CN106217637A - Precast shear wall manufactures equipment and manufacture method - Google Patents
Precast shear wall manufactures equipment and manufacture method Download PDFInfo
- Publication number
- CN106217637A CN106217637A CN201610590923.6A CN201610590923A CN106217637A CN 106217637 A CN106217637 A CN 106217637A CN 201610590923 A CN201610590923 A CN 201610590923A CN 106217637 A CN106217637 A CN 106217637A
- Authority
- CN
- China
- Prior art keywords
- operation platform
- shear wall
- control station
- master console
- dish
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/04—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
- E04C2/06—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres reinforced
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides a kind of precast shear wall and manufactures equipment, including the master console being arranged on horizontal base plate with from control station, and described master console and be provided with the first operation dish and the second operation dish being oppositely arranged from control station;Described first operation dish is arranged on master console by toothed disc, control motor and control the rotation of toothed disc, toothed disc rotarily drives the first operation dish and predetermined manufactured operation platform rotates, described second operation dish is arranged on from control station by driven pulley, after precast shear wall is fixed on predetermined manufactured operation platform and slave operation platform, rotarily drive precast shear wall, slave operation platform, the second operation dish and the driven pulley of toothed disc rotate;Precast shear wall described in the invention manufactures equipment and manufacture method has the advantage that operable large-scale shear wall, the anglec of rotation of shear wall during construction and installation can be arbitrarily adjusted by the master console being oppositely arranged with from control station, have simple to operate, the advantages such as speed of application is fast.
Description
Technical field
The invention belongs to construction engineering technical field, especially relates to a kind of precast shear wall and manufactures equipment and manufacture
Method.
Background technology
At present, the form of construction work of shear wall has two kinds, and one is to be assembled by prefabricated reinforced concrete wall panel, owing to being
Distance manufacture, assembling, therefore, speed of application is fast, but intensity is poor;Another kind is cast in situs armored concrete, i.e. in construction
On-the-spot reinforcing bar both sides assemble row's template respectively, casting concrete slurry between two row's templates, to be solidified after, dismantle both sides
Template, be that surface of wall is floating with concrete, the reinforced concrete structure of cast in situs is one-body molded due to beam column, because of
This, structural strength is relatively big, but the engineering time is longer, and especially exterior surface of wall also needs to smear waterproof material, surface decoration material,
The required engineering time is longer.
Precast shear wall, due to its inherent advantage on speed of application and construction costs, represents shear wall and even builds
The direction of design concept, along with the growth of the market demand and the continuous lifting of production technology, the structure of shear wall is more and more regular,
Size is the most increasing, and the manufacturing to precast shear wall requires more and more higher, existing large scale prefabricated shear wall width
More than 5 meters, highly can reach more than 3 meters, the connector construction of precast shear wall cannot be met by artificial construction, needs
Same prefabricated by heavy mechanical equipment, to ensure the product quality of precast shear wall.
Summary of the invention
In view of this, the invention is directed to a kind of precast shear wall and manufactures equipment and manufacture method, big to solve
Constructional difficulties that type precast shear wall exists in process of production and product quality is inconsistent and efficiency present in parts welding
Low inferior problem.
For reaching above-mentioned purpose, the technical scheme of the invention is achieved in that
Precast shear wall manufactures equipment, including the master console being arranged on horizontal base plate with from control station, described master control
Platform processed be oppositely arranged on same level height from control station;
Described master console is arranged on main basal base, and described main basal base is fixed on horizontal base plate by horizontal rail, institute
State and be arranged on from pedestal from control station, described be fixed on horizontal base plate by fixed plate from pedestal;
Described master console and be provided with the first operation dish and the second operation dish being oppositely arranged from control station;
Described first operation dish is arranged on master console by toothed disc, controls motor and controls the rotation of toothed disc, tooth
Wheel disc rotarily drives the first operation dish and predetermined manufactured operation platform rotates, and described first operation dish is by the first connection post and predetermined manufactured operation
Platform connects, and described predetermined manufactured operation platform is provided with multiple handle hole by reinforcing bar, is often additionally provided with level perforation, institute in row's handle hole
Being provided with stretch in stating level perforation, described predetermined manufactured operation platform is additionally provided with the first positioning seat towards from control station direction;
Described second operation dish is arranged on from control station by driven pulley, described second operation dish by second connection post with
On slave operation platform, described slave operation platform is provided with multiple fixing end reinforced bending ring, described bending ring and described behaviour
It is correspondingly arranged as hole, described second positioning seat that is additionally provided with towards master console direction from operating board, described second positioning seat and
Two positioning seats match, and after precast shear wall is fixed on predetermined manufactured operation platform and slave operation platform, rotarily driving of toothed disc is pre-
Shear wall processed, slave operation platform, the second operation dish and driven pulley rotate;
The end of the stretch in described first operation dish is provided with from dynamic crankshaft, described from dynamic crankshaft and vertically disposed biography
Dynamic montant removably connects, and the bottom of described transmission montant is connected by actively bent axle and the second motor, and described second motor is solid
Being scheduled on the second pedestal, described second pedestal is fixed on main basal base, and stopper slot and truss are passed through in the top of described transmission montant
Connecting, described truss is connected with limited support by chute, and described limited support is fixed on the top of master console;
Described master console and be additionally provided with the load bearing seat that can arbitrarily move between control station, described load bearing seat is by lifting
Frame is connected with lifting base, and the bottom of described lifting base is provided with organizes skate more;
Described master console is also arranged above erection tower with from control station, described master console and also setting between control station
There is adjustable for height workbench.
Further, it is connected post by first between described first operation dish and predetermined manufactured operation platform and forms the first operation sky
Between;It is connected post by second between described second operation dish and slave operation platform and forms the second working place, described first operation
The width in space is 10-25cm, and the width of described second working place is 10-20cm.
Further, described predetermined manufactured operation platform is provided with hole, some location, and described first positioning seat is by positioning hole with pre-
Operating board processed is fixing to be connected;Described slave operation platform is provided with hole, some location, and described second positioning seat is by location Kong Yucong
Dynamic operating board is fixing to be connected.
Further, described horizontal rail includes at least 3 slide rails, and the bottom of described main basal base is provided with bearing wheels, described
Bearing wheels is along slide rail horizontal movement.
Further, described predetermined manufactured operation platform is circular, square, rectangle or triangle.
Further, described predetermined manufactured operation platform is additionally provided with the installing hole of installation pre-embedding metal part.
Further, described truss controls its horizontal balance in chute by horizontal top-bearing jar, and by spacing bullet
Spring defined position.
Further, described driven pulley is connected with from control station by driven fixing seat, and described driven fixing seat is provided with
Limit the fixed disk that driven pulley rotates.
Further, described main basal base is provided with metal defect detection detection equipment.
The manufacture method of precast shear wall, comprises the steps:
Two pieces of building templates are lifted to master console and between control station by A by erection tower, by first piece of building mould
Plate is fixed on predetermined manufactured operation platform by the first positioning seat, and by the second positioning seat, second piece of building template is fixed on driven behaviour
In station, predetermined manufactured operation platform fixes horizontal level and the anglec of rotation of first piece of building template by master console and toothed disc,
Slave operation platform is adjusted the anglec of rotation of second piece of building template by driven pulley and is fixed by fixed disk, passes through horizontal rail
Adjust the distance between first piece of building template and second piece of building template, load bearing seat is placed under two pieces of building templates also
By crane by slight for building template jack-up;
B, lays reinforcing bar between two pieces of prefabricated building templates, and one end of described reinforcing bar is fixed on driven by bending ring
On operating board, the other end of described reinforcing bar stretches out 2-5cm by the handle hole on described predetermined manufactured operation platform, lays pre-embedding metal part
And split bolt;
C, casting concrete is starched, and controls predetermined manufactured operation platform slight left rotation and right rotation swing 5-15min by controlling motor;
D, does reinforcing bar bending operation in the first working place and is limited in stretch, servo-actuated by transmission montant
Union joint is connected with fixing from dynamic crankshaft, by the second motor restrained stretching bar rotary motion, the end of reinforcing bar is rotated braiding,
Fix after truss is moved horizontally 0.5-2cm along chute;
E, removes load bearing seat, unclamps and limits the fixed disk that driven pulley rotates, and adjusts two pieces of building templates by controlling motor
The anglec of rotation, by workbench the metal fixing of shear wall and reinforcing bar done the original state recovering shear wall after fastening processes
State, removes building template by the translation of horizontal rail, after metal defect detection detection equipment Inspection is qualified, and the shearing after completing
Wall is walked by lifting tower crane.
