CN106192720A - A kind of plank road module of floating wooden footway - Google Patents

A kind of plank road module of floating wooden footway Download PDF

Info

Publication number
CN106192720A
CN106192720A CN201610770710.1A CN201610770710A CN106192720A CN 106192720 A CN106192720 A CN 106192720A CN 201610770710 A CN201610770710 A CN 201610770710A CN 106192720 A CN106192720 A CN 106192720A
Authority
CN
China
Prior art keywords
plank road
road module
locating dowel
pavement
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610770710.1A
Other languages
Chinese (zh)
Inventor
樊蓓莉
张凯
夏博
邢萌萌
崔晨晨
赵晓红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Orient Landscape Ecology Limited-Liability Co
Original Assignee
Beijing Orient Landscape Ecology Limited-Liability Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Orient Landscape Ecology Limited-Liability Co filed Critical Beijing Orient Landscape Ecology Limited-Liability Co
Priority to CN201610770710.1A priority Critical patent/CN106192720A/en
Publication of CN106192720A publication Critical patent/CN106192720A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/14Floating bridges, e.g. pontoon bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to the plank road module of floating wooden footway, described plank road module includes the pavement mechanism for walking, for supporting the anchoring mechanism of location, support the float mechanism of described pavement mechanism and for connecting the bindiny mechanism of adjacent plank road module, described pavement mechanism includes plank road panel, it is arranged on the fence of described plank road panel both sides and is arranged on the overcoat of described plank road panel bottom side, described anchoring mechanism includes at least two locating dowels being fixed on substrate under water through described pavement mechanism, described float mechanism includes the annular buoyancy tank being arranged on described pavement mechanism bottom side, described bindiny mechanism includes the thimble structure being arranged on described pavement mechanism bottom side.The plank road module of the floating wooden footway of the present invention can realize modularization assembling, can assembled as required arrange, and sectional maintenance of clean-up, install, easy to maintenance fast, and wooden footway can be kept properly functioning when fluctuation of water table is bigger.

Description

A kind of plank road module of floating wooden footway
Technical field
The present invention relates to view wooden footway construction field, particularly relate to the plank road mould of a kind of floating wooden footway paddled Block.
Background technology
Wooden footway keeps natural landscape because of it, increases the reasons such as tourism temperament and interest, and the utilization in modern ecological view more comes The widest o is general, in natural tourist district, is obtained for application in the municipal field such as garden landscape and Real Estate Landscape.
Especially in region of paddling, the tortuous wooden footway being erected in water system in the case of not affecting natural environment, Walking, rest, view and the multi-functional place exchanged is provided for people.The trestle work viewed and admired in conjunction with stopping, has not only expanded trip Look at scope, alleviate the visual fatigue of people, more bring visitor's closely view and experience, make us producing strong truly place oneself in the midst of big Naturally the impression gone back to nature is neutralized.Therefore, the Waterfront areas multi rack such as wetland park, seaside park, nature reserve area, river mouth If playing the various wooden footways that border on the river.
The version of plank road has overhanging type, column, bolts of inclined column type, groove type, multilamellar flat-topped ridge overlap cluster formula etc., borders on the river The plank road built is typically in the majority with column.This type of wooden footway basis is firm, balance is good and to surrounding environment influence effect Little, it is widely used.But, in the waters of fluctuation in stage big rise and fall, such wooden footway does not the most often conform to because of design Reason causes plank road to be submerged in water, or the distance water surface the farthest affects visitor's experience effect etc., makes the use of such plank road be subject to Limit.
Summary of the invention
It is an object of the invention to paddle wooden footway because of its situation about using of height fixed effect, proposition for existing column The plank road module of a kind of floating wooden footway so that wooden footway can rise and fall and automatic lifting with fluctuation in stage, and can storm resisting, Keep plank road balance firm, solve the problem that general column plank road is not suitable with fluctuation in stage big rise and fall.
For achieving the above object, the invention provides the plank road module of a kind of floating wooden footway, described plank road module includes For the pavement mechanism of walking, for supporting the anchoring mechanism of location, supporting the float mechanism of described pavement mechanism and be used for Connecting the bindiny mechanism of adjacent plank road module, described pavement mechanism includes plank road panel, is arranged on described plank road panel both sides Fence and be arranged on the overcoat of described plank road panel bottom side, described anchoring mechanism includes at least two through described running massager Structure is fixed on the locating dowel of substrate under water, and described float mechanism includes the annular buoyancy tank being arranged on described pavement mechanism bottom side, institute State bindiny mechanism and include being arranged on the thimble structure of described pavement mechanism bottom side.
Preferably, surface through described pavement mechanism in described locating dowel one end, the described locating dowel other end buried in Under water in substrate;And when high water level and described floating wooden footway zero load, described locating dowel top is higher than described plank road panel 1.2~1.5m.
Preferably, a diameter of the 20 of described locating dowel~30cm, material is cement or armored concrete.
Preferably, described locating dowel being provided with block at described substrate under water 50~60cm, described block supports simultaneously Two adjacent described plank road modules.
Preferably, described locating dowel is provided with gap structure, described gap structure surrounding through the position of described pavement mechanism It is provided with buffer structure with the contact surface of described locating dowel.
Preferably, described overcoat is the composite layer being coated with described plank road panel bottom side, fixing, described composite wood The bed of material is glass fibre composite reinforced plastics or engineering plastics.
Preferably, described annular buoyancy tank internal ring be corner be the rectangular configuration of circular arc, described annular buoyancy tank outer shroud Surrounding is the concaveconvex structure of Heterogeneous Permutation.
Preferably, described annular buoyancy tank includes integrated engineering plastics shell and is filled in described enclosure Lightweight foam material.
Preferably, described thimble structure is rectangle, the circular or oval collar, the described collar a diameter of 0.8~ 1.5cm;And described thimble structure is less than 2cm in the displacement of locking rear enclosure interannular.
Preferably, described locating dowel surface configuration gauge.
Based on technique scheme, the invention have the advantage that
The plank road module of the floating wooden footway of the present invention can realize modularization assembling, can assembled as required arrange, and can Segmentation maintenance of clean-up, install, easy to maintenance fast.It uses ring-type float mechanism so that it is define near vacuum ring with the water surface Border, serves sucker effect, adds the described floating wooden footway stability at the water surface, and it is high to make to which overcome general wooden footway The limitation of degree, finally keeps wooden footway properly functioning when fluctuation of water table is bigger.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this Bright schematic description and description is used for explaining the present invention, is not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is plank road module schematic side view;
Fig. 2 is float mechanism elevational schematic view;
Fig. 3 is plank road module assembled schematic side view;
Fig. 4 is plank road module assembled schematic top plan view;
Fig. 5 is annular floating box structure schematic diagram;
Wherein, 1~substrate under water;2~the water surface;3~locating dowel;4~fence;5~plank road panel;6~annular buoyancy tank;7 ~thimble structure;8~plank road module.
Detailed description of the invention
Below by drawings and Examples, technical scheme is described in further detail.
The invention provides a kind of modular floating wooden footway.As shown in figures 1-4, illustrated therein is the one of the present invention Preferred implementation.As shown in figures 1-4, described plank road module 8 includes the pavement mechanism for walking, for supporting location Anchoring mechanism, support the float mechanism of described pavement mechanism and for connecting the bindiny mechanism of adjacent plank road module 8, described step Road mechanism includes plank road panel 5, the fence 4 being arranged on described plank road panel 5 both sides and is arranged on described plank road panel 5 bottom side Overcoat, described anchoring mechanism includes that at least two are fixed on the locating dowels 3 of substrate under water 1, institute through described pavement mechanism Stating float mechanism and include being arranged on the annular buoyancy tank 6 of described pavement mechanism bottom side, described bindiny mechanism includes being arranged on described step The thimble structure 7 of road mechanism bottom side.
Specifically, the plank road module 8 of multiple present invention can form floating wooden footway as required, and each plank road module 8 is equal It is made up of anchoring mechanism, pavement mechanism, float mechanism and bindiny mechanism.Wherein, the length of each plank road module 8 is traditionally arranged to be 3~6 meters, width is arranged according to actual needs, is usually no more than 5 meters.
As it is shown in figure 1, described pavement mechanism include plank road panel 5, be arranged on the fence 4 of described plank road panel 5 both sides with And be arranged on the overcoat of described plank road panel 5 bottom side, described anchoring mechanism include at least two solid through described pavement mechanism Being scheduled on the locating dowel 3 of substrate under water 1, described float mechanism includes the annular buoyancy tank 6 being arranged on described pavement mechanism bottom side, described Bindiny mechanism includes the thimble structure 7 being arranged on described pavement mechanism bottom side.
Wherein, described anchoring mechanism is the positioning supporting point of whole floating wooden footway structure, the anchorage machine of each plank road module 8 Structure is generally made up of at least two locating dowels 3.In the present embodiment, anchoring mechanism is made up of two locating dowels 3, two locating dowels The 3 cornerwise two ends laying respectively at plank road module 8.Described locating dowel 3 is in cylinder, and one end passes described pavement mechanism Surfacing 2, described locating dowel 3 other end is buried in substrate under water 1.The length of locating dowel 3 is by underwater portion length and water Upper part length forms, and above water i.e. locating dowel 3 is higher than the part of the water surface 2, and at high water level and described floating wooden footway Time unloaded, described locating dowel 3 top is higher than described plank road panel 5 1.2~1.5m.Above water height is locating dowel 8 top Height and two parts sum of plank road height itself higher than described plank road panel.
Underwater portion is made up of with lower part the part between the water surface 2 and substrate under water 1 and substrate under water 1.The former with This waters high water level is standard, and the latter is typically as the criterion with the degree of depth of substrate under water less than 1 to supporting course, sum of the two i.e. locating dowel 3 underwater portion height.Preferably, a diameter of the 20~30cm of described locating dowel 3, material is cement or armored concrete.Described The cross-sectional diameter of locating dowel 3 is configured according to SEA LEVEL VARIATION situation, underlying structure situation etc., with 20~30cm is typically Preferably, water surface stormy waves is acutely, loosely or to there is other influences wooden footway stable compared with big or base infrastructure for SEA LEVEL VARIATION situation During situation, can suitably strengthen the diameter of locating dowel 3.And it is that cement or reinforcing bar mix that the material of described locating dowel 3 is set to material Solidifying soil so that it is capable of withstanding water logging, corrosion-resistant, and has sufficiently high intensity.
Preferably, described locating dowel 3 surface configuration gauge, to undertake water stage measurement function.It is highly preferred that it is described fixed Position post 3 on away from described substrate under water 1 50~60cm at be provided with block, described block supports the described plank road of adjacent two simultaneously Module 8.Described block is the protective equipment as safe altitude.Specifically, low when construction waters water level big rise and fall and routine When water level is less than 80cm, for protecting unlikely bottom out because water level is too low bottom floating wooden footway to cause wooden footway to damage and reduction makes With the time limit, at locating dowel 3 design height under water substrate more than 1 50~60cm, block is set.Described block can support simultaneously Play adjacent two wooden footway modules 8, hold the bottom of plank road module 8, brace plank road and the weight of pedestrian.
Wherein, pavement mechanism is made up of affiliated facilities such as plank road panel 5, overcoat and fences 4.The stack of described pavement mechanism Arranging of the affiliated facilities such as pavement slab 5, fence 4 is all identical with normal wood plank road, it should be noted that select through antiseptic wood Material.Preferably, described locating dowel 3 is provided with gap structure, described gap structure surrounding and institute through the position of described pavement mechanism The contact surface stating locating dowel 3 is provided with buffer structure.Specifically, in the present embodiment, the diagonal positions of described pavement mechanism is i.e. The gap structure that the position that locating dowel 3 passes is reserved circular, and arrange with locating dowel 3 contact position in the surrounding of this gap structure Buffer structure, such as soft, wear-resistant material such as rubber rings, with buffer the water surface rise and fall cause plank road to rock and cause with its locating dowel 3 it Between produce shock.Further, certain gap should be left between described locating dowel 3 and buffer structure for described floating wooden footway with water Position fluctuation and lift smoothly.
Further, described pavement mechanism bottom is because of for a long time close to the water surface, for preventing it from causing rotting, giving birth to because of humidity immersion etc. Become rusty and shorten service life, increase overcoat at normal wood plank road bottom.For keeping Lightness, the fastness etc. of plank road module 8, Overcoat typically selects that material is light, intensity is high, composite free of contamination to water body, such as glass fibre composite reinforced plastics, work The macromolecular materials such as engineering plastics, plank road panel 5 bottom side wooden structures is wrapped up, covers by described overcoat, and fixation.Enter one Step, in pavement mechanism, all attachment means such as screw, rivet etc. are the most in advance through antirust treatment.
Wherein, float mechanism is positioned at the lower section of pavement mechanism in plank road module 8, is the buoyant device of described plank road module 8, With support, described pavement mechanism swims on the water surface.As in figure 2 it is shown, float mechanism is arranged at below plank road module 8 by margin location Putting and round, structure is airtight ring-type, constitutes annular buoyancy tank 6.This annular buoyancy tank 6 defines near vacuum with the water surface 2 Space, defines a sucked type structure at the water surface, greatly strengthen the stability of wooden footway.
Preferably, as shown in Fig. 2, Fig. 5, described annular buoyancy tank 6 internal ring be corner be the rectangular configuration of circular arc, described The concaveconvex structure that outer shroud surrounding is Heterogeneous Permutation of annular buoyancy tank 6.Outer shroud surrounding is set to the concaveconvex structure of Heterogeneous Permutation can Play the effect of the wave that disappears, it is possible in the environment that stormy waves is bigger, be obviously enhanced the stability that plank road is overall.Described annular buoyancy tank 6 wraps Include integrated engineering plastics shell and be filled in the lightweight foam material of described enclosure.Specifically, described annular Buoyancy tank 6 uses integral forming process to make, and material can be selected for the light durable materials such as engineering plastics and makes, such as polyethylene (PE) Deng, box house light filling expanded material such as foam plastics etc. so that described annular buoyancy tank 6 should have high temperature resistant, acid and alkali-resistance, Impact resistance, anti-Hou Xingqiang, to the feature such as water environment is pollution-free.It should be noted that the float mechanism of the present invention also should possess relatively High-bearing capacity, bearing capacity should reach the load request of floating wooden footway, keeps floating wooden footway whole machine balancing, stablizes, so The size of annular buoyancy tank 6 arranges up to standard as standard with bearing capacity.
Wherein, bindiny mechanism is arranged at the junction of adjacent two plank road modules 8.Described plank road module 8 is by connecting machine Being configured to plank road overall, bindiny mechanism has made lateral connection between plank road module 8 tight, and allows between plank road module 8 longitudinal The displacement of little yardstick can be there is up and down, have certain flexible buffer space with the walking of visitor, when increasing walking adapting to plank road Comfort.
Specifically, bindiny mechanism is thimble structure, and material is set to rustless steel or zinc-plated ironware, to prevent burn into from getting rusty Use Deng affecting plank road.As shown in Figure 3, Figure 4, described thimble structure is positioned at the lower section of pavement mechanism, in each plank road module 8 even The place of connecing arranges some collars, and the specification of the described collar is set to rectangle, the circular or oval collar, the cross-sectional diameter of the collar own Being set to 0.8~1.5cm, locking rear enclosure interannular displacement up and down is less than 2cm.
The plank road module of the floating wooden footway of the present invention can refer to following steps and installs, to be quickly assembled into floating wood Plank road:
1, all locating dowels and accessory structure thereof are set according to the position of floating wooden footway, and locating dowel should be sent to water The supporting course of lower substrate, it is ensured that stablizing of locating dowel, and preventer is set according to safe altitude;
2, the ring-type buoyancy tank made is fixed on the bottom of plank road module, and plank road module is carried out on the basis of locating dowel Install;
3, it is connected between plank road module with bindiny mechanism, and land and water link block is set according to SEA LEVEL VARIATION.
4, affiliated facility such as fence, the seat etc. of plank road module are set.
The plank road module of the floating wooden footway of the present invention can realize modularization assembling, can assembled as required arrange, and can Segmentation maintenance of clean-up, install, easy to maintenance fast.It uses ring-type float mechanism so that it is define near vacuum ring with the water surface Border, serves sucker effect, adds the described floating wooden footway stability at the water surface, and it is high to make to which overcome general wooden footway The limitation of degree, finally keeps wooden footway properly functioning when fluctuation of water table is bigger.
Finally should be noted that: above example is only in order to illustrate that technical scheme is not intended to limit;To the greatest extent The present invention has been described in detail by pipe with reference to preferred embodiment, and those of ordinary skill in the field are it is understood that still The detailed description of the invention of the present invention can be modified or portion of techniques feature is carried out equivalent;Without deviating from this The spirit of bright technical scheme, it all should be contained in the middle of the technical scheme scope that the present invention is claimed.

Claims (10)

1. the plank road module of a floating wooden footway, it is characterised in that: described plank road module (8) includes the running massager for walking Structure, for supporting the anchoring mechanism of location, support the float mechanism of described pavement mechanism and for connecting adjacent plank road module (8) bindiny mechanism, described pavement mechanism includes plank road panel (5), is arranged on the fence (4) of described plank road panel (5) both sides And it being arranged on the overcoat of described plank road panel (5) bottom side, described anchoring mechanism includes at least two through described running massager Structure is fixed on the locating dowel (3) of substrate under water (1), and described float mechanism includes that the annular being arranged on described pavement mechanism bottom side is floated Case (6), described bindiny mechanism includes the thimble structure (7) being arranged on described pavement mechanism bottom side.
Plank road module the most according to claim 1, it is characterised in that: described locating dowel (3) one end passes described running massager Structure surfaces (2), and described locating dowel (3) other end is buried in substrate under water (1);And at high water level and described floating wood During plank road zero load, described locating dowel (3) top is higher than described plank road panel (5) 1.2~1.5m.
Plank road module the most according to claim 1, it is characterised in that: a diameter of 20~30cm, material of described locating dowel (3) Matter is cement or armored concrete.
Plank road module the most according to claim 2, it is characterised in that: away from described substrate under water (1) in described locating dowel (3) Being provided with block at 50~60cm, described block supports adjacent two described plank road module (8) simultaneously.
Plank road module the most according to claim 1, it is characterised in that: described locating dowel (3) is through described pavement mechanism Position is provided with gap structure, and described gap structure surrounding is provided with buffer structure with the contact surface of described locating dowel (3).
Plank road module the most according to claim 1, it is characterised in that: described overcoat is by described plank road panel (5) end Side cladding, fixing composite layer, described composite layer is glass fibre composite reinforced plastics or engineering plastics.
Plank road module the most according to claim 1, it is characterised in that: described annular buoyancy tank (6) internal ring be corner be round The rectangular configuration of arc, the concaveconvex structure that outer shroud surrounding is Heterogeneous Permutation of described annular buoyancy tank (6).
Plank road module the most according to claim 7, it is characterised in that: described annular buoyancy tank (6) includes integrated work Engineering plastics shell and be filled in the lightweight foam material of described enclosure.
Plank road module the most according to claim 1, it is characterised in that: described thimble structure (7) is rectangle, circular or oval The shape collar, a diameter of the 0.8 of the described collar~1.5cm;And described thimble structure (7) is less than in the displacement of locking rear enclosure interannular 2cm。
Plank road module the most according to claim 2, it is characterised in that: described locating dowel (3) surface configuration gauge.
CN201610770710.1A 2016-08-30 2016-08-30 A kind of plank road module of floating wooden footway Pending CN106192720A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610770710.1A CN106192720A (en) 2016-08-30 2016-08-30 A kind of plank road module of floating wooden footway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610770710.1A CN106192720A (en) 2016-08-30 2016-08-30 A kind of plank road module of floating wooden footway

Publications (1)

Publication Number Publication Date
CN106192720A true CN106192720A (en) 2016-12-07

Family

ID=58089885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610770710.1A Pending CN106192720A (en) 2016-08-30 2016-08-30 A kind of plank road module of floating wooden footway

Country Status (1)

Country Link
CN (1) CN106192720A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812067A (en) * 2017-01-11 2017-06-09 温州万里市政工程有限公司 A kind of removable operation platform for bridge construction

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201120949Y (en) * 2007-10-23 2008-09-24 高树亮 Water core boat
KR200444674Y1 (en) * 2008-04-24 2009-05-27 이정상 A floating bridge
KR20110067217A (en) * 2009-12-14 2011-06-22 (주)에이스마린 Mooring facility
CN202688851U (en) * 2012-05-17 2013-01-23 四川川交路桥有限责任公司 Floating bridge convenient for bridge construction
CN203345168U (en) * 2013-05-23 2013-12-18 冯志雄 Pontoon
CN103895829A (en) * 2014-04-02 2014-07-02 南京工业大学 Continuous-buoy composite floating structure system
CN203975132U (en) * 2014-05-28 2014-12-03 西峡县双龙腾飞水上娱乐制品有限公司 A kind of tent-type leisure fishing ship
WO2015056838A1 (en) * 2013-10-15 2015-04-23 주식회사 혁신 Floating-type marine structure using pontoon
CN206034268U (en) * 2016-08-30 2017-03-22 北京东方园林生态股份有限公司 Float plank road module of wooden plank road

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201120949Y (en) * 2007-10-23 2008-09-24 高树亮 Water core boat
KR200444674Y1 (en) * 2008-04-24 2009-05-27 이정상 A floating bridge
KR20110067217A (en) * 2009-12-14 2011-06-22 (주)에이스마린 Mooring facility
CN202688851U (en) * 2012-05-17 2013-01-23 四川川交路桥有限责任公司 Floating bridge convenient for bridge construction
CN203345168U (en) * 2013-05-23 2013-12-18 冯志雄 Pontoon
WO2015056838A1 (en) * 2013-10-15 2015-04-23 주식회사 혁신 Floating-type marine structure using pontoon
CN103895829A (en) * 2014-04-02 2014-07-02 南京工业大学 Continuous-buoy composite floating structure system
CN203975132U (en) * 2014-05-28 2014-12-03 西峡县双龙腾飞水上娱乐制品有限公司 A kind of tent-type leisure fishing ship
CN206034268U (en) * 2016-08-30 2017-03-22 北京东方园林生态股份有限公司 Float plank road module of wooden plank road

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812067A (en) * 2017-01-11 2017-06-09 温州万里市政工程有限公司 A kind of removable operation platform for bridge construction
CN106812067B (en) * 2017-01-11 2019-02-01 温州万里市政工程有限公司 A kind of removable operation platform for bridge construction

Similar Documents

Publication Publication Date Title
KR102155394B1 (en) Floating offshore wind power generation facility
CN107683371B (en) Method of constructing, assembling and launching a floating wind turbine platform
BR112016018088B1 (en) METHOD OF ASSEMBLY OF PLATFORMS OF A FLOATING WIND TURBINE
ES2386149T3 (en) Feet for an offshore wind power installation
CN206034268U (en) Float plank road module of wooden plank road
US20160075413A1 (en) Submersible active support structure for turbine towers and substations or similar elements, in offshore facilities
US8007204B2 (en) Floating structure for support of mixed use facilities
US7824131B2 (en) Building over the water, group of buildings, their maneuvering methods and their hosting sites
CN104619984A (en) Floating wind turbine platform and method of assembling
EA014336B1 (en) Fixed structure platform on water
CN107653895A (en) Six floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN107806108A (en) Three floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
US8770132B2 (en) Marine wind turbine whole machine
CN107630461A (en) Four floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN206070347U (en) A kind of modular floating wooden footway
CN106522263B (en) A kind of wind-powered electricity generation complete machine construction method of four bucket foundations and concrete support structure
CN206070348U (en) A kind of modular floating wooden footway for the high water level difference water surface
CN106192721A (en) A kind of modular floating wooden footway
CN106192722A (en) A kind of modular floating wooden footway for the high water level difference water surface
CN207987950U (en) Four floating drum buoyancy tank foundation structures on a kind of combined type sea
CN105178347A (en) Offshore anemometer tower foundation, offshore anemometer platform and application method of offshore anemometer platform
CN106192720A (en) A kind of plank road module of floating wooden footway
US11920559B2 (en) Floating platform for high-power wind turbines
CN204080850U (en) Column foot in a kind of ultra-high-tension power transmission line river
CN209162871U (en) A kind of Analysis of Suspension Bridges ' Anchorage composite foundation suitable for deep water soft clay area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207