CN106162657A - A kind of method and apparatus realizing that between GSM and LTE system, interference is processed - Google Patents

A kind of method and apparatus realizing that between GSM and LTE system, interference is processed Download PDF

Info

Publication number
CN106162657A
CN106162657A CN201510157412.0A CN201510157412A CN106162657A CN 106162657 A CN106162657 A CN 106162657A CN 201510157412 A CN201510157412 A CN 201510157412A CN 106162657 A CN106162657 A CN 106162657A
Authority
CN
China
Prior art keywords
gsm
running time
frequency resource
interference
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201510157412.0A
Other languages
Chinese (zh)
Inventor
苗婷
刘星
谢峰
毕峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201510157412.0A priority Critical patent/CN106162657A/en
Priority to PCT/CN2016/077148 priority patent/WO2016155555A1/en
Publication of CN106162657A publication Critical patent/CN106162657A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/14Spectrum sharing arrangements between different networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a kind of method realizing that between gsm system and LTE system, interference is processed, after GSM base station controller determines running time-frequency resource interference information, the running time-frequency resource interference information of described determination is sent to LTE base station;Described running time-frequency resource interference information carries out the foundation of interference process as described LTE base station.The present invention also discloses a kind of device realizing that between gsm system and LTE system, interference is processed.

Description

A kind of method and apparatus realizing that between GSM and LTE system, interference is processed
Technical field
The present invention relates to wireless communication technology field, be specifically related to one realize global system for mobile telecommunications (GSM, Global System For Mobile Communication) system and Long Term Evolution (LTE, Long Term Evolution) method and apparatus that inter-system interference is processed.
Background technology
With developing rapidly of wireless communication technology and enriching constantly of radio communication service, people are to wireless The demand of business and Wireless Telecom Equipment grows with each passing day, thus causes limited frequency spectrum resource increasingly deficient. The user of simultaneously traditional gsm system is fewer and feweri, provides the LTE system of more high data rate User gets more and more, and this makes the frequency spectrum of gsm system idle in a large number, and the frequency spectrum of LTE system is not enough. In order to meet the demand in market, operator is fundamentally changing them and is utilizing the mode of existing frequency spectrum, frequently Spectrum reformation (spectrum refarming) is one of which.
Frequency spectrum reform be solve business demand exponential increase and frequency spectrum resource limited between the one side of contradiction Formula, utilizes frequency spectrum to reform and can promote utilization ratio and the flexibility of frequency spectrum, by the idle frequency of gsm system Spectrum resource lends the LTE system being provided that more high data rate, including following several implementation:
1) the descending idle frequency spectrum of gsm system is lent LTE frequency division multiplexing (FDD, Frequency Division Duplexing) descending, the up idle frequency spectrum of gsm system is lent LTE FDD up;
2) the descending idle frequency spectrum of gsm system is lent time-division LTE (TD-LTE, Time Division Long Term Evolution);
3) the up idle frequency spectrum of gsm system is lent TD-LTE;
4) the up-downgoing idle frequency spectrum of gsm system is lent TD-LTE.
It can thus be seen that the up idle frequency spectrum of gsm system can to lend LTE FDD up, it is possible to To lend TD-LTE.
But, due to the inhomogeneities of gsm system user distribution, the GSM frequency spectrum in a possible region is empty Spare time, and the GSM frequency spectrum in another region is not idle.Fig. 1 is that in prior art, GSM cell is up dry Disturb the schematic diagram of LTE cell, as shown in Figure 1, it is assumed that 890~900MHz is in region A and region B The frequency spectrum of gsm system, in region a, owing to gsm system number of users reduces in a large number, gsm system The 5MHz frequency spectrum of 895~900MHz in frequency spectrum is gradually idle;And gsm system number of users in the B of region Changing less, therefore the gsm system frequency spectrum in the B of region is not idle.The up free time when gsm system Frequency spectrum 895~900MHz lends in the A of region when the up use of LTE FDD cell A of region B, Up working frequency points 898MHz (bandwidth 200kHz) of the GSM cell B of close region A with the B of region Just overlapping, therefore, the up generation of LTE FDD cell A may be disturbed by the up of GSM cell B, The up of LTE FDD cell A is likely to the up generation interference to GSM cell B;Solid line in Fig. 1 Arrow line represents useful signal, and dotted arrow line represents interference signal.Equally, up when gsm system Idle frequency spectrum 895~900MHz lends in the A of region when the TD-LTE cell A use of region B, The up of GSM cell B also can be to the up generation interference of TD-LTE cell A, TD-LTE cell A Up be likely to GSM cell B up generation interference.
At present, the method processing interference is by one buffering of planning between region A and region B Band (buffer zone), arranges gsm system in buffer strip and LTE system all can not use GSM system The up idle frequency spectrum of system, or up idle frequency spectrum (the i.e. LTE cell in part with gsm system Reject from its working frequency range and have the frequency spectrums of operation of GSM cell of interference relationships with it).Although the program Solve interference problem, but there is the waste of frequency spectrum resource.
Content of the invention
In order to solve the technical problem of existing existence, the embodiment of the present invention expectation provide one realize GSM and The method and apparatus that between LTE system, interference is processed.
Embodiments provide one and realize global system for mobile telecommunications gsm system and Long Term Evolution LTE system The method that between system, interference is processed, described method includes:
GSM base station controller determines running time-frequency resource interference information;GSM base station controller is by described determination Running time-frequency resource interference information is sent to LTE base station;Described running time-frequency resource interference information is as described LTE base station Carry out the foundation of interference process.
In such scheme, described GSM base station controller in the following manner at least one determine institute State running time-frequency resource interference information:
Mode one: described GSM base station controller is disturbed according to each up working frequency points of subordinate's cell Situation, determines the position of disturbed GSM cell, disturbed GSM user, disturbed GSM The follow-up running time-frequency resource schedule information of user and disturbed GSM user follow-up running time-frequency resource scheduling Information index, so that it is determined that described running time-frequency resource interference information;
Mode two: described GSM base station controller receives the up disturbed instruction that described LTE base station sends Information, according to described up disturbed instruction information, determines in the instruction of described up disturbed instruction information The follow-up running time-frequency resource scheduling of the GSM user producing interference on running time-frequency resource, the GSM user producing interference The running time-frequency resource schedule information that the GSM user of information and generation interference is follow-up indexes, so that it is determined that institute State running time-frequency resource interference information;Wherein, described up disturbed instruction information includes at least one of: quilt Interference frequency domain information, disturbed time-domain information, interfered cell position.
In such scheme, described running time-frequency resource interference information includes at least one of: produce the GSM of interference The mark of user, produce the follow-up running time-frequency resource schedule information of the GSM user of interference, the GSM producing interference The follow-up running time-frequency resource schedule information index of user, the position of disturbed GSM cell, disturbed GSM The follow-up running time-frequency resource schedule information of the mark of user, disturbed GSM user, disturbed GSM use The follow-up running time-frequency resource schedule information index in family.
In such scheme, at GSM base station controller, the running time-frequency resource interference information of described determination is sent to After LTE base station, described method can also include: GSM base station controller receives LTE base station according to institute State running time-frequency resource interference information and carry out the response message of interference process;Described response message includes: whether to carry out The mark that interference is processed.
In such scheme, described method can also include: GSM base station controller is when LTE base station sends Frequently resource interference information invalid instruction message;
Described running time-frequency resource interference information invalid instruction message includes at least one of: running time-frequency resource interference is believed Cease the follow-up running time-frequency resource schedule information of invalid GSM ID, invalid GSM user, invalid The follow-up running time-frequency resource schedule information index of GSM user.
In such scheme, described GSM base station controller is by core network element, webmaster network element, directly connect Mouthful, in centerized fusion node at least one to carry out information mutual with LTE base station.
Embodiments provide one and realize global system for mobile telecommunications gsm system and Long Term Evolution LTE system The method that between system, interference is processed, described method includes:
LTE base station receives the running time-frequency resource interference information that GSM base station controller sends;LTE base station according to Described running time-frequency resource interference information carries out interference process.
In such scheme, described running time-frequency resource interference information includes at least one of: produce the GSM of interference The mark of user, produce the follow-up running time-frequency resource schedule information of the GSM user of interference, the GSM producing interference The follow-up running time-frequency resource schedule information index of user, the position of disturbed GSM cell, disturbed GSM The follow-up running time-frequency resource schedule information of the mark of user, disturbed GSM user, disturbed GSM use The follow-up running time-frequency resource schedule information index in family.
In such scheme, described LTE base station disturbs information to carry out interference process according to described running time-frequency resource, bag Include: described LTE base station receives the described running time-frequency resource interference information that GSM base station controller sends, and obtains The follow-up running time-frequency resource schedule information of GSM user in described running time-frequency resource interference information, and described Any user is not dispatched on the follow-up corresponding Physical Resource Block of running time-frequency resource schedule information of GSM user, or Only scheduling is positioned at the user of center of housing estate, or does not carry out any process.
In such scheme, described LTE base station is dispatched at the follow-up running time-frequency resource of the GSM user producing interference The corresponding Physical Resource Block of information does not dispatch any user, or only scheduling is positioned at the user of center of housing estate.
In such scheme, described LTE base station judges that whether the position of disturbed GSM cell is little at LTE In the interference range in district, if it is, LTE base station is at the follow-up running time-frequency resource of disturbed GSM user The corresponding Physical Resource Block of schedule information does not dispatch any user, or only scheduling is positioned at the user of center of housing estate; If it does not, LTE base station does not carry out any process.
In such scheme, described method farther includes: described LTE base station judges disturbed GSM user Whether follow-up with the LTE Cell Edge User running time-frequency resource schedule information one of follow-up running time-frequency resource schedule information Cause, if it is, LTE base station is in the follow-up running time-frequency resource schedule information pair of disturbed GSM user The Physical Resource Block answered does not dispatches any user, or only scheduling is positioned at the user of center of housing estate;If it does not, LTE base station does not carry out any process.
In such scheme, receive, in LTE base station, the running time-frequency resource interference information that GSM base station controller sends Before, described method can also include: described LTE base station sends up being done to GSM base station controller Disturb instruction information;As described GSM base station controller, described up disturbed instruction information determines that time-frequency provides The foundation of source interference information;Wherein, described up disturbed instruction information includes at least one of: done Scrambling domain information, disturbed time-domain information, interfered cell position.
In such scheme, send up disturbed instruction letter in described LTE base station to GSM base station controller Before breath, described method can also include: whether described LTE base station judges to disturb from gsm system, When interference is from gsm system, LTE base station sends up disturbed instruction letter to GSM base station controller Breath;Otherwise, LTE base station does not sends up disturbed instruction information to GSM base station controller.
In such scheme, after LTE base station disturbs information to carry out interference process according to described running time-frequency resource, Described method can also include: described LTE base station sends, to GSM base station controller, the response that interference is processed Message;Described response message includes: whether to carry out the mark of interference process.
In such scheme, described method can also include:
The running time-frequency resource interference invalid instruction of information that described LTE base station receives the transmission of GSM base station controller disappears Breath;Described running time-frequency resource interference information invalid instruction message includes at least one of: running time-frequency resource interference is believed Cease the follow-up running time-frequency resource schedule information of invalid GSM ID, invalid GSM user, invalid The follow-up running time-frequency resource schedule information index of GSM user.
In such scheme, receive, in LTE base station, the running time-frequency resource interference information that GSM base station controller sends After invalid instruction message, described method also includes: LTE base station is disturbed according to receiving described running time-frequency resource Information invalid instruction message adjusts the scheduling to subordinate user.
In such scheme, described LTE base station passes through core network element, webmaster network element, direct interface, concentration In formula control node at least one to carry out information mutual with GSM base station controller.
Embodiments provide one and realize global system for mobile telecommunications gsm system and Long Term Evolution LTE system The device that between system, interference is processed, is positioned at GSM base station controller, and described device includes: running time-frequency resource disturbs Information determination unit and running time-frequency resource interference information transmitting unit;Wherein,
Described running time-frequency resource disturbs information determination unit, is used for determining running time-frequency resource interference information, and by described The running time-frequency resource interference information determining is sent to described running time-frequency resource interference information transmitting unit;
Described running time-frequency resource disturbs information transmitting unit, for sending out the running time-frequency resource of described determination interference information Give LTE base station;Described running time-frequency resource interference information carries out the foundation of interference process as described LTE base station.
Embodiments provide one and realize global system for mobile telecommunications gsm system and Long Term Evolution LTE system The device that between system, interference is processed, is positioned at LTE base station, and described device includes: running time-frequency resource interference information receives Unit and interference processing unit;Wherein,
Described running time-frequency resource disturbs information receiving unit, for receiving the time-frequency that GSM base station controller sends Resource interference information, and described running time-frequency resource interference information is sent to described interference processing unit;
Described interference processing unit, described in disturbing information receiving unit transmission according to described running time-frequency resource Running time-frequency resource interference information carries out interference process.
A kind of method and dress realizing that between GSM and LTE system, interference is processed that the embodiment of the present invention is provided Put, after GSM base station controller determines running time-frequency resource interference information, by the running time-frequency resource interference of described determination Information is sent to LTE base station;Described running time-frequency resource interference information carries out interference process as described LTE base station Foundation.So, LTE base station is disturbed according to the running time-frequency resource schedule information of the gsm system obtaining Process, can effectively avoid LTE system and GSM while using gsm system up idle frequency spectrum Interfering between system, improves the utilization rate of frequency spectrum resource.
Brief description
Fig. 1 is the schematic diagram of prior art GSM cell uplink interference LTE cell;
Fig. 2 realizes, for what the embodiment of the present invention provided, the method flow that between GSM and LTE system, interference is processed Figure one;
Fig. 3 realizes, for what the embodiment of the present invention provided, the method flow that between GSM and LTE system, interference is processed Figure two;
The base realizing the device that interference is processed between GSM and LTE system that Fig. 4 provides for the embodiment of the present invention This structure chart one;
The base realizing the device that interference is processed between GSM and LTE system that Fig. 5 provides for the embodiment of the present invention This structure chart two;
Fig. 6 realizes, for what the embodiment of the present invention provided, the method example that between GSM and LTE system, interference is processed Property flow chart one;
Fig. 7 realizes, for what the embodiment of the present invention provided, the method example that between GSM and LTE system, interference is processed Property flowchart 2;
Fig. 8 realizes, for what the embodiment of the present invention provided, the method example that between GSM and LTE system, interference is processed Property flow chart 3;
Fig. 9 realizes, for what the embodiment of the present invention provided, the method example that between GSM and LTE system, interference is processed Property flow chart four;
Figure 10 realizes, for what the embodiment of the present invention provided, the method example that between GSM and LTE system, interference is processed Property flow chart five.
Detailed description of the invention
In the embodiment of the present invention, after GSM base station controller determines running time-frequency resource interference information, by described really Fixed running time-frequency resource interference information is sent to LTE base station;Described running time-frequency resource interference information is as described LTE Base station carries out the foundation of interference process.
Below by drawings and the specific embodiments, the present invention is described in further detail.
Embodiment one
The embodiment of the present invention one provides a kind of method realizing that between GSM and LTE system, interference is processed, as Shown in Fig. 2, the method comprises the following steps:
Step 201:GSM base station controller determines running time-frequency resource interference information;
Concrete, GSM base station controller can in the following manner at least one determine that running time-frequency resource is done Disturb information:
Mode one: GSM base station controller according to the disturbed situation of each up working frequency points of subordinate's cell, Determine the position of disturbed GSM cell, disturbed GSM user, after disturbed GSM user Continuous running time-frequency resource schedule information and the follow-up running time-frequency resource schedule information rope of disturbed GSM user Draw, so that it is determined that running time-frequency resource interference information;
Mode two: GSM base station controller receives the up disturbed instruction information that LTE base station sends, root According to described up disturbed instruction information, determine the running time-frequency resource in the instruction of described up disturbed instruction information The upper GSM user producing interference, the follow-up running time-frequency resource schedule information of GSM user producing interference, with And produce the follow-up running time-frequency resource schedule information index of the GSM user disturbing, so that it is determined that running time-frequency resource is done Disturb information.
Wherein, the disturbed situation of described GSM base station controller each up working frequency points of subordinate's cell, Can describe one of in the following manner: carrier/interface ratio (C/I, also referred to as interference protection ratio), the bit error rate (SER, Symbol Error Rate), bit error rate (BER, Bit Error Rate);For example, the load of GSM user Do and be less than certain threshold than C/I, or bit error rate SER of GSM user exceedes certain threshold, or GSM Bit error rate BER of user exceedes certain threshold, is considered as this GSM user and receives severe jamming.
Described up disturbed instruction information includes at least one of: disturbed frequency domain information, disturbed when Domain information, interfered cell position;
Wherein, described disturbed frequency domain information refers to disturbed frequency domain, can be expressed as center frequency point and quilt Interference physics resource block information, or one or more initial frequency and the frequency range terminating frequency representation, or The frequency range that the one or more initial frequency of person and bin width represent;Described disturbed physical resource block message The physical resource number of blocks that can comprise by the whole bandwidth of physical resource block number and cell represents;Or, Represent by the bitmap sequence of all Physical Resource Block, for example, represent disturbed Physical Resource Block with 1, 0 represents do not have disturbed Physical Resource Block;
Described disturbed time-domain information refers to disturbed time range, can be expressed as the nothing at subframe numbers and place thereof The initial time of line frame, or the initial time of the radio frames at timeslot number and place thereof, or initial time, Duration and cycle, or the time period that one or more initial time and end time represent, or The time period that one or more initial times and duration represent;
During reality realizes, when described up disturbed instruction information comprises disturbed frequency domain information simultaneously During with disturbed time-domain information, refer to the disturbed running time-frequency resource with paired frequency domain and time-domain representation.
Described follow-up running time-frequency resource schedule information includes: the time domain schedule information of resource and the frequency domain of resource are adjusted Degree information, wherein, described time domain schedule information can be expressed as Schedule Start Time, duration and scheduling Cycle, or the time period that one or more Schedule Start Time and end time represent, or one or The time period that multiple Schedule Start Time and duration represent;Described frequency domain dispatching information can be expressed as Frequency, or start frequency and terminate frequency, or absolute channel numbers;
During reality realizes, when described gsm system and LTE system may determine that a common reference Between;Described initial time and end time can be expressed as inclined relative to the time of the common reference time determining Move;Here " follow-up " refers specifically to from the beginning of the time slot that described GSM user will be scheduled, the end time Indefinite, because GSM base station does not knows when this GSM customer service terminates, similar industry can be added up The average service time of the GSM user of business, provides the follow-up when domain scheduling letter of the GSM user in this time Breath, it is also possible to do not limit the end time, the such as form with the cycle describes the follow-up time domain of GSM user and adjusts Degree information;Determine GSM user's follow-up running time-frequency resource schedule information, be to allow LTE base station according to this letter Breath adjusts scheduling strategy, it is to avoid again disturbed after this GSM user.
The mark of described GSM user can be with any numeral for distinguishing GSM user, letter or word Represent;The follow-up running time-frequency resource schedule information index of described GSM user is one to one with GSM user, Also can be by any numeral for distinguishing GSM user, letter or textual representation;For example, GSM user 1 follow-up running time-frequency resource schedule information concordance list is shown as 01;The follow-up running time-frequency resource scheduling letter of GSM user 2 Breath concordance list is shown as 02.
Described running time-frequency resource interference information includes at least one of: produce the GSM user of interference mark, The follow-up running time-frequency resource schedule information of GSM user, the GSM user producing interference that produce interference are follow-up Running time-frequency resource schedule information index, the position of disturbed GSM cell, the mark of disturbed GSM user The follow-up running time-frequency resource schedule information of knowledge, disturbed GSM user, disturbed GSM user are follow-up Running time-frequency resource schedule information indexes.
In an application scenarios of the present invention, if the GSM in GSM base station controller subordinate's cell is little District A has load on frequency 898MHz for two the GSM users (GSM user 1 and GSM user 2) Do and be less than its threshold value (9dB) than C/I, then disturbed GSM cell is exactly GSM cell A, its Position can be represented by its reception antenna position, and disturbed GSM user is exactly GSM user 1 He GSM user 2, and then GSM cell A is according to dispatching algorithm, determine described GSM user follow-up when Frequently resource scheduling information, i.e. on frequency 898MHz GSM user 1 and GSM user 2 from will be adjusted The time slot of degree starts, and uses frequency 898MHz to carry out the time period of upstream data transmission.
In another application of the invention scene, it is assumed that up disturbed instruction information comprises disturbed frequency domain Information, disturbed time-domain information and interfered cell position, it is determined that produce interference GSM user, with And determine produce interference the follow-up running time-frequency resource schedule information of GSM user to implement process as follows: First, GSM base station controller determines the frequency producing interference according to disturbed frequency domain information;Then, according to Interfered cell position, uses the GSM cell of this frequency in finding out distance interfered cell certain limit, It is i.e. probably the GSM cell of interference source;Finally, it is judged that these GSM cell are at the frequency producing interference Whether edge customer is scheduled, if it is, scheduled edge GSM user is exactly in disturbed time domain Producing the GSM user of interference, then GSM cell is according to dispatching algorithm, determines that these produce interference The follow-up time-frequency domain resources schedule information of GSM user.
The running time-frequency resource interference information of described determination is sent to LTE base by step 202:GSM base station controller Stand;Described running time-frequency resource interference information carries out the foundation of interference process as described LTE base station.
Concrete, described LTE base station carries out interference process according to described running time-frequency resource interference information and includes:
Described LTE base station receives the described running time-frequency resource interference information that described GSM base station controller sends, Obtain the follow-up running time-frequency resource schedule information of the GSM user in described running time-frequency resource interference information, and in institute State and do not dispatch any user on the follow-up corresponding Physical Resource Block of running time-frequency resource schedule information of GSM user, Or only scheduling is positioned at the user of center of housing estate, or does not carry out any process.
During actual realization, described LTE base station is believed in the follow-up running time-frequency resource scheduling of described GSM user Cease and on corresponding Physical Resource Block, do not dispatch any user, refer to that LTE base station does not distribute described GSM user The follow-up corresponding Physical Resource Block of running time-frequency resource schedule information gives any LTE user.Described LTE base station Do not carry out any process, refer to that the scheduling scheme of LTE base station is not affected by described running time-frequency resource interference information, Described LTE base station carries out the scheduling of user according to oneself original scheduling mode.
In an application scenarios of the present invention, described LTE base station disturbs information to do according to running time-frequency resource Disturb process to include: described LTE base station is producing the follow-up running time-frequency resource schedule information of the GSM user disturbing Corresponding Physical Resource Block does not dispatch any user, or only scheduling is positioned at the user of center of housing estate.
In another application of the invention scene, described LTE base station disturbs information to carry out according to running time-frequency resource Interference processes and includes: whether described LTE base station judges the position of disturbed GSM cell in LTE cell Interference range in, if it is, LTE base station is at the follow-up running time-frequency resource of disturbed GSM user The corresponding Physical Resource Block of schedule information does not dispatch any user, or only scheduling is positioned at the user of center of housing estate; If it does not, LTE base station does not carry out any process;
During actual realization, the interference range of LTE cell refers to centered on the position of LTE cell Border circular areas;Described LTE base station judges the position of disturbed GSM cell whether dry in LTE cell In the range of disturbing, particularly as follows: the position that described LTE base station calculates disturbed GSM cell is little with this LTE Distance between the position in district;Judge whether described distance is less than the radius of LTE area interference border circular areas, If it is less, think the position of disturbed GSM cell in the interference range of LTE cell;If It is not less than, then it is assumed that the position of disturbed GSM cell is not in the interference range of LTE cell;
In addition, described judge that operation also can be carried out in the upper layer node of LTE base station, at this moment LTE's is upper It is right that the position of disturbed GSM cell and corresponding disturbed GSM user profile are only sent to by node layer It produces the LTE base station of interference;Here, the upper layer node of described LTE base station can be: mobility pipe Reason entity (MME, Mobility Management Entity) or gateway (S-GW, Serving Or the network entity such as newly-increased centerized fusion node GateWay).
In another application of the invention scene, described LTE base station disturbs information to carry out according to running time-frequency resource Interference processes and includes: described LTE base station judges the follow-up running time-frequency resource schedule information of disturbed GSM user Whether follow-up with LTE Cell Edge User running time-frequency resource schedule information consistent, if it is, LTE base The follow-up corresponding Physical Resource Block of running time-frequency resource schedule information standing in disturbed GSM user is not dispatched Any user, or only scheduling is positioned at the user of center of housing estate;If it does not, LTE base station does not carry out any place Reason;
During actual realization, described LTE base station can judge disturbed GSM user in the following manner Whether follow-up with the LTE Cell Edge User running time-frequency resource schedule information one of follow-up running time-frequency resource schedule information Cause: for each disturbed up frequency of disturbed GSM user, described LTE base station calculates at this In the sub-frame of uplink that in the corresponding frequency range of frequency, LTE Cell Edge User is scheduled, disturbed GSM user Scheduled accumulated time length;Whether judge the ratio of described accumulated time length and this subframe time length Exceed and set threshold value (such as threshold value as 70%), if it exceeds, then it is assumed that disturbed GSM user The follow-up running time-frequency resource schedule information running time-frequency resource schedule information follow-up with LTE Cell Edge User is consistent; Otherwise it is assumed that it is inconsistent.
Further, at GSM base station controller, the running time-frequency resource interference information of described determination is sent to LTE After base station, described method can also include:
Step 203:GSM base station controller receives LTE base station and disturbs information to carry out according to described running time-frequency resource The response message that interference is processed;Wherein, described response message includes: whether to carry out the mark of interference process. During actual realization, carry out the mark of interference process and the mark not carrying out interference process, it can be provided Any for distinguishing letter, numeral or the word etc. whether carrying out interference process, for example, it is possible to be set to work as Represent when being designated 1 and carry out interference process, represent when being designated 0 and do not carry out interference process.
Further, described method can also include:
Step 204:GSM base station controller sends the running time-frequency resource interference invalid instruction of information to LTE base station and disappears Breath;Wherein, described running time-frequency resource interference information invalid instruction message is used for indicating that running time-frequency resource interference information is lost Effect.During actual realization, the failure condition of running time-frequency resource interference information, such as GSM can be set in advance Customer service terminates, be switched to other cells, scheduling changes, and once meets failure condition, GSM Base station controller just sends running time-frequency resource interference information invalid instruction message to LTE base station;
Described running time-frequency resource interference information invalid instruction message includes at least one of: running time-frequency resource interference is believed Cease the follow-up running time-frequency resource schedule information of invalid GSM ID, invalid GSM user, invalid The follow-up running time-frequency resource schedule information index of GSM user.
During actual realization, the execution sequence of above-mentioned steps 203 and step 204 does not limits;Step 204 can To perform after step 203, it is also possible to before step 203 or perform simultaneously.
Further, in the above-mentioned method realizing interference process between GSM and LTE system, described GSM base The mode of the information interaction of station control and LTE base station includes at least one of: by core network element, Webmaster network element, direct interface, centerized fusion node.
Embodiment two
The embodiment of the present invention two provides a kind of method realizing that between GSM and LTE system, interference is processed, as Shown in Fig. 3, the method comprises the following steps:
Step 301:LTE base station receives the running time-frequency resource interference information that GSM base station controller sends;
Wherein, described running time-frequency resource interference information includes at least one of: produce the GSM user of interference Mark, the follow-up running time-frequency resource schedule information of GSM user producing interference, the GSM producing interference use The follow-up running time-frequency resource schedule information index in family, the position of disturbed GSM cell, disturbed GSM The follow-up running time-frequency resource schedule information of the mark of user, disturbed GSM user, disturbed GSM use The follow-up running time-frequency resource schedule information index in family.
Further, receive, in described LTE base station, the running time-frequency resource interference letter that GSM base station controller sends Before breath, the method can also include: described LTE base station sends up being done to GSM base station controller Disturb instruction information;As described GSM base station controller, described up disturbed instruction information determines that time-frequency provides The foundation of source interference information;
Described up disturbed instruction information includes at least one of: disturbed frequency domain information, disturbed when Domain information, interfered cell position.
Further, up disturbed instruction information is sent in described LTE base station to GSM base station controller Before, the method can also include: whether LTE base station judges to disturb from gsm system, when interference comes When gsm system, LTE base station sends up disturbed instruction information to GSM base station controller;Otherwise, LTE base station does not sends up disturbed instruction information to GSM base station controller;
Wherein, described LTE base station judges that whether interference includes from the method for gsm system: LTE base station And adjacent LTE base station arranges quiet period to disturbed frequency range, LTE base station is according to measurement in quiet period Whether the signal power strength in disturbed frequency range judges interference from gsm system;Or, LTE base station Obtaining GSM base station controller subordinate's Cell Edge User schedule information, up according to subordinate's cell is done Whether consistent with GSM cell edge customer scheduling information disturb resource, it is judged that whether interference is from gsm system.
Step 302:LTE base station disturbs information to carry out interference process according to described running time-frequency resource.
Concrete, described LTE base station carries out interference process according to described running time-frequency resource interference information and includes:
Described LTE base station receives the described running time-frequency resource interference information that described GSM base station controller sends, Obtain the follow-up running time-frequency resource schedule information of the GSM user in described running time-frequency resource interference information, and in institute State and do not dispatch any user on the follow-up corresponding Physical Resource Block of running time-frequency resource schedule information of GSM user, Or only scheduling is positioned at the user of center of housing estate, or does not carry out any process.
During actual realization, described LTE base station is believed in the follow-up running time-frequency resource scheduling of described GSM user Cease and on corresponding Physical Resource Block, do not dispatch any user, refer to that LTE base station does not distribute described GSM user The follow-up corresponding Physical Resource Block of running time-frequency resource schedule information gives any LTE user.Described LTE base station Do not carry out any process, refer to that the scheduling scheme of LTE base station is not affected by described running time-frequency resource interference information, Described LTE base station carries out the scheduling of user according to oneself original scheduling mode.
In an application scenarios of the present invention, described LTE base station disturbs information to do according to running time-frequency resource Disturb process to include: described LTE base station is producing the follow-up running time-frequency resource schedule information of the GSM user disturbing Corresponding Physical Resource Block does not dispatch any user, or only scheduling is positioned at the user of center of housing estate.
In another application of the invention scene, described LTE base station disturbs information to carry out according to running time-frequency resource Interference processes and includes: whether described LTE base station judges the position of disturbed GSM cell in LTE cell Interference range in, if it is, LTE base station is adjusted at the follow-up running time-frequency resource of disturbed GSM user The corresponding Physical Resource Block of degree information does not dispatch any user, or only scheduling is positioned at the user of center of housing estate; If it does not, LTE base station does not carry out any process;
During actual realization, the interference range of LTE cell refers to centered on the position of LTE cell Border circular areas;Described LTE base station judges the position of disturbed GSM cell whether dry in LTE cell In the range of disturbing, particularly as follows: the position that described LTE base station calculates disturbed GSM cell is little with this LTE Distance between the position in district;Judge whether described distance is less than the radius of LTE area interference border circular areas, If it is less, think the position of disturbed GSM cell in the interference range of LTE cell;If It is not less than, then it is assumed that the position of disturbed GSM cell is not in the interference range of LTE cell;
In addition, described judge that operation also can be carried out in the upper layer node of LTE base station, at this moment LTE's is upper It is right that the position of disturbed GSM cell and corresponding disturbed GSM user profile are only sent to by node layer It produces the LTE base station of interference;Here, the upper layer node of described LTE base station can be: mobility pipe Reason entity (MME, Mobility Management Entity) or gateway (S-GW, Serving Or the network entity such as newly-increased centerized fusion node GateWay).
In another application of the invention scene, described LTE base station disturbs information to carry out according to running time-frequency resource Interference processes and includes: described LTE base station judges the follow-up running time-frequency resource schedule information of disturbed GSM user Whether follow-up with LTE Cell Edge User running time-frequency resource schedule information consistent, if it is, LTE base The follow-up corresponding Physical Resource Block of running time-frequency resource schedule information standing in disturbed GSM user is not dispatched Any user, or only scheduling is positioned at the user of center of housing estate;If it does not, LTE base station does not carry out any place Reason;
During actual realization, described LTE base station can judge disturbed GSM user in the following manner Whether follow-up with the LTE Cell Edge User running time-frequency resource schedule information one of follow-up running time-frequency resource schedule information Cause: for each disturbed up frequency of disturbed GSM user, described LTE base station calculates at this In the sub-frame of uplink that in the corresponding frequency range of frequency, LTE Cell Edge User is scheduled, disturbed GSM user Scheduled accumulated time length;Whether judge the ratio of described accumulated time length and this subframe time length Exceed and set threshold value (such as threshold value as 70%), if it exceeds, then it is assumed that disturbed GSM user The follow-up running time-frequency resource schedule information running time-frequency resource schedule information follow-up with LTE Cell Edge User is consistent; Otherwise it is assumed that it is inconsistent.
Further, after LTE base station disturbs information to carry out interference process according to described running time-frequency resource, institute The method of stating can also include:
Step 303:LTE base station sends, to GSM base station controller, the response message that interference is processed;Wherein, Described response message includes: whether to carry out the mark of interference process.During actual realization, carry out at interference The mark of reason and do not carry out the mark of interference process, it can be provided any whether carry out at interference for distinguishing The letter of reason, numeral or word etc., for example, it is possible to be set to when being designated 1 represent and carried out at interference Reason, represents when being designated 0 and does not carries out interference process.
Further, described method can also include:
Step 304:LTE base station receives the running time-frequency resource interference invalid finger of information that GSM base station controller sends Show message;Wherein, described running time-frequency resource interference information invalid instruction message is used for indicating running time-frequency resource interference letter Breath lost efficacy;During actual realization, the failure condition of running time-frequency resource interference information can be set in advance, for example GSM customer service terminates, be switched to other cells, scheduling changes, and once meets failure condition, GSM base station controller just sends running time-frequency resource interference information invalid instruction message to LTE base station;
Described running time-frequency resource interference information invalid instruction message includes at least one of: running time-frequency resource interference is believed Cease the follow-up running time-frequency resource schedule information of invalid GSM ID, invalid GSM user, invalid The follow-up running time-frequency resource schedule information index of GSM user.
Further, LTE base station receive GSM base station controller send running time-frequency resource interference information without After effect instruction message, the method can also include: LTE base station is done according to the described running time-frequency resource receiving Information of disturbing invalid instruction message adjusts the scheduling to subordinate user;For example, running time-frequency resource interference letter is no longer limited Cease the scheduling behaviour on the follow-up Physical Resource Block corresponding to running time-frequency resource schedule information of invalid GSM user Make.
During actual realization, the execution sequence of above-mentioned steps 303 and step 304 does not limits;Step 304 can To perform after step 303, it is also possible to perform before or while step 303.
Further, in the above-mentioned method realizing interference process between GSM and LTE system, described LTE base Stand and the mode of information interaction of GSM base station controller includes at least one of: by core net net Unit, webmaster network element, direct interface, centerized fusion node.
Embodiment three
The embodiment of the present invention three provides a kind of device realizing that between GSM and LTE system, interference is processed, position On GSM base station controller, as shown in Figure 4, described device includes: running time-frequency resource interference information determines Unit 41 and running time-frequency resource interference information transmitting unit 42;Wherein,
Described running time-frequency resource disturbs information determination unit 41, is used for determining running time-frequency resource interference information, and by institute The running time-frequency resource interference information stating determination is sent to described running time-frequency resource interference information transmitting unit 42;
Described running time-frequency resource disturbs information transmitting unit 42, for by the running time-frequency resource interference information of described determination It is sent to LTE base station;Described running time-frequency resource interference information carries out interference process as described LTE base station Foundation.
Concrete, described running time-frequency resource disturbs information determination unit 41, for according to GSM base station controller The disturbed situation of each up working frequency points of subordinate's cell, determine disturbed GSM cell position, The follow-up running time-frequency resource schedule information of disturbed GSM user, disturbed GSM user and being done The follow-up running time-frequency resource schedule information index of the GSM user that disturbs, so that it is determined that running time-frequency resource interference information.
Further, described device can also include: up disturbed instruction information receiving unit 43, is used for Receive the up disturbed instruction information that LTE base station sends, and described up disturbed instruction information is sent Disturb information determination unit 41 to running time-frequency resource;
Described running time-frequency resource disturbs information determination unit 41, is further used for according to described up disturbed instruction Information, determines that the GSM producing interference on the running time-frequency resource of described up disturbed instruction information instruction uses Family, the GSM use producing the follow-up running time-frequency resource schedule information of the GSM user disturbing and generation interference The follow-up running time-frequency resource schedule information index in family, so that it is determined that running time-frequency resource interference information.
Wherein, the disturbed situation of described GSM base station controller each up working frequency points of subordinate's cell, Can describe one of in the following manner: carrier/interface ratio (C/I, also referred to as interference protection ratio), the bit error rate (SER, Symbol error rate), bit error rate (BER, Bit Error Rate);For example, the load of GSM user Do and be less than certain threshold than C/I, or bit error rate SER of GSM user exceedes certain threshold, or GSM Bit error rate BER of user exceedes certain threshold, is considered as this GSM user and receives severe jamming.
Described up disturbed instruction information includes at least one of: disturbed frequency domain information, disturbed when Domain information, interfered cell position;
Wherein, described disturbed frequency domain information refers to disturbed frequency domain, can be expressed as center frequency point and quilt Interference physics resource block information, or one or more initial frequency and the frequency range terminating frequency representation, or The frequency range that the one or more initial frequency of person and bin width represent;Described disturbed physical resource block message The physical resource number of blocks that can comprise by the whole bandwidth of physical resource block number and cell represents;Or, Represent by the bitmap sequence of all Physical Resource Block, for example, represent disturbed Physical Resource Block with 1, 0 represents do not have disturbed Physical Resource Block;
Described disturbed time-domain information refers to disturbed time range, can be expressed as the nothing at subframe numbers and place thereof The initial time of line frame, or the initial time of the radio frames at timeslot number and place thereof, or initial time, Duration and cycle, or the time period that one or more initial time and end time represent, or The time period that one or more initial times and duration represent;
During reality realizes, when described up disturbed instruction information comprises disturbed frequency domain information simultaneously During with disturbed time-domain information, refer to the disturbed running time-frequency resource with paired frequency domain and time-domain representation.
Described follow-up running time-frequency resource schedule information includes: the time domain schedule information of resource and the frequency domain of resource are adjusted Degree information, wherein, described time domain schedule information can be expressed as Schedule Start Time, duration and scheduling Cycle, or the time period that one or more Schedule Start Time and end time represent, or one or The time period that multiple Schedule Start Time and duration represent;Described frequency domain dispatching information can be expressed as Frequency, or start frequency and terminate frequency, or absolute channel numbers;
During reality realizes, when described gsm system and LTE system may determine that a common reference Between;Described initial time and end time can be expressed as inclined relative to the time of the common reference time determining Move;Here " follow-up " refers specifically to from the beginning of the time slot that described GSM user will be scheduled, the end time Indefinite, because GSM base station does not knows when this GSM customer service terminates, similar industry can be added up The average service time of the GSM user of business, provides the follow-up when domain scheduling letter of the GSM user in this time Breath, it is also possible to do not limit the end time, the such as form with the cycle describes the follow-up time domain of GSM user and adjusts Degree information;Determine GSM user's follow-up running time-frequency resource schedule information, be to allow LTE base station according to this letter Breath adjusts scheduling strategy, it is to avoid again disturbed after this GSM user.
The mark of described GSM user can be with any numeral for distinguishing GSM user, letter or word Represent;The follow-up running time-frequency resource schedule information index of described GSM user is one to one with GSM user, Also can be by any numeral for distinguishing GSM user, letter or textual representation;For example, GSM user 1 follow-up running time-frequency resource schedule information concordance list is shown as 01;The follow-up running time-frequency resource scheduling letter of GSM user 2 Breath concordance list is shown as 02.
Described running time-frequency resource interference information includes at least one of: produce the GSM user of interference mark, The follow-up running time-frequency resource schedule information of GSM user, the GSM user producing interference that produce interference are follow-up Running time-frequency resource schedule information index, the position of disturbed GSM cell, the mark of disturbed GSM user The follow-up running time-frequency resource schedule information of knowledge, disturbed GSM user, disturbed GSM user are follow-up Running time-frequency resource schedule information indexes.
Further, described device can also include: interference processes response message receiving unit 44, is used for connecing Receiving LTE base station disturbs information to carry out the response message of interference process according to described running time-frequency resource;Wherein, described Response message includes: whether to carry out the mark of interference process;During actual realization, carry out interference process Mark and the mark not carrying out interference process, it can be provided any for distinguishing whether carry out interference process Letter, numeral or word etc., for example, it is possible to be set to when being designated 1 represent and carried out interference process, Represent when being designated 0 and do not carry out interference process.
Further, described device can also include: running time-frequency resource interference information invalid instruction message sends single Unit 45, for sending running time-frequency resource interference information invalid instruction message to LTE base station;Wherein, described time-frequency Resource interference information invalid instruction message is used for indicating that running time-frequency resource interference information lost efficacy;During actual realization, Can arrange the failure condition of running time-frequency resource interference information in advance, such as GSM customer service terminates, switches Changing to other cells, scheduling, once meeting failure condition, GSM base station controller is just to LTE Base station sends running time-frequency resource interference information invalid instruction message;The interference invalid instruction of information of described running time-frequency resource disappears Breath includes at least one of: running time-frequency resource disturbs the GSM ID, invalid GSM that information is invalid The follow-up running time-frequency resource schedule information rope of the follow-up running time-frequency resource schedule information of user, invalid GSM user Draw.
Further, described device, for by core network element, webmaster network element, direct interface, concentration In formula control node at least one and LTE base station between to carry out information mutual.
Embodiment four
The embodiment of the present invention four provides a kind of device realizing that between GSM and LTE system, interference is processed, position In LTE base station, as it is shown in figure 5, described device includes: running time-frequency resource interference information receiving unit is the 51st, Interference processing unit 52;Wherein,
Described running time-frequency resource disturb information receiving unit 51, for receive GSM base station controller send when Frequently resource interference information, and described running time-frequency resource interference information is sent to described interference processing unit 52;Its In, described running time-frequency resource interference information includes at least one of: produce the GSM user of interference mark, The follow-up running time-frequency resource schedule information of GSM user, the GSM user producing interference that produce interference are follow-up Running time-frequency resource schedule information index, the position of disturbed GSM cell, the mark of disturbed GSM user The follow-up running time-frequency resource schedule information of knowledge, disturbed GSM user, disturbed GSM user are follow-up Running time-frequency resource schedule information indexes;
Described interference processing unit 52, for disturbing information receiving unit 51 to send according to described running time-frequency resource Described running time-frequency resource interference information carry out interference process.
Concrete, described interference processing unit 52 is for carrying out interference process in the following manner: described interference Processing unit 52 obtains the follow-up running time-frequency resource scheduling letter of the GSM user in described running time-frequency resource interference information Breath, and do not dispatch on the follow-up corresponding Physical Resource Block of running time-frequency resource schedule information of described GSM user Any user, or only scheduling is positioned at the user of center of housing estate, or do not carry out any process.
During actual realization, described LTE base station is believed in the follow-up running time-frequency resource scheduling of described GSM user Cease and on corresponding Physical Resource Block, do not dispatch any user, refer to that LTE base station does not distribute described GSM user The follow-up corresponding Physical Resource Block of running time-frequency resource schedule information gives any LTE user.Described LTE base station Do not carry out any process, refer to that the scheduling scheme of LTE base station is not affected by described running time-frequency resource interference information, Described LTE base station carries out the scheduling of user according to oneself original scheduling mode.
Further, described interference processing unit 52, follow-up specifically for the GSM user in generation interference The corresponding Physical Resource Block of running time-frequency resource schedule information on do not dispatch any user, or only scheduling is positioned at little The user of district center.
Further, described interference processing unit 52, specifically for judging the position of disturbed GSM cell Put whether in the interference range of LTE cell, if it is, described interference processing unit 52 is disturbed The follow-up corresponding Physical Resource Block of running time-frequency resource schedule information of GSM user on do not dispatch any user, Or only scheduling is positioned at the user of center of housing estate;If it does not, described interference processing unit 52 does not carry out any place Reason;
Wherein, the interference range of described LTE cell refers to the circle centered on the position of LTE cell Region;Whether described interference processing unit 52 judges the position of disturbed GSM cell in LTE cell It in interference range is: described interference processing unit 52 calculates position and this LTE of disturbed GSM cell Distance between the position of cell;Judge whether described distance is less than the radius of LTE area interference border circular areas, If it is lower, described interference processing unit 52 determines the position of disturbed GSM cell in LTE cell In interference range;If it is not, described interference processing unit 52 determines the position of disturbed GSM cell Put not in the interference range of LTE cell.
Further, described interference processing unit 52, follow-up specifically for judging disturbed GSM user Whether follow-up with LTE Cell Edge User running time-frequency resource schedule information running time-frequency resource schedule information be consistent, as Fruit is, then described interference processing unit 52 is at the follow-up running time-frequency resource scheduling letter of disturbed GSM user Cease corresponding Physical Resource Block and do not dispatch any user, or only scheduling is positioned at the user of center of housing estate;If No, described interference processing unit 52 does not carry out any process;
Wherein, described interference processing unit 52 judge in the following manner disturbed GSM user follow-up when Frequently whether follow-up with LTE Cell Edge User resource scheduling information running time-frequency resource schedule information be consistent: for Each disturbed up frequency of disturbed GSM user, described interference processing unit 52 calculates at this frequency In the sub-frame of uplink that in the corresponding frequency range of point, LTE Cell Edge User is scheduled, disturbed GSM user's quilt The accumulated time length of scheduling;Judge whether described accumulated time length surpasses with the ratio of this subframe time length Cross and set threshold value (such as threshold value as 70%), if it does, described interference processing unit 52 determines quilt The follow-up running time-frequency resource schedule information of the interference GSM user running time-frequency resource follow-up with LTE Cell Edge User Schedule information is consistent;Otherwise described interference processing unit 52 determines the follow-up time-frequency money of disturbed GSM user The schedule information running time-frequency resource schedule information follow-up with LTE Cell Edge User in source is inconsistent.
Further, described device can also include: up disturbed instruction information transmitting unit 53, is used for Determine that interference, when gsm system, sends up disturbed instruction information to GSM base station controller, with GSM base station controller is made to determine running time-frequency resource interference information according to described up disturbed instruction information;Institute State up disturbed instruction information and include at least one of: disturbed frequency domain information, disturbed time-domain information, Interfered cell position.
Further, described up disturbed instruction information transmitting unit 53, is used for determining that interference is not from During gsm system, do not send up disturbed instruction information to GSM base station controller.
Concrete, described up disturbed instruction information transmitting unit 53, dry for determining in the following manner Whether disturb from gsm system:
LTE base station and adjacent LTE base station thereof arrange quiet period, described up disturbed finger to disturbed frequency range Show that information transmitting unit 53 judges according to the signal power strength in the disturbed frequency range of measurement in quiet period Whether interference is from gsm system;Or,
Described up disturbed instruction information transmitting unit 53 obtains GSM base station controller subordinate's cell edge User scheduling information, whether the up disturbed resource according to subordinate's cell is adjusted with GSM cell edge customer Degree information is consistent, it is judged that whether interference is from gsm system.
Further, described device can also include: interference process response message transmitting element 54, for GSM base station controller sends the response message that interference is processed;Described response message includes: whether to disturb The mark processing;During actual realization, carry out the mark of interference process and the mark not carrying out interference process, Can be arranged to any for distinguishing letter, numeral or the word etc. whether carrying out interference process, for example, can Carry out interference process to be set to when being designated 1 represent, represented when being designated 0 and do not carry out at interference Reason.
Further, described device can also include: running time-frequency resource interference information invalid instruction message sink list Unit 55, the running time-frequency resource sending for receiving GSM base station controller disturbs information invalid instruction message, and Information invalid instruction message is disturbed to adjust the scheduling to LTE base station subordinate user according to described running time-frequency resource;
Described running time-frequency resource interference information invalid instruction message includes at least one of: running time-frequency resource interference is believed Cease the follow-up running time-frequency resource schedule information of invalid GSM ID, invalid GSM user, invalid The follow-up running time-frequency resource schedule information index of GSM user;Described running time-frequency resource interference information invalid instruction message For indicating that running time-frequency resource interference information lost efficacy.
Further, described device, for by core network element, webmaster network element, direct interface, concentration In formula control node at least one and GSM base station controller between to carry out information mutual.
In specific implementation process, above-mentioned running time-frequency resource interference information determination unit the 41st, running time-frequency resource interference letter The 42nd, up disturbed instruction information receiving unit the 43rd, the interference of breath transmitting element processes response message receiving unit 44 and running time-frequency resource interference information invalid instruction message sending unit 45 can be by GSM base station controller In central processing unit (CPU, Central Processing Unit), microprocessor (MPU, Micro Processing Unit), digital signal processor (DSP, Digital Signal Processor) or able to programme Logic array (FPGA, Field-Programmable Gate Array) realizes;Above-mentioned running time-frequency resource is done The 51st, disturb information receiving unit disturbs processing unit the 52nd, up disturbed instruction information transmitting unit the 53rd, to do Disturb process response message transmitting element 54 and running time-frequency resource interference information invalid instruction message reception units 55 Can be realized by CPU, MPU, DSP or the FPGA in LTE base station.
Realize between GSM and LTE system at interference below by what the embodiment of the present invention was provided by specific example The method of reason, does to be discussed in detail.
In following example, evolved base station (eNB, Evolved Node B) is LTE FDD base station, Bandwidth of operation is 5MHz, and frequency range is up idle frequency spectrum 895MHz to the 900MHz of GSM, base Station control (BSC, Base Station Controller) is the base station controller of gsm system, and T is GSM The public reference time point that system and LTE system determine.
Example one
Fig. 6 is the flow chart of this example one, as shown in Figure 6, and the core net of LTE system and gsm system Network element be respectively mobile management entity (MME, Mobility Management Entity) and general packet without Node (SGSN, Serving GPRS supported by line service (GPRS, General Packet Radio Service) Support Node), this example comprises the following steps:
Step 600:BSC determines running time-frequency resource interference information;
Concrete, described BSC is according to the quilt of the edge customer of scheduling in each up working frequency points of subordinate's cell Disturbed condition, determines the follow-up time-frequency money of the position of disturbed GSM cell, disturbed GSM user The follow-up running time-frequency resource schedule information index of source schedule information, disturbed GSM user, and then when generating Frequently resource interference information.
Wherein, running time-frequency resource interference information includes: the position of disturbed GSM cell (east longitude 40 degree, North latitude 50 degree);The follow-up running time-frequency resource schedule information of disturbed GSM user 1 (frequency is 897.8MHz, Initial time 1 is T+0.5ms, and the end time 1 is T+1.5ms, and initial time 2 is T+9.2ms, terminates Time 2 is T+10.4ms ..., initial time k is T+100ms, and end time k is T+102.3ms); The follow-up running time-frequency resource schedule information index 01 of disturbed GSM user 1;Disturbed GSM user 2 Follow-up running time-frequency resource schedule information (frequency is 897.8MHz, and initial time 1 is T+2ms, at the end of Between 1 be T+6.6ms, initial time 2 is T+11.2ms, and the end time 2 is T+12.4ms ..., rise Time beginning, n was T+150ms, and end time n is T+154.6ms);After disturbed GSM user 2 Continuous running time-frequency resource schedule information index 02.Wherein, k and n is natural number, depends on that GSM cell is estimated The scheduled duration of the GSM user of meter.
Step 601:BSC sends described running time-frequency resource interference information to eNB;
Concrete: running time-frequency resource interference information is sent to SGSN by BSC, and SGSN is by described running time-frequency resource Interference information is transmitted to MME, and described running time-frequency resource interference information is transmitted to eNB by MME again.
After step 602:eNB receives running time-frequency resource interference information, carry out interference process;
Concrete, eNB determines disturbed GSM cell the 1st, 2 interference range being positioned at LTE cell, ENB is corresponding in the follow-up running time-frequency resource schedule information of disturbed GSM user 1 and GSM user 2 Do not dispatch any user on Physical Resource Block, or only scheduling be positioned at the user of center of housing estate, thus avoid right Gsm system produces interference.
Step 603:eNB sends interference and processes response message to BSC;Wherein, repeating process includes: eNB Interference process response message is sent to MME, and described interference process response message is transmitted to by MME Described interference process response message is transmitted to BSC by SGSN, SGSN again;Described interference processes response message Including: carry out the mark 1 of interference process, represent that BSC has carried out interference process.
Example two
Fig. 7 is the flow chart of this example two, as it is shown in fig. 7, the webmaster network element of LTE system is: network element pipe Reason system (EMS, Element Management System) 1 and NMS (NMS, Network Management System)1;The webmaster network element of gsm system is: EMS2 and NMS2;This example bag Include following steps:
Step 700:eNB sends up disturbed instruction information to BSC;Wherein, eNB through EMS1, Described up disturbed instruction information is sent to BSC by NMS1, NMS2, EMS2;
Concrete, the current up disturbed situation of eNB subordinate's cell is frequency range 897.95MHz of LTE cell Disturbed by phased manner to 898.13MHz, and the corresponding frequency being precisely gsm system of this frequency range 898MHz, eNB are according to disturbed situation, it is judged that be probably the interference that adjacent GSM cells is caused, therefore Determine and send up disturbed instruction information to BSC;Described up disturbed instruction information includes: disturbed Frequency domain information (897.95MHz to 898.13MHz);Disturbed time-domain information (initial time 1 is T+2ms, End time 1 is T+3ms;Initial time 2 is T+5ms, and the end time 2 is T+6ms);Disturbed Subdistrict position (east longitude 43 degree, north latitude 56 degree).
Step 701:BSC determines running time-frequency resource interference information according to up disturbed instruction information;
Concrete, after BSC receives up disturbed instruction information, according to up disturbed instruction information In disturbed frequency domain information determine produce interference frequency be 898MHz, then according to interfered cell position Put, in finding out distance interfered cell certain limit, use the GSM cell of this frequency, these GSM cell It is exactly the cell that may produce interference, it is assumed that have two GSM cell: Cell2 and Cell3, then sentence respectively Whether disconnected Cell2 and Cell3 scheduled edge customer in the disturbed time domain of frequency 898MHz, it is assumed that sentence Disconnected result is that Cell2 scheduled edge customer in the disturbed time domain of frequency 898MHz, then Cell2 is exactly Producing the GSM cell of interference, edge customer scheduled in described disturbed time domain produces interference exactly GSM user;
BSC is according to the time domain of the edge customer dispatched in the disturbed time domain of frequency 898MHz in Cell2 Schedule information, determines that running time-frequency resource interference information includes: produce the follow-up time-frequency of the GSM user 3 of interference Resource scheduling information: frequency is 898MHz, initial time is T+2ms, and the duration is 1.2ms, scheduling Cycle is 3ms;Produce the follow-up running time-frequency resource schedule information index 03 of the GSM user 3 of interference.
Step 702:BSC sends the running time-frequency resource determining and disturbs information to eNB, during this information sends Through EMS2, NMS2, NMS1, EMS1.
After step 703:eNB receives running time-frequency resource interference information, carry out interference process;
Concrete, eNB is follow-up according to the frequency 898MHz producing interference, the GSM user producing interference Time-domain resource schedule information and index thereof, and combine the situation that is disturbed of subordinate's cell, determine little at GSM It is disturbed that district produces eNB subordinate's cell on the running time-frequency resource of interference, and therefore eNB determines at GSM cell Produce only scheduling on the corresponding Physical Resource Block of running time-frequency resource of interference and be positioned at the user of center of housing estate, it is to avoid quilt The interference of gsm system.
Example three
Fig. 8 is the flow chart of this example three, as shown in Figure 8, is passed by new interface between eNB and BSC Passing information, this example comprises the following steps:
Step 800:eNB sends up disturbed instruction information to BSC;
Concrete, eNB is according to the current up disturbed situation of subordinate's cell: the center of LTE CellA cell Frequency is 897.5MHz, and the bitmap sequence of disturbed Physical Resource Block is (1000000000000000000000000), i.e. first Physical Resource Block is disturbed, eNB and adjacent ENB arranges quiet period to disturbed frequency range 895.43~895.61MHz, and such as quiet period is that T+1ms starts, Silence durations is 9.2ms, the signal work(in disturbed frequency range that LTE base station is measured in judging quiet period Rate intensity, beyond power threshold, therefore judges to be probably what adjacent GSM cells was caused;On it is thus determined that The disturbed instruction information of row is: disturbed frequency domain information be disturbed center frequency point be 897.5MHz, disturbed The bitmap sequence of Physical Resource Block is (1000000000000000000000000), interfered cell position It is set to (east longitude 43 degree, north latitude 56 degree).
Step 801:BSC is according to up disturbed instruction information and each up work frequency of BSC subordinate's cell The disturbed situation of point determines running time-frequency resource interference information;
Concrete, after BSC receives up disturbed instruction information, according to up disturbed instruction information In disturbed frequency domain information determine produce interference frequency be 895.6MHz, then use the GSM of this frequency Cell is exactly to produce the GSM cell of interference, it is assumed that use the GSM cell of this frequency to have two: Cell4 And Cell5, then judge LTE interfered cell position whether in the interference range of Cell4 or Cell5, Judged result be LTE interfered cell position in the interference range of Cell4, the also interference model at Cell5 In enclosing, the cell therefore producing interference is Cell4 and Cell5, according to Cell4 and Cell5 user scheduling situation, Determine produce interference GSM user, produce interference the follow-up running time-frequency resource schedule information of GSM user and Its index.Determine that the method for the GSM cell producing interference depends on concrete implementation algorithm, it is also possible to root According to disturbed situation on frequency 895.6MHz for Cell4 and Cell5, determine that the GSM producing interference is little District, I will not elaborate.Additionally BSC is always according to each disturbed situation of up working frequency points of subordinate's cell, Determine the position of disturbed GSM cell, disturbed GSM user, after disturbed GSM user Continuous running time-frequency resource schedule information and index thereof;
BSC according to Cell4 and Cell5 produces the GSM user of interference on frequency 895.6MHz follow-up Time domain schedule information and the follow-up time-frequency domain schedule information of disturbed GSM user, determine that time-frequency provides Source interference information includes: (frequency is to produce the follow-up running time-frequency resource schedule information of the GSM user 1 disturbing 895.6MHz, initial time is T+0.5ms, and the duration is 1ms, and dispatching cycle is 10ms);Produce The running time-frequency resource schedule information that the GSM user 1 of interference is follow-up indexes 01;Produce the GSM user 2 of interference (frequency is 895.6MHz to follow-up running time-frequency resource schedule information, and initial time is T+2ms, the duration For 1ms, dispatching cycle is 10ms);Produce the follow-up running time-frequency resource scheduling letter of the GSM user 2 of interference Breath index 02;Disturbed GSM cell position is (east longitude 40 degree, north latitude 50 degree), disturbed The follow-up running time-frequency resource schedule information of GSM user 3 (frequency is 896MHz, and initial time is T+1ms, Duration is 0.5ms, and dispatching cycle is 10ms);The follow-up time-frequency money of disturbed GSM user 3 Source schedule information index 03.
Running time-frequency resource interference information is sent to eNB by step 802:BSC;
After step 803:eNB receives running time-frequency resource interference information, carry out interference process;
Concrete, eNB according to the GSM user of the frequency 895.6MHz producing interference and generation interference when Domain scheduling information, and combine the situation that is disturbed of subordinate's cell, determine when GSM cell produces interference Frequently in resource, eNB subordinate's cell is disturbed, and therefore eNB determines the GSM user producing interference Any use is not dispatched on (GSM1, GSM2) follow-up corresponding Physical Resource Block of running time-frequency resource schedule information Family, it is to avoid by the interference of gsm system;
The position according to disturbed GSM cell for the eNB and the interference range of LTE cell, it is judged that disturbed GSM cell be positioned at the interference range of LTE cell, eNB is disturbed GSM user (GSM3) The follow-up corresponding Physical Resource Block of running time-frequency resource schedule information do not dispatch any user, or only scheduling position In the user of center of housing estate, thus avoid producing interference to gsm system.
Step 804:BSC sends running time-frequency resource interference information invalid instruction message to eNB;
Concrete, when GSM user 1 is switched to other GSM cell, BSC sends time-frequency to eNB Resource interference information invalid instruction message, wherein running time-frequency resource interference information invalid instruction message comprise invalid The follow-up running time-frequency resource schedule information of GSM user 1, i.e. produces the follow-up time-frequency of the GSM user 1 of interference Resource scheduling information: frequency is 895.6MHz, initial time is T+0.5ms, and the duration is 1ms, adjusts The cycle of spending is 10ms;ENB adjusts the scheduling to subordinate user after receiving this message, for example no longer limit GSM Scheduling operation on the follow-up corresponding Physical Resource Block of time domain schedule information of user 1.
Example four
Fig. 9 is the flow chart of this example four, as it is shown in figure 9, pass through centerized fusion between eNB and BSC Node (CCP, Central Control Point) transmits information, and this example comprises the following steps:
Step 900:BSC determines running time-frequency resource interference information;
Concrete, BSC, according to the disturbed situation in each up working frequency points of subordinate's cell, determines and is done The follow-up time-frequency of the position of the GSM cell disturbed, disturbed GSM user, disturbed GSM user Resource scheduling information, and then generate running time-frequency resource interference information.
The running time-frequency resource interference information of determination is sent to eNB by step 901:BSC;Wherein, BSC is to CCP Sending running time-frequency resource interference information, CCP forwards that information to eNB;
Wherein, running time-frequency resource interference information includes: the position of disturbed GSM cell (east longitude 40 degree, North latitude 50 degree), mark GSM01 of disturbed GSM user, the follow-up running time-frequency resource of GSM01 is adjusted (absolute channel numbers is 40 to degree information, and initial time is T+0.5ms, and the duration is 1ms, scheduling week Phase is 10ms);
CCP is according to the position of GSM cell disturbed in running time-frequency resource interference information, and determination may be right GSM cell produces the LTE cell of interference, and the method for determination may is that with the position of disturbed GSM cell It is set to center, draws circle with the interference distance of LTE cell for radius, be positioned at LTE cell (the i.e. LTE of circle Part or all of cell coverage area is positioned at circle) it is exactly the LTE that may produce interference to GSM cell Cell;Other method can certainly be used, do not limit here;The interference radius of concrete LTE cell Can require according to the network planning and the eNB type of LTE cell predefines, then running time-frequency resource be disturbed Information is sent to produce interference and working frequency range to GSM cell to be had overlapping with disturbed GSM frequency The eNB of LTE cell.
After step 902:eNB receives running time-frequency resource interference information, carry out interference process;
Concrete, eNB, according to disturbed absolute channel numbers 40, searches and corresponding by frequency is 898MHz, the corresponding thing of time-domain resource schedule information that the disturbed user of GSM cell is follow-up on this frequency Any user is not dispatched on reason Resource Block.
Step 903:eNB sends interference to BSC and processes response message;Wherein, interference is processed and rings by eNB Answering message to be sent to CCP, response message is transmitted to BSC by CCP;Described interference processes bag in response message Include: whether carry out interference process is designated 1, i.e. carried out interference process.
Running time-frequency resource interference information invalid instruction message is sent to CCP by step 904:BSC, and CCP should Message is transmitted to eNB;
Concrete, when the service ending of GSM01, BSC sends the running time-frequency resource interference invalid instruction of information Message, wherein running time-frequency resource interference information invalid instruction message comprises the invalid GSM of running time-frequency resource interference information ID GSM01, eNB adjusts the scheduling to subordinate user, for example, no longer limits after receiving this message Scheduling operation on the follow-up corresponding Physical Resource Block of time-domain resource schedule information of GSM01 user.
Example five
Figure 10 is the flow chart of this example five, as shown in Figure 10, passes through new interface between eNB and BSC Transmission information, this example comprises the following steps:
Step 1000:BSC determines running time-frequency resource interference information;
Concrete, BSC is disturbed according to the edge customer of scheduling in each up working frequency points of subordinate's cell Situation, determines the follow-up running time-frequency resource schedule information of disturbed GSM user and index thereof, and then generates Running time-frequency resource disturbs information.
Step 1001:BSC sends running time-frequency resource interference information to eNB;
Described running time-frequency resource interference information includes: the follow-up running time-frequency resource scheduling of disturbed GSM user 1 (frequency is 897.8MHz to information, and initial time is T+0.5ms, and the duration is 1.2ms, dispatching cycle For 13.8ms), the follow-up running time-frequency resource schedule information index of disturbed GSM user 1 is 01, disturbed The follow-up running time-frequency resource schedule information of GSM user 2 (frequency is 897.8MHz, and initial time is T+2ms, Duration is 1.2ms, and dispatching cycle is 13.8ms), the follow-up time-frequency money of disturbed GSM user 2 Source schedule information index is 02.
After step 1002:eNB receives running time-frequency resource interference information, carry out interference process;
Concrete, eNB judges that disturbed GSM user 1 and the follow-up running time-frequency resource of GSM user 2 are dispatched Whether follow-up with LTE Cell Edge User information running time-frequency resource schedule information be consistent, when judged result is one During cause, eNB is in the follow-up running time-frequency resource schedule information of disturbed GSM user 1 and GSM user 2 Corresponding Physical Resource Block does not dispatch any user, or only scheduling is positioned at the user of center of housing estate, thus keeps away Exempt to produce interference to gsm system.
Step 1003:BSC sends running time-frequency resource interference information invalid instruction message to eNB;
Concrete, when GSM user 1 is switched to other GSM cell, BSC sends running time-frequency resource interference Information invalid instruction message, wherein running time-frequency resource interference information invalid instruction message includes: invalid GSM uses The follow-up running time-frequency resource schedule information index 01 in family, eNB adjusts the scheduling to subordinate user after receiving this message, For example no longer limit the tune on the follow-up corresponding Physical Resource Block of running time-frequency resource schedule information of GSM user 1 Degree operation.
In each example above-mentioned, determine that the method for LTE area interference scope is: first according to gsm system Interference-tolerant calculate jamming power thresholding;Then the signal power height that the LTE base station receiving is launched is calculated In jamming power threshold areas, the interference range of this region i.e. LTE cell.The interference range of LTE cell can To pre-set, it would however also be possible to employ additive method calculates interference range, does not limits here.
In addition, in each example above-mentioned, the interference distance of LTE cell refers to that LTE base station arrives interference range border Ultimate range;Same, the determination method of the interference range of GSM cell is similar with LTE cell.
Those skilled in the art are it should be appreciated that embodiments of the invention can be provided as method, system or meter Calculation machine program product.Therefore, the present invention can use hardware embodiment, software implementation or combine software and The form of the embodiment of hardware aspect.And, the present invention can use and wherein include calculating one or more Computer-usable storage medium (including but not limited to magnetic disc store and the optical storage of machine usable program code Device etc.) form of the upper computer program implemented.
The present invention is with reference to method according to embodiments of the present invention, equipment (system) and computer program product The flow chart of product and/or block diagram describe.It should be understood that can by computer program instructions flowchart and/ Or the flow process in each flow process in block diagram and/or square frame and flow chart and/or block diagram and/or square frame Combination.These computer program instructions can be provided to all-purpose computer, special-purpose computer, embedded processing The processor of machine or other programmable data processing device is to produce a machine so that by computer or its The instruction that the processor of his programmable data processing device performs produce for realizing in one flow process of flow chart or The device of the function specified in multiple flow processs and/or one square frame of block diagram or multiple square frame.
These computer program instructions may be alternatively stored in and can guide computer or other programmable data processing device In the computer-readable memory working in a specific way so that be stored in this computer-readable memory Instruction produces the manufacture including command device, and this command device realizes at one flow process of flow chart or multiple stream The function specified in journey and/or one square frame of block diagram or multiple square frame.
These computer program instructions also can be loaded in computer or other programmable data processing device, makes Sequence of operations step must be performed to produce computer implemented place on computer or other programmable devices Reason, thus the instruction performing on computer or other programmable devices provides for realizing flow chart one The step of the function specified in flow process or multiple flow process and/or one square frame of block diagram or multiple square frame.
The above, only presently preferred embodiments of the present invention, it is not intended to limit the protection model of the present invention Enclose.

Claims (20)

1. the side realizing that between global system for mobile telecommunications gsm system and Long Term Evolution LTE system, interference is processed Method, it is characterised in that described method includes:
GSM base station controller determines running time-frequency resource interference information;
The running time-frequency resource interference information of described determination is sent to LTE base station by GSM base station controller;Described Running time-frequency resource interference information carries out the foundation of interference process as described LTE base station.
2. method according to claim 1, it is characterised in that described GSM base station controller passes through In in the following manner at least one determine described running time-frequency resource interference information:
Mode one: described GSM base station controller is disturbed according to each up working frequency points of subordinate's cell Situation, determines the position of disturbed GSM cell, disturbed GSM user, disturbed GSM The follow-up running time-frequency resource schedule information of user and disturbed GSM user follow-up running time-frequency resource scheduling Information index, so that it is determined that described running time-frequency resource interference information;
Mode two: described GSM base station controller receives the up disturbed instruction that described LTE base station sends Information, according to described up disturbed instruction information, determines in the instruction of described up disturbed instruction information The follow-up running time-frequency resource scheduling of the GSM user producing interference on running time-frequency resource, the GSM user producing interference The running time-frequency resource schedule information that the GSM user of information and generation interference is follow-up indexes, so that it is determined that institute State running time-frequency resource interference information;Wherein, described up disturbed instruction information includes at least one of: quilt Interference frequency domain information, disturbed time-domain information, interfered cell position.
3. method according to claim 1 and 2, it is characterised in that described running time-frequency resource disturbs information Including at least one of:
The follow-up running time-frequency resource scheduling of the mark producing the GSM user of interference, the GSM user producing interference Information, the running time-frequency resource schedule information that the GSM user of generation interference is follow-up index, disturbed GSM is little The follow-up running time-frequency resource of the position in district, the mark of disturbed GSM user, disturbed GSM user is adjusted The follow-up running time-frequency resource schedule information index of degree information, disturbed GSM user.
4. method according to claim 1 and 2, it is characterised in that will at GSM base station controller After the running time-frequency resource interference information of described determination is sent to LTE base station, described method also includes:
GSM base station controller receives LTE base station and disturbs information to carry out interference process according to described running time-frequency resource Response message;
Described response message includes: whether to carry out the mark of interference process.
5. method according to claim 1 and 2, it is characterised in that described method also includes:
GSM base station controller sends running time-frequency resource interference information invalid instruction message to LTE base station;
Described running time-frequency resource interference information invalid instruction message includes at least one of: running time-frequency resource interference is believed Cease the follow-up running time-frequency resource schedule information of invalid GSM ID, invalid GSM user, invalid The follow-up running time-frequency resource schedule information index of GSM user.
6. method according to claim 1 and 2, it is characterised in that described GSM base station controller By in core network element, webmaster network element, direct interface, centerized fusion node at least one and LTE It is mutual that base station carries out information.
7. the side realizing that between global system for mobile telecommunications gsm system and Long Term Evolution LTE system, interference is processed Method, it is characterised in that described method includes:
LTE base station receives the running time-frequency resource interference information that GSM base station controller sends;
LTE base station disturbs information to carry out interference process according to described running time-frequency resource.
8. method according to claim 7, it is characterised in that described running time-frequency resource interference information includes At least one of:
The follow-up running time-frequency resource scheduling of the mark producing the GSM user of interference, the GSM user producing interference Information, the running time-frequency resource schedule information that the GSM user of generation interference is follow-up index, disturbed GSM is little The follow-up running time-frequency resource of the position in district, the mark of disturbed GSM user, disturbed GSM user is adjusted The follow-up running time-frequency resource schedule information index of degree information, disturbed GSM user.
9. the method according to claim 7 or 8, it is characterised in that described LTE base station is according to institute State running time-frequency resource interference information and carry out interference process, comprising:
Described LTE base station receives the described running time-frequency resource interference information that GSM base station controller sends, and obtains The follow-up running time-frequency resource schedule information of GSM user in described running time-frequency resource interference information, and described Any user is not dispatched on the follow-up corresponding Physical Resource Block of running time-frequency resource schedule information of GSM user, or Only scheduling is positioned at the user of center of housing estate, or does not carry out any process.
10. method according to claim 9, it is characterised in that described method farther includes: institute State LTE base station and produce the follow-up corresponding physical resource of running time-frequency resource schedule information of the GSM user disturbing Block does not dispatch any user, or only scheduling is positioned at the user of center of housing estate.
11. methods according to claim 9, it is characterised in that described method farther includes: institute State LTE base station judge the position of disturbed GSM cell whether in the interference range of LTE cell, as Fruit is, then LTE base station is at the follow-up corresponding physics of running time-frequency resource schedule information of disturbed GSM user Resource Block does not dispatch any user, or only scheduling is positioned at the user of center of housing estate;If it does not, LTE base station Do not carry out any process.
12. methods according to claim 9, it is characterised in that described method farther includes: institute State LTE base station judge the follow-up running time-frequency resource schedule information of disturbed GSM user whether with LTE cell limit The follow-up running time-frequency resource schedule information of edge user is consistent, if it is, LTE base station is at disturbed GSM The follow-up corresponding Physical Resource Block of running time-frequency resource schedule information of user does not dispatch any user, or only adjusts Degree is positioned at the user of center of housing estate;If it does not, LTE base station does not carry out any process.
13. methods according to claim 7 or 8, it is characterised in that receive GSM in LTE base station Before the running time-frequency resource interference information that base station controller sends, described method also includes:
Described LTE base station sends up disturbed instruction information to GSM base station controller;Described up quilt Interference instruction information determines the foundation of running time-frequency resource interference information as described GSM base station controller;
Wherein, described up disturbed instruction information includes at least one of: disturbed frequency domain information, quilt Interference time-domain information, interfered cell position.
14. methods according to claim 13, it is characterised in that in described LTE base station to GSM Before base station controller sends up disturbed instruction information, described method also includes:
Whether described LTE base station judges to disturb from gsm system, when interference is from gsm system, LTE base station sends up disturbed instruction information to GSM base station controller;Otherwise, LTE base station not to GSM base station controller sends up disturbed instruction information.
15. methods according to claim 7 or 8, it is characterised in that in LTE base station according to described After running time-frequency resource interference information carries out interference process, described method also includes:
Described LTE base station sends, to GSM base station controller, the response message that interference is processed;
Described response message includes: whether to carry out the mark of interference process.
16. methods according to claim 7 or 8, it is characterised in that described method also includes:
The running time-frequency resource interference invalid instruction of information that described LTE base station receives the transmission of GSM base station controller disappears Breath;
Described running time-frequency resource interference information invalid instruction message includes at least one of: running time-frequency resource interference is believed Cease the follow-up running time-frequency resource schedule information of invalid GSM ID, invalid GSM user, invalid The follow-up running time-frequency resource schedule information index of GSM user.
17. methods according to claim 16, it is characterised in that receive GSM base in LTE base station After the running time-frequency resource interference information invalid instruction message that station control sends, described method also includes:
LTE base station adjusts to subordinate user according to receiving described running time-frequency resource interference information invalid instruction message Scheduling.
18. methods according to claim 7 or 8, it is characterised in that described LTE base station passes through core In heart network element, webmaster network element, direct interface, centerized fusion node at least one with GSM base station It is mutual that controller carries out information.
19. 1 kinds realize interference process between global system for mobile telecommunications gsm system and Long Term Evolution LTE system Device, is positioned at GSM base station controller, it is characterised in that described device includes: running time-frequency resource interference letter Breath determining unit and running time-frequency resource interference information transmitting unit;Wherein,
Described running time-frequency resource disturbs information determination unit, is used for determining running time-frequency resource interference information, and by described The running time-frequency resource interference information determining is sent to described running time-frequency resource interference information transmitting unit;
Described running time-frequency resource disturbs information transmitting unit, for sending out the running time-frequency resource of described determination interference information Give LTE base station;Described running time-frequency resource interference information carries out the foundation of interference process as described LTE base station.
20. 1 kinds realize interference process between global system for mobile telecommunications gsm system and Long Term Evolution LTE system Device, is positioned at LTE base station, it is characterised in that described device includes: running time-frequency resource interference information receives single Unit and interference processing unit;Wherein,
Described running time-frequency resource disturbs information receiving unit, for receiving the time-frequency that GSM base station controller sends Resource interference information, and described running time-frequency resource interference information is sent to described interference processing unit;
Described interference processing unit, described in disturbing information receiving unit transmission according to described running time-frequency resource Running time-frequency resource interference information carries out interference process.
CN201510157412.0A 2015-04-03 2015-04-03 A kind of method and apparatus realizing that between GSM and LTE system, interference is processed Withdrawn CN106162657A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510157412.0A CN106162657A (en) 2015-04-03 2015-04-03 A kind of method and apparatus realizing that between GSM and LTE system, interference is processed
PCT/CN2016/077148 WO2016155555A1 (en) 2015-04-03 2016-03-23 Method and apparatus for processing interference between gsm system and lte system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510157412.0A CN106162657A (en) 2015-04-03 2015-04-03 A kind of method and apparatus realizing that between GSM and LTE system, interference is processed

Publications (1)

Publication Number Publication Date
CN106162657A true CN106162657A (en) 2016-11-23

Family

ID=57003857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510157412.0A Withdrawn CN106162657A (en) 2015-04-03 2015-04-03 A kind of method and apparatus realizing that between GSM and LTE system, interference is processed

Country Status (2)

Country Link
CN (1) CN106162657A (en)
WO (1) WO2016155555A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019080455A1 (en) * 2017-10-27 2019-05-02 华为技术有限公司 Message processing method, access point device, and message processing device
CN109756976A (en) * 2017-11-03 2019-05-14 维沃移动通信有限公司 Evade the method and the network equipment of signal interference

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102118758A (en) * 2011-01-28 2011-07-06 中兴通讯股份有限公司 Frequency spectrum sharing method for GSM (Global System for Mobile Communication) system and LTE (Long Term Evolution) system and systems thereof
CN102349336A (en) * 2009-03-12 2012-02-08 高通股份有限公司 Methods and apparatus for adjacent channel interference mitigation in access point base stations
CN103202053A (en) * 2010-11-05 2013-07-10 摩托罗拉移动有限责任公司 Configuring unscheduled periods to enable interference reduction in heterogeneous networks
CN103404188A (en) * 2012-12-27 2013-11-20 华为技术有限公司 Spectrum resource sharing method and base station
WO2014165289A1 (en) * 2013-03-12 2014-10-09 Rearden, Llc Systems and methods for exploiting inter-cell multiplexing gain in wireless cellular systems via distributed input distributed output technology

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012062364A1 (en) * 2010-11-11 2012-05-18 Nokia Siemens Networks Oy Interference management for coexisting radio systems
US9107232B2 (en) * 2010-12-10 2015-08-11 Qualcomm Incorporated Interference management between multiple networks

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102349336A (en) * 2009-03-12 2012-02-08 高通股份有限公司 Methods and apparatus for adjacent channel interference mitigation in access point base stations
CN103202053A (en) * 2010-11-05 2013-07-10 摩托罗拉移动有限责任公司 Configuring unscheduled periods to enable interference reduction in heterogeneous networks
CN102118758A (en) * 2011-01-28 2011-07-06 中兴通讯股份有限公司 Frequency spectrum sharing method for GSM (Global System for Mobile Communication) system and LTE (Long Term Evolution) system and systems thereof
CN103404188A (en) * 2012-12-27 2013-11-20 华为技术有限公司 Spectrum resource sharing method and base station
WO2014165289A1 (en) * 2013-03-12 2014-10-09 Rearden, Llc Systems and methods for exploiting inter-cell multiplexing gain in wireless cellular systems via distributed input distributed output technology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019080455A1 (en) * 2017-10-27 2019-05-02 华为技术有限公司 Message processing method, access point device, and message processing device
CN109756976A (en) * 2017-11-03 2019-05-14 维沃移动通信有限公司 Evade the method and the network equipment of signal interference

Also Published As

Publication number Publication date
WO2016155555A1 (en) 2016-10-06

Similar Documents

Publication Publication Date Title
CN106465391B (en) Resource regulating method, scheduler, base station, terminal and system
CN107306438A (en) A kind of generation method of wireless access network section, wireless access network and section manager
CN110278062A (en) Resource instruction determines method and device
CN106465171B (en) The method and apparatus of MBSFN measuring configuration and report
CN106255213B (en) It is a kind of configure time domain scheduling unit method and base station
CN108738135A (en) Uplink information sending method, method of reseptance and device
EP3855839A1 (en) Method and apparatus for distribution and synchronization of radio resource assignments in a wireless communication system
CN107431909A (en) User's set and base station
CN105490790B (en) The configuration method and device of secondary carrier in carrier wave polymerization
CN106162888A (en) PUCCH resource collocation method in carrier aggregation and equipment thereof
CN106454908A (en) Scheduling information processing method and device
CN109155902A (en) A kind of multi-broadcast communication method, the network equipment, user equipment and system
JP2022191387A (en) Paging occasion start determination
CN109150445A (en) A kind of Downlink Control Information sends and receives method and apparatus
CN107889251A (en) A kind of determination method, the network equipment and the terminal of time-domain resource unit set structure
CN109309545A (en) A kind of method, equipment and system indicating time slot format
CN103650558B (en) Carrier selecting method and device
KR101512585B1 (en) Method and device for allocating uplink channel resource of cooperative multi-point transmission/reception
CN109391342A (en) A kind of data transmission method, relevant device and system
WO2017113206A1 (en) Data communication method, terminal device, and network device
CN107734699A (en) A kind of uplink scheduling method and relevant device
CN109219138A (en) Method, apparatus, electronic equipment and the storage medium of transmission process
CN103313311B (en) A kind of radio resource management method, user equipment and network side
CN106162657A (en) A kind of method and apparatus realizing that between GSM and LTE system, interference is processed
CN110139389A (en) A kind of method, apparatus and computer storage medium of buffer region state reporting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20161123

WW01 Invention patent application withdrawn after publication