Relative to prior art, the precast shear wall described in the invention manufactures equipment and manufacture method has following excellent
Gesture:
(1) operable large-scale shear wall, is being executed by the master console being oppositely arranged and can arbitrarily adjusting from control station
The advantages such as the anglec of rotation of shear wall in work installation process, has simple to operate, and speed of application is fast;
(2) building template is removed by horizontal rail after concrete grout solidifies and is had dismounting speed soon, and demolishing process is put down
Surely the body of wall of shear wall will not be caused damage;
(3) shear wall construction flow process is simple, will not move the most on a large scale, greatly alleviate labor intensity and
Difficulty of construction;
(4) workman may select the angle operation of the most comfortable when shear wall is artificial construction, and easy construction, speed of application are also
Can accelerate.
Accompanying drawing explanation
The accompanying drawing of the part constituting the invention is used for providing being further appreciated by the invention, and the present invention creates
The schematic description and description made, for explaining the invention, is not intended that the improper restriction to the invention.?
In accompanying drawing:
Fig. 1 is the schematic diagram that the precast shear wall described in the invention embodiment manufactures equipment.
Description of reference numerals:
10-master console;11-main basal base;12-horizontal rail;13-toothed disc;14-the first operation dish;15-controls electricity
Machine;16-first connects post;20-predetermined manufactured operation platform;21-the first positioning seat;22-stretch;23-is from dynamic crankshaft;The servo-actuated company of 24-
Joint;25-the second motor;26-actively bent axle;27-the second pedestal;28-transmission montant;30-limited support;31-chute;32-
Truss;33-stopper slot;40-load bearing seat;41-crane;42-lifting base;43-skate;50-is from control station;51-driven pulley;
52-the second operation dish;53-slave operation platform;54-the second positioning seat;55-second connects post;56-is from pedestal;57-fixed plate;
60-horizontal base plate.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the invention and the feature in embodiment can
To be mutually combined.
In the description of the invention, it is to be understood that term " " center ", " longitudinally ", " laterally ", " on ", D score,
Orientation or the position relationship of the instruction such as "front", "rear", "left", "right", " vertically ", " level ", " top ", " end ", " interior ", " outward " are
Based on orientation shown in the drawings or position relationship, it is for only for ease of description the invention and simplifies description rather than instruction
Hint indication device or element must have specific orientation, with specific azimuth configuration and operation, be not understood that
For the restriction to the invention.Additionally, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicate
Or imply relative importance or the implicit quantity indicating indicated technical characteristic.Thus, " first ", " second " etc. are defined
Feature can express or implicitly include one or more this feature.In the description of the invention, unless separately
Being described, " multiple " are meant that two or more.
In the description of the invention, it should be noted that unless otherwise clearly defined and limited, term " peace
Dress ", should be interpreted broadly " being connected ", " connection ", for example, it may be fix connection, it is also possible to be to removably connect, or integratedly
Connect;Can be to be mechanically connected, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary,
It can be the connection of two element internals.For the ordinary skill in the art, on can being understood by concrete condition
State term concrete meaning in the invention.
Below with reference to the accompanying drawings 1 and describe the invention in detail in conjunction with the embodiments.
The present invention provides a kind of precast shear wall to manufacture equipment, including master console 10 He being arranged on horizontal base plate 60
From control station 50, described master console 10 be oppositely arranged on same level height from control station 50;
Master console 10 and from control station 50 cooperate for fix shear wall building template and adjust building template
Angle of inclination, precise control, greatly facilitate construction;
Described master console 10 is arranged on main basal base 11, and described main basal base 11 is fixed on horizontal base by horizontal rail 12
On plate 60, described it is arranged on from pedestal 56 from control station 50, described is fixed on horizontal base plate from pedestal 56 by fixed plate 57
On 60;Horizontal rail 12, for controlling main basal base 11 movement in the horizontal direction, i.e. facilitates the direction controlling building template, also uses
Building template is removed after shear wall construction completes.
