CN106208040B - The optimization method in power supply network path - Google Patents

The optimization method in power supply network path Download PDF

Info

Publication number
CN106208040B
CN106208040B CN201610564311.XA CN201610564311A CN106208040B CN 106208040 B CN106208040 B CN 106208040B CN 201610564311 A CN201610564311 A CN 201610564311A CN 106208040 B CN106208040 B CN 106208040B
Authority
CN
China
Prior art keywords
path
user
object function
distribution
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610564311.XA
Other languages
Chinese (zh)
Other versions
CN106208040A (en
Inventor
张永浩
周兴华
郭志民
石亚欣
宁杰
赵红波
袁成勇
吴博
蔡正勇
张小斐
万迪明
谢枫
方茂益
赵树志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JOIN BRIGHT ELECTRIC POWER TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd
Original Assignee
BEIJING JOIN BRIGHT ELECTRIC POWER TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JOIN BRIGHT ELECTRIC POWER TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Henan Electric Power Co Ltd, Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd filed Critical BEIJING JOIN BRIGHT ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201610564311.XA priority Critical patent/CN106208040B/en
Publication of CN106208040A publication Critical patent/CN106208040A/en
Application granted granted Critical
Publication of CN106208040B publication Critical patent/CN106208040B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Abstract

The present invention provides a kind of optimization method in power supply network path, and step includes:1) address coordinate of the application user of collection, rank, application capacity, history electricity consumption basic data are sent to data center;2) the multiple distribution facilities to match with application user are drawn;3) address coordinate of the multiple distribution facility is obtained;4) object function of the mathematical modeling of critical path method (CPM) is built;5) application simulation software solves, and length chooses path in the top from small to large by path;6) object function of the mathematical modeling of minimum cost method is built;7) path of minimum cost is chosen according to the object function of step 6.The present invention effectively improves the normalization and reasonability of power supply plan establishment, improves operating efficiency and the accuracy of distribution, realizes effective guidance to site inspection personnel, reduce the site inspection time, improve the satisfaction of user.

Description

The optimization method in power supply network path
Technical field
The present invention relates to power network power supply field, more particularly to a kind of optimization method in power supply network path.
Background technology
As the development of power grid construction and administrative skill and computer technology and the communication technology are increasingly wide in power domain General application, at the same electricity transaction is also being faced with this market-oriented deep change, how to improve the quality of power supply, power supply can It is the task of top priority of power system by property, efficiency of service.Especially as the end power distribution network management of power system, even more ensure Electric power safety, reliable, efficient pith.Distribution management system is exactly to utilize current advanced computer monitoring, network Communication, data processing technique are monitored to the operating condition of distribution, controlled, and its equipment, drawing and routine work are realized Offline, online management, the automatic segmentation of distribution reliability of operation and failure is improved, failure is handled soon.With electric power to it is economical, Life, service etc. the significance level of various aspects it is growing, the safe and reliable operation of power distribution network is particularly important.Negative While lotus largely increases, power distribution network scale constantly expands, and grid structure, the mode of connection and the method for operation are increasingly sophisticated.At present The formulation of power supply plan is reconnoitred by manual site, and workload is big, and efficiency is low, poor user experience, and easily error.And artificial volume Fixture has the characteristics of subjectivity, randomness and unordered access, it is easy to damages grid structure, chaotic power supply area etc. and asks Topic, and the time that artificial establishment needs is more, so as to cause power-on time elongated, reduces power supplying efficiency.
The content of the invention
In view of the above-mentioned problems, the present invention provides a kind of optimization method in power supply network path, step includes:
1) by data acquisition module, by the address coordinate of the application user of collection, rank, application capacity, history electricity consumption Basic data is sent to data center;
2) extracted by the data being connected with sales service system, marketing generalized information system, scheduling system and production management system Module, draw the multiple distribution facilities to match with application user;
3) address coordinate of the multiple distribution facility is obtained;
4) object function of the mathematical modeling of critical path method (CPM) is built, its constraints can for selected distribution setting Open capacity is more than the application capacity of the application user and user's quality of voltage meets quality of voltage requirement;
5) application simulation software solves, and length chooses path in the top from small to large by path;
6) object function of the mathematical modeling of minimum cost method is built;
7) according to the object function of step 6, using the value at cost in the path selected by simulation software calculation procedure 5, choose The path of minimum cost.
Preferred scheme is:The mathematical modeling object function of the shortest path is:
Wherein, (xi, yi), i=1,2. ... n-1 be distribution facility point coordinates, (x0, y0) it is the address for applying for user Coordinate;N is the number that the distribution to match with application user is set.
Preferred scheme is:The mathematical modeling object function of the minimum cost method is:
Wherein, (xi, yi), i=1,2. ... n-1 are the point coordinates of distribution facility;(x0, y0) it is the address for applying for user Coordinate;N is the number value that the distribution to match with application user is set;Q is circuit specific investment cost cost;P ties up for circuit unit Protect cost;MiFor the fixed cost of distribution facility.
The present invention, using simulation software, draws optimal power supply plan, effectively by shortest path and minimum cost model The normalization and reasonability of power supply plan establishment are improved, operating efficiency and the accuracy of distribution is improved, realizes to scene Effective guidance of explorer, reduces the site inspection time, improves the satisfaction of user.
Embodiment
With reference to embodiment, the present invention is described in further detail, to make those skilled in the art's reference Specification word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or more The presence or addition of individual other elements or its combination.
Big data analysis refers to analyze huge data.Big data may be summarized to be 4 V, and data volume is big (Volume), speed fast (Velocity), type more (Variety), authenticity (Veracity), some scholars also include data It is worth (Value).Vocabulary of the big data as IT industries most burning hot at present, thing followed data warehouse, data safety, number The utilization that the commercial value of big data is surrounded according to analysis, data mining etc. is increasingly becoming profit Jiao that industry personage falls over each other to pursue Point.With the arriving in big data epoch, big data analysis is also arisen at the historic moment.
As the development of power grid construction and administrative skill and computer technology and the communication technology are increasingly wide in power domain General application, at the same electricity transaction is also being faced with this market-oriented deep change, how to improve the quality of power supply, power supply can It is the task of top priority of power system by property, efficiency of service.Especially as the end power distribution network management of power system, even more ensure Electric power safety, reliable, efficient pith.Distribution management system is exactly to utilize current advanced computer monitoring, network Communication, data processing technique are monitored to the operating condition of distribution, controlled, and its equipment, drawing and routine work are realized Offline, online management, the automatic segmentation of distribution reliability of operation and failure is improved, failure is handled soon.The present invention using The Witness Softwares of System Simulation of Lanner groups of Britain exploitation, it is the simulation software of main flow in the world.Either in manufacturing industry Or service trade, the simulation model of the emulation platform Establishing process can be used.Witness can carry out the dynamic of system flow Modeling emulates with operation, and software itself provides the model element of substantial amounts of description system, and user can be convenient to use these Model sets up the logical description of the operation of system.During whole modeling and simulation, user can be according to the imitative of different phase True result, momentarily changes system model.Witness can also carry out the emulation dynamic demonstration of flow, and it, which is provided, intuitively flows Cheng Yunhang dynamic animated show, makes user clearly and intuitively understand the running of system.
The present invention provides a kind of optimization method in power supply network path, and step includes:
1) by data acquisition module, by the address coordinate of the application user of collection, rank, application capacity, history electricity consumption Basic data is sent to data center;
2) mould is extracted by the data being connected with marketing system, marketing generalized information system, scheduling system and production management system Block, draw the multiple distribution facilities to match with application user;
3) address coordinate of the multiple distribution facility is obtained;
4) object function of the mathematical modeling of critical path method (CPM) is built, its constraints can for selected distribution setting Open capacity is more than the application capacity of the application user and user's quality of voltage meets quality of voltage requirement;
5) application simulation software solves, and length chooses path in the top from small to large by path;
6) object function of the mathematical modeling of minimum cost method is built;
7) according to the object function of step 6, using the value at cost in the path selected by simulation software calculation procedure 5, choose The path of minimum cost.
The mathematical modeling object function of the shortest path is:
Wherein, (xi, yi), i=1,2. ... n-1 be distribution facility point coordinates, (x0, y0) it is the address for applying for user Coordinate;N is the number that the distribution to match with application user is set.
The object function of the mathematical modeling of the minimum cost method is:
Wherein, (xi, yi), i=1,2. ... n-1 are the point coordinates of distribution facility;(x0, y0) it is the address for applying for user Coordinate;N is the number value that the distribution to match with application user is set;Q is circuit specific investment cost cost;P ties up for circuit unit Protect cost;MiFor the fixed cost of distribution facility.
Embodiment
1) by data acquisition module, by the address coordinate of the application user of collection, rank, application capacity, history electricity consumption Basic data is sent to data center;
2) mould is extracted by the data being connected with marketing system, marketing generalized information system, scheduling system and production management system Block, draw 5 distribution facilities to match with application user;
3) address coordinate of 5 distribution facilities is obtained, it is respectively (x1, y1)、(x2, y2)、(x3, y3)、(x4, y4)、 (x5, y5), coordinate data is as follows:
Distribution facility Coordinate (xi, yi)(㎞)
T1 (1,3.8)
T2 (6,9.2)
T3 (9.7,13.1)
T4 (14,9.8)
T5 (19,4.5)
Table 1 is the address coordinate of 5 distribution facilities
4) object function of the mathematical modeling of critical path method (CPM) is built, its constraints can for selected distribution setting Open capacity is more than the application capacity of the application user and user's quality of voltage meets quality of voltage requirement, the shortest path The object function of mathematical modeling be:
Wherein, (xi, yi), i=1,2. ... n-1 be distribution facility point coordinates, (x0, y0) it is the address for applying for user Coordinate;N is the number that the distribution to match with application user is set;
5) coordinate data is input in witness emulation platforms, is solved using witness simulation softwares, obtain outbound path The three path L of length from small to large1、L2And L3And L1(T1, T3, T5) < L2(T3, T4, T5) < L3(T2, T4, T5);
6) object function of the mathematical modeling of minimum cost method, the target letter of the mathematical modeling of the minimum cost method are built Number is:
Wherein, (xi, yi), i=1,2. ... n-1 are the point coordinates of distribution facility;(x0, y0) it is the address for applying for user Coordinate;N is the number value that the distribution to match with application user is set;Q is circuit specific investment cost cost;P ties up for circuit unit Protect cost;MiFor the fixed cost of distribution facility, L in the present embodiment1、L2And L3Coordinate be:
Table 2 is path L1、L2And L3Coordinate
7) according to minimum cost object function, path L is calculated using simulation software1、L2And L3Value at cost, the cost Value is L by order from small to large2< L1< L3, the path for choosing minimum cost is L2
Although embodiment of the present invention is disclosed as above, it is not restricted in specification and embodiment listed With it can be applied to various suitable the field of the invention completely, can be easily for those skilled in the art Other modification is realized, therefore under the universal limited without departing substantially from claim and equivalency range, it is of the invention and unlimited In specific details.

Claims (1)

1. the optimization method in power supply network path, it is characterised in that step includes:
1) by data acquisition module, by the address coordinate of the application user of collection, rank, application capacity, history electricity consumption basis Data are sent to data center;
2) mould is extracted by the data being connected with sales service system, marketing generalized information system, scheduling system and production management system Block, draw the multiple distribution facilities to match with application user;
3) address coordinate of the multiple distribution facility is obtained;
4) object function of the mathematical modeling of critical path method (CPM) is built, its constraints opens for what selected distribution was set Capacity is more than the application capacity of the application user and user's quality of voltage meets quality of voltage requirement;
5) solved using Witness Softwares of System Simulation, length chooses path in the top from small to large by path;
6) object function of the mathematical modeling of minimum cost method is built;
7) according to the object function of step 6, using the value at cost in the path selected by simulation software calculation procedure 5, choose minimum The path of cost;
The mathematical modeling object function of the critical path method (CPM) is:
Wherein, (xi, yi), i=1,2. ... n-1 be distribution facility point coordinates, (x0, y0) it is the address coordinate for applying for user;n The number set for the distribution to match with application user;
The mathematical modeling object function of the minimum cost method is:
Wherein, (xi, yi), i=1,2. ... n-1 are the point coordinates of distribution facility;(x0, y0) it is the address coordinate for applying for user;n The number value set for the distribution to match with application user;Q is circuit specific investment cost cost;P is circuit organizational maintenance cost; MiFor the fixed cost of distribution facility.
CN201610564311.XA 2016-07-18 2016-07-18 The optimization method in power supply network path Active CN106208040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610564311.XA CN106208040B (en) 2016-07-18 2016-07-18 The optimization method in power supply network path

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610564311.XA CN106208040B (en) 2016-07-18 2016-07-18 The optimization method in power supply network path

Publications (2)

Publication Number Publication Date
CN106208040A CN106208040A (en) 2016-12-07
CN106208040B true CN106208040B (en) 2018-03-02

Family

ID=57492961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610564311.XA Active CN106208040B (en) 2016-07-18 2016-07-18 The optimization method in power supply network path

Country Status (1)

Country Link
CN (1) CN106208040B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108667135B (en) * 2017-03-31 2022-12-30 腾讯科技(深圳)有限公司 Method and device for realizing power dispatching
CN107301482A (en) * 2017-08-10 2017-10-27 嘉兴恒创电力设计研究院有限公司 A kind of power distribution network medium-voltage line paths planning method based on city integrated piping lane
CN107909226B (en) * 2017-12-20 2021-11-02 国家电网公司 Business expansion installation power supply scheme design method and device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101114967A (en) * 2007-08-31 2008-01-30 安徽大学 Method for constructing complex network quotient space model
US20130096976A1 (en) * 2011-10-18 2013-04-18 International Business Machines Corporation Cost-effective and reliable utilities distribution network
CN105391052A (en) * 2015-10-30 2016-03-09 国家电网公司 Power grid smoothness assessment method

Also Published As

Publication number Publication date
CN106208040A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN101973031B (en) Cloud robot system and implementation method
CN106208040B (en) The optimization method in power supply network path
CN102663232B (en) A kind of multidimensional simulation analysis system of user oriented energy efficiency evaluation and method thereof
CN104899404B (en) A kind of emulation cloud platform and implementation
CN104317283A (en) Hardware-in-the-loop test platform and test method for wind power plant control system
CN104753985A (en) Session list display method and device
CN107330056A (en) Wind power plant SCADA system and its operation method based on big data cloud computing platform
CN102663182A (en) Intelligent virtual maintenance training system for large equipment
CN102609808A (en) Method and device for performing energy consumption management on data center
CN104463465A (en) Real-time monitoring cluster processing method based on distributed models
CN106200448B (en) A kind of long-range mapped system of industry interface implementation
Špicar et al. Use of Monte Carlo modified Markov Chains in capacity planning
CN206558029U (en) A kind of dispatcher training system system
CN110011971A (en) A kind of manual configuration method of network security policy
CN204331449U (en) Based on the SCADA intelligent monitoring dispatching system of GDI
CN205936985U (en) Novel fan monitoring device based on virtual 3D
CN104252667A (en) Material production scheduling simulation device
CN103473600A (en) Intelligent robot system for power transformation operation and maintenance integrated simulation
Yan et al. Genetic algorithm based optimization for energy-aware hybrid flow shop scheduling
CN105159741A (en) Water conservancy model simulating computation system and computation method based on cloud serving
CN111598522A (en) Electrified railway contact net computing system and method based on cloud platform
Jinqi et al. The supply chain network on cloud manufacturing environment based on coin model with q-learning algorithm
Trilaksono et al. Supply Preparation Of Line Production Through Capacity Using Simulation Model In Garment Industry
Dubey Internet of Things: Mathematical Relevance
Zhong et al. Equivalent ramp rate function for thermal power systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant