CN106216432B - A kind of method for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel - Google Patents

A kind of method for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel Download PDF

Info

Publication number
CN106216432B
CN106216432B CN201610591586.2A CN201610591586A CN106216432B CN 106216432 B CN106216432 B CN 106216432B CN 201610591586 A CN201610591586 A CN 201610591586A CN 106216432 B CN106216432 B CN 106216432B
Authority
CN
China
Prior art keywords
reel
hot rolling
steel
piling
skidding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610591586.2A
Other languages
Chinese (zh)
Other versions
CN106216432A (en
Inventor
闫峥嵘
康炜
张世厚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN201610591586.2A priority Critical patent/CN106216432B/en
Publication of CN106216432A publication Critical patent/CN106216432A/en
Application granted granted Critical
Publication of CN106216432B publication Critical patent/CN106216432B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C47/00Winding-up, coiling or winding-off metal wire, metal band or other flexible metal material characterised by features relevant to metal processing only
    • B21C47/02Winding-up or coiling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C47/00Winding-up, coiling or winding-off metal wire, metal band or other flexible metal material characterised by features relevant to metal processing only
    • B21C47/34Feeding or guiding devices not specially adapted to a particular type of apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Winding, Rewinding, Material Storage Devices (AREA)

Abstract

The present invention relates to hot rolling field, is specifically a kind of method for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel.A kind of method for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel, in the hot rolling, when coiling machine coiling band steel thickness is more than or equal to 7mm, when reel load relay is connected, plc, which is checked whether, meets the following conditions, reel values for actual speed reel set-point velocity amplitude > 0, reel setting moment values reel actual torque value > 8kNm, the coil wrapper roll Time Delay Opening if all meeting, when reel setting moment values reel actual torque value is less than 1kNm, Wrapping Roll is opened;Meet if not all, normally open Wrapping Roll.The present invention solves the problems, such as the reel skidding piling of steel that hot rolling reeling heavy gauge steel strip easily occurs.

Description

A kind of method for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel
Technical field
The present invention relates to hot rolling field, is specifically a kind of side for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel Method.
Background technology
When hot rolling coiler rolls up heavy gauge steel strip, since the small coil ability of reel power itself is low or strip steel head temperature is inclined Low reason easily causes strip steel head to skid, and Wrapping Roll is automatically opened up still according to former control logic in this case, just It can cause to batch piling of steel;If setting Wrapping Roll winding strip steel head number of turns increase, it may result in coil of strip and form head tower, constrain Production is normally carried out.Therefore, batching for normal strip how had not only been ensured, but also think gauge special steel can be solved and made in reel skidding It is the target that we work into piling of steel problem.
The content of the invention
The technical problems to be solved by the invention are:How the asking of hot rolling reeling heavy gauge steel strip reel skidding piling of steel is solved Topic.
The technical solution adopted in the present invention is:A kind of side for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel Method, in the hot rolling, when coiling machine coiling band steel thickness is more than or equal to 7mm, when reel load relay is connected, plc Check whether and meet the following conditions
Reel values for actual speed-reel set-point velocity amplitude > 0
Reel sets moment values-reel actual torque value > 8kNm
The coil wrapper roll Time Delay Opening if all meeting, until reel sets moment values-reel actual torque value During less than 1kNm, Wrapping Roll is opened;Meet if not all, normally open Wrapping Roll.
Reel skids and shows reel values for actual speed and be more than reel set-point velocity amplitude during strip coiling, while reel is set Determine moment values-reel actual torque value > 8kNm.During the normal coil of coiling machine, in order to ensure scroll is normal, according to batching load Relay is connected and strip winding number of drum turns(Generally 3~5 circles)Wrapping Roll is opened, coiling machine is set up by strip steel head Tension force normal volume rounding block strip;Coiling machine strip steel head is when reel skids, if Wrapping Roll is opened according to normal condition, Then strip piling of steel.For this according to coiling band steel thickness, batch that load relay, spool velocity be poor, reel torque difference determines volume The control program of machine aided winding up roller Time Delay Opening is taken, so that it is guaranteed that heavy gauge steel strip head is unlikely to piling of steel when reel skids.
The beneficial effects of the invention are as follows:The present invention solves the reel skidding piling of steel that hot rolling reeling heavy gauge steel strip easily occurs Problem, avoids the rolling line channel blockage caused by batching piling of steel, improves production efficiency, realizes hot rolling coiler and stablizes control System.
Embodiment
Implementation process of the present invention is entirely to be realized automatically in computer program.Main process is:According to rolled band steel Thickness, reel load relay connect signal and with steel drum slide condition estimate of situation, automatic real accordingly by primary computer Existing coil wrapper roll control, meets production control and requires.
Embodiment 1:
When the carbon steel T610L heads that target strip is thickness 7.9mm reach reel, reel load relay is connected, and one Level computer is by controlling program to calculate the difference of reel values for actual speed and reel given speed value at this time(5.6-5.1=0.5)、 Reel sets the difference of moment values and reel actual torque value(22.8-8.5=14.3 kNm).Spool velocity difference is more than zero, volume at this time Cylinder torque deviation is more than 8kNm, meets whole slide conditions, coil wrapper roll Time Delay Opening, and Wrapping Roll helps reel to continue to twine Around the strip of skidding, it is less than 1kNm until reel sets moment values-reel actual torque value, after reel tension force is normally established, journey Sequence sends Wrapping Roll and opens order again, it is ensured that batches not piling of steel.
Specific embodiment 2:
When the carbon steel T610L heads that target strip is thickness 10mm reach reel, reel load relay is connected, level-one Computer is by controlling program to calculate the difference of reel values for actual speed and reel given speed value at this time(4.5-4.2=0.3m/s)、 Reel sets the difference of moment values and reel actual torque value(24.7-12.5=12.2 kNm).At this time spool velocity difference be more than zero, Reel torque deviation is more than 8kNm, meets whole slide conditions, coil wrapper roll Time Delay Opening, and Wrapping Roll helps reel to continue The strip to skid is wound, is less than 1kNm until reel sets moment values-reel actual torque value, after reel tension force is normally established, Program sends Wrapping Roll and opens order again, it is ensured that batches not piling of steel.

Claims (1)

  1. A kind of 1. method for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel, it is characterised in that:In the hot rolling, when When coiling machine coiling band steel thickness is more than or equal to 7mm, when reel load relay is connected, plc, which is checked whether, meets following bar Part
    Reel values for actual speed-reel given speed value > 0
    Reel sets moment values-reel actual torque value > 8kNm
    The coil wrapper roll Time Delay Opening if all meeting, until reel setting moment values-reel actual torque value is less than During 1kNm, Wrapping Roll is opened;Meet if not all, normally open Wrapping Roll.
CN201610591586.2A 2016-07-26 2016-07-26 A kind of method for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel Active CN106216432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610591586.2A CN106216432B (en) 2016-07-26 2016-07-26 A kind of method for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610591586.2A CN106216432B (en) 2016-07-26 2016-07-26 A kind of method for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel

Publications (2)

Publication Number Publication Date
CN106216432A CN106216432A (en) 2016-12-14
CN106216432B true CN106216432B (en) 2018-04-20

Family

ID=57534049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610591586.2A Active CN106216432B (en) 2016-07-26 2016-07-26 A kind of method for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel

Country Status (1)

Country Link
CN (1) CN106216432B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114453453B (en) * 2022-01-12 2023-12-22 首钢京唐钢铁联合有限责任公司 Method for judging slip of mandrel in coiled strip steel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001162320A (en) * 1999-12-07 2001-06-19 Ishikawajima Harima Heavy Ind Co Ltd Method for coiling with down coiler on rolling line and device therefor
CN101439366A (en) * 2008-12-25 2009-05-27 山西太钢不锈钢股份有限公司 Method for coiling hot continuous rolling high-intensity medium plate
CN103223420A (en) * 2012-01-29 2013-07-31 宝山钢铁股份有限公司 Method for controlling inner ring indentations of hot-rolled steel coil, and system
CN103341524A (en) * 2013-04-18 2013-10-09 首钢京唐钢铁联合有限责任公司 Calibration method for roll gap of wrapper roller of coiling machine
CN104874639A (en) * 2014-02-27 2015-09-02 宝山钢铁股份有限公司 Dynamic control method of coiler auxiliary coiling roller seam

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001162320A (en) * 1999-12-07 2001-06-19 Ishikawajima Harima Heavy Ind Co Ltd Method for coiling with down coiler on rolling line and device therefor
CN101439366A (en) * 2008-12-25 2009-05-27 山西太钢不锈钢股份有限公司 Method for coiling hot continuous rolling high-intensity medium plate
CN103223420A (en) * 2012-01-29 2013-07-31 宝山钢铁股份有限公司 Method for controlling inner ring indentations of hot-rolled steel coil, and system
CN103341524A (en) * 2013-04-18 2013-10-09 首钢京唐钢铁联合有限责任公司 Calibration method for roll gap of wrapper roller of coiling machine
CN104874639A (en) * 2014-02-27 2015-09-02 宝山钢铁股份有限公司 Dynamic control method of coiler auxiliary coiling roller seam

Also Published As

Publication number Publication date
CN106216432A (en) 2016-12-14

Similar Documents

Publication Publication Date Title
CN104249091B (en) A kind of control method of orientation silicon steel continuous annealing unit coiling tension
CN106269994B (en) A kind of hot continuous rolling plate rolling side guide control method
CN104475448B (en) A kind of production technology of prevention paper-thin steel coil " sag " defect
CN106903167A (en) Method and device for controlling pinch roll
CN103990652B (en) A kind of loop control method of pipe line steel
CN106216432B (en) A kind of method for solving hot rolling reeling heavy gauge steel strip reel skidding piling of steel
CN103223420A (en) Method for controlling inner ring indentations of hot-rolled steel coil, and system
CN105404320A (en) Cold rolling continuous annealing unit tension control method and system
CN107755436B (en) A method of solution thin gauge strip tail portion loses tension and flies into coiling machine
CN106493172B (en) A method of it solving Thin Strip Steel and generates fold in batching crossing process
CN106391723B (en) The double coiling speeds of cold continuous rolling switch and build Zhang Fangfa
CN104001754B (en) The anti-turriform defects controlling method of the asymmetric flipper guide of a kind of coiling machine and application
CN113441549B (en) Method for controlling coiled shape of medium-high carbon steel coiled material with omega (C) of not less than 0.45%
CN102284504B (en) Control method of reconstruction of lost coiling tracking of hot rolling production line
CN106311802A (en) Carrousel coiler mandrel clamped coil discharge controlling method
CN105396880B (en) A kind of method for coiling of hot rolled thin strip high-strength steel band
CN106238503A (en) A kind of control method preventing heavy gauge steel strip from batching staggered floor
CN110314934B (en) Flying shear control method for cold rolling mill
CN110639959B (en) Control method for preventing flat rolling of hot-rolled strip steel
CN101402400A (en) Finished product winding through-center belt bundling method for leveling machine group
JP2014065077A5 (en)
US8490451B2 (en) Method for rolling strip-shaped rolling stock, in particular metal strip
JPS62289306A (en) Control device for continuous rolling
JP6112079B2 (en) Winding control method in continuous rolling line
CN206689201U (en) A kind of production equipment for hot rolling steel band

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant