CN106193289A CN201510222728.3A CN201510222728A CN106193289A CN 106193289 A CN106193289 A CN 106193289A CN 201510222728 A CN201510222728 A CN 201510222728A CN 106193289 A CN106193289 A CN 106193289A
Authority
CN
China
Prior art keywords
tie
rod
steel
locating piece
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510222728.3A
Other languages
Chinese (zh)
Other versions
CN106193289B (en
Inventor
李志红
李先南
钟振华
张允升
范光云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201510222728.3A priority Critical patent/CN106193289B/en
Publication of CN106193289A publication Critical patent/CN106193289A/en
Application granted granted Critical
Publication of CN106193289B publication Critical patent/CN106193289B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of simple tie-rod jig, including base (4), steel pipe locating piece (5), end plate locating piece (6) and alignment pin (7), it is characterized in that: described base (4) is channel-section steel, described steel pipe locating piece (5) is the steel plate of two pieces of band V-notch, described end plate locating piece (6) is two blocks of square steel plates, described alignment pin (7) is the short round steel that two root length degree are identical, wherein: steel pipe locating piece (5) V-notch can guarantee that the central axis of steel pipe and the centrage of two square end plates (2) overlap, when the upper surface of two alignment pins (7) is concordant with the upper surface of connecting plate (3), just transverse center face with end plate (2), the transverse center face of tie-rod connecting plate (3) overlaps, so that connecting plate (3) is on the tram of end plate (2).The simple tie-rod jig of the present invention and making and use method thereof have the advantage improving tie-rod installation accuracy and improving tie-rod processing and installation effectiveness.

Description

Simple tie-rod jig and making and use method thereof
Technical field
The present invention relates to a kind of mould, specifically, be a kind of simple tie-rod jig and making and use method thereof.
Background technology
In gate-type steel structure of light-weight building, the Main Function of tie-rod is transmission axle power (such as wind load or crane longitudinal direction brake weight), with intersect (shearing) horizontal support, intersect column braces or longitudinal rigid frame formula column braces compound action, form stable longitudinal bracing system;Increase the lateral stability of beam column component, the Out-of-plane Effective Length of beam column component can be reduced under Structure Calculation.For original steel roof truss, wind up tie-rod and lower edge tie-rod, and tie-rod is connected with roof truss top-bottom chord with cross support node respectively;For solid-web rigid frame component, tie-rod is pressed design height or spacing and is connected with beam column component on horizontal support node between column braces or beam.
Fig. 1 is the structural representation of the tie-rod of the embodiment of the present invention.Having bolt hole on two connecting plates at the two ends of tie-rod, during installation, the bolt hole above tie-rod connecting plate must correlate mutually with post, beam upper junction plate bolt hole, in order to bolt passes from bolt hole and tie-rod and pillar, beam linked together.In the tie-rod course of processing, if deviation occurs in the connecting plate location at tie-rod two ends, this may result in the bolt hole pitch-row on the connecting plate of tie-rod two ends and two connecting plates at deviation or two ends occurs the most at grade, ultimately results in installation difficulty.
The most known tie-rod course of processing also exists above-mentioned all inconvenience and problem.
Summary of the invention
The purpose of the present invention, is to propose a kind of simple tie-rod jig that can process tie-rod accurately and fast.
It is another object of the present invention to propose the manufacture method of a kind of simple tie-rod jig that can process tie-rod accurately and fast.
A further object of the present invention, is to propose the using method of a kind of simple tie-rod jig that can process tie-rod accurately and fast.
For achieving the above object, the technical solution of the present invention is:
A kind of simple tie-rod jig, including base, steel pipe locating piece, end plate locating piece and connecting plate alignment pin, it is characterised in that:
Described base is channel-section steel;
Described steel pipe locating piece is the steel plate of two pieces of band V-notch, is respectively welded the both sides being fixed on elongate steel plate centre of surface;
Described end plate locating piece is two blocks of square steel plates, is respectively welded the two ends being fixed on elongate steel plate surface;
Described alignment pin is the short round steel that two root length degree are identical, and two short round steel are parallel to each other, vertical welding is fixed on end plate locating piece surface;
Wherein: steel pipe locating piece V-notch can guarantee that the central axis of steel pipe and the centrage of two square end plates overlap, when two alignment pins are through two holes of connecting plate, and when the upper surface of two alignment pins is concordant with the upper surface of connecting plate, the transverse center face of tie-rod connecting plate just overlaps with the transverse center face of end plate, so that connecting plate is on the tram of end plate.
The simple tie-rod jig of the present invention can also be further achieved by the following technical measures.
Aforesaid simple tie-rod jig, depending on the length of wherein said base is according to tie-rod size to be processed.
Aforesaid simple tie-rod jig, depending on the two round steel length of the wherein said alignment pin size according to tie-rod diameter of steel tube to be processed and end plate.
The manufacture method of a kind of simple tie-rod jig, it is characterised in that comprise the following steps:
A, basis tie-rod size to be processed take one section of channel-section steel;
B, the steel plate of two pieces of V-notch of making are respectively welded at channel-section steel surface, make the summit of V-notch be positioned on channel-section steel surface longitudinal centrage;
C, two blocks of square steel plates of making are respectively welded at two ends, channel-section steel surface, make the centrage of square steel plate be positioned on channel-section steel surface longitudinal centrage;
The bolt hole pitch-row of the tie-rod that d, basis are to be processed makes the steel column that two-stage nitration height is identical, and is weldingly fixed on the centrage both sides of square steel plate.
The manufacture method of the simple tie-rod jig of the present invention can also be further achieved by the following technical measures.
Aforesaid method, depending on wherein said channel-section steel length is according to tie-rod length;
The using method of a kind of simple tie-rod jig, it is characterised in that comprise the following steps:
A, basis tie-rod size to be processed take one section of channel-section steel;
B, steel pipe is put on steel pipe locating piece, adjusts the position of steel pipe, then two end plates is attached to the two ends of steel pipe by two riveter respectively respectively, is put respectively by two end plates and be welded on steel pipe after being positioned by end plate locating piece;
Two pieces of connecting plates are positioned by c, two riveter respectively by alignment pin, make alignment pin upper surface concordant with connecting plate upper surface, then by two pieces of connecting plates respectively with two end plates spot welding, group is to complete;
D, by group to good tie-rod, take down from mould, unified put, circulate successively, by tie-rod group in batch to rear, then unified to carry out in batch being welded into finished product by welder.
After using technique scheme, the simple tie-rod jig of the present invention and making and use method thereof have the advantage that
1, tie-rod installation accuracy is improved
Use the connecting plate at tie-rod two ends that the inventive method processes at grade and all tie-rod bolt hole pitch-rows all as, there is no deviation, can be general at steel construction processing conditions, in the case of machining accuracy is difficult to meet requirement, meet the installation accuracy requirement of tie-rod, avoid the bolt hole pitch-row on the connecting plate of tie-rod two ends and occur that two connecting plates at deviation or two ends cause the problem of installation difficulty the most at grade, substantially increase the machining accuracy of tie-rod.
2, tie-rod processing and installation effectiveness are improved
Using the inventive method processing tie-rod, method is unified clearly, it is not necessary to unwrapping wire on tie-rod part, part is directly put into location group on mould right, saves process time, improve working (machining) efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the tie-rod of the embodiment of the present invention;
Fig. 2 is the simple tie-rod jig structural representation of the embodiment of the present invention;
Fig. 3 is the use view of the simple tie-rod jig of the embodiment of the present invention.
In figure: 1 steel pipe, 2 end plates, 3 connecting plates, 4 bases, 5 steel pipe locating pieces, 6 end plate locating pieces, 7 alignment pins.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Embodiment 1
A kind of simple tie-rod jig, including base 4, pipe locating piece 5, end plate locating piece 6 and connecting plate alignment pin 7.
Referring now to the structural representation of the tie-rod that Fig. 1-2, Fig. 1 are the embodiment of the present invention, Fig. 2 is the simple tie-rod jig structural representation of the embodiment of the present invention.As it can be seen, described base 4 is channel-section steel, depending on length is according to tie-rod length;
Described steel pipe locating piece 5 is the steel plate of two pieces of band V-notch, is respectively welded the both sides being fixed on elongate steel plate centre of surface;
Described end plate locating piece 6 is two blocks of square steel plates, is respectively welded the two ends being fixed on elongate steel plate surface;
Described alignment pin 7 is the short round steel that two root length degree are identical, and two short round steel are parallel to each other, vertical welding is fixed on end plate locating piece 6 surface;
Wherein: steel pipe locating piece 5V v notch v can guarantee that the central axis of steel pipe and the centrage of two square end plates 2 overlap, when two alignment pins 7 are through two holes of connecting plate 2, and when the upper surface of two alignment pins 7 is concordant with the upper surface of connecting plate 3, the transverse center face of tie-rod connecting plate 3 just overlaps with the transverse center face of end plate 2, so that connecting plate 3 is on the tram of end plate 2.Depending on the two round steel length of described alignment pin 7 size according to tie-rod diameter of steel tube to be processed and end plate.
Embodiment 2
The manufacture method of a kind of simple tie-rod jig, it is characterised in that comprise the following steps:
A, basis tie-rod size to be processed take one section of channel-section steel, depending on described channel-section steel length is according to the tie-rod length processed.
B, the steel plate of two pieces of V-notch of making are respectively welded at channel-section steel surface, make the summit of V-notch be positioned on channel-section steel surface longitudinal centrage;
C, two blocks of square steel plates of making are respectively welded at two ends, channel-section steel surface, make the centrage of square steel plate be positioned on channel-section steel surface longitudinal centrage;
The bolt hole pitch-row of the tie-rod that d, basis are to be processed makes the round steel that two-stage nitration height is identical, and is weldingly fixed on the centrage both sides of square steel plate.
Embodiment 3
The using method of a kind of simple tie-rod jig, it is characterised in that comprise the following steps:
A, basis tie-rod size to be processed take one section of channel-section steel, depending on described channel-section steel length is according to the tie-rod length processed.
B, steel pipe 1 is put on steel pipe locating piece 5, adjusts the position of steel pipe 1, then two end plates 2 is attached to the two ends of steel pipe 1 by two riveter respectively respectively, is welded in respectively on steel pipe 1 by two end plates 2 after being positioned by end plate locating piece 6;
Two pieces of connecting plates 3 are positioned by c, two riveter respectively by alignment pin 7, make alignment pin 7 upper surface concordant with connecting plate 3 upper surface, then by two pieces of connecting plates 3 respectively with two end plates 2 spot welding, group is to complete.
D, by group to good tie-rod, take down from mould, unified put, circulate successively, by tie-rod group in batch to rear, then unified to carry out in batch being welded into finished tie bar by welder.
The present invention has substantive distinguishing features and significant technological progress, and the simple tie-rod jig of the present invention need not unwrapping wire on tie-rod part, part is directly put into location group on mould right, saves process time, improve working (machining) efficiency.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, it is also possible to make various conversion or change.Therefore, the technical scheme of all equivalents also should belong to scope of the invention, should be limited by each claim.

Claims (6)

1. a simple tie-rod jig, including base (4), steel pipe locating piece (5), end plate locating piece (6) and alignment pin (7), it is characterised in that:
Described base (4) is channel-section steel;
Described steel pipe locating piece (5) is the steel plate of two pieces of band V-notch, is respectively welded the both sides being fixed on elongate steel plate centre of surface;
Described end plate locating piece (6) is two blocks of square steel plates, is respectively welded the two ends being fixed on elongate steel plate surface;
Described alignment pin (7) is the short round steel that two root length degree are identical, and two short round steel are parallel to each other, vertical welding is fixed on end plate locating piece (6) surface;
Wherein: steel pipe locating piece (5) V-notch can guarantee that the central axis of steel pipe and the centrage of two square end plates (2) overlap, when two alignment pins (7) are through two holes of connecting plate (2), and when the upper surface of two alignment pins (7) is concordant with the upper surface of connecting plate (3), just transverse center face with end plate (2), the transverse center face of tie-rod connecting plate (3) overlaps, so that connecting plate (3) is on the tram of end plate (2).
2. simple tie-rod jig as claimed in claim 1, it is characterised in that depending on the length of described base (4) is according to tie-rod length to be processed.
3. simple tie-rod jig as claimed in claim 1, it is characterised in that depending on the two short round steel length of described alignment pin (7) size according to tie-rod steel pipe (1) diameter to be processed and end plate (2).
4. the manufacture method of a simple tie-rod jig, it is characterised in that comprise the following steps:
A, basis tie-rod size to be processed take one section of channel-section steel;
B, the steel plate of two pieces of V-notch of making are respectively welded at channel-section steel surface, make the summit of V-notch be positioned on channel-section steel surface longitudinal centrage;
C, two blocks of square steel plates of making are respectively welded at two ends, channel-section steel surface, make the centrage of square steel plate be positioned on channel-section steel surface longitudinal centrage;
D, bolt hole pitch-row according to tie-rod to be processed make the round steel that two-stage nitration height is identical, and are weldingly fixed on the centrage both sides of square steel plate, and the distance between round steel is equal to the centre distance in two holes of connecting plate.
5. the manufacture method of simple tie-rod jig as claimed in claim 4, it is characterised in that depending on described base (4) length is according to tie-rod length.
6. the using method of a simple tie-rod jig as claimed in claim 1, it is characterised in that comprise the following steps:
A, basis tie-rod size to be processed take one section of channel-section steel;
B, steel pipe (1) is put on steel pipe locating piece (5), adjust the position of steel pipe (1), two end plates (2) is attached to the two ends of steel pipe 1 by two riveter respectively respectively again, is welded in respectively on steel pipe (1) by two end plates (2) after being positioned by end plate locating piece 6;
Two pieces of connecting plates (3) are positioned by c, two riveter respectively by alignment pin (7), make alignment pin (7) upper surface concordant with connecting plate 3 upper surface, then by two pieces of connecting plates (3) respectively with two end plates (2) spot welding, group is to complete;
D, by group to good tie-rod, take down from mould, unified put, circulate successively, by tie-rod group in batch to rear, then unified to carry out in batch being welded into finished product by welder.
CN201510222728.3A 2015-05-05 2015-05-05 Simple tie-rod positioning mold and its making and use method Active CN106193289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510222728.3A CN106193289B (en) 2015-05-05 2015-05-05 Simple tie-rod positioning mold and its making and use method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510222728.3A CN106193289B (en) 2015-05-05 2015-05-05 Simple tie-rod positioning mold and its making and use method

Publications (2)

Publication Number Publication Date
CN106193289A true CN106193289A (en) 2016-12-07
CN106193289B CN106193289B (en) 2018-07-13

Family

ID=57457877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510222728.3A Active CN106193289B (en) 2015-05-05 2015-05-05 Simple tie-rod positioning mold and its making and use method

Country Status (1)

Country Link
CN (1) CN106193289B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113352018A (en) * 2021-06-25 2021-09-07 中冶建工集团重庆钢结构有限公司 Method for processing tie bars in batch

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2855620Y (en) * 2005-11-30 2007-01-10 巫永元 Equipment for positioning tubular main parts of metal truss
CN202317530U (en) * 2011-11-16 2012-07-11 青岛东方铁塔股份有限公司 Steel tube quick plugboard device
CN102953552A (en) * 2012-11-06 2013-03-06 中冶天工上海十三冶建设有限公司 Method for positioning through hole of pipe truss
CN202984990U (en) * 2012-12-24 2013-06-12 浙江金盛钢管塔有限公司 Steel pipe welding device
CN103317292A (en) * 2013-05-20 2013-09-25 浙江东南网架股份有限公司 Novel connecting and assembling jig and method for pipe flanges

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2855620Y (en) * 2005-11-30 2007-01-10 巫永元 Equipment for positioning tubular main parts of metal truss
CN202317530U (en) * 2011-11-16 2012-07-11 青岛东方铁塔股份有限公司 Steel tube quick plugboard device
CN102953552A (en) * 2012-11-06 2013-03-06 中冶天工上海十三冶建设有限公司 Method for positioning through hole of pipe truss
CN202984990U (en) * 2012-12-24 2013-06-12 浙江金盛钢管塔有限公司 Steel pipe welding device
CN103317292A (en) * 2013-05-20 2013-09-25 浙江东南网架股份有限公司 Novel connecting and assembling jig and method for pipe flanges

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113352018A (en) * 2021-06-25 2021-09-07 中冶建工集团重庆钢结构有限公司 Method for processing tie bars in batch
CN113352018B (en) * 2021-06-25 2022-09-23 中冶建工集团重庆钢结构有限公司 Method for processing tie bars in batch

Also Published As

Publication number Publication date
CN106193289B (en) 2018-07-13

Similar Documents

Publication Publication Date Title
CN203188589U (en) Rigid-frame continuous beam zero block construction bracket supporting system
CN102561510A (en) Factory assembled latticed light steel structure and manufacturing method thereof
CN104070316B (en) A kind of assembled group of welded H section steel is to device and using method thereof
CN204843369U (en) Steel case roof beam steel structure welding anti -deformation platform device
CN102912990A (en) Sliding shoe for sliding construction of steel structure
CN206487155U (en) Pier stud reinforcing bar positioning clamping fixture method Integral processing device
CN202924576U (en) Lifting tool for totally enclosed bus conductor
CN106193289A (en) Simple tie-rod jig and making and use method thereof
CN204817843U (en) Prefabricated utility tunnel's steel reinforcement cage processingequipment
CN102864746A (en) Bearing frame for bridge construction
CN210236845U (en) Adjustable hanger for component steel reinforcement cage
CN202492928U (en) Factory assembly type lattice lightweight steel construction
CN204959965U (en) A steel construction for building in frame
CN204850046U (en) Many davits of both shoulders and crane beam connection structure
CN205111169U (en) Stereo garage comb plate preparation frock
CN204662922U (en) For the movable integral type scaffold of box-structure
CN103741857A (en) Floor system with U-shaped steel beams, steel bar trusses and floor bearing plates
CN204603630U (en) Channel-section steel welding auxiliary clamp
CN105544955A (en) Elevator shaft tool type operation steel platform and manufacturing method thereof
CN215845445U (en) Simple and easy fashioned bed-jig of high-efficient steel reinforcement cage preparation
CN212193742U (en) Concrete cutting platform
CN210288080U (en) Bailey sheet for constructional engineering
CN204098218U (en) Longitudiual truss
CN213772978U (en) Wet seam hanging die for prefabricated bent cap
CN211991545U (en) Splicing welding device for connecting sleeve of main chord member of standard knot of tower crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant