CN106185535A CN201510239025.1A CN201510239025A CN106185535A CN 106185535 A CN106185535 A CN 106185535A CN 201510239025 A CN201510239025 A CN 201510239025A CN 106185535 A CN106185535 A CN 106185535A
Authority
CN
China
Prior art keywords
load
electric power
information
power
accumulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510239025.1A
Other languages
Chinese (zh)
Other versions
CN106185535B (en
Inventor
寺崎正幸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Publication of CN106185535A publication Critical patent/CN106185535A/en
Application granted granted Critical
Publication of CN106185535B publication Critical patent/CN106185535B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages

Landscapes

  • Elevator Control (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The accumulator plant of embodiment possesses accumulator, the 1st information receiving unit receiving the operating condition information of the 1st load and receives the 2nd information receiving unit of the 2nd operating condition information loaded.Operating condition information based on the 1st load and the operating condition information of the 2nd load, distributed to the 1st load and the 2nd load from the electric power of accumulator output by power distribution circuit.From accumulator, the electric power to the 1st load supply is adjusted to, by the 1st output unit, the power value distributed by power distribution unit.From accumulator, the electric power to the 2nd load supply is adjusted to, by the 2nd output unit, the power value distributed by power distribution unit.

Description

Accumulator plant
Technical field
Embodiments of the present invention relate to accumulator plant.
Background technology
Conventionally, there is known accumulation is sent out from the source power supplies such as Utilities Electric Co., the solar energy that is arranged at building The electric power of the electricity supply such as system, and to specific load supply electric power when having a power failure and/or during electric power scarcity Accumulator plant.Generally, accumulator plant possesses the accumulator of accumulation electric power, the capacity of accumulator Consider that the maximum rated electric power of the load becoming object is selected.Such as, by from accumulator supply electricity In the case of the load of power includes lift appliance, selected have the maximum power consumed with lift appliance The accumulator of the output capacity matched.That is, make when the maximum load of cage cage with In the case of normal speed rises, lift appliance consumes maximum power, so when accumulator selected Consider this maximum power.
But, disappear in the maximum becoming the load employing the operating object accumulating the electric power in accumulator In the case of power consumption power is big and/or the quantity of the load that becomes object many in the case of, it is desirable to accumulator High capacity, expense may increase.Further, since accumulator maximizes, so being difficult to ensure that setting Place, and then, also can produce the attendant equipments such as fire-fighting equipment and be also possible to this problem that maximizes.
Therefore, accumulate in the case of the electric power of accumulator operates (during accumulator operating) using, Sometimes the running speed of the cage of elevator is set as the speed slower than normal speed, seeks to store The reduction of battery capacity.It addition, for the same purpose, sometimes to the common portion etc. of building The power system of illumination supply electric power is split, and carries out local when accumulator operates and turns off the light.
But, if reducing the capacity of accumulator, then the duration of runs loaded shortens, it is possible to difficult Have a power failure so that reply is long-time.It addition, for the capacity reducing accumulator, it is also possible to consider that restriction becomes The quantity of the load of the object of accumulator operating, but in this case, it is believed that can hamper in building Daily life or business.
It addition, the method to the electric power of various load supplies that adjusts is known.For example, as it is known that there is base Decide whether to start the power consumption of the 2nd load in the 1st operating state loaded that priority is high Method, respectively adjust load output so that the 1st load load output with the 2nd load load The summation of output is consistent with predetermined desired value.
Summary of the invention
The problem that invention is to be solved
The load of the object becoming accumulator operating sets according to the intention of user, but arranges at building In the case of having lift appliance, there is the necessity liter of the object operated as accumulator by lift appliance High tendency.Especially, in high-rise and/or high-rise apartment building, this necessity raises further.
The cage of lift appliance utilizes hoist engine to lift, when cage lifts, by rolling up Machine of raising consumes relatively more electric power.But, the probability that cage the most persistently lifts is low.By This, hoist engine perseveration the most continuously, not equal to its action is interval, Respective movement time has the tendency shortened.It addition, hoist engine consumes the most when electronic operating Electric power, but when regeneration operating, consume electric power fewer than during electronic operating.Therefore, the disappearing of hoist engine Power consumption power changes according to operating condition.
It addition, load as other, the pressure of the tap water included in improving building can be enumerated The pressure pump of force (forcing) pump.Force (forcing) pump in building, use substantial amounts of tap water simultaneously and from the beginning The pressure of water become less than predetermined force value in the case of action, make on the pressure of tap water of reduction Rise.Now, force (forcing) pump consumes electric power.Thus, as above-mentioned hoist engine, force (forcing) pump is not even The perseveration of continuous ground, its action is typically interval.It addition, force (forcing) pump consumes the most when starting Electric power, but such starting state will not continue for a long time.It is changed into steady have passed through starting state When determining operating condition, consume electric power and become few compared with time dynamic.So, the consumption electric power of force (forcing) pump according to Its operating condition and change.
So, when accumulator operates, consume close to maximum rated electric power in each loads simultaneously The probability of electric power is low.Thus, when accumulator operates, according to the operating condition of each load, can be from The electric power of accumulator output has remaining tendency.I.e., it is difficult in various loads, use storage efficiently Amass the electric power in accumulator.
The present invention considers that this point completes, and its object is to offer one can be according to each load Operating condition suitably distribute from accumulator to each load supply electric power, each load can be made efficiently The accumulator plant of operating.
Means for solving the above
The accumulator plant of embodiment is to the work being arranged at building when having a power failure or during electric power scarcity It is the lift appliance of the 1st load and the 2nd load supply different from lift appliance being arranged at building The accumulator plant of electric power.This accumulator plant possesses: accumulator, and it can be to the 1st load and the The electric power that 2 load supplies are accumulated;1st information receiving unit, it receives the operating shape of the 1st load State information;And the 2nd information receiving unit, it receives the operating condition information of the 2nd load.Based on By the 1st information receiving unit receive the 1st load operating condition information and by the 2nd information receive The operating condition information of the 2nd load that unit receives, is distributed by electric power from the electric power of accumulator output Unit distributes to the 1st load and the 2nd load.From this accumulator to the electric power of the 1st load supply by the 1 output unit is adjusted to the power value distributed by power distribution unit.Supply to the 2nd load from accumulator The electric power given is adjusted to, by the 2nd output unit, the power value distributed by power distribution unit.
Accompanying drawing explanation
Fig. 1 is the structure illustrating the building being provided with lift appliance in embodiments of the present invention Skeleton diagram.
Fig. 2 is the figure in the cage of the lift appliance illustrating Fig. 1.
Fig. 3 is the figure of the boarding place of the lift appliance illustrating Fig. 1.
Fig. 4 is the figure of the structure of the accumulator plant illustrating Fig. 1.
Detailed description of the invention
Hereinafter, referring to the drawings, embodiments of the present invention are illustrated.
As it is shown in figure 1, be provided with the various loads consuming electric power at the building such as building, apartment 100. In FIG, as the load being arranged on such building 100, it is shown that lift appliance 1, use In the pressure pump 20 of pressure of the tap water improved in building 100 and be arranged on building The illuminator 30 of the common portion etc. of 100.
Lift appliance 1 possesses in elevating road 2 lifting cage 3 freely, via main rope 4 It is linked to the counterweight 5 of cage 3 and makes cage 3 and counterweight 5 via main rope 4 The hoist engine 6 (lifting drive division) of lifting.Main rope 4 is hung on the traction sheave linked with hoist engine 6 7.In such a configuration, driving traction sheave 7 to rotate by hoist engine 6, main rope 4 is rolled-up, Cage 3 and counterweight 5 lift respectively, and cage 3 is being arranged at the multiple of building 100 Arbitrary boarding place 8 in boarding place 8 is stopped, and user can boarding.
Hoist engine 6 is controlled to carry out action by elevator control gear 9.It addition, as in figure 2 it is shown, riding It is provided with in car 3 for supplying the user having taken cage 3 to register purpose stratum (target zone) Purpose stratum button 10 (purpose stratum calling mechanism), for registering the car door of cage 3 The opening and closing button 11 (opening and closing calling mechanism) of the opening and closing instruction of 12.Elevator control gear 9 is based on passing through The purpose stratum of purpose stratum button 10 registration controls the operating of cage 3, based on passing through opening and closing Car door 12 and the boarding place door 13 of cage 3 are opened by the opening and closing instruction of button 11 registration Close.As it is shown on figure 3, be provided with car call button 14 (car call registration dress in each boarding place 8 Put), elevator control gear 9 controls to take advantage of based on the car call registered by car call button 14 Operating with car 3.
As it is shown in figure 1, pressure pump 20 possesses the pressure of the tap water in improving building 100 The pressure detector 22 of the pressure of the tap water in the force (forcing) pump 21 of power, detection building 100 and Pressure based on the tap water detected by pressure detector 22 controls the pump of force (forcing) pump 21 and controls dress Put 23.Apparatus for controlling pump 23 makes in the case of the pressure of tap water becomes less than predetermined force value Force (forcing) pump 21 action.Thus, the pressure of tap water improves.
Illuminator 30 possesses the luminance detection device 32 of the illumination in illumination 31, detection building 100 And control to illuminate the illumination control apparatus of 31 based on the illumination detected by luminance detection device 32 33.In the case of the illumination control apparatus 33 illumination in building 100 gets lower than predetermined illumination Illumination 31 action, illumination 31 is made to light.
The accumulator plant 50 of present embodiment is configured to when having a power failure or during electric power scarcity to as the 1st The lift appliance 1 of load, the pressure pump 20 of the 2nd load as different from the 1st load, work Illuminator 30 for 3rd load the most different from the 1st load and the 2nd load supplies electric power.
As shown in Figure 4, accumulator plant 50 possesses: accumulator 51, and it accumulates electric power, it is possible to will The power supply of accumulation is to lift appliance 1, pressure pump 20 and illuminator 30;1st information Receiving circuit 52 (the 1st information receiving unit), it receives the operating condition information of lift appliance 1; 2nd Information Receiving Circuits 53 (the 2nd information receiving unit), it receives the operating of pressure pump 20 Status information;And the 3rd Information Receiving Circuits 54 (the 3rd information receiving unit), it receives illumination The operating condition information of device 30.
Accumulator 51 is built from source power supplies such as Utilities Electric Co. 55 or be arranged at via charging circuit 56 The solar power system etc. building thing 100 is filled with electric power.Can be from the maximum output electricity of accumulator 51 output Power is determined by the powered-on capacity etc. of accumulator 51 self.Additionally, accumulate in the electric power storage of accumulator 51 Amount (amount of power) is obtained by power distribution circuit 57 described later.More specifically, it is filled with accumulator The electric power of 51 is sent to power distribution circuit 57 as information from charging circuit 56, from accumulator 51 Output total electricity as information respectively from the 1st output circuit the 58, the 2nd output circuit 59 described later And the 3rd output circuit 60 be sent to power distribution circuit 57, power distribution circuit 57 is based on these The information sended over is obtained and is accumulated in the charge capacity of accumulator 51.
1st Information Receiving Circuits 52 preferably receives various operating condition information.In the present embodiment, The operating condition information that 1st Information Receiving Circuits 52 is received includes the use electric power letter of lift appliance 1 Breath, lift appliance 1 are carrying out this information of regeneration operating, are not carrying out purpose stratum and register this letter Cease and do not carry out this information of call registration.Such as, the use power information of lift appliance 1 can Obtain to the total electricity of each equipment supplies such as hoist engine 6 from via elevator control gear 9, lift appliance 1 is the most carrying out the cage 3 liters that regeneration operating can be detected according to elevator control gear 9 The consumption electric power of the hoist engine 6 during fall judges.It addition, such as, if carry out purpose stratum Registration can judge according to the information from the purpose stratum button 10 being arranged at cage 3, is The no call registration that carried out can be according to the information from the car call button 14 being arranged at boarding place 8 Judge.1st Information Receiving Circuits 52 receives these information from elevator control gear 9 all the time, receives To information be stored in power distribution circuit 57 described later.
2nd Information Receiving Circuits 53 preferably receives various operating condition information.In the present embodiment, What the operating condition information that the 2nd Information Receiving Circuits 53 is received included pressure pump 20 makes electricity consumption Force information, the predetermined force value of pressure ratio this information big of tap water and adding of pressure pump 20 Press pump 21 have passed through starting state and is in this information of steady running state.Such as, pressure pump The power information that uses of 20 can be from the total electricity supplied to force (forcing) pump 21 grade via apparatus for controlling pump 23 Obtaining, whether the pressure of tap water can be examined from the pressure of pressure pump 20 greatly than predetermined force value Surveying device 22 to obtain, whether force (forcing) pump 21 is in steady running state can be according to apparatus for controlling pump 23 The consumption electric power of the force (forcing) pump 21 detected judges.2nd Information Receiving Circuits 53 is all the time from pump control Device 23 processed receives these information, and the information received is stored in power distribution circuit 57 described later.
3rd Information Receiving Circuits 54 preferably receives various operating condition information.In the present embodiment, The operating condition information that 3rd Information Receiving Circuits 54 is received includes the use electric power of illuminator 30 Illuminance information in information and building 100.Such as, the use power information of illuminator 30 is permissible Obtain, in building 100 to the total electricity illuminating the supplies such as 31 from via illumination control apparatus 33 Illuminance information can obtain from the luminance detection device 32 of illuminator 30.3rd Information Receiving Circuits 54 All the time receiving these information from illumination control apparatus 33, the information received is stored in electric power described later and divides Distribution road 57.
Distribute to by power distribution circuit 57 (power distribution unit) from the electric power of accumulator 51 output Lift appliance 1, pressure pump 20 and illuminator 30.More specifically, power distribution circuit 57 operating condition information based on the lift appliance 1 received by the 1st Information Receiving Circuits 52, by The operating condition information of the pressure pump 20 that the 2nd Information Receiving Circuits 53 receives and by the 3rd The operating condition information of the illuminator 30 that Information Receiving Circuits 54 receives is to distribute electric power.Now, So as to the mode below the maximum output power of accumulator 51, by export from accumulator 51 Electric power is respectively allocated to lift appliance 1, pressure pump 20 and illuminator 30.That is, distribute to The electric power of lift appliance 1, distribute to the electric power of pressure pump 20 and distribute to illuminator 30 Electric power add up to below the maximum output power of accumulator 51.
Receive as it has been described above, have in power distribution circuit 57 storage by the 1st Information Receiving Circuits 52 The use power information of lift appliance 1.Equally, have by the 2nd in power distribution circuit 57 storage The use power information of the pressure pump 20 that Information Receiving Circuits 53 receives, and storage has by the The use power information of the illuminator 30 that 3 Information Receiving Circuits 54 receive.Thus, electric power divides Distribution road 57 was configured to according to each scheduled period using power information to obtain the past preserved The maximum of interior lift appliance 1 uses electric power, the maximum of force (forcing) pump 21 to use electric power and illuminator The maximum use electric power of 30.
Power distribution circuit 57 preferably uses electric power at the maximum of the lift appliance 1 obtained as described above In the case of below the maximum output power of accumulator 51, to lift appliance 1 distribution and its ambassador Electric power with electric power quite (or consistent).I.e., it is possible to make the priority of lift appliance 1 higher than adding Press pump device 20 and illuminator 30, preferentially distribute electric power to lift appliance 1.
It addition, power distribution circuit 57 can be to lift appliance 1 distribution and its maximum use electric power phase When electric power in the case of obtain the remaining output power of accumulator 51, in the remaining output obtained Electric power is in the case of pressure pump 20 maximum uses more than electric power, to force (forcing) pump 21 distribution with Its maximum electric power using electric power suitable.I.e., it is possible to lift appliance 1, pressure pump 20 and The order of illuminator 30 sets priority to them.
Power distribution circuit 57 can be able to distribute and the use from lift appliance 1 to lift appliance 1 In the case of the maximum that power information obtains uses the electric power that electric power is suitable, adjust to lift appliance as follows The electric power of 1 distribution.
Such as, the 1st Information Receiving Circuits 52 receive lift appliance 1 carrying out regeneration operating this In the case of one information, power distribution circuit 57 can make the electric power distributing to lift appliance 1 less than electricity The maximum of ladder device 1 uses electric power.In this case, owing to lift appliance 1 carries out regeneration operating, So electric power will not be consumed in hoist engine 6, as the consumption electric power of lift appliance 1 than electronic operating Time few.Therefore, the electric power distributing to lift appliance 1 can be set to fewer than its maximum use electric power.
It addition, such as, receive at the 1st Information Receiving Circuits 52 and do not carry out purpose at lift appliance 1 In the case of stratum is registered this information and is not carried out this information of call registration, power distribution circuit 57 The electric power distributing to lift appliance 1 can be made to use electric power less than the maximum of lift appliance 1.In these feelings Under condition, owing to the cage 3 of lift appliance 1 does not lifts but rest against a boarding place 8 and stop Only, so hoist engine 6 does not temporarily have the plan of action.Therefore, the electric power of lift appliance 1 is distributed to Can be set to fewer than its maximum use electric power.
Power distribution circuit 57 can distribute and making from pressure pump 20 to pressure pump 20 In the case of the maximum obtained with power information uses the electric power that electric power is suitable, distribution can be adjusted as follows Electric power to pressure pump 20.
Such as, the force value that the pressure ratio of the tap water in receiving building 100 is predetermined big this In the case of information, power distribution circuit 57 can make the electric power distributing to pressure pump 20 be less than The maximum of pressure pump 20 uses electric power.In this case, pressure pump 20 may consume The force (forcing) pump 21 of a large amount of electric power does not temporarily have the plan of action.Therefore, pressure pump 20 is distributed to Electric power can be set to maximum use electric power few than it.
It addition, such as, it is in steady running state at the force (forcing) pump 21 receiving pressure pump 20 In the case of this information, power distribution circuit 57 can make to distribute to being less than of pressure pump 20 The maximum of pressure pump 20 uses electric power.In this case, may be used owing to force (forcing) pump 21 have passed through The starting state of electric power can be consumed and be changed into the steady running state that electric power is fewer than starting state that consumes, So the consumption electric power of force (forcing) pump 21 tails off.Therefore, the electric power distributing to pressure pump 20 is permissible It is set to fewer than its maximum use electric power.
Power distribution circuit 57 can the illumination in receiving building 100 higher than predetermined illumination this Electric power is not distributed to illuminator 30 in the case of one information.Such as, on the daytime etc. that weather is good, Even if being also possible to be able to ensure that enough illumination in the case of not lighting illumination 31.In such feelings Under condition, do not supply electric power to illuminator 30 and supply electric power to other devices 1,20.Especially Be, power distribution circuit 57 can to illuminator 30 distribution with make electricity consumption from illuminator 30 The maximum that force information obtains uses and uses such distribution method under the electric power that electric power is suitable is effective.
It addition, the accumulator plant 50 of present embodiment to be also equipped with the 1st output circuit the 58, the 2nd defeated Go out circuit 59, the 3rd output circuit 60, the 1st pass on circuit 61, the 2nd pass on circuit 62 and the 3 pass on circuit 63.
1st output circuit 58 (the 1st output unit) will supply to lift appliance 1 from accumulator 51 Electric power be adjusted to the power value distributed by power distribution circuit 57.Thus, from accumulator 51 to electricity The electric power that ladder device 1 supply is suitable with the power value distributed by power distribution circuit 57.Equally, the 2nd The electric power that output circuit 59 (the 2nd output unit) will supply to pressure pump 20 from accumulator 51 Being adjusted to the power value distributed by power distribution circuit 57, (the 3rd output is single for the 3rd output circuit 60 Unit) will be adjusted to by power distribution circuit 57 to the electric power that illuminator 30 supplies from accumulator 51 The power value of distribution.Thus, supply respectively to pressure pump 20 and illuminator 30 from accumulator 51 Give the electric power suitable with the power value distributed by power distribution circuit 57.
1st passes on the elevator that circuit 61 (the 1st transmission unit) will be distributed by power distribution circuit 57 The power value information of device 1 conveys to elevator control gear 9.Elevator control gear 9 is based on reception and registration Power value information, changes method for detecting abnormality as required.Such as, construct at elevator control gear 9 Have and the electric power of supply is less than predetermined value as the abnormal method for detecting abnormality detecting and sending alarm In the case of, change method for detecting abnormality, even if so that the power value of distribution also will not less than predetermined value It is detected as exception.
Equally, the 2nd circuit 62 (the 2nd transmission unit) is passed on will to be distributed by power distribution circuit 57 The power value information of pressure pump 20 convey to apparatus for controlling pump 23.With elevator control gear 9 Equally, apparatus for controlling pump 23, based on the power value information passed on, changes method for detecting abnormality as required. It addition, the 3rd passes on the photograph that circuit 63 (the 3rd transmission unit) will be distributed by power distribution circuit 57 The power value information of bright device 30 conveys to illumination control apparatus 33.As elevator control gear 9, Illumination control apparatus 33, based on the power value information passed on, changes method for detecting abnormality as required.
Then, the effect to the present embodiment included structure that illustrates.Here, conduct One example, is set to 10kW and with elevator to the maximum output power of the accumulator 51 that accumulation has electric power The order of device 1, pressure pump 20 and illuminator 30 sets priority to them Example illustrates.It addition, to from the lift appliance 1 received by the 1st Information Receiving Circuits 52 Use that power information obtains maximum to use electric power be 6kW, from by the 2nd Information Receiving Circuits 53 The pressure pump 20 received use that power information obtains maximum use electric power be 5kW, from The maximum that the use power information of the illuminator 30 received by the 3rd Information Receiving Circuits 54 obtains Use electric power is that the example of 4kW illustrates.
In this case, the maximum maximum output power using electric power to be accumulator 51 of lift appliance 1 Below.Thus, power distribution circuit 57 is suitable with its maximum use electric power to lift appliance 1 distribution Electric power (that is, 6kW).Then, the remaining output power of accumulator 51 becomes 4kW.Accumulator The remaining output power of 51 than pressure pump 20 is maximum uses electric power few.Thus, electric power divides The remaining output power 4kW of accumulator 51 is distributed to pressure pump 20 in distribution road 57.Additionally, Electric power is not distributed to illuminator 30.
Then, the electric power supplied to lift appliance 1 from accumulator 51 is adjusted by the 1st output circuit 58 For 6kW, the electric power supplied to pressure pump 20 from accumulator 51 is adjusted by the 2nd output circuit 59 Whole for 4kW.The electric power supplied to illuminator 30 from accumulator 51 is adjusted by the 3rd output circuit 60 Whole for 0kW.Thus, the electric power of 6kW is supplied to lift appliance 1, it is possible to realize lift appliance 1 Steady running.On the other hand, the electric power of 4kW is supplied to pressure pump 20.Due to pressurization The electric power of pump installation 20 supply reduces 1kW, so the running ability of force (forcing) pump 21 is by 20% The suppression of left and right.Further, since do not supply electric power to illuminator 30, so illumination 31 is not lighted. Such that make in the case of the output power of accumulator 51 is limited, it is also possible to by suppression force (forcing) pump The running ability of device 20 also makes illuminator 30 be failure to actuate to realize the steady running of lift appliance 1.
It addition, the 1st passes on the electricity of the circuit 61 lift appliance 1 by being distributed by power distribution circuit 57 Force value information conveys to elevator control gear 9, and the 2nd reception and registration circuit 62 will be by power distribution circuit 57 The power value information of the pressure pump 20 of distribution conveys to apparatus for controlling pump 23.3rd passes on circuit The power value information of the illuminator 30 distributed by power distribution circuit 57 is conveyed to Lighting control by 63 Device 33.Thereby, it is possible to prevent apparatus for controlling pump 23 from being cut by the electric power supplied to pressure pump 20 Subtracted 1kW and be detected as exception, and be prevented from apparatus for controlling pump 23 will be not to illuminator 30 Supply electric power is detected as exception.
Even if as it has been described above, in the case of being assigned with electric power to each device, power distribution circuit 57 The electric power distributed to each device can also be adjusted as follows.
Such as, in the case of lift appliance 1 carries out regeneration operating, can will distribute to elevator The electric power of device 1 is set to the electric power fewer than 6kW, such as 3kW.In such a case it is possible to will be surplus 1kW in the electric power of remaining 3kW distributes to pressure pump 20, makes to distribute to pressure pump The electric power of 20 add up to 5kW.Thereby, it is possible to realize the steady running of pressure pump 20.So After, remaining 2kW can be distributed to illuminator 30.In this case, at illuminator 30 Illumination 31 be made up of the multiple systems being partitioned in building 100 in the case of, it is possible to make one Illumination 31 lighting divided.If it addition, the illumination 31 of illumination can be adjusted, then can also carry out little Lighting under illumination.
It addition, such as, do not carry out the registration of purpose stratum at lift appliance 1 and do not carry out call registration In the case of, it is also possible to as described above cut down distribute to lift appliance 1 electric power and will be because of reduction The remaining electric power produced distributes to pressure pump 20 and/or illuminator 30
And then, can distribute to pressure pump 20 at the electric power being distributed to lift appliance 1 by reduction In the case of the electric power (5kW) suitable with the maximum use electric power of pressure pump 20, electric power divides Distribution road 57 can also adjust the electric power distributed to each device as follows.
Such as, in the case of the predetermined force value of the pressure ratio of the tap water in building 100 is big, The electric power distributing to pressure pump 20 can be set to the electric power fewer than 5kW, such as 3kW.? In the case of Gai, remaining 2kW can be distributed to illuminator 30, make to distribute to illuminator 30 Electric power add up to 4kW.Thereby, it is possible to make whole illuminations 31 of illuminator 30 with specified photograph Degree is lighted.
It addition, such as, in the case of force (forcing) pump 21 is in steady running state, as it has been described above, also Can cut down and distribute to the electric power of pressure pump 20 and the remaining electric power produced because of reduction is divided Dispensing illuminator 30.
Additionally, in the case of illumination in building 100 is higher than predetermined illumination, (such as weather is good Good daytime etc.), power distribution circuit 57 can not also distribute electric power to illuminator 30.In these feelings Under condition, more electric power can be distributed according to priority to lift appliance 1 and pressure pump 20.
So, according to present embodiment, operating condition information based on lift appliance 1, force (forcing) pump fill Put the operating condition information of 20 and the operating condition information of illuminator 30, will be from accumulator 51 The electric power of output is respectively allocated to lift appliance 1, pressure pump 20 and illuminator 30, by the 1 output circuit the 58, the 2nd output circuit the 59 and the 3rd output circuit 60 adjusts respectively from accumulator The electric power of 51 supplies.Thereby, it is possible to according to the operating condition of each device 1,20,30, will be from electric power storage The limited electric power of pond 51 output suitably distributes to each device 1,20,30 from accumulator 51.Therefore, When accumulator operates, it is also possible to make each device 1,20,30 operate efficiently.
It addition, according to present embodiment, it is possible to operating condition based on each device 1,20,30 is suitable Electric power is distributed to each device 1,20,30.Thus, even if in the maximum by each device 1,20,30 Use the situation that electric power adds up to merely and the total electricity that obtains is more than the maximum output power of accumulator 51 Under, it is also possible to suitably distribute electric power according to the operating condition of each device 1,20,30, it is possible to make each dress Put 1,20,30 to operate efficiently.
It addition, according to present embodiment, it is possible to when accumulator operates from accumulator 51 to as electric power storage The lift appliance 1 that the necessity of object of pond operating is high supplies electric power, it is possible to according to each device 1,20, The operating state of 30 the most suitably supplies electric power from accumulator 51 to other devices 20,30.Thus, energy While the operating of enough lift appliances 1 high to importance degree in suppression counteracts, make each device 1, 20,30 operate efficiently.
Additionally, in above-mentioned present embodiment, to lift appliance 1, pressure pump 20 and The example that the order of illuminator 30 sets priority to them is illustrated.But, do not limit In this, the priority of each device 1,20,30 arbitrarily can set according to the intention of user.
It addition, in above-mentioned present embodiment, to lift appliance 1, pressure pump 20 and The load distribution of these 3, illuminator 30 is illustrated from the example of the electric power of accumulator 51 output. But, it being not limited to this, the allocated quantity from the load of the electric power of accumulator 51 output both can be 2 Individual, it is also possible to be more than 4.
It addition, in above-mentioned present embodiment, to be the 2nd load with pressure pump 20, to shine Bright device 30 is that the example of the 3rd load is illustrated.But, it is not limited to this, as long as be arranged at Same building thing 100 also consumes the load of electric power, is not limited to pressure pump 20, illuminator 30.It addition, distribute the situation of electric power at the device beyond pressure pump 20, illuminator 30 Under, adjustment power distribution circuit 57 can be set according to the characteristic of each device, method of operation and be distributed Electric power time condition.
Embodiment in accordance with the above, it is possible to suitably distribute from storage according to the operating condition of each load Battery 51 is to the electric power of each load supply, it is possible to make each load operate efficiently.
Although being illustrated several embodiments of the invention, but these embodiments are as an example And propose, it is not intended to limit the scope of invention.The embodiment of these novelties can be various with other The form of various kinds is implemented, it is possible to carries out various omission in the range of the main idea without departing from invention, put Change, change.These embodiments and deformation thereof are contained in scope and/or the main idea of invention, and comprise In the invention described in claims and the scope of equalization thereof.

Claims (8)

1. an accumulator plant, when having a power failure or during electric power scarcity, to the conduct being arranged at building The lift appliance of the 1st load is different from described lift appliance the 2nd negative be arranged at described building Carry supply electric power, it is characterised in that possess:
Accumulator, its electric power can accumulated to described 1st load and described 2nd load supply;
1st information receiving unit, it receives the operating condition information of described 1st load;
2nd information receiving unit, it receives the operating condition information of described 2nd load;
Power distribution unit, it is described 1st negative based on received by described 1st information receiving unit The operating condition information carried and the fortune of described 2nd load received by described 2nd information receiving unit Turn status information, the electric power exported from described accumulator is distributed to described 1st load and the described 2nd Load;
1st output unit, it will be adjusted to from described accumulator to the electric power of described 1st load supply The power value distributed by described power distribution unit;And
2nd output unit, it will be adjusted to from described accumulator to the electric power of described 2nd load supply The power value distributed by described power distribution unit.
Accumulator plant the most according to claim 1, it is characterised in that
The operating condition information of described 1st load received by described 1st information receiving unit includes institute State the use power information of lift appliance,
At the described use electric power from described 1st load received by described 1st information receiving unit In the case of the maximum use electric power that information obtains is below the maximum output power of described accumulator, institute State power distribution unit and the electric power suitable with the maximum use electric power of described 1st load is distributed to described 1st load.
Accumulator plant the most according to claim 2, it is characterised in that
The described operating condition information of described 1st load that described 1st information receiving unit is received is also This information of regeneration operating is being carried out including described lift appliance,
Can loaded with the described 1st to described 1st load distribution by described power distribution unit Ambassador is just receiving described lift appliance with the suitable electric power of electric power and described 1st information receiving unit In the case of carrying out this information of regeneration operating, described power distribution unit makes to distribute to the described 1st The electric power of load uses electric power less than described the maximum of 1st load.
Accumulator plant the most according to claim 2, it is characterised in that
The described operating condition information of described 1st load that described 1st information receiving unit is received is also Be included in described lift appliance do not carry out purpose stratum register this information and do not carry out call registration this Information,
Can loaded with the described 1st to described 1st load distribution by described power distribution unit Ambassador receives at described lift appliance with the suitable electric power of electric power and described 1st information receiving unit Do not carry out in the case of purpose stratum registers this information and do not carry out this information of call registration, described Power distribution unit makes the electric power the distributing to described 1st load maximum use less than described 1st load Electric power.
5. according to the accumulator plant according to any one of claim 2~4, it is characterised in that
The operating condition information of described 2nd load received by described 2nd information receiving unit includes institute State the use power information of the 2nd load,
Can loaded with the described 1st to described 1st load distribution by described power distribution unit Ambassador is with the suitable electric power of electric power and from the described 2nd received by described 2nd information receiving unit The maximum use electric power that the described use power information of load obtains is the maximum output from described accumulator In the case of electric power deducts below the remaining output power after the electric power distributing to described 1st load, Described power distribution unit will use the electric power that electric power is suitable to distribute to institute with the maximum of described 2nd load State the 2nd load.
Accumulator plant the most according to claim 5, it is characterised in that
Described 2nd load is disposed on the tap water in improving described building of described building The pressure pump of pressure,
The described operating condition information of described 2nd load that described 2nd information receiving unit is received is also Including the force value that the pressure ratio of described tap water is predetermined this information big,
Can distributed and from described 2nd load to described 2nd load by described power distribution unit What described use power information obtained maximum use electric power that electric power is suitable and receives described tap water The predetermined force value of pressure ratio this information big in the case of, described power distribution unit makes to distribute to The electric power of described 2nd load uses electric power less than described the maximum of 2nd load.
Accumulator plant the most according to claim 5, it is characterised in that
Described 2nd load be disposed on described building for the tap water in described building is entered The pressure pump of row pressurization,
The described operating condition information of described 2nd load that described 2nd information receiving unit is received is also Have passed through starting state including described pressure pump and be in this information of steady running state,
The institute from described 2nd load can distributed to described 2nd load by described power distribution unit State use that power information obtains maximum use electric power and receive described 2nd load and be in stable fortune In the case of turning this information of state, described power distribution unit makes to distribute to the electricity of described 2nd load Power uses electric power less than described the maximum of 2nd load.
Accumulator plant the most according to claim 1, it is characterised in that be also equipped with:
1st transmission unit, its described 1st electric power loaded that will be distributed by described power distribution unit Value information conveys to described 1st load;With
2nd transmission unit, its described 2nd electric power loaded that will be distributed by described power distribution unit Value information conveys to described 2nd load.
CN201510239025.1A 2015-01-22 2015-05-12 Accumulator plant Expired - Fee Related CN106185535B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015010592A JP6089050B2 (en) 2015-01-22 2015-01-22 Storage battery device
JP2015-010592 2015-01-22

Publications (2)

Publication Number Publication Date
CN106185535A true CN106185535A (en) 2016-12-07
CN106185535B CN106185535B (en) 2018-11-27

Family

ID=56434845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510239025.1A Expired - Fee Related CN106185535B (en) 2015-01-22 2015-05-12 Accumulator plant

Country Status (2)

Country Link
JP (1) JP6089050B2 (en)
CN (1) CN106185535B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107706972A (en) * 2017-09-30 2018-02-16 湖南海翼电子商务股份有限公司 Power output control method, circuit and charging device for charging device
JP7088436B1 (en) * 2020-08-12 2022-06-21 三菱電機株式会社 Power management device and power management method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201465285U (en) * 2009-07-16 2010-05-12 秦兵 Single wire remote control wall switch system
CN102113270A (en) * 2008-08-01 2011-06-29 传感电子有限责任公司 Battery backed power-over-ethernet system
CN102590760A (en) * 2012-02-27 2012-07-18 力帆实业(集团)股份有限公司 Storage battery state detection device and detection method thereof
JP2014220874A (en) * 2013-05-02 2014-11-20 株式会社リコー Power supply system, control device for power supply system, control method for power supply system, and power supply program
CN104184394A (en) * 2014-07-09 2014-12-03 佛山职业技术学院 Household off-grid photovoltaic power generation system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5456325B2 (en) * 2009-01-06 2014-03-26 パナソニック株式会社 Power control system, control method and program for power control system
JP2012242219A (en) * 2011-05-18 2012-12-10 Panasonic Industrial Devices Sunx Tatsuno Co Ltd Power measurement device
JP2013013277A (en) * 2011-06-30 2013-01-17 Sanyo Electric Co Ltd Power-adjusting device
WO2014155626A1 (en) * 2013-03-28 2014-10-02 中国電力株式会社 Power supply control device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102113270A (en) * 2008-08-01 2011-06-29 传感电子有限责任公司 Battery backed power-over-ethernet system
CN201465285U (en) * 2009-07-16 2010-05-12 秦兵 Single wire remote control wall switch system
CN102590760A (en) * 2012-02-27 2012-07-18 力帆实业(集团)股份有限公司 Storage battery state detection device and detection method thereof
JP2014220874A (en) * 2013-05-02 2014-11-20 株式会社リコー Power supply system, control device for power supply system, control method for power supply system, and power supply program
CN104184394A (en) * 2014-07-09 2014-12-03 佛山职业技术学院 Household off-grid photovoltaic power generation system

Also Published As

Publication number Publication date
JP6089050B2 (en) 2017-03-01
CN106185535B (en) 2018-11-27
JP2016135083A (en) 2016-07-25

Similar Documents

Publication Publication Date Title
CN101088896B (en) Method and device to reduce the energy consumption of an elevator, and elevator with the device
CN102649522B (en) Elevator
US20080185234A1 (en) Elevator system
CN108292857A (en) The self-adaptive electric power management of self-holding energy collecting system
CN109422150A (en) Power system, method and vertical transport device for transporting vertically
CN106185535A (en) Accumulator plant
CN107310995B (en) Elevator set management and control device
JP2014117041A (en) Electric power system of building with elevator
SG190906A1 (en) Energy efficient elevator installation
WO2011053294A1 (en) Elevator door controller system
CN103863921B (en) Elevator
CN103482439A (en) Elevator system and elevator control method
JP6077302B2 (en) LIGHTING DEVICE, LIGHTING SYSTEM, AND LIGHTING DEVICE CONTROL METHOD
CN103384638B (en) For presenting method and the elevator device of information at elevator run duration
AU2018203372B2 (en) Emergency elevator power management
CN116513921A (en) Counterweight of elevator
KR20120032160A (en) A integral power supply device of lighting equipment
CN101830374A (en) Elevator device
CN103896123A (en) Elevator control system
CN105577038B (en) Direct current generator family expenses garage parking
JP2006143388A (en) Blackout operation device for elevator
CN209635683U (en) A kind of novel elevator lighting system
DE202013100078U1 (en) The photoelectric energy saving LED lighting equipments
CN114314221A (en) Traction elevator system
CN206142632U (en) High -efficient speed -raising elevator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee