China
Prior art keywords
wall
structure body
template
xoncrete structure
construction technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610544104.8A
Other languages
Chinese (zh)
Inventor
张同波
刘晓英
于德湖
吕春辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingjian Group Co Ltd
Original Assignee
Qingjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingjian Group Co Ltd filed Critical Qingjian Group Co Ltd
Priority to CN201610544104.8A priority Critical patent/CN106193635A/en
Publication of CN106193635A publication Critical patent/CN106193635A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/246Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets

Abstract

The invention discloses a kind of xoncrete structure body of wall curing in the mold construction technology, relate to the maintenance process field of concrete material, in order to solve to produce after existing concrete wall pours gap, the problem of seepage.The present invention uses template convered with film, carries out rapping in the specific time, carries out form removal after concreting completes maintenance 14 days, its can effective heat and moisture preserving, prevent wall crazing.The present invention is used for xoncrete structure body of wall maintenance, and it ensure that wall quality, reduces gap probability of occurrence, has higher economic benefit.

Description

A kind of xoncrete structure body of wall curing in the mold construction technology
Technical field
The present invention relates to the maintenance process of a kind of concrete material, specifically, relate to a kind of xoncrete structure body of wall band Mould maintenance construction technique.
Background technology
At present, xoncrete structure body of wall maintenance is one of difficult point in building engineering construction, not only lacks the maintenance of specification Construction technology, and in constructing, confusion is more.In order to speed up the work or template in unit in charge of construction's work progress at the scene Turnover, generally shortly form removal after walls concrete final set, causes the situation of xoncrete structure wall crazing often to send out Raw.Therefore, selecting rational maintenance method is the key link of xoncrete structure wall construction, is to control the table temperature difference in concrete With internal temperature stress, the key that guarantees concrete wall final mass.For there being the xoncrete structure body of wall of seepage resistance demand, one There is crack and is formed perfoliate in denier, will cause wall leakage, the internal reinforcing bar of corrosion, the serious carrying energy reducing structure Power, the durability of crime of injuries by explosive substances to buildings and goods therein, causes greater loss to engineering construction.Therefore, either from quality safety angle, economic angle Degree still uses angle, is all badly in need of a kind of body of wall maintenance method simply, effectively and reasonably to ensure executing of xoncrete structure body of wall Working medium amount.
Summary of the invention
For solving the problems referred to above, the present invention provides a kind of xoncrete structure body of wall curing in the mold construction technology, and it can drop The probability that low body of wall crackle occurs, it is ensured that the quality of body of wall.
Xoncrete structure body of wall curing in the mold construction technology of the present invention, comprises the following steps:
(1) fixed form, then in template, casting concrete forms body of wall;
(2) rapping: pour the thickness body of wall less than 1 meter, pine film in 18-31 hour after pouring, pour thickness more than 1 meter Body of wall after pouring in 18-50 hour pine film;
(3) form removal: curing in the mold form removal after 14 days.
In prior art, concrete wall is after having poured, and generally requires periodically water spray, or brushing sealing compound enters Row maintenance, not only complex steps, and relatively costly;Use maintaining process described herein, at special time rapping, tear open Mould, it is not necessary to spray water again, brushing sealing compound to carry out maintenance, whole maintaining process operation simpler, save maintenance cost, and Wall quality is good, and this maintenance process can reduce body of wall and the probability in gap occurs.And above-mentioned maintenance rapping time is continuous 5 days rings Situation when border temperature averages is higher than 5 DEG C.
Further, in step (1), template surface does aluminum coated steel, template surface use Tai Er palm fibre film, domestic palm fibre film or Black film does aluminum coated steel, and template thickness is 10-18mm.At the beginning of template construct, aluminum coated steel is done on the surface of template, in maintenance Journey can keep the temperature of concrete wall, humidity, body of wall moisture loss will not be made too fast, body of wall temperature also will not be made to scatter and disappear Too fast, in conjunction with the setting of template thickness condition, subsequent process without other maintenance measures, such as, need not wet curing, also without Need brushing sealing compound maintenance.
Further, when within continuous 5 days, ambient temperature meansigma methods is not higher than 5 DEG C, template thickness is 15-18mm, in the case of being somebody's turn to do, The rapping time determines according to the intensity measurement value of concrete wall test cube in the same condition: make concrete wall test cube in the same condition, examination The size of block is 100mm × 100mm × 100mm, and the intensity measurement value of this test block reaches rapping during 1Mpa.
Further, when within continuous 5 days, ambient temperature meansigma methods is not higher than 5 DEG C, template selects the template that heat conductivity is low, as Wooden agglutination formwork, bamboo plywood form, plastic formwork or styrofoam.
Further, rapping processes step and is: cap nut pine 1 ring that will tighten in template, does not do break the mold and processes, piece Flitch is taked to overlap.
Compared with prior art, the invention has the beneficial effects as follows:
(1) maintenance process described herein, reduces the probability of occurrence in body of wall gap, the template of aluminum coated steel and pine Mould, the control of striking time so that concrete wall is incubated in process of setting, moistening effect is good, gap probability of occurrence reduces, Ensure that the quality of body of wall;
(2) maintenance process described herein, owing to reducing the probability that body of wall gap occurs, it is possible to be substantially reduced the later stage Maintenance cost, it is also possible to avoid the part engineering caused because of wall quality to do over again, keep in repair and construction delay;Good in economic efficiency;
(3) in addition to strictly controlling rapping, striking time, it is not necessary to other maintenance processes, it is not necessary to wet curing, without brushing Sealing compound, simple to operation, and maintenance water can be saved, good in economic efficiency.
Accompanying drawing explanation
Fig. 1 is concrete wall curing in the mold schematic diagram;
Wherein, 1-template;2-through-wall bolt;3-concrete wall.
Detailed description of the invention
With embodiment, the present invention is further explained below in conjunction with the accompanying drawings.
Embodiment 1
A kind of xoncrete structure body of wall curing in the mold construction technology, this concrete wall 3 is at ambient temperature is 20 ± 5 DEG C Pouring, concrete wall 3 thickness poured is 0.6m, comprises the following steps:
(1) select overlay film complete template 1, use domestic palm fibre film overlay film bamboo plywood as template 1, described in Fig. 1, Fixing template 1, then in template 1, casting concrete forms body of wall;Template 1 a size of 2440 × 1220 × 10mm;
(2) rapping: pine film in pouring latter 18-31 hour, also will tighten the cap nut of through-wall bolt 2 in template 1 Pine 1 ring, does not do break the mold and processes, and piece takes flitch to overlap;
(3) form removal: curing in the mold form removal after 14 days.
In this maintenance process, the rapping time is determined by following method the earliest:
Do two stifled experiment walls, concrete walls length 4.4 meters, wide 0.2 meter, high 1.4 meters, concrete strength be C30, C40 within the walls Intermediate configurations monolayer C8 reinforced mesh, a diameter of 12mm of body of wall split bolt, unites in screw rod one end after additionally split bolt is fixing One welding one cap nut.
Poured concrete and started timing, be respectively 10 at body of wall curing time, 12,14,16,18,20,22,24,26h Time, choose 3 split bolts of body of wall bottom respectively, Screw arbor with nut at both-ends cap nut is unclamped, turns welding ends with torque wrench, survey The moment of torsion that Screw arbor with nut at both-ends rotates must be made;Equally, choose 2 split bolts on body of wall top respectively, survey after corresponding time rapping Obtain corresponding split bolt withdrawal resistance, prepare the withdrawal resistance relation curve of corresponding time.
Indwelling test block, and carry out cured under same condition.The 6 groups of test blocks of indwelling respectively of C30, C40 concrete, often group 3, exists respectively Test block pour after the 16th, 18,20,22,24,26h test test block comprcssive strength.The comprcssive strength analyzing test block in early days increases, Draw the test block pressure resistance intensity that the rapping time is corresponding the earliest.
The determination of rapping time the earliest mainly determines according to the following two kinds method, in two ways in the numerical value that obtains bigger Person is 20 hours as rapping time the earliest, the such as time of rapping the earliest obtained according to method (1), and according to method (2) Survey the time of rapping the earliest be 22 hours, then in maintaining process rapping time the earliest for pouring the 22nd hour afterwards, the latest The rapping time is still for after pouring the 31st hour.
(1) determine with torque relationship formula according to withdrawal resistance
[F (t)] r > Tmax
F (t) is the withdrawal resistance of a certain rapping time correspondence bolt;
R is the radius of Screw arbor with nut at both-ends;
TmaxThe peak torque of split bolt it is applied to for scene;
When meeting this formula, it can be determined that split bolt does not rotate, as long as now corresponding withdrawal resistance F (t) is more than The withdrawal resistance relation curve of the corresponding time above the prepared withdrawal resistance when this curing time, can carry out rapping.
(2) record torque value when rotating according to experiment Screw arbor with nut at both-ends and on-the-spot rapping actual measurement torque value analysis determines
T1>0.4T
T1 is the moment of torsion recorded during Screw arbor with nut at both-ends rotation;
T is on-the-spot rapping actual measurement torque value;
When meeting this formula, Screw arbor with nut at both-ends will not rotate, and determines the rapping time the earliest with this.
Embodiment 2
A kind of xoncrete structure body of wall curing in the mold construction technology, this concrete wall 3 pours winter, and winter refers to The meansigma methods of continuous 5 days ambient temperatures is not higher than 5 DEG C, and the thickness of wall body poured is 1.2m, comprises the following steps:
(1) selecting overlay film complete template 1, the bamboo plywood of employing Tai Er palm fibre film overlay film is as template 1, described in Fig. 1, Fixing template 1, then in template 1, casting concrete forms body of wall;Template 1 a size of 2440 × 1220 × 18mm;
(2) rapping: the rapping time is determined by following method: make concrete wall 3 test cube in the same condition, this test block strong Degree measured value reaches rapping during 1Mpa;The size of described concrete wall 3 test cube in the same condition is 100mm × 100mm × 100mm, Rapping method is: by loose 1 ring of cap nut of the through-wall bolt 2 tightened in template 1, not doing break the mold and process, piece takes flitch Overlap joint;
(3) form removal: curing in the mold form removal after 14 days.
Using concrete wall maintenance construction technique described herein, the construction quality of body of wall can be guaranteed, base Originally solve In Great Basement body of wall and the common quality defect such as hollowing, crackle occurs, be greatly reduced basement wall simultaneously Maintenance and maintenance cost.As a example by bay work is known in Qingdao and Huang Island, often repair 1 square metre of hollowing or crackle basement wall, Labour cost, fee of material, machinery expense etc. need to be spent to add up to 20 yuan, this engineering basement wall area totally 10000 square metres, then can keep away Exempt from economic loss about 200,000 yuan, remarkable in economical benefits.
Conventional engineering is not in place because of body of wall maintenance, often results in the quality problems such as wall crazing, seepage, in turn results in structure Maintenance with the engineering such as waterproof, do over again and construction delay, make engineering suffer economic loss in various degree.With in girth 500m The integral basement citing of isotactic die worker's journey, disregards foig, only considers the normal conditions of one wall vertical crack of 2m, several The processing cost that the scheme of kind is occurred is the most as shown in table 1 below:
Table 1 different schemes processing cost is detailed
Fracture width < 0.3mm, body of wall ne-leakage, it is only necessary to inner surface carries out general repairing treatment, combining of every crack Closing renewal expense is 20 yuan, and processing cost needs 5000 yuan;
Fracture width >=0.3mm, the slight seepage of body of wall, inside body of wall, carry out polyurethane slip casting, slip casting along crack boring Pitch of holes≤20cm, each hole comprehensive cost is 80 yuan, and every linear meter(lin.m.) expense is 80 × 100 ÷ 20=400 units;If only 1% Crack-leakage palpus injecting treatment, is calculated by slip casting length 2m/ road, and the total cost that whole cracks carry out surface process is 7000 Unit;
As crack has a strong impact on structural safety, carry out merely waterproof slip casting and will cannot meet far away examination and use requirement, According to the order of severity, the structure slip casting caused, repairing, waterproof slip casting, external wall waterproof do over again even structural strengthening, structure do over again with And the process of structure detection will be greatly increased processing cost, cause serious financial consequences.
Using concrete wall maintenance construction technique described herein, the construction quality of body of wall can be guaranteed, warp Ji remarkable benefit.

Claims (10)

1. an xoncrete structure body of wall curing in the mold construction technology, it is characterised in that comprise the following steps:
(1) fixed form, then in template, casting concrete forms body of wall;
(2) rapping: pour the thickness body of wall less than 1 meter, pine film in 18-31 hour after pouring, pour the thickness wall more than 1 meter Body after pouring in 18-50 hour pine film;
(3) form removal: curing in the mold form removal after 14 days.
Xoncrete structure body of wall curing in the mold construction technology the most according to claim 1, it is characterised in that template in step Aluminum coated steel is done on surface.
Xoncrete structure body of wall curing in the mold construction technology the most according to claim 2, it is characterised in that template surface makes Aluminum coated steel is done with Tai Er palm fibre film, domestic palm fibre film or black film.
Xoncrete structure body of wall curing in the mold construction technology the most according to claim 1, it is characterised in that template thickness is 10-18mm。
Xoncrete structure body of wall curing in the mold construction technology the most according to claim 4, it is characterised in that continuous 5 days rings When border temperature averages is not higher than 5 DEG C, template (1) thickness is 15-18mm.
Xoncrete structure body of wall curing in the mold construction technology the most according to claim 5, it is characterised in that continuous 5 days rings When border temperature averages is not higher than 5 DEG C, make concrete wall test cube in the same condition, when the intensity measurement value of this test block reaches 1Mpa Rapping.
Xoncrete structure body of wall curing in the mold construction technology the most according to claim 6, it is characterised in that described concrete The size of body of wall test cube in the same condition is 100mm × 100mm × 100mm.
Xoncrete structure body of wall curing in the mold construction technology the most according to claim 5, it is characterised in that in step (1), When within continuous 5 days, ambient temperature is not higher than 5 DEG C, template selects the template that heat conductivity is low.
Xoncrete structure body of wall curing in the mold construction technology the most according to claim 8, it is characterised in that template selects wood Glued mould, bamboo plywood form, plastic formwork or styrofoam.
10., according to the xoncrete structure body of wall curing in the mold construction technology described in claim 1~9 any claim, it is special Levying and be, rapping processes step and is: cap nut pine 1 ring that will tighten in template, does not do break the mold and processes, and piece takes flitch to take Connect.
CN201610544104.8A 2016-07-12 2016-07-12 A kind of xoncrete structure body of wall curing in the mold construction technology Pending CN106193635A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610544104.8A CN106193635A (en) 2016-07-12 2016-07-12 A kind of xoncrete structure body of wall curing in the mold construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610544104.8A CN106193635A (en) 2016-07-12 2016-07-12 A kind of xoncrete structure body of wall curing in the mold construction technology

Publications (1)

Publication Number Publication Date
CN106193635A true CN106193635A (en) 2016-12-07

Family

ID=57476847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610544104.8A Pending CN106193635A (en) 2016-07-12 2016-07-12 A kind of xoncrete structure body of wall curing in the mold construction technology

Country Status (1)

Country Link
CN (1) CN106193635A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111255226A (en) * 2020-01-19 2020-06-09 上海建工四建集团有限公司 Double-layer heat-insulation template
CN112593749A (en) * 2020-12-08 2021-04-02 中铁八局集团有限公司 Construction method of anti-seepage concrete of MBBR water treatment process structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101579726A (en) * 2009-06-25 2009-11-18 莱芜钢铁股份有限公司 Compound spoil-retaining wall with holes for tundish and preparation process thereof
JP2015168923A (en) * 2014-03-05 2015-09-28 鹿島建設株式会社 Method of manufacturing concrete structure, and concrete curing sheet
CN204850504U (en) * 2015-07-03 2015-12-09 鞍山中冶置业有限公司 Concrete curing means
CN105256998A (en) * 2015-09-22 2016-01-20 广西建工集团第三建筑工程有限责任公司 Automatic in-situ concrete vertical structure maintaining method capable of circulating water

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101579726A (en) * 2009-06-25 2009-11-18 莱芜钢铁股份有限公司 Compound spoil-retaining wall with holes for tundish and preparation process thereof
JP2015168923A (en) * 2014-03-05 2015-09-28 鹿島建設株式会社 Method of manufacturing concrete structure, and concrete curing sheet
CN204850504U (en) * 2015-07-03 2015-12-09 鞍山中冶置业有限公司 Concrete curing means
CN105256998A (en) * 2015-09-22 2016-01-20 广西建工集团第三建筑工程有限责任公司 Automatic in-situ concrete vertical structure maintaining method capable of circulating water

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
贾均磊等: "模板约束对地下室墙体开裂影响的试验研究", 《第21届全国结构工程学术会议论文集第Ⅱ册》 *
韩聪聪等: "养护方式对混凝土内部相对湿度变化的影响研究", 《混凝土》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111255226A (en) * 2020-01-19 2020-06-09 上海建工四建集团有限公司 Double-layer heat-insulation template
CN112593749A (en) * 2020-12-08 2021-04-02 中铁八局集团有限公司 Construction method of anti-seepage concrete of MBBR water treatment process structure

Similar Documents

Publication Publication Date Title
CN201333743Y (en) Concrete heat-insulation and moisture-retention curing template
CN100572710C (en) The non-net polyphenyl plate cast-in-place concrete exterior wall heat-preserving job practices
CN106801517B (en) External reinforcing and reinforcing method for school shed with prefabricated porous plate brick mixed structure
CN204492159U (en) A kind of for concrete wall seam areas formwork seal bracing means
CN104790569A (en) Formwork-free shear wall and construction method thereof
CN103758358A (en) Steel plate angle iron combined constructional column and anchor adhering steel plate brickwork reinforcing structure and construction method
CN209323348U (en) Hollow sandwich multi-cavity steel tube concrete component
CN113718777A (en) Mass concrete crack prevention construction method
CN103835523A (en) Ultra-long extra-large reinforced concrete structure engineering crack prevention process
CN106193635A (en) A kind of xoncrete structure body of wall curing in the mold construction technology
CN107313531A (en) A kind of assembled integral shear wall connecting node and its system and its construction technology
CN106401041A (en) Cast-in-situ concrete construction method for pseudo-classic architecture slope roof
CN104563282A (en) Integral constructing method of house body structure and wall structure and house
WO2012081975A1 (en) Controlled curing of concrete
CN105822068B (en) Ultralong thin walled concrete walls under hot environment pour and maintenance process
CN105350790A (en) Method for reinforcing reinforced concrete slab through prefabricating pre-stress TRC sheet
CN110578300A (en) Large-volume concrete pouring process for special-shaped bridge pier column
CN207685984U (en) A kind of overlength underground garage external wall structure
CN207003735U (en) Connection cast-in-situ steel reinforced concrete assembled wall in a kind of double-template assembled
CN207646954U (en) Cast-in-place concrete compound external mold plate body system
CN205189435U (en) Reinforced concrete reinforced structure
CN214246617U (en) Unilateral mould bearing structure is striden to height
CN215055279U (en) Thickness control device for steel plate concrete shear wall symmetrical wall body
CN203475821U (en) Steel formwork used for construction of wall bodies on two sides of deformation joint
CN106639300A (en) Assembly type inner connecting concrete heat preservation formwork and concrete formwork for building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207