CN106211366A - Substation power data information collection network - Google Patents

Substation power data information collection network Download PDF

Info

Publication number
CN106211366A
CN106211366A CN201610837731.0A CN201610837731A CN106211366A CN 106211366 A CN106211366 A CN 106211366A CN 201610837731 A CN201610837731 A CN 201610837731A CN 106211366 A CN106211366 A CN 106211366A
Authority
CN
China
Prior art keywords
substation
switch
ethernet
collection
central office
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610837731.0A
Other languages
Chinese (zh)
Inventor
王绍槐
李剑鸣
杨曜宁
彭莎
罗杰
郭丹
杜宗林
朱玮琪
胡鹏飞
苏倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hunan Electric Power Co Ltd
Zhuzhou Power Supply Co of State Grid Hunan Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Hunan Electric Power Co Ltd
Zhuzhou Power Supply Co of State Grid Hunan Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Hunan Electric Power Co Ltd, Zhuzhou Power Supply Co of State Grid Hunan Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Hunan Electric Power Co Ltd
Priority to CN201610837731.0A priority Critical patent/CN106211366A/en
Publication of CN106211366A publication Critical patent/CN106211366A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W84/00Network topologies
    • H04W84/18Self-organising networks, e.g. ad-hoc networks or sensor networks
    • H04W84/22Self-organising networks, e.g. ad-hoc networks or sensor networks with access to wired networks
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of transformer station energy data information gathering network, including gathering main website, local side switch, electric energy meter, combining unit, stand in switch, acquisition terminal and RS485 turn ethernet module;RS485 is turned ethernet module and is connected with electric energy meter by RS485 bus, is connected with local side switch by Ethernet, for reading power meters data reforwarding office's end switch;In standing, switch is connected with local side switch by Ethernet;Acquisition terminal is connected with gathering main website drawn game end switch, resolves energy data and forwards collection main website, or receives the control command of collection main website transmission, resolves and reforwarding office's end switch.The present invention turns ethernet module with an acquisition terminal and RS485 and replaces multiple stage acquisition terminal, decreases equipment investment and maintenance workload, and less to the variation of existing electrical energy data acquiring network, the suitability is good, and reliability is high.

Description

变电站电能数据信息采集网络Substation power data information collection network

技术领域technical field

本发明具体涉及一种变电站电能数据信息采集网络。The invention specifically relates to a substation power data information collection network.

背景技术Background technique

随着国家经济技术的发展和人们生活水平的提高,电能已经成了为人们日常生产和生活中最重要的二次能源。With the development of national economy and technology and the improvement of people's living standards, electric energy has become the most important secondary energy in people's daily production and life.

目前,电网变电站主要有两类,一类为普通的老式变电站,一类为新式智能变电站:对于老式变电站,在每个测量点都配置了单独的电能表,从电能表到采集终端都敷设了单独的485通信电缆,一般每个采集终端都有多个485通信接口,完成电表信息的抄读并上传到主站,但是因为采集终端连接的线缆较多,所以采集终端一般只能安装在变电站本地,采集终端收集电能表的数据后通过以太网传输到设置在地调通信机房内的局端交换机,再通过局端交换机传输到采集主站;对于智能变电站,其并没有传统意义上的电能表,取而代之的是具有电能数据计量、控制和保护于一体的合并单元;采集终端对电能信息的采集通过以太网从合并单元读取,因此,采集终端下行通道就没有了众多的485电缆,而是通过一根以太网连接电缆连接交换机,并通过交换机与各个合并单元连接,采集终端的上行通道一般也采用专用以太网,与地调通信机房内的局端交换机连接;老式变电站和智能变电站的电能数据信息采集网络具体如图1所示。At present, there are mainly two types of power grid substations, one is ordinary old-fashioned substations, and the other is new-style smart substations: For old-fashioned substations, a separate electric energy meter is configured at each measurement point, and the electric energy meter is laid to the collection terminal. A separate 485 communication cable, generally each collection terminal has multiple 485 communication interfaces to complete the reading of the meter information and upload it to the main station, but because there are many cables connected to the collection terminal, the collection terminal can generally only be installed in Locally in the substation, the collection terminal collects the data of the electric energy meter and transmits it to the central office switch installed in the communication room of the ground survey through Ethernet, and then transmits it to the main collection station through the central office switch; for smart substations, there is no traditional The energy meter is replaced by a merging unit that integrates energy data measurement, control and protection; the acquisition terminal collects energy information from the merging unit through Ethernet, so there are no many 485 cables in the downlink channel of the acquisition terminal. Instead, connect the switch through an Ethernet connection cable, and connect to each merging unit through the switch. The uplink channel of the collection terminal generally uses a dedicated Ethernet to connect with the local end switch in the communication room of the ground survey; the old-fashioned substation and the smart substation The power data information collection network is shown in Figure 1.

根据现有的老式变电站和智能变电站的电能数据采集网络可以知道,无论变电站的类型,每一个变电站均需要有一个采集终端进行数据的集中采集,而采集终端成本较高,这将给电网带来较大的资金负担。According to the existing electric energy data acquisition network of old-fashioned substations and smart substations, no matter the type of substation, each substation needs a collection terminal for centralized data collection, and the cost of collection terminals is relatively high, which will bring great harm to the power grid. Larger financial burden.

发明内容Contents of the invention

本发明的目的在于提供一种成本低廉、可靠性高、而且通信网络拓扑简单的变电站电能数据信息采集网络。The purpose of the present invention is to provide a substation power data information collection network with low cost, high reliability and simple communication network topology.

本发明提供的这种变电站电能数据信息采集网络,包括采集主站、局端交换机,普通变电站内的电能表、智能变电站内的合并单元、与合并单元连接的站内交换机,还包括采集终端和RS485转以太网模块;RS485转以太网模块通过RS485总线与普通变电站的电能表连接,并通过以太网与局端交换机连接,RS485转以太网模块用于通过RS485总线读取电能表的数据,并通过以太网发送至局端交换机;智能变电站内的站内交换机通过以太网直接与局端交换机连接;采集终端连接在采集主站和局端交换机之间,用于模拟多个变电站的档案配置、协议解析、电能数据采集与存储并转发至采集主站,或者用于接收采集主站发送的命令并解析后转发至局端交换机。The substation power data information collection network provided by the present invention includes a collection master station, a central office switch, an electric energy meter in an ordinary substation, a merging unit in an intelligent substation, and an in-station switch connected to the merging unit, as well as a collection terminal and RS485 Ethernet module; the RS485 to Ethernet module is connected to the energy meter of the ordinary substation through the RS485 bus, and connected to the local switch through the Ethernet. The RS485 to Ethernet module is used to read the data of the energy meter through the RS485 bus, and through The Ethernet is sent to the central office switch; the intra-station switch in the smart substation is directly connected to the central office switch through Ethernet; the collection terminal is connected between the collection master station and the central office switch to simulate file configuration and protocol analysis of multiple substations , Electric energy data collection and storage and forwarding to the collection master station, or used to receive the command sent by the collection master station and parse it and forward it to the central office switch.

所述的采集终端与局端交换机均设置在地调通信机房内。Both the collection terminal and the central office switch are set in the communication room of the ground survey.

所述的采集终端为工控机。The collection terminal is an industrial computer.

所述的采集终端与采集主站的连接为以太网连接。The connection between the collection terminal and the collection master station is an Ethernet connection.

所述的采集终端与局端交换机的连接为以太网连接。The connection between the collection terminal and the central office switch is an Ethernet connection.

本发明提供的这种变电站电能数据信息采集网络,通过增加RS485转以太网模块将普通变电站的电能数据直接转换为以太网数据进行传输,从而替换了普通变电站的采集终端;将智能变电站和普通变电站内原有的采集终端取消,在局端交换机和采集主站之间增加采集终端,减少了智能变电站和普通变电站内采集终端的布置;在工控机上实现采集终端的功能,最终实现了以一台工控机和RS485转以太网模块代替多台变电站内采集终端的目的,从而节省了变电站内采集终端的布置费用,极大地减少了变电站电能数据信息采集网络的布置成本;而且本发明提供的这种变电站电能数据信息采集网络,对现有的变电站电能数据采集网络变动极少,适用性极佳,而且网络拓扑结构简单且成熟,在极大节省了成本的基础上依旧保证了网络的可靠性。The substation electric energy data information acquisition network provided by the present invention can directly convert the electric energy data of ordinary substations into Ethernet data for transmission by adding an RS485 to Ethernet module, thus replacing the acquisition terminals of ordinary substations; The original acquisition terminal in the center is canceled, and the acquisition terminal is added between the central office switch and the acquisition master station, which reduces the arrangement of acquisition terminals in the smart substation and the ordinary substation; the function of the acquisition terminal is realized on the industrial computer, and finally a single industrial control terminal is realized. computer and RS485 to Ethernet module to replace the purpose of collecting terminals in multiple substations, thereby saving the arrangement cost of collecting terminals in the substation and greatly reducing the arrangement cost of the substation electric energy data information acquisition network; and the substation provided by the present invention The power data information collection network has very little change to the existing substation power data collection network, and has excellent applicability, and the network topology is simple and mature, which still ensures the reliability of the network on the basis of greatly saving costs.

附图说明Description of drawings

图1为背景技术的变电站电能数据信息采集网络的拓扑结构示意图。FIG. 1 is a schematic diagram of a topology structure of a substation power data information collection network in the background technology.

图2为本发明的变电站电能数据信息采集网络的拓扑结构示意图。Fig. 2 is a schematic diagram of the topology of the substation power data information collection network of the present invention.

具体实施方式detailed description

如图2所示为本发明的变电站电能数据信息采集网络的拓扑结构示意图:从图中可以看到,对于老式普通变电站,变电站的电能数据是通过电能表计量的,若干电能表均通过RS485总线连接到RS485总线转以太网模块上,电能表也通过RS485总线将计量的电能数据传输到RS485总线转以太网模块,并由RS485总线转以太网模块转换成以太网通信数据,通过以太网传输到局端交换机上;而对于新式智能变电站,则电能数据是通过合并单元计量的,若干合并单元通过以太网连接到站内交换机上,电能计量数据也通过以太网发送到站内交换机上,再由站内交换机通过以太网发送到局端交换机;局端交换机布置在地调通信机房处,用于接收老式普通变电站和新式智能变电站上传的电能计量数据,并转发给采集终端;采集终端同样可以设置在地调通信机房处,用于解析局端交换机收集到的电能数据并转发至采集主站,或者用于接收采集主站发送的命令并解析后转发局端交换机。采集终端可以采用工控机。As shown in Figure 2, it is a schematic diagram of the topology of the substation power data information acquisition network of the present invention: as can be seen from the figure, for the old-fashioned common substation, the power data of the substation is measured by electric energy meters, and several electric energy meters are all passed through the RS485 bus Connected to the RS485 bus-to-Ethernet module, the energy meter also transmits the measured energy data to the RS485 bus-to-Ethernet module through the RS485 bus, and is converted into Ethernet communication data by the RS485 bus-to-Ethernet module, which is transmitted to the On the central office switch; and for the new smart substation, the power data is measured through the merging unit, and several merging units are connected to the switch in the station through Ethernet, and the power metering data is also sent to the switch in the station through Ethernet, and then the switch in the station It is sent to the central office switch through Ethernet; the central office switch is arranged in the communication room of the local dispatcher to receive the electric energy measurement data uploaded by the old ordinary substation and the new smart substation, and forward it to the collection terminal; the collection terminal can also be set at the local dispatcher In the communication room, it is used to analyze the power data collected by the central office switch and forward it to the collection master station, or to receive the command sent by the collection master station and forward it to the central office switch after analysis. The acquisition terminal can be an industrial computer.

本发明实现了一台终端对多个智能变电站或多个普通变电站的电能信息采集,而且新建立的变电站无需再在变电站内安装采集终端,节省了设备投资,也减少了设备维护工作量;其次,在普通变电站内通过RS485转以太网模块代替原有的采集终端,可以节省采集终端,同样减少了设备投资和维护工作量。而且本发明方案网路拓扑简单可靠,适用性极好。The present invention realizes the collection of electric energy information of multiple intelligent substations or multiple ordinary substations by one terminal, and the newly established substation does not need to install collection terminals in the substation, which saves equipment investment and reduces the workload of equipment maintenance; secondly , In ordinary substations, the original collection terminal is replaced by the RS485 to Ethernet module, which can save the collection terminal, and also reduce equipment investment and maintenance workload. Moreover, the network topology of the scheme of the present invention is simple and reliable, and has excellent applicability.

Claims (5)

1.一种变电站电能数据信息采集网络,包括采集主站、局端交换机,普通变电站内的电能表、智能变电站内的合并单元和、合并单元连接的站内交换机和采集终端,其特征在于还包括RS485转以太网模块;RS485转以太网模块通过RS485总线与普通变电站的电能表连接,并通过以太网与局端交换机连接,RS485转以太网模块用于通过RS485总线读取电能表的数据,并通过以太网发送至局端交换机;智能变电站内的站内交换机通过以太网直接与局端交换机连接;采集终端连接在采集主站和局端交换机之间,用于解析局端交换机收集到的电能数据并转发至采集主站,或者用于接收采集主站发送的命令并解析后转发局端交换机。1. a substation electric energy data information acquisition network, including collecting master station, central office switch, electric energy meter in the common substation, the merging unit in the intelligent substation and, the in-station switch and the collecting terminal that the merging unit is connected, it is characterized in that also comprising RS485-to-Ethernet module; RS485-to-Ethernet module is connected to the electric energy meter of the ordinary substation through the RS485 bus, and connected to the central office switch through the Ethernet. The RS485-to-Ethernet module is used to read the data of the electric energy meter through the RS485 bus, and Send it to the central office switch through Ethernet; the intra-station switch in the smart substation is directly connected to the central office switch through Ethernet; the collection terminal is connected between the collection master station and the central office switch to analyze the power data collected by the central office switch And forward it to the collection master station, or to receive the command sent by the collection master station and forward it to the central office switch after parsing it. 2.根据权利要求1所述的变电站电能数据信息采集网络,其特征在于所述的采集终端与局端交换机均设置在地调通信机房内。2. The substation electric energy data information collection network according to claim 1, characterized in that both the collection terminal and the central office switch are set in the ground dispatching communication room. 3.根据权利要求1所述的变电站电能数据信息采集网络,其特征在于所述的采集终端为工控机。3. The substation power data information collection network according to claim 1, characterized in that said collection terminal is an industrial computer. 4.根据权利要求1~3之一所述的变电站电能数据信息采集网络,其特征在于所述的采集终端与采集主站的连接为以太网连接。4. The substation power data information collection network according to any one of claims 1 to 3, characterized in that the connection between the collection terminal and the collection master station is an Ethernet connection. 5.根据权利要求1~3之一所述的变电站电能数据信息采集网络,其特征在于所述的采集终端与局端交换机的连接为以太网连接。5. The substation electric energy data information collection network according to any one of claims 1 to 3, characterized in that the connection between the collection terminal and the central office switch is an Ethernet connection.
CN201610837731.0A 2016-09-22 2016-09-22 Substation power data information collection network Pending CN106211366A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610837731.0A CN106211366A (en) 2016-09-22 2016-09-22 Substation power data information collection network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610837731.0A CN106211366A (en) 2016-09-22 2016-09-22 Substation power data information collection network

Publications (1)

Publication Number Publication Date
CN106211366A true CN106211366A (en) 2016-12-07

Family

ID=58067022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610837731.0A Pending CN106211366A (en) 2016-09-22 2016-09-22 Substation power data information collection network

Country Status (1)

Country Link
CN (1) CN106211366A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109374937A (en) * 2018-12-06 2019-02-22 广东电网有限责任公司 An electric energy metering device, system and method
CN112968527A (en) * 2021-04-06 2021-06-15 广东翰新科技有限公司 Transformer substation dual-terminal device and implementation method thereof
CN113472839A (en) * 2021-05-10 2021-10-01 国家电网有限公司华东分部 Data cascade acquisition and transmission system suitable for gateway bus balance system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201910822U (en) * 2010-12-31 2011-07-27 利尔达科技有限公司 Electric meter group network based on Ethernet technology
CN102593950A (en) * 2011-07-29 2012-07-18 中广核工程有限公司 Networking system for digital transformer substation
CN203102591U (en) * 2012-11-19 2013-07-31 绵阳灵通电讯设备有限公司 Electric energy information collecting device of power consumers

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201910822U (en) * 2010-12-31 2011-07-27 利尔达科技有限公司 Electric meter group network based on Ethernet technology
CN102593950A (en) * 2011-07-29 2012-07-18 中广核工程有限公司 Networking system for digital transformer substation
CN203102591U (en) * 2012-11-19 2013-07-31 绵阳灵通电讯设备有限公司 Electric energy information collecting device of power consumers

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109374937A (en) * 2018-12-06 2019-02-22 广东电网有限责任公司 An electric energy metering device, system and method
CN112968527A (en) * 2021-04-06 2021-06-15 广东翰新科技有限公司 Transformer substation dual-terminal device and implementation method thereof
CN113472839A (en) * 2021-05-10 2021-10-01 国家电网有限公司华东分部 Data cascade acquisition and transmission system suitable for gateway bus balance system

Similar Documents

Publication Publication Date Title
CN202309232U (en) Intelligent power distribution terminal
CN202495807U (en) Remote centralized measurement and control system for power distribution network
CN104897973A (en) Single-phase distribution transformer loss online monitoring apparatus
CN110927447A (en) Multi-core-modularization-based station area six-branch loss monitoring device and monitoring method
CN106211366A (en) Substation power data information collection network
CN203135574U (en) Intelligent monitoring terminal of distribution transformer
CN207675854U (en) A kind of distributed line loss monitoring device for ring main unit
CN202033401U (en) Wireless current measuring device
CN204496687U (en) A kind of mixed type concentrated collection meter reading terminal
CN103595133B (en) A kind of transformer station dehumidifier intelligent monitor system
CN211605668U (en) An IoT low-voltage power distribution cabinet
CN206948036U (en) A kind of intelligent distribute-electricity transformer district terminal
CN201965753U (en) Acquisition device
CN109861391A (en) An intelligent low-voltage integrated distribution box management system based on the Internet of Things
CN210072898U (en) Remote meter reading acquisition device based on NB-IoT and power supply system thereof
CN203552454U (en) Centralized meter reading terminal for realization of power distribution and power utilization information collection
CN206004911U (en) Transformer station's energy data information gathering network
CN202523201U (en) Power-utilization acquisition terminal of smart power grid
CN102790427A (en) Electric monitoring and management system for intelligent distribution network
CN104569532A (en) Collecting-combining-integrated device of electronic transformer
CN205177151U (en) Power consumption information collection system's module terminal II type
CN205231854U (en) Prepackage type substation operation state monitoring system based on thing networking
CN202150738U (en) Remote monitoring system for reactive power compensator
CN204732280U (en) Intelligent transformer on 10kV post
CN203800929U (en) All-electric carrier communication remote integrated meter reading system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207

RJ01 Rejection of invention patent application after publication