CN106181148A - A kind of welding procedure of corrosion resistant boiler tail flue gas pipeline alloy - Google Patents

A kind of welding procedure of corrosion resistant boiler tail flue gas pipeline alloy Download PDF

Info

Publication number
CN106181148A
CN106181148A CN201610675380.8A CN201610675380A CN106181148A CN 106181148 A CN106181148 A CN 106181148A CN 201610675380 A CN201610675380 A CN 201610675380A CN 106181148 A CN106181148 A CN 106181148A
Authority
CN
China
Prior art keywords
welding
weld
temperature
flue gas
corrosion resistant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610675380.8A
Other languages
Chinese (zh)
Other versions
CN106181148B (en
Inventor
郑琰
叶元华
王通
刘杰
杨国娟
赵凯东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tefu Development Co., Ltd
Original Assignee
Zhejiang Tuff Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tuff Boiler Co Ltd filed Critical Zhejiang Tuff Boiler Co Ltd
Priority to CN201610675380.8A priority Critical patent/CN106181148B/en
Publication of CN106181148A publication Critical patent/CN106181148A/en
Application granted granted Critical
Publication of CN106181148B publication Critical patent/CN106181148B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Arc Welding In General (AREA)
  • Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)

Abstract

The invention discloses the welding procedure of a kind of corrosion resistant boiler tail flue gas pipeline alloy, the welding procedure of described corrosion resistant boiler tail flue gas pipeline alloy, comprise the steps: to prepare, select materials, spot welding, welding pre-treatment, bank of tubes welding, photocuring, detection, deburring, molding, scarfing cinder.Present invention process is simple, easy to operate, has welded use heat-preservation cotton and has covered, crackle will not have occurred because of quick refrigeration.

Description

A kind of welding procedure of corrosion resistant boiler tail flue gas pipeline alloy
Technical field
The present invention relates to a kind of boiler manfacturing technical field, a kind of corrosion resistant boiler tail flue gas pipeline alloy Welding procedure.
Background technology
Often carrying out high-temperature heating in boiler, it is made up of the row's of number steel pipe, and steel pipe is distributed in boiler furnace surrounding, traditional Welding procedure always there will be crackle.This is because in current welding procedure, commonly used welding method is: welding rod arc Weldering, submerged-arc welding, gas metal-arc welding, flux cored wire arc welding, gas tungsten arc welding, plasma weldering, electroslag welding Deng.For corrosion resistant boiler tail flue gas pipeline alloy, welding procedure is to determine the primary influence factor of product quality, Especially for important Welding Structure.Such as the complete penetraction and fusion in welding Welding Structure such as boiler, pressure vessel, its welding point be all according to etc. Intensity Design, the intensity of welding point weaken or toughness is not enough, all can cause whole welding and joint premature failure, even Cause serious catastrophic effect.
Summary of the invention
It is an object of the invention to provide the welding procedure of a kind of corrosion resistant boiler tail flue gas pipeline alloy, to solve The problem proposed in above-mentioned background technology.
For achieving the above object, the present invention provides following technical scheme:
The welding procedure of a kind of corrosion resistant boiler tail flue gas pipeline alloy, comprises the steps:
(1) prepare: by carrying out polishing rust cleaning at boiler weld bond before welding, be then used by abluent and be carried out, 72 DEG C of bakings Place at lucifuge after Gan;
(2) select materials: the welding wire and solder flux that meet JIS Z3312-1999 standard are joined in microwave high-temperature equipment, microwave Temperature is 120 DEG C-130 DEG C, and the microwave time is 15min-35min, and high-temperature heating is cooled to 4 DEG C after terminating under helium is protected;
(3) spot welding: preheated by boiler weld, weld preheating temperature is 160 DEG C-180 DEG C, is thrown by welding wire subsequently Light is the most stand-by in being positioned over heat-preservation cylinder, and solder flux carries out metal bath heating, and water bath heating temperature is 65 DEG C-68 DEG C;
(4) welding pre-treatment: contacting with welding wire after the weld deburring after preheating, apply pressure contact, pressure is 75MPa-92MPa, time of contact is 15s-20s, then spreads upon on welding wire by the solder flux after water-bath, and lucifuge stands 1h;
(5) bank of tubes welding: electric welding machine carries out parameter setting, weld electric current 225A-260A, voltage 32V-40V and weldering Connecing speed 120mm-130mm/min, first carry out front welding, the texture then according to weld carries out reverse side welding, all Welding uses asbestos to wrap up after terminating, and the parcel time is 12h-18h, and parcel temperature is 12 DEG C-18 DEG C;
(6) photocuring: being removed by asbestos, carry out ultraviolet light irradiation subsequently, irradiation time is 13min-18min;
(7) detection: use survey meter that weld carries out carrying out flaw detection, and it is smooth to carry out reconditioning;
(8) deburring: weld is again placed in flash trimmer and carries out deburring;
(9) molding: weld entirety is carried out heat treatment, the temperature of heat treatment is 650 DEG C-700 DEG C, the time of heat treatment For 1h-2h, programming rate is 50 DEG C-100 DEG C, and cooling rate is 60 DEG C-80 DEG C;
(10) scarfing cinder: the weld after molding is carried out the removing of slag, and uses detergent treatment.
As the further scheme of the present invention: described in step (1), the key component of abluent includes triethylene glycol butyl ether Amine, butyl glycol ether, stearate, hydroxyacetic acid, disodiumedetate, sodium carbonate, dodecylbenzene sodium sulfonate, Fructus Citri Limoniae Acid sodium.
As the further scheme of the present invention: in step (2), microwave temperature is 125 DEG C, the microwave time is 30min.
As the further scheme of the present invention: in step (3), weld preheating temperature is 170 DEG C, and water bath heating temperature is 67℃。
As the further scheme of the present invention: in step (4), pressure is 88MPa, time of contact is 18s.
As the further scheme of the present invention: weld electric current 250A, voltage 36V and speed of welding in step (5) 125mm/min。
As the further scheme of the present invention: in step (5), the parcel time is 16h, parcel temperature is 15 DEG C.
As the further scheme of the present invention: in step (6), irradiation time is 16min.
As the further scheme of the present invention: in step (9), the temperature of heat treatment is 680 DEG C, the time of heat treatment is 1.5h, programming rate is 80 DEG C, and cooling rate is 70 DEG C.
As the further scheme of the present invention: described in step (10), the key component of cleaning agent includes lauryl methyl oxygen Change amine, propylene glycol monomethyl ether, TTA, aliphatic alcohol polyoxyvinethene phosphate, dimethyl cyclohexyl amine, sulfenyl phenolate Calcium.
Compared with prior art, the invention has the beneficial effects as follows:
Easily operated motility is good, and Technological adaptability is strong, to work place without particular/special requirement, can weld in any position, On the premise of guaranteeing that weldquality meets corresponding technical standard and product technology price modification on request, reach the highest welding efficiency With minimum production cost, to obtain maximum economic benefit.
Detailed description of the invention
Below in conjunction with the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, Obviously, described embodiment is only a part of embodiment of the present invention rather than whole embodiments.Based in the present invention Embodiment, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, all Belong to the scope of protection of the invention.
Embodiment 1
The welding procedure of a kind of corrosion resistant boiler tail flue gas pipeline alloy, comprises the steps:
(1) prepare: by carrying out polishing rust cleaning at boiler weld bond before welding, be then used by abluent and be carried out, 72 DEG C of bakings Place at lucifuge after Gan;
(2) select materials: the welding wire and solder flux that meet JIS Z3312-1999 standard are joined in microwave high-temperature equipment, microwave Temperature is 120 DEG C, and the microwave time is 15min, and high-temperature heating is cooled to 4 DEG C after terminating under helium is protected;
(3) spot welding: preheated by boiler weld, weld preheating temperature is 160 DEG C, is polished by welding wire subsequently and puts In being placed in heat-preservation cylinder stand-by, solder flux carries out metal bath heating, and water bath heating temperature is 65 DEG C;
(4) welding pre-treatment: contacting with welding wire after the weld deburring after preheating, apply pressure contact, pressure is 75MPa, time of contact is 15s, then spreads upon on welding wire by the solder flux after water-bath, and lucifuge stands 1h;
(5) bank of tubes welding: electric welding machine carries out parameter setting, weld electric current 225A, voltage 32V and speed of welding 120mm/min, first carries out front welding, and the texture then according to weld carries out reverse side welding, and all welding make after terminating Wrapping up with asbestos, the parcel time is 12h, and parcel temperature is 12 DEG C;
(6) photocuring: being removed by asbestos, carry out ultraviolet light irradiation subsequently, irradiation time is 13min;
(7) detection: use survey meter that weld carries out carrying out flaw detection, and it is smooth to carry out reconditioning;
(8) deburring: weld is again placed in flash trimmer and carries out deburring;
(9) molding: weld entirety is carried out heat treatment, the temperature of heat treatment is 650 DEG C, and the time of heat treatment is 1h, Programming rate is 50 DEG C, and cooling rate is 60 DEG C;
(10) scarfing cinder: the weld after molding is carried out the removing of slag, and uses detergent treatment.
Wherein:
The key component of abluent described in step (1) include triethylene glycol butyl ether amine, butyl glycol ether, stearate, Hydroxyacetic acid, disodiumedetate, sodium carbonate, dodecylbenzene sodium sulfonate, sodium citrate.
Described in step (10), the key component of cleaning agent includes lauryl methyl amine oxide, propylene glycol monomethyl ether, methylbenzene A pair of horses going side by side triazole, aliphatic alcohol polyoxyvinethene phosphate, dimethyl cyclohexyl amine, calcium sulfenyl phenolate.
Embodiment 2
The welding procedure of a kind of corrosion resistant boiler tail flue gas pipeline alloy, comprises the steps:
(1) prepare: by carrying out polishing rust cleaning at boiler weld bond before welding, be then used by abluent and be carried out, 72 DEG C of bakings Place at lucifuge after Gan;
(2) select materials: the welding wire and solder flux that meet JIS Z3312-1999 standard are joined in microwave high-temperature equipment, microwave Temperature is 122 DEG C, and the microwave time is 28min, and high-temperature heating is cooled to 4 DEG C after terminating under helium is protected;
(3) spot welding: preheated by boiler weld, weld preheating temperature is 165 DEG C, is polished by welding wire subsequently and puts In being placed in heat-preservation cylinder stand-by, solder flux carries out metal bath heating, and water bath heating temperature is 66 DEG C;
(4) welding pre-treatment: contacting with welding wire after the weld deburring after preheating, apply pressure contact, pressure is 75MPa, time of contact is 15s, then spreads upon on welding wire by the solder flux after water-bath, and lucifuge stands 1h;
(5) bank of tubes welding: electric welding machine carries out parameter setting, weld electric current 225A, voltage 32V and speed of welding 120mm/min, first carries out front welding, and the texture then according to weld carries out reverse side welding, and all welding make after terminating Wrapping up with asbestos, the parcel time is 12h, and parcel temperature is 12 DEG C;
(6) photocuring: being removed by asbestos, carry out ultraviolet light irradiation subsequently, irradiation time is 14min;
(7) detection: use survey meter that weld carries out carrying out flaw detection, and it is smooth to carry out reconditioning;
(8) deburring: weld is again placed in flash trimmer and carries out deburring;
(9) molding: weld entirety is carried out heat treatment, the temperature of heat treatment is 652 DEG C, and the time of heat treatment is 1.1h, programming rate is 62 DEG C, and cooling rate is 63 DEG C;
(10) scarfing cinder: the weld after molding is carried out the removing of slag, and uses detergent treatment.
Wherein:
The key component of abluent described in step (1) include triethylene glycol butyl ether amine, butyl glycol ether, stearate, Hydroxyacetic acid, disodiumedetate, sodium carbonate, dodecylbenzene sodium sulfonate, sodium citrate.
Described in step (10), the key component of cleaning agent includes lauryl methyl amine oxide, propylene glycol monomethyl ether, methylbenzene A pair of horses going side by side triazole, aliphatic alcohol polyoxyvinethene phosphate, dimethyl cyclohexyl amine, calcium sulfenyl phenolate.
Embodiment 3
The welding procedure of a kind of corrosion resistant boiler tail flue gas pipeline alloy, comprises the steps:
(1) prepare: by carrying out polishing rust cleaning at boiler weld bond before welding, be then used by abluent and be carried out, 72 DEG C of bakings Place at lucifuge after Gan;
(2) select materials: the welding wire and solder flux that meet JIS Z3312-1999 standard are joined in microwave high-temperature equipment, microwave Temperature is 125 DEG C, and the microwave time is 30min, and high-temperature heating is cooled to 4 DEG C after terminating under helium is protected;
(3) spot welding: preheated by boiler weld, weld preheating temperature is 170 DEG C, is polished by welding wire subsequently and puts In being placed in heat-preservation cylinder stand-by, solder flux carries out metal bath heating, and water bath heating temperature is 67 DEG C;
(4) welding pre-treatment: contacting with welding wire after the weld deburring after preheating, apply pressure contact, pressure is 88MPa, time of contact is 18s, then spreads upon on welding wire by the solder flux after water-bath, and lucifuge stands 1h;
(5) bank of tubes welding: electric welding machine carries out parameter setting, weld electric current 250A, voltage 36V and speed of welding 125mm/min, first carries out front welding, and the texture then according to weld carries out reverse side welding, and all welding make after terminating Wrapping up with asbestos, the parcel time is 16h, and parcel temperature is 15 DEG C;
(6) photocuring: being removed by asbestos, carry out ultraviolet light irradiation subsequently, irradiation time is 16min;
(7) detection: use survey meter that weld carries out carrying out flaw detection, and it is smooth to carry out reconditioning;
(8) deburring: weld is again placed in flash trimmer and carries out deburring;
(9) molding: weld entirety is carried out heat treatment, the temperature of heat treatment is 680 DEG C, and the time of heat treatment is 1.5h, programming rate is 80 DEG C, and cooling rate is 70 DEG C;
(10) scarfing cinder: the weld after molding is carried out the removing of slag, and uses detergent treatment.
Wherein:
The key component of abluent described in step (1) include triethylene glycol butyl ether amine, butyl glycol ether, stearate, Hydroxyacetic acid, disodiumedetate, sodium carbonate, dodecylbenzene sodium sulfonate, sodium citrate.
Described in step (10), the key component of cleaning agent includes lauryl methyl amine oxide, propylene glycol monomethyl ether, methylbenzene A pair of horses going side by side triazole, aliphatic alcohol polyoxyvinethene phosphate, dimethyl cyclohexyl amine, calcium sulfenyl phenolate.
Embodiment 4
The welding procedure of a kind of corrosion resistant boiler tail flue gas pipeline alloy, comprises the steps:
(1) prepare: by carrying out polishing rust cleaning at boiler weld bond before welding, be then used by abluent and be carried out, 72 DEG C of bakings Place at lucifuge after Gan;
(2) select materials: the welding wire and solder flux that meet JIS Z3312-1999 standard are joined in microwave high-temperature equipment, microwave Temperature is 129 DEG C, and the microwave time is 32min, and high-temperature heating is cooled to 4 DEG C after terminating under helium is protected;
(3) spot welding: preheated by boiler weld, weld preheating temperature is 172 DEG C, is polished by welding wire subsequently and puts In being placed in heat-preservation cylinder stand-by, solder flux carries out metal bath heating, and water bath heating temperature is 67 DEG C;
(4) welding pre-treatment: contacting with welding wire after the weld deburring after preheating, apply pressure contact, pressure is 91MPa, time of contact is 18s, then spreads upon on welding wire by the solder flux after water-bath, and lucifuge stands 1h;
(5) bank of tubes welding: electric welding machine carries out parameter setting, weld electric current 255A, voltage 38V and speed of welding 127mm/min, first carries out front welding, and the texture then according to weld carries out reverse side welding, and all welding make after terminating Wrapping up with asbestos, the parcel time is 17h, and parcel temperature is 17 DEG C;
(6) photocuring: being removed by asbestos, carry out ultraviolet light irradiation subsequently, irradiation time is 16min;
(7) detection: use survey meter that weld carries out carrying out flaw detection, and it is smooth to carry out reconditioning;
(8) deburring: weld is again placed in flash trimmer and carries out deburring;
(9) molding: weld entirety is carried out heat treatment, the temperature of heat treatment is 692 DEG C, and the time of heat treatment is 1.8h, programming rate is 90 DEG C, and cooling rate is 75 DEG C;
(10) scarfing cinder: the weld after molding is carried out the removing of slag, and uses detergent treatment.
Wherein:
The key component of abluent described in step (1) include triethylene glycol butyl ether amine, butyl glycol ether, stearate, Hydroxyacetic acid, disodiumedetate, sodium carbonate, dodecylbenzene sodium sulfonate, sodium citrate.
Described in step (10), the key component of cleaning agent includes lauryl methyl amine oxide, propylene glycol monomethyl ether, methylbenzene A pair of horses going side by side triazole, aliphatic alcohol polyoxyvinethene phosphate, dimethyl cyclohexyl amine, calcium sulfenyl phenolate.
Embodiment 5
The welding procedure of a kind of corrosion resistant boiler tail flue gas pipeline alloy, comprises the steps:
(1) prepare: by carrying out polishing rust cleaning at boiler weld bond before welding, be then used by abluent and be carried out, 72 DEG C of bakings Place at lucifuge after Gan;
(2) select materials: the welding wire and solder flux that meet JIS Z3312-1999 standard are joined in microwave high-temperature equipment, microwave Temperature is 130 DEG C, and the microwave time is 35min, and high-temperature heating is cooled to 4 DEG C after terminating under helium is protected;
(3) spot welding: preheated by boiler weld, weld preheating temperature is 180 DEG C, is polished by welding wire subsequently and puts In being placed in heat-preservation cylinder stand-by, solder flux carries out metal bath heating, and water bath heating temperature is 68 DEG C;
(4) welding pre-treatment: contacting with welding wire after the weld deburring after preheating, apply pressure contact, pressure is 92MPa, time of contact is 20s, then spreads upon on welding wire by the solder flux after water-bath, and lucifuge stands 1h;
(5) bank of tubes welding: electric welding machine carries out parameter setting, weld electric current 260A, voltage 40V and speed of welding 130mm/min, first carries out front welding, and the texture then according to weld carries out reverse side welding, and all welding make after terminating Wrapping up with asbestos, the parcel time is 18h, and parcel temperature is 18 DEG C;
(6) photocuring: being removed by asbestos, carry out ultraviolet light irradiation subsequently, irradiation time is 18min;
(7) detection: use survey meter that weld carries out carrying out flaw detection, and it is smooth to carry out reconditioning;
(8) deburring: weld is again placed in flash trimmer and carries out deburring;
(9) molding: weld entirety is carried out heat treatment, the temperature of heat treatment is 700 DEG C, and the time of heat treatment is 2h, Programming rate is 100 DEG C, and cooling rate is 80 DEG C;
(10) scarfing cinder: the weld after molding is carried out the removing of slag, and uses detergent treatment.
Wherein:
The key component of abluent described in step (1) include triethylene glycol butyl ether amine, butyl glycol ether, stearate, Hydroxyacetic acid, disodiumedetate, sodium carbonate, dodecylbenzene sodium sulfonate, sodium citrate.
Described in step (10), the key component of cleaning agent includes lauryl methyl amine oxide, propylene glycol monomethyl ether, methylbenzene A pair of horses going side by side triazole, aliphatic alcohol polyoxyvinethene phosphate, dimethyl cyclohexyl amine, calcium sulfenyl phenolate.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of the spirit or essential attributes of the present invention, it is possible to realize the present invention in other specific forms.Therefore, no matter From the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all by fall in the implication of equivalency and scope of claim Change is included in the present invention.
Although moreover, it will be appreciated that this specification is been described by according to embodiment, but the most each embodiment only wraps Containing an independent technical scheme, this narrating mode of description is only that for clarity sake those skilled in the art should Description can also be formed those skilled in the art through appropriately combined as an entirety, the technical scheme in each embodiment May be appreciated other embodiments.

Claims (10)

1. the welding procedure of a corrosion resistant boiler tail flue gas pipeline alloy, it is characterised in that comprise the steps:
(1) prepare: by carrying out polishing rust cleaning at boiler weld bond before welding, be then used by abluent and be carried out, after 72 DEG C dry Place at lucifuge;
(2) select materials: the welding wire and solder flux that meet JIS Z3312-1999 standard are joined in microwave high-temperature equipment, microwave temperature Being 120 DEG C-130 DEG C, the microwave time is 15min-35min, and high-temperature heating is cooled to 4 DEG C after terminating under helium is protected;
(3) spot welding: preheated by boiler weld, weld preheating temperature is 160 DEG C-180 DEG C, is polished also by welding wire subsequently In being positioned over heat-preservation cylinder stand-by, solder flux carries out metal bath heating, and water bath heating temperature is 65 DEG C-68 DEG C;
(4) welding pre-treatment: contacting with welding wire after the weld deburring after preheating, apply pressure contact, pressure is 75MPa-92MPa, time of contact is 15s-20s, then spreads upon on welding wire by the solder flux after water-bath, and lucifuge stands 1h;
(5) bank of tubes welding: electric welding machine carries out parameter setting, weld electric current 225A-260A, voltage 32V-40V and welding speed Degree 120mm-130mm/min, first carries out front welding, and the texture then according to weld carries out reverse side welding, all welding Using asbestos to wrap up after end, the parcel time is 12h-18h, and parcel temperature is 12 DEG C-18 DEG C;
(6) photocuring: being removed by asbestos, carry out ultraviolet light irradiation subsequently, irradiation time is 13min-18min;
(7) detection: use survey meter that weld carries out carrying out flaw detection, and it is smooth to carry out reconditioning;
(8) deburring: weld is again placed in flash trimmer and carries out deburring;
(9) molding: weld entirety is carried out heat treatment, the temperature of heat treatment is 650 DEG C-700 DEG C, and the time of heat treatment is 1h-2h, programming rate is 50 DEG C-100 DEG C, and cooling rate is 60 DEG C-80 DEG C;
(10) scarfing cinder: the weld after molding is carried out the removing of slag, and uses detergent treatment.
The welding procedure of corrosion resistant boiler tail flue gas pipeline alloy the most according to claim 1, it is characterised in that step Suddenly the key component of abluent described in (1) includes triethylene glycol butyl ether amine, butyl glycol ether, stearate, hydroxyacetic acid, second Edetate disodium, sodium carbonate, dodecylbenzene sodium sulfonate, sodium citrate.
The welding procedure of corrosion resistant boiler tail flue gas pipeline alloy the most according to claim 1 and 2, its feature exists In, in step (2), microwave temperature is 125 DEG C, and the microwave time is 30min.
The welding procedure of corrosion resistant boiler tail flue gas pipeline alloy the most according to claim 3, it is characterised in that step Suddenly in (3), weld preheating temperature is 170 DEG C, and water bath heating temperature is 67 DEG C.
The welding procedure of corrosion resistant boiler tail flue gas pipeline alloy the most according to claim 4, it is characterised in that step Suddenly in (4), pressure is 88MPa, and time of contact is 18s.
The welding procedure of corrosion resistant boiler tail flue gas pipeline alloy the most according to claim 5, it is characterised in that step Suddenly weld electric current 250A, voltage 36V and speed of welding 125mm/min in (5).
The welding procedure of corrosion resistant boiler tail flue gas pipeline alloy the most according to claim 6, it is characterised in that step Suddenly in (5), the parcel time is 16h, and parcel temperature is 15 DEG C.
The welding procedure of corrosion resistant boiler tail flue gas pipeline alloy the most according to claim 7, it is characterised in that step Suddenly in (6), irradiation time is 16min.
The welding procedure of corrosion resistant boiler tail flue gas pipeline alloy the most according to claim 8, it is characterised in that step Suddenly in (9), the temperature of heat treatment is 680 DEG C, and the time of heat treatment is 1.5h, and programming rate is 80 DEG C, and cooling rate is 70 DEG C.
The welding procedure of corrosion resistant boiler tail flue gas pipeline alloy the most according to claim 9, it is characterised in that The key component of cleaning agent described in step (10) include lauryl methyl amine oxide, propylene glycol monomethyl ether, TTA, Aliphatic alcohol polyoxyvinethene phosphate, dimethyl cyclohexyl amine, calcium sulfenyl phenolate.
CN201610675380.8A 2016-08-17 2016-08-17 A kind of welding procedure of corrosion resistant boiler tail flue gas pipeline alloy Active CN106181148B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610675380.8A CN106181148B (en) 2016-08-17 2016-08-17 A kind of welding procedure of corrosion resistant boiler tail flue gas pipeline alloy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610675380.8A CN106181148B (en) 2016-08-17 2016-08-17 A kind of welding procedure of corrosion resistant boiler tail flue gas pipeline alloy

Publications (2)

Publication Number Publication Date
CN106181148A true CN106181148A (en) 2016-12-07
CN106181148B CN106181148B (en) 2017-12-19

Family

ID=57521748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610675380.8A Active CN106181148B (en) 2016-08-17 2016-08-17 A kind of welding procedure of corrosion resistant boiler tail flue gas pipeline alloy

Country Status (1)

Country Link
CN (1) CN106181148B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110961858A (en) * 2019-12-23 2020-04-07 东方电气集团东方汽轮机有限公司 High-frequency pulse electric arc repairing method for precision casting defect of heavy gas turbine equiaxial crystal blade

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010029990A1 (en) * 1988-09-17 2001-10-18 Teruhisa Takahashi Heat and corrosion resistant steel pipe having multi-layered coating
JP2001324062A (en) * 2000-05-18 2001-11-22 Nkk Corp Bell and spigot joint type propulsion pipe
CN102808192A (en) * 2012-07-30 2012-12-05 南京航空航天大学 Water-based cleaning agent for welding of zirconium material and use method thereof
CN103862141A (en) * 2014-03-11 2014-06-18 中国化学工程第六建设有限公司 Chemical composite steel pipe welding process
CN104801834A (en) * 2014-08-14 2015-07-29 江苏绿叶锅炉有限公司 T91 water wall tube row welding technology
CN105290570A (en) * 2015-09-25 2016-02-03 王灿炳 Metal surface treatment method
CN105473276A (en) * 2013-08-06 2016-04-06 千住金属工业株式会社 Conductive bonding agent and soldered joint

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010029990A1 (en) * 1988-09-17 2001-10-18 Teruhisa Takahashi Heat and corrosion resistant steel pipe having multi-layered coating
JP2001324062A (en) * 2000-05-18 2001-11-22 Nkk Corp Bell and spigot joint type propulsion pipe
CN102808192A (en) * 2012-07-30 2012-12-05 南京航空航天大学 Water-based cleaning agent for welding of zirconium material and use method thereof
CN105473276A (en) * 2013-08-06 2016-04-06 千住金属工业株式会社 Conductive bonding agent and soldered joint
CN103862141A (en) * 2014-03-11 2014-06-18 中国化学工程第六建设有限公司 Chemical composite steel pipe welding process
CN104801834A (en) * 2014-08-14 2015-07-29 江苏绿叶锅炉有限公司 T91 water wall tube row welding technology
CN105290570A (en) * 2015-09-25 2016-02-03 王灿炳 Metal surface treatment method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110961858A (en) * 2019-12-23 2020-04-07 东方电气集团东方汽轮机有限公司 High-frequency pulse electric arc repairing method for precision casting defect of heavy gas turbine equiaxial crystal blade

Also Published As

Publication number Publication date
CN106181148B (en) 2017-12-19

Similar Documents

Publication Publication Date Title
CN104084675B (en) A kind of high-temperature nickel-base alloy welding procedure
CN106670738B (en) The welding procedure of boiler tubing G115 steel
CN103962791A (en) Welding repair method for large-sized heat-resistant steel castings
CN106825871B (en) A kind of welding procedure of aluminium alloy
CN104801834A (en) T91 water wall tube row welding technology
CN103451650A (en) Laser quick repair process method for large rotary machine bearing bush
CN102922098A (en) Method for welding thick aluminum alloy plate
CN103212913A (en) Fitting up and welding method of major-diameter thin-wall stainless steel bellows
CN104668908B (en) Stainless steel welded steel pipe machining process
CN103422083B (en) High-efficiency one-step acid-washing stainless steel passivation cream
CN103464873A (en) Electric-arc welding process for Ti alloy and nickel-base high-temperature alloy
CN104607773B (en) Tubulation welding method of stainless steel outer composite tube
CN106181148B (en) A kind of welding procedure of corrosion resistant boiler tail flue gas pipeline alloy
CN102284772B (en) Argon arc back sealing welding method for housing of low-pressure water supply heater of third-generation nuclear power steam turbine
CN105983761A (en) High-strength steel welding process
CN104801820A (en) TP347H tube and 1 Cr18Ni9Ti tube row welding technology
CN106181091B (en) A kind of boiler welding process method
CN104625345A (en) C-HRA-3 high-temperature nickel-based alloy welding technology
CN104439644A (en) Inert gas shielded welding process of aluminum alloy thick plate with thickness being over 12 mm
CN102500889A (en) Method for welding ferrite-austenite double-phase stainless steel
CN105983766A (en) Low-carbon steel and alloy steel welding method
CN105728906A (en) Welding technique for oil cylinder
CN108907606B (en) Welding gun repairing method for CLOOS welding robot
CN104439649A (en) 6 mm-thick steel plate tungsten inert gas shielded welding process
CN104526126A (en) TIG (tungsten inert gas) welding process of aluminum with thickness of 14-16mm and alloy thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Changan city Jiaxing town Zhejiang city of Haining province (314408 agricultural areas) and tide Road No. 36

Patentee after: Zhejiang Tefu Development Co., Ltd

Address before: Changan city Jiaxing town Zhejiang city of Haining province (314408 agricultural areas) and tide Road No. 36

Patentee before: Zhejiang Teffu Boiler Co., Ltd.