Described master console 10 and be provided with the first operation dish 14 and the second operation dish 52 being oppositely arranged from control station 50;
First operation dish 14 and the second operation dish 52 are mainly used in fixing predetermined manufactured operation platform 20 and slave operation platform 53, in construction for
The shear wall of different model typically requires fixing predetermined manufactured operation platform 20 and the slave operation platform 53 changing different model.
Adjusting master console 10 and the distance between control station 50 by horizontal rail 12, this distance is in order to join suitable difference
The shear wall of length, by the second operation dish 52 from control station 50 of rotarily driving of the first operation dish 14 of master console 10
The cooperation rotary steerable shear wall of driven rotation, the first operation dish 14 and the second operation dish 52 and the inclination angle of building template
Degree.
Described first operation dish 14 is arranged on master console 10 by toothed disc 13, controls motor 15 and controls toothed disc 13
Rotation, toothed disc 13 rotarily drives the first operation dish 14 and predetermined manufactured operation platform 20 rotates, and described first operation dish 14 is by the
One connects post 16 is connected with predetermined manufactured operation platform 20, and described predetermined manufactured operation platform 20 is provided with multiple handle hole by reinforcing bar, often arranges
Being additionally provided with level perforation in handle hole, be provided with stretch 22 in the perforation of described level, described predetermined manufactured operation platform 20 is towards from control
Platform 50 direction is additionally provided with the first positioning seat 21;Handle hole can be used for highlighting the reserved location of reinforcing bar and metalwork, can facilitate cutting
The metalwork of power wall does constructing operation, and level perforation is used for installing stretch 22, and stretch 22 can be used for fixing reinforcing bar and metal
Part or be used for weaving winding reinforcing bar.
Described second operation dish 52 is arranged on from control station 50 by driven pulley 51, and described second operation dish 52 is by second
Connecting on post 55 and slave operation platform 53, described slave operation platform 53 is provided with multiple fixing end reinforced bending ring, described
Bending ring is correspondingly arranged with described handle hole, described is additionally provided with the second positioning seat 54 from operating board towards master console 10 direction,
Described second positioning seat 54 matches with the second positioning seat 54, when precast shear wall is fixed on predetermined manufactured operation platform 20 and slave operation
After platform 53, rotarily drive precast shear wall, slave operation platform the 53, second operation dish 52 and the driven pulley 51 of toothed disc 13 rotate;
The end of the stretch 22 in described first operation dish 14 is provided with from dynamic crankshaft 23, described from dynamic crankshaft 23 with vertical
The transmission montant 28 arranged removably connects, and the bottom of described transmission montant 28 is connected by actively bent axle 26 and the second motor 25
Connecing, described second motor 25 is fixed on the second pedestal 27, and described second pedestal 27 is fixed on main basal base 11, and described transmission is erected
The top of bar 28 is connected with truss 32 by stopper slot 33, and described truss 32 is connected with limited support 30 by chute 31, described
Limited support 30 is fixed on the top of master console 10;
Described master console 10 and be additionally provided with the load bearing seat 40 that can arbitrarily move between control station 50, described load bearing seat 40
Being connected with lifting base 42 by crane 41, the bottom of described lifting base 42 is provided with many group skates 43;
Described master console 10 is also arranged above erection tower with from control station 50, described master console 10 with from control station 50
Between be additionally provided with adjustable for height workbench
Further, it is connected post 16 by first between described first operation dish 14 and predetermined manufactured operation platform 20 and forms the first behaviour
Make space;It is connected post 55 by second between described second operation dish 52 and slave operation platform 53 and forms the second working place, institute
The width stating the first working place is 10-25cm, and the width of described second working place is 10-20cm, the first reserved operation
Space and the second working place can facilitate the construction of shear wall both sides, such as fixing end reinforced, installation metalwork, welding assembly etc.
Operation.
Described predetermined manufactured operation platform 20 is provided with hole, some location, and described first positioning seat 21 is by hole, location and predetermined manufactured operation
Platform 20 is fixing to be connected;Described slave operation platform 53 is provided with hole, some location, and described second positioning seat 54 is by location Kong Yucong
Dynamic operating board 53 is fixing to be connected.
Described horizontal rail 12 includes that at least 3 slide rails, the bottom of described main basal base 11 are provided with bearing wheels, described bearing wheels
Along slide rail horizontal movement.
Described predetermined manufactured operation platform 20 is circular, square, rectangle or triangle, on the profile of predetermined manufactured operation platform 20 is not limited to
State shape.
The installing hole installing pre-embedding metal part it is additionally provided with on described predetermined manufactured operation platform 20.
Described truss 32 controls its horizontal balance in chute 31 by horizontal top-bearing jar, and is limited by limit spring
Position.
Described driven pulley 51 is connected with from control station 50 by driven fixing seat, described driven fixing seat be provided with limit from
The fixed disk that driving wheel 51 rotates.
Described main basal base 11 is provided with metal defect detection detection equipment, and metal defect detection detection equipment is used for detecting inside shear wall
Metal parts whether existing defects, can complete to manufacture and characterization processes, after shear wall construction completes the most simultaneously
Detect qualified can direct entrucking shipment, simplify technological process and ensure that product quality simultaneously.
The manufacture method of precast shear wall, comprises the steps:
Two pieces of building templates are lifted to master console 10 and between control station 50 by erection tower, build first piece by A
Building mould is fixed on predetermined manufactured operation platform 20 by the first positioning seat 21, and second piece of building template is solid by the second positioning seat 54
Being scheduled on slave operation platform 53, predetermined manufactured operation platform 20 fixes the water of first piece of building template by master console 10 and toothed disc 13
Mean place and the anglec of rotation, slave operation platform 53 adjusts the anglec of rotation of second piece of building template and by solid by driven pulley 51
Price fixing is fixed, and adjusts the distance between first piece of building template and second piece of building template by horizontal rail 12, by load bearing seat
40 are placed on slight for building template jack-up under two pieces of building templates and by crane 41;
B, lays reinforcing bar between two pieces of prefabricated building templates, and one end of described reinforcing bar is fixed on driven by bending ring
On operating board 53, the other end of described reinforcing bar stretches out 2-5cm by the handle hole on described predetermined manufactured operation platform 20, lays pre-buried gold
Belong to part and split bolt;
C, casting concrete is starched, and controls predetermined manufactured operation platform 20 slight left rotation and right rotation swing 5-15min by controlling motor 15;
D, does reinforcing bar bending operation in the first working place and is limited in stretch 22, by transmission montant 28
Servo-actuated union joint 24 is connected, by the second motor 25 restrained stretching bar 22 rotary motion by the end of reinforcing bar with fixing from dynamic crankshaft 23
Portion rotates braiding, fixing after truss 32 is moved horizontally 0.5-2cm along chute 31;
E, removes load bearing seat 40, unclamps and limits the fixed disk that driven pulley 51 rotates, and adjusts two pieces by control motor 15 and builds
The anglec of rotation of building mould, is done after fastening processes by workbench recover shear wall by metal fixing and the reinforcing bar of shear wall
Original state state, removes building template by the translation of horizontal rail 12, after metal defect detection detection equipment Inspection is qualified, after completing
Shear wall by lifting tower crane walk.
The foregoing is only the preferred embodiment of the invention, not in order to limit the invention, all at this
Within the spirit of innovation and creation and principle, any modification, equivalent substitution and improvement etc. made, should be included in the invention
Protection domain within.
Claims (10)
1. precast shear wall manufactures equipment, it is characterised in that: include the master console (10) that is arranged on horizontal base plate (60) and
From control station (50), described master console (10) be oppositely arranged on same level height from control station (50);
Described master console (10) is arranged on main basal base (11), and described main basal base (11) is fixed on water by horizontal rail (12)
On flat substrate (60), described be arranged on from pedestal (56) from control station (50), described from pedestal (56) by fixed plate (57)
It is fixed on horizontal base plate (60);
Described master console (10) is provided with the first relative operation dish (14) and the second operation dish (52) with from control station (50);
Described first operation dish (14) is arranged on master console (10) by toothed disc (13), controls motor (15) and controls gear
The rotation of dish (13), toothed disc (13) rotarily drives the first operation dish (14) and predetermined manufactured operation platform (20) rotates, described first behaviour
Making dish (14) to be connected with predetermined manufactured operation platform (20) by the first connection post (16), described predetermined manufactured operation platform (20) is provided with multiple logical
Cross the handle hole of reinforcing bar, be often additionally provided with level perforation in row's handle hole, in the perforation of described level, be provided with stretch (22), described pre-
Operating board processed (20) is towards being additionally provided with multiple first positioning seat (21) from control station (50) direction;
Described second operation dish (52) is arranged on from control station (50) by driven pulley (51), and described second operation dish (52) leads to
Crossing the second connection post (55) to be connected with slave operation platform (53), described slave operation platform (53) is provided with multiple fixing end reinforced
Bending ring, described bending ring is correspondingly arranged with the handle hole on described predetermined manufactured operation platform (20), described slave operation platform (53)
Multiple second positioning seat (54), described second positioning seat (54) and the first positioning seat it is additionally provided with towards master console (10) direction
(21) match, after precast shear wall is fixed between predetermined manufactured operation platform (20) and slave operation platform (53), toothed disc (13)
Rotarily drive the first operation dish (14), predetermined manufactured operation platform (20), precast shear wall, slave operation platform (53), the second operation dish
(52) and driven pulley (51) rotate;
The end of the stretch (22) in described first operation dish (14) is provided with from dynamic crankshaft (23), described from dynamic crankshaft (23) with
The servo-actuated union joint (24) of vertically disposed transmission montant (28) removably connects, and the bottom of described transmission montant (28) is by main
Dynamic crankshaft (26) is connected with the second motor (25), and described second motor (25) controls transmission montant (28) and moves back and forth and then control
Stretch (22) rotary motion, described second motor (25) is fixed on the second pedestal (27), and described second pedestal (27) is fixed
On main basal base (11), the top of described transmission montant (28) is connected with truss (32) by stopper slot (33), described truss
(32) being connected with limited support (30) by chute (31), described truss (30) can move horizontally along chute (31) or fixing, institute
State limited support (30) and be fixed on the top of master console (10);
Described master console (10) and be additionally provided with the load bearing seat (40) that can arbitrarily move, described load bearing seat between control station (50)
(40) being connected with lifting base (42) by crane (41), the bottom of described lifting base (42) is provided with organizes skate (43) more;
Described master console (10) is also arranged above erection tower with from control station (50), described master console (10) with from control station
(50) adjustable for height workbench it is additionally provided with between.
Precast shear wall the most according to claim 1 manufactures equipment, it is characterised in that: described first operation dish (14) is with pre-
The first working place is formed by the first connection post (16) between operating board processed (20);Described second operation dish (52) and driven behaviour
Forming the second working place by the second connection post (55) between station (53), the width of described first working place is 10-
25cm, the width of described second working place is 10-20cm.
Precast shear wall the most according to claim 1 manufactures equipment, it is characterised in that: set on described predetermined manufactured operation platform (20)
Having hole, some location, described first positioning seat (21) is connected by hole, location and predetermined manufactured operation platform (20) are fixing;Described driven behaviour
Station (53) is provided with hole, some location, and described second positioning seat (54) is fixing even by hole, location and slave operation platform (53)
Connect.
Precast shear wall the most according to claim 1 manufacture equipment, it is characterised in that: described horizontal rail (12) include to
Few 3 slide rails, the bottom of described main basal base (11) is provided with bearing wheels, and described bearing wheels is along slide rail horizontal movement.
Precast shear wall the most according to claim 1 manufactures equipment, it is characterised in that: described predetermined manufactured operation platform (20) is circle
Shape, square, rectangle or triangle.
Precast shear wall the most according to claim 1 manufactures equipment, it is characterised in that: described predetermined manufactured operation platform (20) is upper also
It is provided with the installing hole installing pre-embedding metal part.
Precast shear wall the most according to claim 1 manufactures equipment, it is characterised in that: described truss (32) passes through level top
Cylinder pressure controls its horizontal balance in chute, and by limit spring defined position.
Precast shear wall the most according to claim 1 manufactures equipment, it is characterised in that: described driven pulley (51) is by driven
Fixing seat is connected with from control station (50), and described driven fixing seat is provided with and limits the fixed disk that driven pulley (51) rotates.
Precast shear wall the most according to claim 1 manufactures equipment, it is characterised in that: described main basal base (11) is provided with gold
Belong to flaw detection equipment.
10. the manufacture method of precast shear wall, it is characterised in that: comprise the steps:
Two pieces of building templates are lifted to master console (10) and between control station (50) by erection tower, build first piece by A
Building mould is fixed on predetermined manufactured operation platform (20) by the first positioning seat (21), by second piece of building template by the second positioning seat
(54) being fixed on slave operation platform (53), predetermined manufactured operation platform (20) fixes first by master console (10) and toothed disc (13)
The horizontal level of block building template and the anglec of rotation, slave operation platform (53) adjusts second piece of building template by driven pulley (51)
The anglec of rotation and fixed by fixed disk, adjust first piece of building template and second piece of building template by horizontal rail (12)
Between distance, load bearing seat (40) is placed under two pieces of building templates and by crane (41), building template is slightly pushed up
Rise;
B, lays reinforcing bar between two pieces of prefabricated building templates, and one end of described reinforcing bar is fixed on slave operation by bending ring
On platform (53), the other end of described reinforcing bar stretches out 2-5cm by the handle hole on described predetermined manufactured operation platform (20), lays pre-buried gold
Belong to part and split bolt;
C, casting concrete is starched, and controls predetermined manufactured operation platform (20) slight left rotation and right rotation swing 5-15min by controlling motor;
D, does reinforcing bar bending operation in the first working place and is limited in stretch (22), by transmission montant (28)
Servo-actuated union joint (24) is connected with fixing from dynamic crankshaft (23), will by the second motor (25) restrained stretching bar (22) rotary motion
The end of reinforcing bar rotates braiding, fixing after truss (32) is moved horizontally 0.5-2cm along chute (31);
E, removes load bearing seat (40), unclamps and limits the fixed disk that driven pulley (51) rotates, and adjusts two pieces by controlling motor (15)
The anglec of rotation of building template, is done after fastening processes by workbench recover shear wall by metal fixing and the reinforcing bar of shear wall
Original state state, remove building template by the translation of horizontal rail (12), after metal defect detection detection equipment Inspection is qualified, by complete
Shear wall after one-tenth is walked by lifting tower crane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610590923.6A CN106217637B (en) | 2016-07-25 | 2016-07-25 | Precast shear wall manufacturing equipment and manufacturing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610590923.6A CN106217637B (en) | 2016-07-25 | 2016-07-25 | Precast shear wall manufacturing equipment and manufacturing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106217637A true CN106217637A (en) | 2016-12-14 |
CN106217637B CN106217637B (en) | 2018-11-23 |
Family
ID=57532892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610590923.6A Active CN106217637B (en) | 2016-07-25 | 2016-07-25 | Precast shear wall manufacturing equipment and manufacturing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106217637B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108274595A (en) * | 2018-01-29 | 2018-07-13 | 中建投(沈阳)易筑节能房屋科技有限公司 | A kind of special production mould therefor realized wallboard and automatically disengaged |
CN110027111A (en) * | 2019-03-22 | 2019-07-19 | 佛山市集知汇科技有限公司 | A kind of fixture being automatically separated the precast beam moulding bed put up |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE931933C (en) * | 1949-08-20 | 1955-08-18 | Wilhelm Dr-Ing Ludowici | Device for the production of beam-shaped precast concrete parts |
CN2442820Y (en) * | 2000-10-17 | 2001-08-15 | 诸城市中协建筑新技术开发有限公司 | Turning mould device for prefabricated wall board |
CN101032838A (en) * | 2006-03-11 | 2007-09-12 | 邱则有 | Centrifugal shaping tool |
CN201186465Y (en) * | 2008-03-28 | 2009-01-28 | 中国葛洲坝集团股份有限公司 | Member site fabrication rotating turnover device |
CN101844700A (en) * | 2010-06-21 | 2010-09-29 | 深南电路有限公司 | Auto-rotating board turnover machine |
CN204398088U (en) * | 2015-01-10 | 2015-06-17 | 德州海天机电科技有限公司 | A kind of prefabricated components shaping fixed type multifunctional upset Working mould table |
CN204977500U (en) * | 2015-05-20 | 2016-01-20 | 卓达新材料科技集团有限公司 | Panel turnover machine |
-
2016
- 2016-07-25 CN CN201610590923.6A patent/CN106217637B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE931933C (en) * | 1949-08-20 | 1955-08-18 | Wilhelm Dr-Ing Ludowici | Device for the production of beam-shaped precast concrete parts |
CN2442820Y (en) * | 2000-10-17 | 2001-08-15 | 诸城市中协建筑新技术开发有限公司 | Turning mould device for prefabricated wall board |
CN101032838A (en) * | 2006-03-11 | 2007-09-12 | 邱则有 | Centrifugal shaping tool |
CN201186465Y (en) * | 2008-03-28 | 2009-01-28 | 中国葛洲坝集团股份有限公司 | Member site fabrication rotating turnover device |
CN101844700A (en) * | 2010-06-21 | 2010-09-29 | 深南电路有限公司 | Auto-rotating board turnover machine |
CN204398088U (en) * | 2015-01-10 | 2015-06-17 | 德州海天机电科技有限公司 | A kind of prefabricated components shaping fixed type multifunctional upset Working mould table |
CN204977500U (en) * | 2015-05-20 | 2016-01-20 | 卓达新材料科技集团有限公司 | Panel turnover machine |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108274595A (en) * | 2018-01-29 | 2018-07-13 | 中建投(沈阳)易筑节能房屋科技有限公司 | A kind of special production mould therefor realized wallboard and automatically disengaged |
CN110027111A (en) * | 2019-03-22 | 2019-07-19 | 佛山市集知汇科技有限公司 | A kind of fixture being automatically separated the precast beam moulding bed put up |
Also Published As
Publication number | Publication date |
---|---|
CN106217637B (en) | 2018-11-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104088461B (en) | Y type cast-in-situ concrete columns template system and construction method thereof | |
CN207160349U (en) | A kind of dot point rotatably plug-in PC wallboard connecting mechanisms and device | |
CN106284665B (en) | A kind of oblique steel column double helix space structure and its construction method | |
CN106437020A (en) | Preconstruction method of external hanging stone of prefabricated overlapped wall slab and mounting structure | |
CN104895279A (en) | Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure | |
CN106193402B (en) | Girder truss integrated form flooring module and its installation method | |
CN106217637A (en) | Precast shear wall manufactures equipment and manufacture method | |
CN105399018A (en) | Hand-cranking lifting type construction vehicle for prefabricating plant | |
CN103306483A (en) | Industrial construction method of building | |
CN106703265A (en) | Stone and glass mixed curtain wall construction method | |
CN203863813U (en) | Die special for housing industrialization pre-cast concrete component stair | |
CN103758213B (en) | A kind of assembled wallboard and beam body precise positioning mounting connection structure | |
CN103506446A (en) | Device for machining steel-structure arc beam for building | |
CN210880206U (en) | Steel bar positioning device for production of prefabricated reinforced concrete member | |
CN105421739B (en) | The dynamic lifting work car of prefabricated station service | |
CN205614822U (en) | Control boundary beam sharing reinforcement mould and control whole ligature pedestal of boundary beam reinforcing bar | |
CN104314318B (en) | A kind of high accuracy positioning guider and its application method | |
CN111231093A (en) | Automatic assembly line of cloud pavilion alkene EPS prefabricated mould | |
CN211523938U (en) | Floor pipeline and preparation device thereof | |
CN102689354B (en) | Vertical mould used for prefabricating high speed railway bridge curtain board and curtain board prefabricating method completed by using vertical mould | |
CN104196150B (en) | A kind of steel plate shear force wall and making method thereof | |
CN206267414U (en) | A kind of mounting structure of the plug-in stone material of prefabricated composite wallboard | |
CN102400507A (en) | Decoration line system for back-bolt curtain wall | |
CN205712637U (en) | High-rise oversize stone material molding unit body and grid system thereof | |
CN207144152U (en) | A kind of socket joint attachment structure for burst steel skeleton integral assembling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |