CN106159962A - Gong Biantai district distribution transforming fall damage device - Google Patents

Gong Biantai district distribution transforming fall damage device Download PDF

Info

Publication number
CN106159962A
CN106159962A CN201510129704.3A CN201510129704A CN106159962A CN 106159962 A CN106159962 A CN 106159962A CN 201510129704 A CN201510129704 A CN 201510129704A CN 106159962 A CN106159962 A CN 106159962A
Authority
CN
China
Prior art keywords
power
current
low
power information
service terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510129704.3A
Other languages
Chinese (zh)
Inventor
王志忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510129704.3A priority Critical patent/CN106159962A/en
Publication of CN106159962A publication Critical patent/CN106159962A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The present invention relates to a kind of Gong Biantai district distribution transforming fall damage device, belong to power transmission and distribution fall damage device technical field of structures.nullIt is provided with the open-type high-tension current inductor coupled successively、Power distribution transformer、Low-temperature measurement current transformer,Low-temperature measurement current transformer primary side outfan connection low-voltage power power distribution cabinet、Full-automatic low-voltage power reactive compensation cabinet、Intelligent electric energy meter and power information collection site service terminal,The secondary side outfan of high-tension current inductor also current loop with full-automatic low-voltage power reactive compensation cabinet and power information collection site service terminal connects,The secondary side outfan of low-temperature measurement current transformer connects with the current loop of intelligent electric energy meter,Collection and the transmission of data is connected each other between intelligent electric energy meter and power information collection site service terminal,Complete low-temperature measurement electric current and the high pressure monitoring current synchronous transfer to power information acquisition system main website,Power utility check personnel are facilitated to verify、Comparison,Effectively reduce management line loss.

Description

Gong Biantai district distribution transforming fall damage device
Technical field
The present invention relates to a kind of Gong Biantai district distribution transforming fall damage device, belong to power transmission and distribution fall damage device technical field of structures.
Background technology
At present, general common transformer platform district is fitted with low pressure examination metering device, owing to supplied user power utilization situation is complicated, controller switching equipment the most specially becomes the outmoded backwardness of user and line loss specific responsibility manages the aspects such as relatively weak, become the severely afflicated area that high-voltage line loss is high, tax evasion electrical phenomena is serious.
The reason causing Gong Biantai district high-voltage line loss high mainly has:
1, most of Gong Biantai districts are fitted without full-automatic reactive power compensator, fail complicated power load is carried out effective reactive-load compensation, and electricity consumption reactive loss is bigger.
2, the usual rate of load condensate of common transformer is relatively low, and load fluctuation is relatively big, lacks and effectively compensates transformator with device, and the reactive loss of transformator self is bigger.
3, specific responsibility personnel in platform district are reply Low-voltage Line Loss performance assessment criteria, deliberately juggle things on examination metering device, make the few quantity calculation of table of merit rating, artificially cause increasing of high-voltage line loss.
In order to change this present situation, effectively reduce transformator and the reactive loss of power load, contain artificial tax evasion electrical phenomena, in conjunction with existing metering device and power user power consumption information acquisition system, develop the saving energy and decreasing loss device of a kind of high performance-price ratio.
Summary of the invention
The electricity consumption reactive loss Yamato that it is an object of the invention to solve prior art existence is the problem causing high-voltage line loss to increase, it is provided that a kind of Gong Biantai district distribution transforming fall damage device, to reach the purpose of saving energy and decreasing loss.
The present invention is by the following technical solutions:
nullGong Biantai district distribution transforming fall damage device,It is characterized in that and is provided with the open-type high-tension current inductor 2 coupled successively、Power distribution transformer 3、Low-temperature measurement current transformer 4,The primary current outfan connection low-voltage power power distribution cabinet 5 of low-temperature measurement current transformer 4、Full-automatic low-voltage power reactive compensation cabinet 6、Intelligent electric energy meter 7 and power information collection site service terminal 8,The secondary current outfan of high-tension current inductor 2 also current loop with full-automatic low-voltage power reactive compensation cabinet 6 and power information collection site service terminal 8 connects,Low-temperature measurement current transformer 4 connects with the current loop of intelligent electric energy meter 7,Collection and the transmission of data is connected each other between intelligent electric energy meter 7 and power information collection site service terminal 8,Power information collection site service terminal realizes the collection to intelligent electric energy meter record data and transmission,And by the metering circuit of self,The current values that high-tension current inductor detects is recorded and sends,Complete low-temperature measurement electric current and the high pressure monitoring current synchronous transfer to power information acquisition system main website 9,In the data that power information acquisition system main website storage and display power information collection site service terminal are uploaded.
Described high-tension current inductor 2 uses the open-type high-tension current inductor that high-tension line is special, can gather metering transformer high-pressure side line current easily, need not disconnect high pressure major loop, have feature with low cost, easy to use during installation.
Described full-automatic low-voltage power reactive compensation cabinet 6 is installed on low-tension side of power transformer, utilize low-tension side of power transformer voltage signal and high voltage side current signal, compare through intellectuality, computing and control, realize the real-time switching of multistage little step-length capacitor, reach the full compensation to power load reactive power and transformator self excitation reactive power power.
Described intelligent electric energy meter 7 is used for measuring power consumption, record stores every power consumption parameter, and by RS-485 interface and power information collection site service terminal intercommunication, transfers data to power information collection site service terminal.
Described power information collection site service terminal 8, realize the collection to intelligent meter record data and transmission, and by the metering circuit of self, the current values that open-type high-tension current inductor detects is recorded and sends, completes low-temperature measurement electric current and the high pressure monitoring current synchronous transfer to power information acquisition system main website.
The present invention can realize the power load to Gong Biantai district and the idle full compensation of transformator self, the reactive power of power load and the reactive power of transformator self are carried out the most full-automatic compensation the most simultaneously, reduce reactive loss to greatest extent, effectively reduce technical loss.Also high voltage side current to transformator can be acquired metering in real time, and can by the data and the low-temperature measurement data that gather by electricity consumption field service terminal synchronized upload to power information acquisition system main website, facilitate power utility check personnel to carry out verifying, comparison, find that this district's stoichiometric point, with or without tax evasion electrical phenomena, effectively reduces management line loss in time.Efficiently solve the line loss height in Gong Biantai district, run the phenomenon that power factor is low, administrative vulnerability is big.
Accompanying drawing explanation
Fig. 1: for the Gong Biantai district distribution transforming fall damage device electrical block diagram equipped with power information collection site service terminal;
Fig. 2: for equipped with the Gong Biantai district distribution transforming fall damage device electrical block diagram taking control metering integrated intelligent meter;
In figure: 1, three-phase high-voltage power supply inlet wire, 2, open-type high-tension current inductor, 3, power distribution transformer, 4, low-temperature measurement current transformer, 5, low-voltage power power distribution cabinet, 6, full-automatic low-voltage power reactive compensation cabinet, 7, intelligent electric energy meter, 8, power information collection site service terminal, 9, power information acquisition system main website, 10, monitoring intelligent meter, 11, take control metering integrated intelligent meter.
Detailed description of the invention
Referring to the drawings, provide the detailed description of the invention of the present invention, be used for the structure of the present invention is further described.
Embodiment 1
The Gong Biantai district distribution transforming fall damage device of the present embodiment, as shown in Figure 1, installs open-type high-tension current inductor 3 in the high-pressure side of power distribution transformer 2, and the low-pressure side at power distribution transformer installs full-automatic low-voltage power reactive compensation cabinet 6.The secondary circuit of open-type high-tension current inductor 2 seals in sample rate current loop and the metering current loop of power information collection site service terminal 8 of full-automatic low-voltage power reactive compensation cabinet.So, full-automatic low-voltage power reactive compensation cabinet 6 can be by the voltage power factor angle of the secondary current of open-type high-tension current inductor 2 with power distribution transformer 3 low-pressure side, automatically select switching and compensate electric capacity, power load and the idle of transformator self are compensated, thus decreases reactive loss to greatest extent;The high voltage side current of open-type high-tension current inductor detection; stored by the record of power information collection site service terminal; low-voltage load electric current together with intelligent electric energy meter 7 metering; utilize the transmission of GPRS/CDMA public network channel synchronization to power information acquisition system main website 9; power utility check personnel can be by the analyses and comparison to high-low pressure electric current; it is found to have more intuitively without drain conditions steathily, thus finds and investigate and prosecute stealing infringement in time, the power resource of protection country.
Embodiment 2
As shown in Figure 2, the present embodiment difference from Example 1 is, when stoichiometric point is provided with expense control metering integrated intelligent meter 11, need a monitoring intelligent meter 10 is installed at the scene, the high voltage side of transformer electric current of record open-type high-tension current inductor 2 detection, it is transferred to power information collection site service terminal 8 by RS-485 interface, completes low-temperature measurement electric current and the high pressure monitoring current synchronous transfer to power information acquisition system main website, other same as in Example 1.
Protection scope of the present invention is not limited to embodiment given above, every according to all of technical scheme achieved by the thinking of the present invention, belongs to protection scope of the present invention.

Claims (4)

  1. null1. Gong Biantai district distribution transforming fall damage device,It is characterized in that being provided with the open-type high-tension current inductor (2) coupled successively、Power distribution transformer (3)、Low-temperature measurement current transformer (4),Low-temperature measurement current transformer (4) outfan connection low-voltage power power distribution cabinet (5)、Full-automatic low-voltage power reactive compensation cabinet 6、Intelligent electric energy meter (7) and power information collection site service terminal (8),The secondary current outfan of high-tension current inductor (2) also current loop with full-automatic low-voltage power reactive compensation cabinet (6) and power information collection site service terminal (8) connects,The secondary current outfan of low-temperature measurement current transformer (4) connects with the current loop of intelligent electric energy meter (7),Collection and the transmission of data is connected each other between intelligent electric energy meter (7) and power information collection site service terminal (8),Power information collection site service terminal realizes the collection to intelligent electric energy meter record data and transmission,And by the metering circuit of self,The current values that high-tension current inductor detects is recorded and sends,Complete low-temperature measurement electric current and the high pressure monitoring current synchronous transfer to power information acquisition system main website (9),In the data that power information acquisition system main website storage and display power information collection site service terminal are uploaded.
  2. 2. according to Gong Biantai district distribution transforming fall damage device described in claim 1, it is characterised in that described high-tension current inductor (2) uses the open-type high-tension current inductor that high-tension line is special.
  3. 3. according to Gong Biantai district distribution transforming fall damage device described in claim 1 or 2, it is characterized in that described full-automatic low-voltage power reactive compensation cabinet (6) is installed on low-tension side of power transformer, utilize low-tension side of power transformer voltage signal and high voltage side current signal, compare through intellectuality, computing and control, realize the real-time switching of multistage little step-length capacitor, reach the full compensation to power load reactive power and transformator self excitation reactive power power.
  4. 4. according to Gong Biantai district distribution transforming fall damage device described in claim 1-3 any claim, it is characterized in that described intelligent electric energy meter (7) is used for measuring power consumption, record stores every power consumption parameter, and by RS-485 interface and power information collection site service terminal intercommunication, transfer data to power information collection site service terminal;Power information collection site service terminal carries out metering to open-type high-tension current inductor detection high pressure monitoring current and stores, and sends to power information acquisition system main website with the low-temperature measurement current synchronization of intelligent electric energy meter metering.
CN201510129704.3A 2015-03-24 2015-03-24 Gong Biantai district distribution transforming fall damage device Pending CN106159962A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510129704.3A CN106159962A (en) 2015-03-24 2015-03-24 Gong Biantai district distribution transforming fall damage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510129704.3A CN106159962A (en) 2015-03-24 2015-03-24 Gong Biantai district distribution transforming fall damage device

Publications (1)

Publication Number Publication Date
CN106159962A true CN106159962A (en) 2016-11-23

Family

ID=58063895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510129704.3A Pending CN106159962A (en) 2015-03-24 2015-03-24 Gong Biantai district distribution transforming fall damage device

Country Status (1)

Country Link
CN (1) CN106159962A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106908698A (en) * 2017-04-28 2017-06-30 刘颖 A kind of line loss detects automatic acquisition device and its method
CN115411838A (en) * 2022-04-29 2022-11-29 天津浩源慧能科技有限公司 Transformer area iron loss reducing system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106908698A (en) * 2017-04-28 2017-06-30 刘颖 A kind of line loss detects automatic acquisition device and its method
CN115411838A (en) * 2022-04-29 2022-11-29 天津浩源慧能科技有限公司 Transformer area iron loss reducing system and method
CN115411838B (en) * 2022-04-29 2024-04-02 天津浩源汇能股份有限公司 System and method for reducing iron loss of transformer in transformer area

Similar Documents

Publication Publication Date Title
CN101908780B (en) Intelligent remote monitoring box-type substation
CN208094204U (en) A kind of electric vehicle and power grid energy two-way exchange system
CN205304271U (en) Alternating current circuit field energy collection system of impedance characteristic based on transformer
US9733278B2 (en) System for measuring loss of HVDC
CN104300553A (en) Rural power network low voltage comprehensive treatment control device and method
CN102074994B (en) Charging device of direct-current (DC) system
CN203119559U (en) Distributed direct-current power source monitoring device
CN104901342A (en) Capacitor voltage division-based high-voltage electricity taking device
CN106159962A (en) Gong Biantai district distribution transforming fall damage device
CN105811442B (en) A kind of electrification access device of Mobile energy storage system grid connection 10kV route
CN102545232A (en) Distributed type intelligent reactive compensation box
CN204992272U (en) Dual supply massive quantity power supply and high expanded pull -out type measuring equipment that does not repeat of low meter that supplies
CN204517410U (en) Damage device falls in the distribution transforming of Gong Biantai district
CN104009652A (en) Portable direct-current power supply
CN203839952U (en) Low-voltage intelligent voltage regulator
CN103390897A (en) Low-voltage distribution area dispersion reactive compensation method based on wireless network
Bollen et al. CIGRE/CIRED C4. 24–power quality in the future grid–first introduction
CN203466477U (en) Intelligent box-type transformer substation
CN104734163A (en) Power factor compensation device in light-load operating of transformer, connecting system and compensation method thereof
CN204992580U (en) Expanded not repeated fixed measuring equipment of dual power supply
CN103346500A (en) Intelligent box-type transformer substation
CN202906218U (en) Novel intelligent charge controllable box type transformer
CN106712314B (en) Wireless energy-taking low-voltage power supply system based on electrified railway equipment
CN204992273U (en) Expanded pull -out type measuring equipment that does not repeat of dual power supply
CN206332455U (en) A kind of pole voltage power-less comprehensive compensating device towards urban power distribution network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161123