CN106193406B - The Drawing-Core square steel internal mold construction method of pre-tensioning system cored slab - Google Patents

The Drawing-Core square steel internal mold construction method of pre-tensioning system cored slab Download PDF

Info

Publication number
CN106193406B
CN106193406B CN201610637034.0A CN201610637034A CN106193406B CN 106193406 B CN106193406 B CN 106193406B CN 201610637034 A CN201610637034 A CN 201610637034A CN 106193406 B CN106193406 B CN 106193406B
Authority
CN
China
Prior art keywords
reinforcing bar
square steel
steel
bar
internal model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610637034.0A
Other languages
Chinese (zh)
Other versions
CN106193406A (en
Inventor
孙中绪
李忠诚
陈建华
端学武
郝建华
解佳飞
曹树强
张玉
刘福春
李锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group No.2 Engineering Co., Ltd
East China Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201610637034.0A priority Critical patent/CN106193406B/en
Publication of CN106193406A publication Critical patent/CN106193406A/en
Application granted granted Critical
Publication of CN106193406B publication Critical patent/CN106193406B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/326Floor structures wholly cast in situ with or without form units or reinforcements with hollow filling elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to the Drawing-Core square steel internal mold construction methods during construction of pre-tensioning system cored slab.Mainly it is to solve easily to float using benzene plate core using the cored slab core of pre-tensioning system construction at present, combines the problems such as steel core die is yielding and invent.The material used includes:Square steel tube, Steel bar rack, plastic film, steel band, positioning mold;Assembled square steel internal model:It takes several positioning molds in tandem, square steel tube is laid on positioning mold, Steel bar rack is set on square steel tube, against Steel bar rack and put steel pipe, square steel tube outside steel pipe using plastic film with after the completion of Steel bar rack assembly, being wrapped up tightly;Square steel internal model is clamped using baling press and steel band, after cored slab underplate concrete pours, square steel internal model is transported to installation place, bind roof steel bar, web and concrete roof are poured, when concrete strength reaches and removes the requirement of square steel internal model, Steel bar rack, square steel tube are extracted out.Advantage is to be not easy to float, and is unlikely to deform.

Description

The Drawing-Core square steel internal mold construction method of pre-tensioning system cored slab
Technical field:
The present invention relates to the Drawing-Core square steel internal mold construction methods during construction of pre-tensioning system cored slab.
Background technology:
To the cored slab core using pre-tensioning system construction, traditional construction technique is mainly using benzene plate core or combination steel core Mould, although both the above cored slab core mould construction comparative maturity, benzene plate core is small due to conducting oneself with dignity, in the construction process Easily there are rising phenomenon, cause hollow board finished product top plate thickness inadequate.And combine steel core die be one piece of block steel form it is assembled and Into being susceptible to template deformation, piece, faulting of slab ends, physical dimension cause hollow board finished product internal look poor, tear open there are error Worker is needed to enter inside during mould to remove one piece of block of template, is lost time, form removal is difficult.
The content of the invention:
The technical problems to be solved by the invention are to provide that a kind of construction quality is good, the cycle is short, are not in floating mould phenomenon, The Drawing-Core square steel internal mold construction method of the relatively low pre-tensioning system cored slab of construction cost.
What above-mentioned purpose was realized in:The material used using this method is included:Several square steel tubes, several reinforcing bars Stent, plastic film, steel band, several positioning molds;
The Steel bar rack be octagon, i.e., including upper reinforcing bar, lower reinforcing bar, left reinforcing bar, right reinforcing bar, upper left diagonal reinforcement, Lower-left diagonal reinforcement, upper right diagonal reinforcement, bottom right diagonal reinforcement, the left end of upper reinforcing bar and the upper end of left reinforcing bar are connected by upper left diagonal reinforcement It connects, the right end of upper reinforcing bar is connected with the upper end of right reinforcing bar by upper right diagonal reinforcement, and the lower end of the left end and left reinforcing bar of lower reinforcing bar leads to Lower-left diagonal reinforcement connection is crossed, the right end of lower reinforcing bar is connected with the lower end of right reinforcing bar by bottom right diagonal reinforcement;
The positioning mold includes two supporting rods, and the both ends of connecting rod are connected fixation with two supporting rods respectively, also Including left oblique pull reinforcing bar and right oblique pull reinforcing bar, the upper end of left oblique pull reinforcing bar is fixed on the lower part of a supporting rod, left oblique pull reinforcing bar Lower end be fixed in connecting rod, the upper end of right oblique pull reinforcing bar is fixed on the lower part of another supporting rod, under right oblique pull reinforcing bar End is fixed in connecting rod;
Assembled square steel internal model:It takes several positioning molds in tandem, square steel tube is laid on to the connecting rod of positioning mold And on left oblique pull reinforcing bar and right oblique pull reinforcing bar, it is spaced a distance on square steel tube and a Steel bar rack is set, against reinforcement bar support Left reinforcing bar, upper left diagonal reinforcement, right reinforcing bar, upper right diagonal reinforcement, the upper reinforcing bar of frame put square steel tube, and square steel tube is assembled with Steel bar rack After finishing, it is tight using plastic film package outside square steel tube, and ensure the smooth corrugationless of Plastic film surface, main application Be ensure square steel internal model and concrete efficiently separate and the flatness on concrete surface;After plastic film wraps up, with the lumps of wood gently Beat square steel tube, make square steel tube in the same plane, corner angle are clearly demarcated, avoid the occurrence of faulting of slab ends phenomenon, finally using baling press and Steel band clamps square steel internal model, ensures the overall stability and physical dimension of square steel internal model, when cored slab underplate concrete pours After, square steel internal model from positioning mold is transported to installation place, roof steel bar is bound, after reinforcing bar is bound, starts to pour Web and concrete roof when concrete strength reaches and can remove the requirement of square steel internal model, Steel bar rack are taken out, then general side Steel pipe is extracted out one by one.
It is an advantage of the invention that:For Drawing-Core square steel internal model from great, appearance disclosure satisfy that the physical dimension of cored slab, and tear open Mould is convenient.In form removal, the Steel bar rack taking-up in square steel internal model can be extracted square steel tube out one by one, form removal is convenient, section Make an appointment, the shortcomings that Drawing-Core square steel internal model avoids both the above conventional core mold, ensure that hollow board finished product top plate thickness and Protective layer thickness, and internal look is smooth straight.
Description of the drawings:
Fig. 1 is square steel internal model assembled state schematic diagram in the present invention, and 1 is Steel bar rack in figure, and 2 be positioning mold, 3 sides of being Steel pipe;
Fig. 2 is the structure diagram of Steel bar rack in the present invention, and 1-1 is upper reinforcing bar in figure, and 1-2 is lower reinforcing bar, and 1-3 is left Reinforcing bar, 1-4 are right reinforcing bars, and 1-5 is upper left diagonal reinforcement, and 1-6 is upper right diagonal reinforcement, and 1-7 is lower-left diagonal reinforcement, and 1-8 is that bottom right is oblique Reinforcing bar;
Fig. 3 is the structure diagram of positioning mold in the present invention, and 2-1 is supporting rod in figure, and 2-2 be connecting rod, 2-3 It is left oblique pull reinforcing bar, 2-4 be right oblique pull reinforcing bar.
Specific embodiment:
The present invention will be further described below in conjunction with the accompanying drawings:
The material used using this method is included:If several square steel tubes, several Steel bar racks, plastic film, steel band, Dry positioning mold;
The Steel bar rack be octagon, i.e., including upper reinforcing bar, lower reinforcing bar, left reinforcing bar, right reinforcing bar, upper left diagonal reinforcement, Lower-left diagonal reinforcement, upper right diagonal reinforcement, bottom right diagonal reinforcement, the left end of upper reinforcing bar and the upper end of left reinforcing bar are connected by upper left diagonal reinforcement It connects, the right end of upper reinforcing bar is connected with the upper end of right reinforcing bar by upper right diagonal reinforcement, and the lower end of the left end and left reinforcing bar of lower reinforcing bar leads to Lower-left diagonal reinforcement connection is crossed, the right end of lower reinforcing bar is connected with the lower end of right reinforcing bar by bottom right diagonal reinforcement;
The positioning mold includes two supporting rods, and the both ends of connecting rod are connected fixation with two supporting rods respectively, also Including left oblique pull reinforcing bar and right oblique pull reinforcing bar, the upper end of left oblique pull reinforcing bar is fixed on the lower part of a supporting rod, left oblique pull reinforcing bar Lower end be fixed in connecting rod, the upper end of right oblique pull reinforcing bar is fixed on the lower part of another supporting rod, under right oblique pull reinforcing bar End is fixed in connecting rod;
Assembled square steel internal model:Take three positioning molds in tandem, by square steel tube be laid on positioning mold connecting rod and On left oblique pull reinforcing bar and right oblique pull reinforcing bar, at interval of 1.5 meters of settings, one Steel bar rack on square steel tube, Steel bar rack against Left reinforcing bar, upper left diagonal reinforcement, right reinforcing bar, upper right diagonal reinforcement, upper reinforcing bar put square steel tube, square steel tube and the assembled completion of Steel bar rack Afterwards, it is tight using plastic film package outside square steel tube, and ensure the smooth corrugationless of Plastic film surface, it is mainly used for protecting Card square steel internal model and concrete efficiently separate and the flatness on concrete surface;After plastic film wraps up, gently beaten with the lumps of wood Square steel tube makes square steel tube in the same plane, and corner angle are clearly demarcated, avoids the occurrence of faulting of slab ends phenomenon, finally using baling press and steel band Square steel internal model is clamped, ensures the overall stability and physical dimension of square steel internal model, when cored slab underplate concrete pours end Afterwards, square steel internal model from positioning mold is transported to installation place, binds roof steel bar, after reinforcing bar is bound, start to pour web And concrete roof, when concrete strength reaches and can remove the requirement of square steel internal model, Steel bar rack is taken out, then by square steel tube It extracts out one by one.
Drawing-Core square steel tube internal model possess overall stiffness is big, work efficiency is high, strong applicability, dismounting it is simple and easy to do, the technology is not Reduced by only due to narrow space in cored slab and caused by core installation, to remove work difficulty big, ensureing cored slab quality While, cost is also effectively reduced, shortens construction period.

Claims (1)

1. the Drawing-Core square steel internal mold construction method of pre-tensioning system cored slab, it is characterized in that:The material used includes:Several square steel Pipe, several Steel bar racks, plastic film, steel band, several positioning molds;
The Steel bar rack is octagon, i.e., including upper reinforcing bar, lower reinforcing bar, left reinforcing bar, right reinforcing bar, upper left diagonal reinforcement, lower-left Diagonal reinforcement, upper right diagonal reinforcement, bottom right diagonal reinforcement, the left end of upper reinforcing bar are connected with the upper end of left reinforcing bar by upper left diagonal reinforcement, on The right end of reinforcing bar is connected with the upper end of right reinforcing bar by upper right diagonal reinforcement, and the left end of lower reinforcing bar passes through lower-left with the lower end of left reinforcing bar Diagonal reinforcement connects, and the right end of lower reinforcing bar is connected with the lower end of right reinforcing bar by bottom right diagonal reinforcement;
The positioning mold includes two supporting rods, and the both ends of connecting rod are connected fixation with two supporting rods respectively, further include Left oblique pull reinforcing bar and right oblique pull reinforcing bar, the upper end of left oblique pull reinforcing bar are fixed on the lower part of a supporting rod, under left oblique pull reinforcing bar End is fixed in connecting rod, and the upper end of right oblique pull reinforcing bar is fixed on the lower part of another supporting rod, and the lower end of right oblique pull reinforcing bar is consolidated It is scheduled in connecting rod;
Assembled square steel internal model:It takes several positioning molds in tandem, square steel tube is laid on to connecting rod and the left side of positioning mold On oblique pull reinforcing bar and right oblique pull reinforcing bar, one Steel bar rack is set at interval of certain distance on square steel tube, againsts Steel bar rack Left reinforcing bar, upper left diagonal reinforcement, right reinforcing bar, upper right diagonal reinforcement, upper reinforcing bar put square steel tube;
Square steel tube with after the completion of Steel bar rack assembly, and ensureing plastic film outside square steel tube using plastic film package tightly Surfacing corrugationless;After plastic film wraps up, square steel tube is gently beaten with the lumps of wood, is generally aligned in the same plane square steel tube On, corner angle are clearly demarcated, avoid the occurrence of faulting of slab ends phenomenon, finally clamped square steel internal model using baling press and steel band, ensure square steel internal model Overall stability and physical dimension, after cored slab underplate concrete pours, square steel internal model is transported from positioning mold To installation place, roof steel bar is bound, after reinforcing bar is bound, starts to pour web and concrete roof, treats that concrete strength reaches To when can remove the requirement of square steel internal model, Steel bar rack is taken out, then extracts square steel tube one by one out.
CN201610637034.0A 2016-08-07 2016-08-07 The Drawing-Core square steel internal mold construction method of pre-tensioning system cored slab Active CN106193406B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610637034.0A CN106193406B (en) 2016-08-07 2016-08-07 The Drawing-Core square steel internal mold construction method of pre-tensioning system cored slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610637034.0A CN106193406B (en) 2016-08-07 2016-08-07 The Drawing-Core square steel internal mold construction method of pre-tensioning system cored slab

Publications (2)

Publication Number Publication Date
CN106193406A CN106193406A (en) 2016-12-07
CN106193406B true CN106193406B (en) 2018-05-25

Family

ID=57498171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610637034.0A Active CN106193406B (en) 2016-08-07 2016-08-07 The Drawing-Core square steel internal mold construction method of pre-tensioning system cored slab

Country Status (1)

Country Link
CN (1) CN106193406B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106696076A (en) * 2016-12-19 2017-05-24 中交路桥建设有限公司 Supporting method for hollow plate inner mold prefabricated through pre-tensioning method
CN107901197A (en) * 2017-11-07 2018-04-13 内蒙古路桥集团有限责任公司 A kind of prefabricated case beam square steel tube core
CN110409308A (en) * 2019-07-31 2019-11-05 佛山科学技术学院 A kind of secondary construction method for pouring cored slab
CN112536896A (en) * 2019-09-20 2021-03-23 黑龙江农垦建工路桥有限公司 Ring-axis symmetric supporting-fixing type hollow slab core mold construction process
CN112049018A (en) * 2020-09-10 2020-12-08 中铁十四局集团第四工程有限公司 Folding core mould of hollow slab beam for highway construction
CN113021584A (en) * 2021-03-04 2021-06-25 临沂市政集团有限公司 Pre-tensioning prestressed hollow slab umbrella support splicing type core mold and construction process thereof
CN114991197B (en) * 2022-08-03 2022-11-11 中国二十二冶集团有限公司 Cup foundation formwork construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3802996B2 (en) * 1999-05-07 2006-08-02 戸田建設株式会社 Construction method of flat slabs using steel pipe concrete columns
CN101059014B (en) * 2007-05-15 2010-05-19 广东省建筑设计研究院 Steel pipe hollow concrete building floor and construction method thereof
CN101619602B (en) * 2009-07-14 2011-12-07 南通宏华建筑安装有限公司 Construction method of cast-in-place concrete cored slabs with self stationary high-strength thin-wall pipe internal mold
CN203462757U (en) * 2013-09-13 2014-03-05 中铁十九局集团第二工程有限公司 Internal steel mold for hollow slab girder construction
CN104139451A (en) * 2014-08-15 2014-11-12 中石化胜利建设工程有限公司 Concrete core slab prefabricated internal mold, assembling frame and assembling method

Also Published As

Publication number Publication date
CN106193406A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN106193406B (en) The Drawing-Core square steel internal mold construction method of pre-tensioning system cored slab
CN105649213B (en) A kind of construction method of intensive cloth muscle area large-scale steel structure built-in fitting
CN104831932B (en) A kind of construction technology of high-grade concrete suspension column
CN203440965U (en) Splicing structure of laminated floor slab
CN206796130U (en) A kind of concrete mold with reserving hole
CN108381730A (en) A kind of producing device and production method of hybrid beam
CN207878750U (en) A kind of laminated floor slab prefabricated board
CN204139466U (en) A kind of concrete prefabricated cushion block
CN110258885A (en) A kind of bidirectional stress truss floor support plate of green energy conservation
CN203441000U (en) Anti-slip device for concrete pouring of gentle slope oblique beam structure
CN205637579U (en) Beam slab post -cast strip template mechanism
CN108442594A (en) A kind of thin floor and its construction technology
CN210685148U (en) Reinforced concrete combined prefabricated bottom plate
CN204898909U (en) Prefabricated composite insulation board and cast in situ concrete wall structure thereof
CN211007662U (en) Shaped template for steel reinforced concrete beam
CN202170634U (en) Flexible caulking mold for an expansion joint of a concrete structure
CN110080439B (en) Wall and construction process thereof
CN207296115U (en) A kind of cast-in-situ floor high accuracy positioning control system
CN207700064U (en) Prefabricated T roof beam reinforcement platform
CN208163916U (en) A kind of producing device of hybrid beam
CN207944479U (en) A kind of piping lane slope board concrete isolating device
CN110965676A (en) Combined type superposed wall and construction method
CN209308400U (en) A kind of rotten prevention and treatment system of wall
CN108894422A (en) Assembled Profiled Steel Sheet and Concrete Composite Floor and construction method
CN204604574U (en) A kind of precast beam wets the pre-buried plate device of seam reinforcing bar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211207

Address after: Room 901, building 2, Zhongsu century building, 425 Xinjian North Road, Yuyao City, Ningbo City, Zhejiang Province, 315400

Patentee after: China Railway 19th Bureau Group East China Engineering Co.,Ltd.

Patentee after: China Railway 19th Bureau Group No.2 Engineering Co., Ltd

Address before: 111000 No. 17 Heping Road, Baita District, Liaoning, Liaoyang

Patentee before: CHINA RAILWAY 19TH BUREAU GROUP 2ND Co.,Ltd.