CN106208143A - A kind of based on receiving wind power measuring method under regional power grid varying duty - Google Patents
A kind of based on receiving wind power measuring method under regional power grid varying duty Download PDFInfo
- Publication number
- CN106208143A CN106208143A CN201610734997.2A CN201610734997A CN106208143A CN 106208143 A CN106208143 A CN 106208143A CN 201610734997 A CN201610734997 A CN 201610734997A CN 106208143 A CN106208143 A CN 106208143A
- Authority
- CN
- China
- Prior art keywords
- power grid
- power
- regional
- regional power
- peak
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
Abstract
The invention discloses a kind of based on receiving wind power measuring method under regional power grid varying duty, solve existing regional power grid and receive the technical problem that wind power measuring and calculating is unreasonable, credibility is poor.First determine the minimum start-up mode of regional power grid, calculate the wind-powered electricity generation of the peak load of regional power grid and regional power grid under which and receive power, it is then based on the minimum start-up mode of regional power grid, calculate the peak load of regional power grid corresponding when wind-powered electricity generation receiving power is 0, subsequently based on regional power grid maximum start-up mode, calculate the wind-powered electricity generation of the peak load of regional power grid and regional power grid under which and receive power, finally set up rectangular coordinate system, abscissa is the peak load of regional power grid, vertical coordinate is that wind-powered electricity generation receives power, draw out and receive power curve based on wind-powered electricity generation in the case of regional power grid load variations.Alleviating the operating pressure of management and running personnel, strength has ensured the safe and stable operation of electrical network.
Description
Technical field
Patent of the present invention relates to the measuring method that can receive wind-power electricity generation power under a kind of regional power grid varying duty.
Background technology
Owing to the output of wind-driven generator has randomness, intermittent feature, when wind-driven generator is incorporated into
During existing regional power grid, owing to the load of regional power grid is ceaselessly changing, the peak regulation nargin of regional power grid is different, the most relatively
The most dynamically calculate regional power grid wind-powered electricity generation receive ability, with ensure regional power grid when low ebb load, wind-power electricity generation merit
In rate and regional power grid, other generated output summation keeps balance with the electricity consumption total load power of regional power grid, becomes region and adjusts
The difficult problem that degree runs.Along with being continuously increased of wind-powered electricity generation proportion in regional power grid, wind-powered electricity generation keeps the impact of balance also to above-mentioned power
Increasing.The wind power of regional power grid receives ability influenced by many factors, such as: region load peak-valley difference, region are sent
Electrical power/by factors such as electrical power and peak-valley difference, the peak modulation capacity of dissimilar generating set, up/down spinning reserve capacities
Impact.But the regional power grid wind power carried out at present receives Capability Measurement to be to carry out factors above roughly by rule of thumb mostly
Estimation or only consider the impact of wherein certain several factor, cause wind-powered electricity generation to receive power credibility poor, regional power grid wind power
Receive unreasonable, even when low ebb load, need start and stop fired power generating unit to carry out peak regulation, cause with electricity power enterprise to power scheduling
The biggest pressure, has a strong impact on the safe and stable operation of regional power grid.
Summary of the invention
The invention provides a kind of based on receiving wind power measuring method under regional power grid varying duty, solve existing
Regional power grid receives the technical problem that wind power measuring and calculating is unreasonable, credibility is poor.
The present invention is to solve above technical problem by the following technical programs:
A kind of based on receiving wind power measuring method under regional power grid varying duty, comprise the following steps:
First determine the minimum start-up mode of regional power grid, calculate the peak load of regional power grid and regional power grid under which
Wind-powered electricity generation receives power, the i.e. first point, specifically comprises the following steps that
The first step, wind-driven generator is linked in regional power grid, obtains the basis generating merit of all kinds of electromotors in regional power grid
Rate, including: wind power foundation power, photovoltaic crew base power, conventional hydropower crew base power, pump-storage generator base
All kinds of crew base power are added and obtain region by plinth generated output, thermal power plant unit base power, non-thermal power plant unit base power
The minimum generated output that electrical network is total;
Second step, the peak of acquisition regional power grid send power, the peak spinning reserve capacity of regional power grid, the height of regional power grid outside
By power in peak, first by the minimum generated output total for the regional power grid peak plus regional power grid by power, that obtain and subtract
Power is sent on the peak removing regional power grid outside, then deducts the peak spinning reserve capacity of regional power grid, obtains the peak of regional power grid
Load;
3rd step, the difference of the peak regulation rate deducting non-thermal power plant unit by the peak load of regional power grid are multiplied by the base of non-thermal power plant unit
Plinth power obtains the generated output lower limit of non-thermal power plant unit;The peak regulation rate of thermal power plant unit is deducted by the peak load of regional power grid
Difference be multiplied by thermal power plant unit basis generated output and obtain the generated output lower limit of thermal power plant unit;Pump-storage generator basis
Generated output is converted into pump-storage generator basis and draws water power;
4th step, by the generated output lower limit of non-thermal power plant unit plus the generated output lower limit of thermal power plant unit, the sum obtained
Deduct pump-storage generator basis to draw water power, obtain the generated output lower limit of regional power grid;
5th step, deducting the peak-valley ratio of the peak load of regional power grid by the peak load of regional power grid, the difference obtained is taken advantage of
With the peak load of regional power grid, obtain the low ebb load of regional power grid;Regional power grid is deducted by the peak load of regional power grid
Peak send the peak-valley ratio of power outside, the difference obtained is multiplied by the peak of regional power grid sends power outside, obtains regional power grid
Low ebb sends power outside;Deduct the peak-valley ratio by power in the peak of regional power grid by the peak load of regional power grid, obtain
Difference is multiplied by the peak of regional power grid by power, obtains in the low ebb of regional power grid by power;
6th step, send the low ebb load of regional power grid outside power plus the low ebb of regional power grid, that obtain and deduct region electricity
By power in the low ebb of net, then deduct the low ebb spinning reserve capacity of regional power grid, obtain the low ebb workload demand of regional power grid;
7th step, the low ebb workload demand of regional power grid is deducted the generated output lower limit of regional power grid, obtain regional power grid
Under minimum start-up mode, the wind-powered electricity generation of regional power grid receives power;
It is then based on the minimum start-up mode of regional power grid, calculates the height of regional power grid corresponding when wind-powered electricity generation receiving power is 0
Peak load, i.e. second point, specifically comprise the following steps that
8th step, each generating set of regional power grid is categorized as: wind power foundation power, photovoltaic crew base power, often
Rule Hydropower Unit base power, pump-storage generator basis generated output, thermal power plant unit base power, non-thermal power plant unit basis merit
Rate, obtains the basic generated output of all kinds of electromotors in regional power grid;
9th step, the difference of the peak regulation rate deducting non-thermal power plant unit by the peak load of regional power grid are multiplied by the base of non-thermal power plant unit
Plinth power obtains the generated output lower limit of non-thermal power plant unit;The peak regulation of thermal power plant unit is deducted by the peak load of regional power grid
The difference of rate is multiplied by thermal power plant unit basis generated output and obtains the generated output lower limit of thermal power plant unit;Pump-storage generator base
Plinth generated output is converted into pump-storage generator basis and draws water power;
Tenth step, by the generated output lower limit of non-thermal power plant unit plus the generated output lower limit of thermal power plant unit, the sum obtained
Deduct pump-storage generator basis to draw water power, obtain the generated output lower limit of regional power grid;
When 11st step, regional power grid wind-powered electricity generation receive power to be 0, the low ebb workload demand of regional power grid sending out equal to regional power grid
Electrical power lower limit;
12nd step, deduct the peak of regional power grid by the peak load of regional power grid and send the peak-valley ratio of power outside, obtain
Difference is multiplied by the peak of regional power grid sends power outside, and the low ebb obtaining regional power grid sends power outside;Bear with the peak of regional power grid
Lotus deducts the peak-valley ratio in the peak of regional power grid by power, and the difference obtained is multiplied by the peak of regional power grid by power,
The low ebb obtaining regional power grid is interior by power;
13rd step, by the low ebb workload demand of the regional power grid low ebb plus regional power grid by power, that obtain and add again
The low ebb of upper regional power grid turns spare capacity, that obtain and deduct regional power grid send power outside, obtain the low ebb of regional power grid
Load;
14th step, the low ebb load of regional power grid is born divided by the peak deducting regional power grid by the peak load of regional power grid
The difference of the peak-valley ratio of lotus, obtains the height that wind-powered electricity generation under the minimum start-up mode of regional power grid receives power to be 0 time domain electrical network
Peak load;
Subsequently based on regional power grid maximum start-up mode, calculate peak load and the regional power grid of regional power grid under which
Wind-powered electricity generation receive power, the most thirdly, specifically comprise the following steps that
15th step, each generating set of regional power grid is categorized as: wind power foundation power, photovoltaic crew base power,
Conventional hydropower crew base power, pump-storage generator basis generated output, thermal power plant unit peak power, non-thermal power plant unit are maximum
All kinds of powers of the assembling unit are added and obtain the maximum generation power that regional power grid is total by power;
16th step, the peak obtaining regional power grid send power, the peak spinning reserve capacity of regional power grid, regional power grid outside
By power in peak, first by maximum generation power total for regional power grid plus regional power grid peak in by power, the sum obtained
Deduct the peak of regional power grid and send power outside, then deduct the peak spinning reserve capacity of regional power grid, obtain the height of regional power grid
Peak load;
17th step, the difference of the peak regulation rate deducting non-thermal power plant unit by the peak load of regional power grid are multiplied by non-thermal power plant unit
Base power obtains the generated output lower limit of non-thermal power plant unit;The peak regulation of thermal power plant unit is deducted by the peak load of regional power grid
The difference of rate is multiplied by thermal power plant unit basis generated output and obtains the generated output lower limit of thermal power plant unit;Pump-storage generator basis
Generated output is converted into pump-storage generator basis and draws water power;
18th step, by the generated output lower limit of non-thermal power plant unit plus the generated output lower limit of thermal power plant unit, obtain
Draw water power with deducting pump-storage generator basis, obtain the generated output lower limit of regional power grid;
19th step, deduct the peak-valley ratio of the peak load of regional power grid by the peak load of regional power grid, the difference obtained
It is multiplied by the peak load of regional power grid, obtains the low ebb load of regional power grid;Region electricity is deducted by the peak load of regional power grid
The peak-valley ratio of power is sent on the peak of net outside, and the difference obtained is multiplied by the peak of regional power grid sends power outside, obtains regional power grid
Low ebb send power outside;Deduct the peak-valley ratio by power in the peak of regional power grid by the peak load of regional power grid, obtain
Difference be multiplied by the peak of regional power grid by power, obtain in the low ebb of regional power grid by power;
20th step, send the low ebb load of regional power grid outside power plus the low ebb of regional power grid, that obtain and deduct region
By power in the low ebb of electrical network, then the low ebb deducting regional power grid turns spare capacity, obtains the low ebb workload demand of regional power grid;
21st step, the low ebb workload demand of regional power grid is deducted the generated output lower limit of regional power grid, obtain region
Wind-powered electricity generation under electrical network maximum start-up mode receives power;
Finally setting up rectangular coordinate system, abscissa is the peak load of regional power grid, vertical coordinate be wind-powered electricity generation receive power, draw with
Upper three points, are connected first with second point, first line segment smooth with thirdly use respectively;I.e. draw out based on region
Under network load situation of change, wind-powered electricity generation receives power curve.
Curve chart of the present invention is simple and clear, reflect that the wind-powered electricity generation under the conditions of zones of different peak load of grid connects intuitively and accurately
Receiving power, provide technical support for management and running, alleviate the operating pressure of management and running personnel, strength has ensured the peace of electrical network
Full stable operation.
Accompanying drawing explanation
Fig. 1 is the graph of a relation between regional power grid Peak power use load and peak generating set generated output;
Fig. 2 is the graph of a relation between regional power grid valley power consumption load and low ebb generating set generated output;
Fig. 3 is to receive power based on wind-powered electricity generation in the case of regional power grid load variations.
Detailed description of the invention
The present invention is described in detail below in conjunction with the accompanying drawings:
A kind of based on receiving wind power measuring method under regional power grid varying duty, comprise the following steps:
First determine the minimum start-up mode of regional power grid, calculate the peak load of regional power grid and regional power grid under which
Wind-powered electricity generation receives power, the i.e. first point, specifically comprises the following steps that
The first step, wind-driven generator is linked in regional power grid, obtains the basis generating merit of all kinds of electromotors in regional power grid
Rate, including: wind power foundation power 6, photovoltaic crew base power 7, conventional hydropower crew base power 8, water-storage machine
Group basis generated output 9, thermal power plant unit base power 10, non-thermal power plant unit base power 11, by all kinds of crew base power phases
Add and obtain the minimum generated output 5 that regional power grid is total;
Second step, the peak obtaining regional power grid send power 2, the peak spinning reserve capacity 3 of regional power grid, regional power grid outside
By power 4 in peak, first by total for the regional power grid minimum generated output 5 peak plus regional power grid by power 4, obtain
Send power 2 outside with the peak deducting regional power grid, then deduct the peak spinning reserve capacity 3 of regional power grid, obtain regional power grid
Peak load 1;
3rd step, the difference of the peak regulation rate deducting non-thermal power plant unit by the peak load 1 of regional power grid are multiplied by non-thermal power plant unit
Base power 11 obtains the generated output lower limit 19 of non-thermal power plant unit;It is multiplied by by the difference of the 1 peak regulation rate deducting thermal power plant unit
Thermal power plant unit basis generated output 10 obtains the generated output lower limit 20 of thermal power plant unit;Pump-storage generator basis generating merit
Rate 9 is converted into pump-storage generator basis and draws water power 17;
4th step, by the generated output lower limit 19 of non-thermal power plant unit plus the generated output lower limit 20 of thermal power plant unit, obtain
And deduct pump-storage generator basis and draw water power 17, obtain the generated output lower limit 18 of regional power grid;
5th step, deducting the peak-valley ratio of the peak load of regional power grid by the peak load 1 of regional power grid, the difference obtained is taken advantage of
With the peak load 1 of regional power grid, obtain the low ebb load 12 of regional power grid;Region is deducted by the peak load 1 of regional power grid
The peak-valley ratio of power is sent on the peak of electrical network outside, and the difference obtained is multiplied by the peak of regional power grid sends power 2 outside, obtains region electricity
The low ebb of net sends power 13 outside;The peak-valley ratio by power in the peak of regional power grid is deducted by the peak load 1 of regional power grid,
The difference obtained is multiplied by the peak of regional power grid by power 4, obtains in the low ebb of regional power grid by power 14;
6th step, send the low ebb load 12 of regional power grid outside power 13 plus the low ebb of regional power grid, that obtain and deduct district
By power 14 in the low ebb of territory electrical network, then deduct the low ebb spinning reserve capacity 15 of regional power grid, obtain the low ebb of regional power grid
Workload demand 16;
7th step, the low ebb workload demand 16 of regional power grid is deducted the generated output lower limit 18 of regional power grid, obtain region
Under electrical network minimum start-up mode, the wind-powered electricity generation of regional power grid receives power;
It is then based on the minimum start-up mode of regional power grid, calculates the height of regional power grid corresponding when wind-powered electricity generation receiving power is 0
Peak load, i.e. second point, specifically comprise the following steps that
8th step, each generating set of regional power grid is categorized as: wind power foundation power 6, photovoltaic crew base power 7,
Conventional hydropower crew base power 8, pump-storage generator basis generated output 9, thermal power plant unit base power 10, non-thermal power plant unit
Base power 11, obtains the basic generated output of all kinds of electromotors in regional power grid;
9th step, the difference of the peak regulation rate deducting non-thermal power plant unit by the peak load 1 of regional power grid are multiplied by non-thermal power plant unit
Base power 11 obtains the generated output lower limit 19 of non-thermal power plant unit;Thermal power plant unit is deducted by the peak load 1 of regional power grid
The difference of peak regulation rate be multiplied by thermal power plant unit basis generated output 10 and obtain the generated output lower limit 20 of thermal power plant unit;Draw water
Accumulation of energy crew base generated output 9 is converted into pump-storage generator basis and draws water power 17;
Tenth step, by the generated output lower limit 19 of non-thermal power plant unit plus the generated output lower limit 20 of thermal power plant unit, obtain
And deduct pump-storage generator basis and draw water power 17, obtain the generated output lower limit 18 of regional power grid;
When 11st step, regional power grid wind-powered electricity generation receive power to be 0, the low ebb workload demand 16 of regional power grid is equal to regional power grid
Generated output lower limit 18;
12nd step, deduct the peak of regional power grid by the peak load 1 of regional power grid and send the peak-valley ratio of power outside, obtain
Difference is multiplied by the peak of regional power grid sends power 2 outside, and the low ebb obtaining regional power grid sends power 13 outside;With the peak of regional power grid
Load 1 deducts the peak-valley ratio in the peak of regional power grid by power, and the difference obtained is multiplied by the peak of regional power grid by merit
Rate 4, the low ebb obtaining regional power grid is interior by power 14;
13rd step, by the low ebb workload demand 16 of the regional power grid low ebb plus regional power grid by power 14, the sum obtained
The low ebb adding regional power grid turns spare capacity 15, that obtain and deduct regional power grid send power 13 outside, obtain region electricity
The low ebb load 12 of net;
14th step, by the low ebb load 12 of regional power grid divided by the height deducting regional power grid by the peak load 1 of regional power grid
The difference of the peak-valley ratio of peak load, obtains wind-powered electricity generation under the minimum start-up mode of regional power grid and receives power to be 0 time domain electrical network
Peak load 1;
Subsequently based on regional power grid maximum start-up mode, calculate peak load and the regional power grid of regional power grid under which
Wind-powered electricity generation receive power, the most thirdly, specifically comprise the following steps that
15th step, each generating set of regional power grid is categorized as: wind power foundation power 6, photovoltaic crew base power
7, conventional hydropower crew base power 8, pump-storage generator basis generated output 9, thermal power plant unit peak power 10, non-heat supply machine
All kinds of powers of the assembling unit are added and obtain the maximum generation power 5 that regional power grid is total by group peak power 11;
16th step, the peak of acquisition regional power grid send power 2, the peak spinning reserve capacity 3 of regional power grid, regional power grid outside
Peak in by power 4, first by the maximum generation power 5 total for the regional power grid peak plus regional power grid by power 4, obtain
And deduct the peak of regional power grid and send power 2 outside, then deduct the peak spinning reserve capacity 3 of regional power grid, obtain region electricity
The peak load 1 of net;
17th step, the difference of the peak regulation rate deducting non-thermal power plant unit by the peak load 1 of regional power grid are multiplied by non-thermal power plant unit
Base power 11 obtain the generated output lower limit 19 of non-thermal power plant unit;Heat supply machine is deducted by the peak load 1 of regional power grid
The difference of the peak regulation rate of group is multiplied by thermal power plant unit basis generated output 10 and obtains the generated output lower limit 20 of thermal power plant unit;Take out
Water accumulation of energy crew base generated output 9 is converted into pump-storage generator basis and draws water power 17;
18th step, by the generated output lower limit 19 of non-thermal power plant unit plus the generated output lower limit 20 of thermal power plant unit,
To and deduct pump-storage generator basis and draw water power 17, obtain the generated output lower limit 18 of regional power grid;
19th step, deduct the peak-valley ratio of the peak load of regional power grid by the peak load 1 of regional power grid, the difference obtained
It is multiplied by the peak load 1 of regional power grid, obtains the low ebb load 12 of regional power grid;District is deducted by the peak load 1 of regional power grid
The peak-valley ratio of power is sent on the peak of territory electrical network outside, and the difference obtained is multiplied by the peak of regional power grid sends power 2 outside, obtains region
The low ebb of electrical network sends power 13 outside;The peak-valley difference by power in the peak of regional power grid is deducted by the peak load 1 of regional power grid
Rate, the difference obtained is multiplied by the peak of regional power grid by power 4, obtains in the low ebb of regional power grid by power 14;
20th step, send the low ebb load 12 of regional power grid outside power 13 plus the low ebb of regional power grid, that obtain and deduct
By power 14 in the low ebb of regional power grid, then the low ebb deducting regional power grid turns spare capacity 15, obtains the low ebb of regional power grid
Workload demand 16;
21st step, the low ebb workload demand 16 of regional power grid is deducted the generated output lower limit 18 of regional power grid, obtain
Wind-powered electricity generation under regional power grid maximum start-up mode receives power;
Finally setting up rectangular coordinate system, abscissa is the peak load of regional power grid, vertical coordinate be wind-powered electricity generation receive power, draw with
Upper three points, are connected first with second point, first line segment smooth with thirdly use respectively;I.e. draw out based on region
Under network load situation of change, wind-powered electricity generation receives power curve.
Claims (1)
1., based on receiving a wind power measuring method under regional power grid varying duty, comprise the following steps:
First determine the minimum start-up mode of regional power grid, calculate the peak load of regional power grid and regional power grid under which
Wind-powered electricity generation receives power, the i.e. first point, specifically comprises the following steps that
The first step, wind-driven generator is linked in regional power grid, obtains the basis generating merit of all kinds of electromotors in regional power grid
Rate, including: wind power foundation power (6), photovoltaic crew base power (7), conventional hydropower crew base power (8), draw water
Accumulation of energy crew base generated output (9), thermal power plant unit base power (10), non-thermal power plant unit base power (11), by all kinds of machines
Group base power is added and obtains the minimum generated output (5) that regional power grid is total;
Second step, the peak of acquisition regional power grid send power (2), the peak spinning reserve capacity (3) of regional power grid, region electricity outside
By power (4) in the peak of net, first minimum generated output (5) total for regional power grid is added in the peak of regional power grid by power
(4), power (2) is sent on peak that is that obtain and that deduct regional power grid outside, then deducts the peak spinning reserve capacity of regional power grid
(3) peak load (1) of regional power grid, is obtained;
3rd step, the difference of the peak regulation rate deducting non-thermal power plant unit by the peak load (1) of regional power grid are multiplied by non-thermal power plant unit
Base power (11) obtain the generated output lower limit (19) of non-thermal power plant unit;Deduct by the peak load (1) of regional power grid
The difference of the peak regulation rate of thermal power plant unit is multiplied by thermal power plant unit basis generated output (10) and obtains the generated output lower limit of thermal power plant unit
Value (20);Pump-storage generator basis generated output (9) is converted into pump-storage generator basis and draws water power (17);
4th step, by the generated output lower limit (19) of non-thermal power plant unit plus the generated output lower limit (20) of thermal power plant unit,
That obtain and deduct pump-storage generator basis and draw water power (17), obtain the generated output lower limit (18) of regional power grid;
5th step, deduct the peak-valley ratio of the peak load of regional power grid by the peak load (1) of regional power grid, the difference obtained
It is multiplied by the peak load (1) of regional power grid, obtains the low ebb load (12) of regional power grid;By the peak load (1) of regional power grid
The peak-valley ratio of power is sent on the peak deducting regional power grid outside, and the difference obtained is multiplied by the peak of regional power grid sends power (2) outside,
The low ebb obtaining regional power grid sends power (13) outside;It is subject to deduct the peak of regional power grid by the peak load (1) of regional power grid in
The peak-valley ratio of power, the difference obtained is multiplied by the peak of regional power grid by power (4), is subject in obtaining the low ebb of regional power grid
Power (14);
6th step, send the low ebb load (12) of regional power grid outside power (13) plus the low ebb of regional power grid, that obtain and subtract
Go in the low ebb of regional power grid by power (14), then deduct the low ebb spinning reserve capacity (15) of regional power grid, obtain region electricity
The low ebb workload demand (16) of net;
7th step, the low ebb workload demand (16) of regional power grid is deducted the generated output lower limit (18) of regional power grid, obtain
Under regional power grid minimum start-up mode, the wind-powered electricity generation of regional power grid receives power;
It is then based on the minimum start-up mode of regional power grid, calculates the height of regional power grid corresponding when wind-powered electricity generation receiving power is 0
Peak load, i.e. second point, specifically comprise the following steps that
8th step, each generating set of regional power grid is categorized as: wind power foundation power (6), photovoltaic crew base power
(7), conventional hydropower crew base power (8), pump-storage generator basis generated output (9), thermal power plant unit base power (10),
Non-thermal power plant unit base power (11), obtains the basic generated output of all kinds of electromotors in regional power grid;
9th step, the difference of the peak regulation rate deducting non-thermal power plant unit by the peak load (1) of regional power grid are multiplied by non-thermal power plant unit
Base power (11) obtain the generated output lower limit (19) of non-thermal power plant unit;Deduct by the peak load (1) of regional power grid
The difference of the peak regulation rate of thermal power plant unit is multiplied by thermal power plant unit basis generated output (10) and obtains the generated output lower limit of thermal power plant unit
Value (20);Pump-storage generator basis generated output (9) is converted into pump-storage generator basis and draws water power (17);
Tenth step, by the generated output lower limit (19) of non-thermal power plant unit plus the generated output lower limit (20) of thermal power plant unit,
That obtain and deduct pump-storage generator basis and draw water power (17), obtain the generated output lower limit (18) of regional power grid;
When 11st step, regional power grid wind-powered electricity generation receive power to be 0, the low ebb workload demand (16) of regional power grid is equal to regional power grid
Generated output lower limit (18);
12nd step, deduct the peak of regional power grid by the peak load (1) of regional power grid and send the peak-valley ratio of power outside, obtain
Difference be multiplied by the peak of regional power grid and send power (2) outside, the low ebb obtaining regional power grid sends power (13) outside;Use regional power grid
Peak load (1) deduct in the peak of regional power grid the peak-valley ratio by power, the difference obtained is multiplied by the height of regional power grid
By power (4) in peak, the low ebb obtaining regional power grid is interior by power (14);
13rd step, by the low ebb workload demand (16) of regional power grid plus regional power grid low ebb in by power (14), obtain
And add the low ebb of regional power grid and turn spare capacity (15), that obtain and deduct regional power grid send power (13) outside,
Low ebb load (12) to regional power grid;
14th step, the low ebb load (12) of regional power grid is deducted regional power grid divided by by the peak load (1) of regional power grid
The difference of peak-valley ratio of peak load, obtain wind-powered electricity generation under the minimum start-up mode of regional power grid and receive power to be 0 time domain
The peak load (1) of electrical network;
Subsequently based on regional power grid maximum start-up mode, calculate peak load and the regional power grid of regional power grid under which
Wind-powered electricity generation receive power, the most thirdly, specifically comprise the following steps that
15th step, each generating set of regional power grid is categorized as: wind power foundation power (6), photovoltaic crew base merit
Rate (7), conventional hydropower crew base power (8), pump-storage generator basis generated output (9), thermal power plant unit peak power
(10), non-thermal power plant unit peak power (11), by all kinds of powers of the assembling unit be added obtain the maximum generation power that regional power grid is total
(5);
16th step, the peak of acquisition regional power grid send power (2), the peak spinning reserve capacity (3) of regional power grid, region outside
By power (4) in the peak of electrical network, first by maximum generation power (5) total for regional power grid plus regional power grid peak in by merit
Rate (4), peak that is that obtain and that deduct regional power grid is sent power (2) outside, then is deducted the peak spinning reserve capacity of regional power grid
(3) peak load (1) of regional power grid, is obtained;
17th step, the difference of the peak regulation rate deducting non-thermal power plant unit by the peak load (1) of regional power grid are multiplied by non-heat supply machine
The base power (11) of group obtains the generated output lower limit (19) of non-thermal power plant unit;Subtract by the peak load (1) of regional power grid
The difference going the peak regulation rate of thermal power plant unit is multiplied by under the generated output that thermal power plant unit basis generated output (10) obtains thermal power plant unit
Limit value (20);Pump-storage generator basis generated output (9) is converted into pump-storage generator basis and draws water power (17);
18th step, by the generated output lower limit (19) of non-thermal power plant unit plus the generated output lower limit of thermal power plant unit
(20), that obtain and deduct pump-storage generator basis and draw water power (17), obtain the generated output lower limit of regional power grid
(18);
19th step, deduct the peak-valley ratio of the peak load of regional power grid by the peak load (1) of regional power grid, the difference obtained
Value is multiplied by the peak load (1) of regional power grid, obtains the low ebb load (12) of regional power grid;By the peak load 1 of regional power grid
The peak-valley ratio of power is sent on the peak deducting regional power grid outside, and the difference obtained is multiplied by the peak of regional power grid sends power 2 outside,
Low ebb to regional power grid sends power 13 outside;Deduct by the peak load (1) of regional power grid in the peak of regional power grid by power
Peak-valley ratio, the difference obtained is multiplied by the peak of regional power grid by power (4), obtains in the low ebb of regional power grid by power
(14);
20th step, send the low ebb load (12) of regional power grid outside power (13) plus the low ebb of regional power grid, the sum obtained
The low ebb deducting regional power grid is interior by power (14), then the low ebb deducting regional power grid turns spare capacity (15), obtains region electricity
The low ebb workload demand (16) of net;
21st step, the low ebb workload demand (16) of regional power grid is deducted the generated output lower limit (18) of regional power grid,
Obtain the wind-powered electricity generation under regional power grid maximum start-up mode and receive power;
Finally setting up rectangular coordinate system, abscissa is the peak load of regional power grid, vertical coordinate be wind-powered electricity generation receive power, draw with
Upper three points, are connected first with second point, first line segment smooth with thirdly use respectively;I.e. draw out based on region
Under network load situation of change, wind-powered electricity generation receives power curve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610734997.2A CN106208143B (en) | 2016-08-28 | 2016-08-28 | One kind is based on receiving wind power measuring method under regional power grid varying duty |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610734997.2A CN106208143B (en) | 2016-08-28 | 2016-08-28 | One kind is based on receiving wind power measuring method under regional power grid varying duty |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106208143A true CN106208143A (en) | 2016-12-07 |
CN106208143B CN106208143B (en) | 2019-01-11 |
Family
ID=57526694
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610734997.2A Active CN106208143B (en) | 2016-08-28 | 2016-08-28 | One kind is based on receiving wind power measuring method under regional power grid varying duty |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106208143B (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102593853A (en) * | 2012-02-27 | 2012-07-18 | 东北电力大学 | Energy storage system capacity configuration optimizing method capable of enhancing wind power receiving capacity |
-
2016
- 2016-08-28 CN CN201610734997.2A patent/CN106208143B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102593853A (en) * | 2012-02-27 | 2012-07-18 | 东北电力大学 | Energy storage system capacity configuration optimizing method capable of enhancing wind power receiving capacity |
Non-Patent Citations (3)
Title |
---|
沙志成等: "基于调峰平衡的山东电网接纳风电能力分析", 《中国工程咨询》 * |
陈亚军等: "基于调峰能力的陕西电网接纳风电能力分析", 《陕西电力》 * |
韩小琪等: "从系统调峰角度评估电网接纳风电能力", 《中国电力》 * |
Also Published As
Publication number | Publication date |
---|---|
CN106208143B (en) | 2019-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Onar et al. | Dynamic modeling, design and simulation of a wind/fuel cell/ultra-capacitor-based hybrid power generation system | |
Lyu et al. | Coordinated control strategies of PMSG-based wind turbine for smoothing power fluctuations | |
CN101860043B (en) | Low voltage traversing control device and method for serial connection wind power generator set | |
CN202001202U (en) | Non-grid-connected wind-driven generating set used for hydrogen manufacturing | |
Vigna et al. | Modelling and simulation of variable speed pico hydel energy storage system for microgrid applications | |
CN105186660A (en) | Off-grid type wind power hydrogen production conversion system | |
Yao et al. | A control configuration of wind farm for load-following and frequency support by considering the inertia issue | |
CN104978629A (en) | Optimal multi-type power supply complementary peak-adjusting mode and model thereof | |
Gite et al. | Modeling of wind energy system with MPPT control for DC microgrid | |
CN106208144B (en) | One kind is based on receiving wind power measuring method under regional power grid constant load | |
CN201805236U (en) | Series type LVRT (low voltage ride through) control device of wind generating set | |
CN107911061A (en) | Photovoltaic energy storage power station | |
CN104901341B (en) | Thermal power generation coal consumption amount computational methods based on unit output and Changing load-acceleration | |
CN111027179B (en) | Equivalent modeling method for double-fed wind power plant considering auxiliary frequency modulation service | |
CN207339720U (en) | Photovoltaic energy storage power station | |
CN106208143A (en) | A kind of based on receiving wind power measuring method under regional power grid varying duty | |
JP6095109B2 (en) | Power supply system | |
Ji et al. | Collaborative Control of Integrated Generation and Storage for Offshore Wind Turbines | |
Soumia et al. | Maximum power tracking control wind turbine based on permanent magnet synchronous generator with complete converter | |
CN112994056A (en) | Off-grid power generation system and control method and application system thereof | |
Jeman et al. | Stability check of doubly fed induction generator (DFIG) micro grid power system | |
Banawair et al. | DFIG wind-turbine modeling with reactive power control integrated to large distribution network | |
Oh et al. | Capacity Credit and Reasonable ESS Evaluation of Power System Including WTG combined with Battery Energy Storage System | |
CN104485679A (en) | Wind and storage integrated self-balancing control method and system applicable to distribution network | |
Ugartemendia et al. | Wind generation stabilization of fixed speed wind turbine farms with hydrogen buffer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |