渠道应急响应事件不可避免,事故上游段需紧急截断水流或在短期内大幅度改变流量,由正常输水状态切换至应急输水状态。为避免漫溢、衬砌扬压破坏等次生灾害,保障过渡过程的安全、平稳进行,需采用科学的闸门群应急调度方法。
目前针对长距离输水工程应急调控方法的研究还很薄弱,多数研究仅限于应急预案制定的原则和方向,部分涉及退水闸等控制结构的应急水力响应特性,但对于具体调度方法的研究很少,能够提出闸门群调控方法的成果更少,没有一套可具体操作实施的应急调控方法。
当前长距离渠道应急调控通常采用闸前常水位运行方式。如《南水北调中线干线工程突发事件应急调度预案》(Q/NSBDZX G014-2014)中规定:对于事故段上游,均按照闸前常水位控制原则,根据实际水位,实时调整闸门开度。然而,虽然闸前常水位运行方式有利于渠道维持大流量输水,却严重影响其应急调度时的水力响应特性。美国ASCE组织编写的渠系自动化手册(Canal System Automation Manual)中指出,闸前常水位运行方式下渠道水面线绕闸前支枢点旋转,导致渠道流量变化与其自然趋势相反,大大降低了渠道的水力响应与恢复特性。
发明内容
为了克服现有技术的问题,本发明提出了一种长距离输水明渠事故段上游应急响应闸门群控制方法。所述的方法克服闸前常水位运行方式的缺陷,合理调控渠道应急响应时的蓄量变化过程,是解决渠道应急调控难题的重要途径。
本发明的目的是这样实现的:一种长距离输水明渠事故段上游应急响应闸门群控制方法,所述的方法使用的系统包括:一条带有水位反馈控制系统的自流型输水明渠,所述的自流型输水明渠被多个节制闸分隔成多个串联的渠池,所述的渠池内设有分水口;其特征在于:所述方法包括两个过程:准备过程和应急过程;
所述方法的步骤如下:
准备过程包括:
评定等体积运行可行性的步骤:用于评定各渠池应急调控时采用等体积运行的可行性,计算各渠池下游端节制闸的闸前目标水位,并设定闸前水位阈值;
确定等体积运行渠段范围的步骤:用于确定应急调控时切换至等体积运行方式的渠段范围;
应急过程:
同步关闭节制闸的步骤:用于应急事件发生后,第一时刻将事故段上游所有渠池的节制闸同步快速关闭;
计算入流闸门流量调控目标值的步骤:用于计算各渠池在应急输水态下的入流闸门流量调控目标值;
计算蓄量调控目标值的步骤:首先计算各渠池在应急输水态下独自的蓄量调整目标值,然后基于其是否属于切换至等体积运行方式的渠段范围,相应计算上下游渠池间的蓄量传输量,确定各渠池综合的蓄量调控目标值;
计算回调时刻的步骤:用于计算各渠池在应急输水态下入流闸门的回调时刻;
回调入流闸门流量的步骤:用于根据入流闸门流量调控目标值和回调时刻调整各渠池入流闸门的流量;
监控并修正闸前水位的步骤:用于监控各渠池的闸前水位,如果其值偏离闸前水位阈值,则启动水位反馈控制,调整闸门开度至闸前水位偏离值小于阈值为止。
本发明产生的有益效果是:本发明通过评定事故段上游各渠池应急调控时采用等体积运行的可行性,在部分渠池引入等体积运行方式,实施同一渠道等体积与闸前常水位运行方式串接运行的闸门群调控方法,实现渠道由正常输水态向应急输水态安全、高效切换。本发明可快速降低渠道流量并消减蓄积的水量,快速达到新的水量平衡和蓄量平衡,实现正常输水态到应急输水态的过渡;不影响事故段上游沿线各分水口的正常供水,维持了原分水流量计划不变;还可以避免应急过渡过程中蓄量的反复充泄,提高了调控效率,降低了运行成本。
附图说明
下面结合附图和实施例对本发明作进一步说明。
图1是本发明的实施例所述方法的硬件系统原理示意图;
图2是本发明的实施例的举例说明中的事故段上游的三个渠池的符号说明图;
图3是本发明的实施例的举例说明中的事故段上游的三个渠池的流量过程曲线。
具体实施方式
实施例:
本实施例是一种长距离输水明渠事故段上游应急响应闸门群控制方法,所述的方法使用的系统包括:一条带有水位反馈控制系统的自流型输水明渠,所述的自流型输水明渠被多个节制闸1分隔成多个串联的渠池2,所述的渠池内设有分水口3,如图1所示,其中Yu为闸前水位,Yd为闸后水位。
所述的水位反馈控制系统是由电脑和通讯网络,以及传感器和软件组成的系统,用于渠道在正常输水时,对渠道输水过程进行自动化控制的系统。
水位反馈控制系统所使用的电子控制装置和传感器包括:各个节制闸的闸门启闭机构4与各自的闸门控制单元5连接,各个闸门的控制单元通过通讯网络6相互连接并传递传感器信息,各个闸门控制单元与各自的闸前水位传感器7、闸后水位传感器8、闸门开度传感器,分水口流量传感器9连接。
在渠道正常输水的过程中,水位反馈控制系统也正常的运行。在渠道中出现险情或发生故障时,水位反馈控制系统将被关闭,而根据本实施例所述方法所构成的软件系统,在应急过程中将启动,接管水位反馈控制系统的硬件部分,替代水位反馈控制系统的软件部分对渠道进行控制,排除险情。
本实施例包括两个过程:准备过程和应急过程。所述的准备过程是在出现险情之前,预先做好对整个渠道状况的调查和准备工作,避免一旦遇到险情而出现情况不明和数据不清的混乱局面。
所述方法的步骤如下:
一、准备过程包括:
(1)评定等体积运行可行性的步骤:用于评定各渠池应急调控时采用等体积运行的可行性,计算各渠池下游端节制闸的闸前目标水位,并设定闸前水位阈值。以各渠池的设计输水流量和下游端节制闸的闸前目标水位为计算条件,采用明渠恒定非均匀流水面线计算程序计算各渠池蓄量。以零流量为应急调控等体积运行可行性评定的最不利工况,以设计输水流量下各渠池蓄量为计算条件,采用反算法,计算各渠池下游端节制闸的闸前目标水位。如果该水位低于设定的安全水位(如预警水位),则判定该渠池为应急调控时可采用等体积运行的渠池。
(2)确定等体积运行渠段范围的步骤:用于确定应急调控时切换至等体积运行方式的渠段范围。从渠首向下游方向逐渠池判定,从第一个不具备应急调控时等体积运行可行性的渠池开始,其上游(不包含该渠池)定为应急调控时切换至等体积运行方式的渠段,其下游(含该渠池)定为应急调控时仍采用闸前常水位运行方式的渠段。
二、应急过程:
(3)同步关闭节制闸的步骤:用于应急事件发生后,第一时刻将事故段上游所有渠池的节制闸同步快速关闭。如渠道内水位上涨超过预警水位,开启退水闸,直至水位回落至设计水位。
(4)计算入流闸门流量调控目标值的步骤:用于计算各渠池在应急输水态下的入流闸门流量调控目标值。根据渠池入流出流平衡关系,自事故段上游相邻渠池开始,向上游方向逐渠池累加沿线各分水口分水流量,作为该渠池入流闸门应急输水态的目标调控流量。
(5)计算蓄量调控目标值的步骤:先计算各渠池在应急输水态下独自的蓄量调整目标值,再考虑上下游渠池间的蓄量传输量,计算各渠池综合的蓄量调控目标值。
1)计算各渠池在应急输水态下独自的蓄量调控目标值。对于切换至等体积运行的渠池,其蓄量调控目标值直接赋为零;对于仍采用闸前常水位运行的渠池,根据步骤(4)中确定的各渠池在应急输水态下的入流闸门流量调控目标值,采用明渠恒定非均匀流水面线计算程序,分别计算应急调控后与应急调控前的渠池蓄量,并将二者相减,得到各渠池独自的蓄量调控目标值。
2)考虑上下游渠池间的蓄量传输量,计算各渠池在应急输水态下综合的蓄量调控目标值。从事故段上游相邻渠池开始(含该渠池),向渠首方向,自第一个分水口流量大于0的渠池开始,逐渠池累加步骤(5)的1)中确定的各渠池蓄量调整目标值,得到各渠池在应急输水态下的蓄量调控目标值。
(6)计算回调时刻的步骤:用于计算各渠池在应急输水态下入流闸门的回调时刻。
1)首先计算各渠池应急输水态下入流闸门的流量调整目标值。考虑上下游渠池间流量的累加,从事故段上游相邻渠池开始(含该渠池),向渠首方向,逐渠池叠加其分水口流量,得到各渠池应急输水态下入流闸门的流量调整目标值。
2)用步骤(5)中确定的各渠池在应急输水态下的蓄量调控目标值除以入流闸门的流量调控目标值,得到各渠池应急调控蓄量变化历时。如果某渠池的累积应急调控流量为0,则直接赋各渠池应急调控变化过渡时间为0。
3)将应急调控第一时刻与应急调控蓄量变化历时叠加,得到各渠池在应急输水态下入流闸门的回调时刻。
(7)回调入流闸门流量的步骤:用于根据入流闸门流量调控目标值和回调时刻调整各渠池入流闸门的流量。根据步骤(4)步确定的各渠池在应急输水态下的入流闸门流量调控目标值,以及第(6)步确定的各渠池在应急输水态下入流闸门的回调时刻,调整各渠池入流闸门的流量。
(8)监控并修正闸前水位的步骤:用于监控各渠池的闸前水位,如果其值偏离闸前水位阈值,则启动水位反馈控制,调整闸门开度至闸前水位偏离值小于阈值为止。
结合图2~图3,举例说明本实施例所述的方法的实施过程。图2为事故段渠池上游的三个串联渠池的符号说明图。渠池的顺序为:从事故段上游第三个渠池定为渠池1,下面顺序为渠池2、渠池3。QG表示各渠池入流闸门过闸流量,各渠池的过闸流量分别为:QG1、QG2、QG3、QG4。q表示分水口流量, 各渠池的分水口流量分别为:q1、q2、q3。DV为正常输水态切换至应急输水态各渠池的蓄量变化值,各渠池的蓄量变化值分别为:DV1、DV2、DV3。
图3为应急调控过程中,QG1~QG4的流量过程曲线,T为流量调整时刻,图3中的T1~T4是四个调整时刻。DT为时段长,图3中的DT1~DT3为三个调整时长。
步骤(1),评定各渠池应急调控时采用等体积运行的可行性。经分析,渠池1和渠池2均具备应急调控时采用等体积运行的可行性。
步骤(2),确定应急调控时切换至等体积运行方式的渠段范围。经分析,渠池1和渠池2为应急调控时切换至等体积运行方式的渠段,渠池3仍采用闸前常水位运行方式。相应地,随着流量变化,渠池1和渠池2的水面线以渠池中央为支枢点旋转,渠池3的水面线以渠池下游端为支枢点旋转,如图2所示。
步骤(3),应急事件发生后,于第一时刻T1将事故段上游所有渠池的节制闸同步快速关闭。
步骤(4),计算各渠池在应急输水态下的入流闸门流量调控目标值。本例中渠池1~渠池3的对应值分别等于q1+q2+q3、q2+q3和q3。
步骤(5),计算各渠池在应急输水态下的蓄量调控目标值。本例中渠池1~渠池3的对应值均相等,即DV1=DV2=DV3。
步骤(6),计算各渠池在应急输水态下入流闸门的回调时刻。本例中渠池1~渠池3的对应值分别为T4=T1+DT1,T3=T1+DT2,T2=T1+DT3。
步骤(7),根据步骤(4)步确定的各渠池在应急输水态下的入流闸门流量调控目标值,以及第(6)步确定的各渠池在应急输水态下入流闸门的回调时刻,调整各渠池入流闸门的流量。
步骤(8)监控各渠池的闸前水位,如果其值偏离步骤(1)中采用的各渠池下游端节制闸的闸前水位值超过一定阈值(根据工程规模和控制精度要求确定,如常规取20cm),则启动该工程的水位反馈控制系统,调整闸门开度至闸前水位偏离值小于阈值为止。
最后应说明的是,以上仅用以说明本发明的技术方案而非限制,尽管参照较佳布置方案对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案(比如步骤的先后顺序、硬件系统的形式等)进行修改或者等同替换,而不脱离本发明技术方案的精神和范围。
Claims (1)
1.一种长距离输水明渠事故段上游应急响应闸门群控制方法,所述的方法使用的系统包括:一条带有水位反馈控制系统的自流型输水明渠,所述的自流型输水明渠被多个节制闸分隔成多个串联的渠池,所述的渠池内设有分水口;其特征在于:所述方法包括两个过程:准备过程和应急过程;
所述方法的步骤如下:
准备过程包括:
评定等体积运行可行性的步骤:用于评定各渠池应急调控时采用等体积运行的可行性,计算各渠池下游端节制闸的闸前目标水位,并设定闸前水位阈值;
确定等体积运行渠段范围的步骤:用于确定应急调控时切换至等体积运行方式的渠段范围;
应急过程:
同步关闭节制闸的步骤:用于应急事件发生后,第一时刻将事故段上游所有渠池的节制闸同步快速关闭;
计算入流闸门流量调控目标值的步骤:用于计算各渠池在应急输水态下的入流闸门流量调控目标值;
计算蓄量调控目标值的步骤:首先计算各渠池在应急输水态下独自的蓄量调整目标值,然后基于其是否属于切换至等体积运行方式的渠段范围,相应计算上下游渠池间的蓄量传输量,确定各渠池综合的蓄量调控目标值;
计算回调时刻的步骤:用于计算各渠池在应急输水态下入流闸门的回调时刻;
回调入流闸门流量的步骤:用于根据入流闸门流量调控目标值和回调时刻调整各渠池入流闸门的流量;
监控并修正闸前水位的步骤:用于监控各渠池的闸前水位,如果其值偏离闸前水位阈值,则启动水位反馈控制,调整闸门开度至闸前水位偏离值小于阈值为止。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610585122.0A CN106223257B (zh) | 2016-07-25 | 2016-07-25 | 一种长距离输水明渠事故段上游应急响应闸门群控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610585122.0A CN106223257B (zh) | 2016-07-25 | 2016-07-25 | 一种长距离输水明渠事故段上游应急响应闸门群控制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106223257A true CN106223257A (zh) | 2016-12-14 |
CN106223257B CN106223257B (zh) | 2018-04-17 |
Family
ID=57532707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610585122.0A Active CN106223257B (zh) | 2016-07-25 | 2016-07-25 | 一种长距离输水明渠事故段上游应急响应闸门群控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106223257B (zh) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106647289A (zh) * | 2017-03-06 | 2017-05-10 | 武汉大学 | 明渠输水调度闸门延时启闭时间的前馈控制方法 |
CN107223544A (zh) * | 2017-05-18 | 2017-10-03 | 中苏科技股份有限公司 | 一种基于明渠的灌溉控制系统和灌溉控制方法 |
CN108385597A (zh) * | 2018-02-06 | 2018-08-10 | 武汉大学 | 一种基于多渠池蓄量平衡的串联渠道控制模式 |
CN108385599A (zh) * | 2018-04-08 | 2018-08-10 | 武汉大学 | 一种以耦合水位差作为被控量的输水明渠渠系运行方式 |
CN108428065A (zh) * | 2018-04-09 | 2018-08-21 | 长江勘测规划设计研究有限责任公司 | 一种大型输水工程突发事故应急调度方法及监控系统 |
CN108519783A (zh) * | 2018-03-30 | 2018-09-11 | 武汉大学 | 基于渠池蓄量平衡的闸前控制点变目标水位控制系统及模式 |
CN109024466A (zh) * | 2018-08-10 | 2018-12-18 | 中国水利水电科学研究院 | 一种调水工程运行方式转换方法 |
CN109376974A (zh) * | 2018-08-08 | 2019-02-22 | 成都万江港利科技股份有限公司 | 一种灌区水资源综合管理系统 |
CN109629525A (zh) * | 2018-12-21 | 2019-04-16 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种深层取水系统及其操作方法 |
CN110334456A (zh) * | 2019-07-11 | 2019-10-15 | 中国水利水电科学研究院 | 一种基于二层结构的流域生态调度方法 |
CN112989607A (zh) * | 2021-03-17 | 2021-06-18 | 中国水利水电科学研究院 | 一种明渠输水工程事故段退水闸应急调控方法 |
CN113011708A (zh) * | 2021-02-22 | 2021-06-22 | 长江勘测规划设计研究有限责任公司 | 长距离输水渠道的在线调蓄水库及其规模确定方法 |
CN113128068A (zh) * | 2021-05-07 | 2021-07-16 | 河北工程大学 | 长距离明渠输水工程确定性突发水污染事件应急调控方法 |
CN113343595A (zh) * | 2021-05-21 | 2021-09-03 | 武汉大学 | 一种明渠输水系统事故的反演模型及事故流量、位置确定方法 |
CN113343439A (zh) * | 2021-05-21 | 2021-09-03 | 武汉大学 | 一种明渠输水系统事故识别方法 |
CN113566931A (zh) * | 2021-07-22 | 2021-10-29 | 水利部南京水利水文自动化研究所 | 基于边缘计算的闸前反射式水位计智能校准方法及系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100812539B1 (ko) * | 2007-05-07 | 2008-03-11 | 한상관 | 전단면 전폭의 배수장치를 설치하여 오염된 수질을정화시켜주면서 토사 배출이 용이하도록 구비되는 친환경공법을 이용한 댐 |
CN101935996A (zh) * | 2010-09-08 | 2011-01-05 | 中国水利水电科学研究院 | 一种多渠段水位自动控制方法及装置 |
CN101956384A (zh) * | 2010-09-10 | 2011-01-26 | 河海大学 | 基于多目标的群闸自动调度系统 |
CN102191758A (zh) * | 2011-04-02 | 2011-09-21 | 中国水利水电科学研究院 | 一种明渠倒虹吸水位自动控制方法和系统 |
CN103744443A (zh) * | 2014-01-21 | 2014-04-23 | 中国水利水电科学研究院 | 一种基于蓄量动态调节的大型明渠水位自动控制方法 |
-
2016
- 2016-07-25 CN CN201610585122.0A patent/CN106223257B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100812539B1 (ko) * | 2007-05-07 | 2008-03-11 | 한상관 | 전단면 전폭의 배수장치를 설치하여 오염된 수질을정화시켜주면서 토사 배출이 용이하도록 구비되는 친환경공법을 이용한 댐 |
CN101935996A (zh) * | 2010-09-08 | 2011-01-05 | 中国水利水电科学研究院 | 一种多渠段水位自动控制方法及装置 |
CN101956384A (zh) * | 2010-09-10 | 2011-01-26 | 河海大学 | 基于多目标的群闸自动调度系统 |
CN102191758A (zh) * | 2011-04-02 | 2011-09-21 | 中国水利水电科学研究院 | 一种明渠倒虹吸水位自动控制方法和系统 |
CN103744443A (zh) * | 2014-01-21 | 2014-04-23 | 中国水利水电科学研究院 | 一种基于蓄量动态调节的大型明渠水位自动控制方法 |
Non-Patent Citations (2)
Title |
---|
崔巍等: "明渠运行控制算法研究综述", 《南水北调与水利科技》 * |
房彦梅等: "南水北调中线干渠突发水污染事故应急控制策略", 《南水北调与水利科技》 * |
Cited By (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106647289A (zh) * | 2017-03-06 | 2017-05-10 | 武汉大学 | 明渠输水调度闸门延时启闭时间的前馈控制方法 |
CN106647289B (zh) * | 2017-03-06 | 2019-09-10 | 武汉大学 | 明渠输水调度闸门延时启闭时间的前馈控制方法 |
CN107223544A (zh) * | 2017-05-18 | 2017-10-03 | 中苏科技股份有限公司 | 一种基于明渠的灌溉控制系统和灌溉控制方法 |
CN108385597A (zh) * | 2018-02-06 | 2018-08-10 | 武汉大学 | 一种基于多渠池蓄量平衡的串联渠道控制模式 |
CN108519783A (zh) * | 2018-03-30 | 2018-09-11 | 武汉大学 | 基于渠池蓄量平衡的闸前控制点变目标水位控制系统及模式 |
CN108519783B (zh) * | 2018-03-30 | 2020-10-16 | 武汉大学 | 基于渠池蓄量平衡的闸前控制点变目标水位控制系统及方法 |
CN108385599B (zh) * | 2018-04-08 | 2020-02-11 | 武汉大学 | 一种以耦合水位差作为被控量的输水明渠渠系运行方式 |
CN108385599A (zh) * | 2018-04-08 | 2018-08-10 | 武汉大学 | 一种以耦合水位差作为被控量的输水明渠渠系运行方式 |
CN108428065A (zh) * | 2018-04-09 | 2018-08-21 | 长江勘测规划设计研究有限责任公司 | 一种大型输水工程突发事故应急调度方法及监控系统 |
CN108428065B (zh) * | 2018-04-09 | 2024-09-06 | 长江勘测规划设计研究有限责任公司 | 一种大型输水工程突发事故应急调度方法及监控系统 |
CN109376974A (zh) * | 2018-08-08 | 2019-02-22 | 成都万江港利科技股份有限公司 | 一种灌区水资源综合管理系统 |
CN109024466A (zh) * | 2018-08-10 | 2018-12-18 | 中国水利水电科学研究院 | 一种调水工程运行方式转换方法 |
CN109629525A (zh) * | 2018-12-21 | 2019-04-16 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种深层取水系统及其操作方法 |
CN109629525B (zh) * | 2018-12-21 | 2023-09-22 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种深层取水系统及其操作方法 |
CN110334456A (zh) * | 2019-07-11 | 2019-10-15 | 中国水利水电科学研究院 | 一种基于二层结构的流域生态调度方法 |
CN113011708B (zh) * | 2021-02-22 | 2022-09-23 | 长江勘测规划设计研究有限责任公司 | 长距离输水渠道的在线调蓄水库及其规模确定方法 |
CN113011708A (zh) * | 2021-02-22 | 2021-06-22 | 长江勘测规划设计研究有限责任公司 | 长距离输水渠道的在线调蓄水库及其规模确定方法 |
CN112989607A (zh) * | 2021-03-17 | 2021-06-18 | 中国水利水电科学研究院 | 一种明渠输水工程事故段退水闸应急调控方法 |
CN112989607B (zh) * | 2021-03-17 | 2023-08-29 | 中国水利水电科学研究院 | 一种明渠输水工程事故段退水闸应急调控方法 |
CN113128068A (zh) * | 2021-05-07 | 2021-07-16 | 河北工程大学 | 长距离明渠输水工程确定性突发水污染事件应急调控方法 |
CN113128068B (zh) * | 2021-05-07 | 2024-02-02 | 河北工程大学 | 长距离明渠输水工程确定性突发水污染事件应急调控方法 |
CN113343439B (zh) * | 2021-05-21 | 2022-03-04 | 武汉大学 | 一种明渠输水系统事故识别方法 |
CN113343595B (zh) * | 2021-05-21 | 2022-03-04 | 武汉大学 | 一种明渠输水系统事故的反演模型及事故流量、位置确定方法 |
CN113343439A (zh) * | 2021-05-21 | 2021-09-03 | 武汉大学 | 一种明渠输水系统事故识别方法 |
CN113343595A (zh) * | 2021-05-21 | 2021-09-03 | 武汉大学 | 一种明渠输水系统事故的反演模型及事故流量、位置确定方法 |
CN113566931B (zh) * | 2021-07-22 | 2023-06-09 | 水利部南京水利水文自动化研究所 | 基于边缘计算的闸前反射式水位计智能校准方法及系统 |
CN113566931A (zh) * | 2021-07-22 | 2021-10-29 | 水利部南京水利水文自动化研究所 | 基于边缘计算的闸前反射式水位计智能校准方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN106223257B (zh) | 2018-04-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106223257A (zh) | 一种长距离输水明渠事故段上游应急响应闸门群控制方法 | |
CN108181940B (zh) | 适用于串联渠道下游应急断水情况下的闸门调控方法 | |
CN104226951B (zh) | 一种连铸机停浇阶段提高合格定尺铸坯产量的方法 | |
CN205862246U (zh) | 控制系统 | |
CN103744443B (zh) | 一种基于蓄量动态调节的大型明渠水位自动控制方法 | |
CN108519783B (zh) | 基于渠池蓄量平衡的闸前控制点变目标水位控制系统及方法 | |
CA2922906C (en) | Method of demand management and control of fluid pipe networks | |
CN104912152B (zh) | 山丘区输水工程安全运行调度系统及安全运行调度方法 | |
US4498809A (en) | Flow compensated computing controller | |
CN213338451U (zh) | 智能压力管理控制装置及其压力管理控制系统 | |
CN106123111A (zh) | 一种换热站自动控制系统的补水调节控制回路及方法 | |
CN104264630A (zh) | 一种基于叠加消波原理的大型输水明渠闸门控制方法 | |
CN207775857U (zh) | 一种多级船闸自动充排水控制系统 | |
CN205478690U (zh) | 一种锥度保持液压控制装置 | |
DE102010012062A1 (de) | Vorrichtung und Verfahren zum Verschließen einer Abflussöffnung eines metallurgischen Gefäßes | |
CN211450341U (zh) | 氢气加气站的加氢系统 | |
CN103821115A (zh) | 一种解决水电站无压引水隧洞出现明满流的方法 | |
Clemmens | Canal automation | |
CN107740790B (zh) | 一种液压阀 | |
CN103038518A (zh) | 用于致动工作机的液压系统和液压分配器 | |
JP2013151891A (ja) | 流れ込み式発電制御システム | |
JP5084549B2 (ja) | 流込発電所における取水制御システム | |
JP7123773B2 (ja) | 用水管理システム、用水管理装置および用水管理方法 | |
CN204140516U (zh) | 一种异常情况下中包盲板快速推入装置 | |
RU2776082C1 (ru) | Автоматический регулятор уровня воды в водохранилище |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |