CN106150114B - A kind of historical relic's protection device for slowing down blasting vibration - Google Patents

A kind of historical relic's protection device for slowing down blasting vibration Download PDF

Info

Publication number
CN106150114B
CN106150114B CN201610637711.9A CN201610637711A CN106150114B CN 106150114 B CN106150114 B CN 106150114B CN 201610637711 A CN201610637711 A CN 201610637711A CN 106150114 B CN106150114 B CN 106150114B
Authority
CN
China
Prior art keywords
historical relic
bogie
box column
anchoring
epoxy coating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610637711.9A
Other languages
Chinese (zh)
Other versions
CN106150114A (en
Inventor
朱利明
唐俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN201610637711.9A priority Critical patent/CN106150114B/en
Publication of CN106150114A publication Critical patent/CN106150114A/en
Application granted granted Critical
Publication of CN106150114B publication Critical patent/CN106150114B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of historical relic's protection device for slowing down blasting vibration, including box column, anchoring bogie, high-damping block, epoxy coating strand and anchorage;Four angle points in imperial palace are arranged in box column, are linked together by epoxy coating strand, and high-damping block is arranged between box column and imperial palace to reduce influence of the under-traverse tunnel blast working to historical relic.Provided by the present invention for slowing down the historical relic's protection device of under-traverse tunnel blast working vibration, historical relic is effectively ensured and does not generate damage during constructing tunnel, and all facilities of the present apparatus do not generate damage to historical relic, have good protecting effect.

Description

A kind of historical relic's protection device for slowing down blasting vibration
Technical field
The invention belongs to historical relic's protection fields, and in particular to a kind of historical relic's protection device for slowing down blasting vibration.
Background technology
Heritage buildings are important cultural relics and historic sites, and especially ancient tower class building has since their building is of the remote past Centuries, some more than one thousand years or even longer, they experienced the attack of countless natural calamities or artificial injury, or it is more or It is few that all there is this or that different degrees of damages and destruction.Their present situation is difficult to give accurate description with Modern Mechanics And evaluation, we see wise and farsighted, the superb art of architecture and construction quality of ancestors from ancient architecture to one side, while again not It obtains the limitation, limited production capacity and the description of materials that do not recognize to recognize at that time or structure design is unreasonable so that have Building basis bearing capacity is inadequate, and many buildings are difficult to preserve till now.Due to the injury of accumulation, seriously reduces them and support The ability for the interference that anti-natural calamity and modern society's active belt come.Therefore, protect them is in the construction process from damage Very necessary.
Invention content
The present invention's is directed to deficiency in the prior art, provides a kind of historical relic's protection device for slowing down blasting vibration.
To achieve the above object, the present invention uses following technical scheme:
A kind of historical relic's protection device for slowing down blasting vibration, which is characterized in that including:First box column, high-damping Block, epoxy coating strand and anchorage;The first box column quantity is four, is separately positioned on four angle points of historical relic, the One box column includes the steel member for anchoring bogie and support anchoring bogie, is provided between anchoring bogie and the historical relic High-damping block anchors and there also is provided epoxy coating strand on bogie, and the epoxy coating strand is fixed by anchorage.
To optimize above-mentioned technical proposal, the concrete measure taken further includes:
High-damping block there are two being arranged side by side between each anchoring bogie and historical relic.
Each steel member supports three anchoring bogies, each anchor to be evenly arranged three row's epoxy coating steel on bogie Twisted wire, the anchoring bogie are evenly arranged along historical relic short transverse.
Further include the second box column, the second box column quantity is four, is arranged the front-back in historical relic two-by-two, second High-damping block there are two being arranged side by side between box column and historical relic.
The anchoring bogie is steel construction, anchors bogie and steel member is integrally-formed.
The high-damping block is yielding rubber block, thickness 6cm.
The steel member bottom is bolted.
First box column and the second box column are linked together by epoxy coating strand, anchoring bogie, height Damping block, epoxy coating strand and anchorage form external prestressing system.
The beneficial effects of the invention are as follows:Scientific and reasonable for structure, reliability is high, and historical relic is effectively ensured during constructing tunnel Damage is not generated.
Description of the drawings
Fig. 1 is the vertical view of the present invention.
Fig. 2 is the structural schematic diagram of the first box column of the invention.
Fig. 3 is the partial schematic diagram of the first box column of the invention.
Fig. 4 is the top and bottom perspective views of the first box column of the invention.
Fig. 5 is the front view of the present invention.
Reference numeral is as follows:First box column 1, anchoring bogie 1-1, steel member 1-2, high-damping block 2, epoxy coating steel Twisted wire 3, anchorage 4, the second box column 5, bolt 6.
Specific implementation mode
In conjunction with the accompanying drawings, the present invention is further explained in detail.
Historical relic's protection device for slowing down blasting vibration as shown in Figs. 1-5, historical relic is preferably imperial palace, including the first case Type column 1, high-damping block 2, epoxy coating strand 3, anchorage 4 and the second box column 5.First box column, 1 quantity is four, respectively Four angle points in imperial palace are set.First box column 1 includes the steel member of anchoring bogie 1-1 and support anchoring bogie 1-1 1-2, each steel member 1-2 support three anchoring bogie 1-1, anchoring bogie 1-1 to be evenly arranged along imperial palace short transverse, often Three row's epoxy coating strands 3 are evenly arranged on a anchoring bogie 1-1, i.e., a total of three rows three beams steel strand wires, epoxy applies Layer steel strand wires 3 are fixed by anchorage 4.Epoxy coating strand 3 is the anticorrosive prestressed material of novel high-performance, should use symbol Close the underrelaxation steel strand wires of U.S.'s ASTMA416-92 standard productions.
With further reference to Fig. 2, high-damping block 2 there are two being arranged side by side between bogie 1-1 and imperial palace is each anchored, to Avoid direct contact with imperial palace damage city brick.In view of the facility of construction, anchoring bogie 1-1 is steel construction, anchoring bogie 1-1 Integrally-formed with steel member 1-2, steel construction is level-one steel, shares 8 steel columns, and when design is considered as steel column and bears structure Dead weight, anchoring bogie 1-1 bears the pulling force of external prestressing generation, and is evenly distributed to historical relic periphery, and the bottoms steel member 1-2 Portion is fixed by M20 bolts 6.Since anchoring bogie 1-1 tension tonnages are larger, it must assure that quality meets when constructing and set Meter requires, and the anchor plate of anchoring bogie 1-1 must be vertical with prestressing tendon when installing, and positioning should be accurate.
Second box column, 5 quantity is also four, two-by-two the front and back front-back for being symmetricly set on imperial palace, the second box column 5 with High-damping block 2 there are two being also arranged side by side between imperial palace, for imperial palace to be isolated to slow down influence of the public vibration of explosion to imperial palace. High-damping block 2 is yielding rubber block, thickness 6cm.
First box column 1 and the second box column 5 are linked together by epoxy coating strand 3, external prestressing system Mainly by epoxy coating strand 3, mating billet and anchorage 4, anchoring bogie 1-1, high-damping block 2 and anti-corrosion material etc. Composition.
When slowing down the historical relic's protection device of blasting vibration using this, all steel constructions must be protected, and protection can press Following proposal executes:
Derusting scheme:Sandblasting removes old paint film and ground corrosion, until exposing clean steel, structure or component surface are not Must there be old paint film, rust, greasy dirt and impurity.
Application scheme:Using single layer of primer application, priming paint is high molar ratio aqueous inorganic zinc silicate(IC531)Twice(It is dry Film overall thickness 75um).
And when material selection, epoxy filling coating needs meet specification《Seven prestress wires of epoxy coating filled-type Standard criterion》(ASTM A 882/A882M-02a)And《Epoxy coating strand for prestressed concrete》(ISO 14655: 1999(E)).Anchorage 4 uses externally cable Special ground tackle, performance that should meet international post-tensioned prestressing association FIP《Post-tensioned prestressing The examination of system and application proposal》、《External prestressing material and system》And standard GB/T/T14370-2000《Prestressing force Muscle anchorage, fixture and connector》Regulation.
The contact situation of anchoring bogie and historical relic wall should be gone through in stretching construction, before prestressed stretch-draw;Institute It is 0.20R to state prestressed stretch-draw Stress Controlb y, using the single carry out stretching construction of small-size jack, jack form and tonnage Ying Yuqi is consistent.It is influenced needing to pay attention to loss of prestress by root stretching construction using small-size jack, when stretching construction answers It repeatedly mends and draws, it is ensured that every steel strand wires uniform force;Historical relic must be monitored, is examined in prestressing tendon stretching process The situation of change in historical relic crack;After tensioning, prestressing tendon anchors active length without cutting, first can carry out again Secondary benefit is drawn, and second can be unloaded;When tension of prestressed tendon, should there are corresponding safety measure, presstressed reinforcing steel both ends to forbid to stand People;After presstressed reinforcing steel anchoring, when must loosen for some reason, special loosening device is preferably used to unclamp anchorage, whenever not In presstressed reinforcing steel, there are states of tension directly to cut anchorage;Tensioning must comply with global symmetry principle.
Imperial palace periphery anchor ear needs to set up holder, and holder sets up the requirement for having to comply with corresponding specification, standard, and holder is taken If examination is had to pass through after, can be come into operation after qualified.Since holder is set up, use, there are high-altitudes in demolishing process Operation ensures personnel safety so must take appropriate measures.It must be provided with safety guard net on rack platform to be used cooperatively, prevent The setting of protecting wire net must meet the requirement of corresponding specification, standard, regulation, fall danger to avoid personnel.
The above is only the preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-described embodiment, All technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art For those of ordinary skill, several improvements and modifications without departing from the principles of the present invention should be regarded as the protection of the present invention Range.

Claims (4)

1. a kind of historical relic's protection device for slowing down blasting vibration, which is characterized in that including:First box column(1), high-damping Block(2), epoxy coating strand(3)And anchorage(4);First box column(1)Quantity is four, is separately positioned on historical relic Four angle points, the first box column(1)Including anchoring bogie(1-1)Bogie is anchored with support(1-1)Steel member(1-2), The anchoring bogie(1-1)High-damping block is provided between historical relic(2), anchor bogie(1-1)On there also is provided epoxy Coating steel strand wires(3), the epoxy coating strand(3)Pass through anchorage(4)It is fixed;Each anchoring bogie(1-1)With historical relic Between be arranged side by side there are two high-damping block(2), each steel member(1-2)Three anchoring bogies of support(1-1), each to anchor Bogie(1-1)On be evenly arranged three row's epoxy coating strands(3), anchor bogie(1-1)It is equal along historical relic short transverse Even arrangement;It further include the second box column(5), second box column(5)Quantity is four, is arranged before and after historical relic two-by-two Face, the second box column(5)High-damping block there are two being arranged side by side between historical relic(2);First box column(1)With the second box column (5)Pass through epoxy coating strand(3)It links together, anchors bogie(1-1), high-damping block(2), epoxy coating strand (3)And anchorage(4)Form external prestressing system.
2. a kind of historical relic's protection device for slowing down blasting vibration as described in claim 1, it is characterised in that:The anchoring Bogie(1-1)For steel construction, bogie is anchored(1-1)With steel member(1-2)It is integrally-formed.
3. a kind of historical relic's protection device for slowing down blasting vibration as described in claim 1, it is characterised in that:The high resistant Buddhist nun's block(2)For yielding rubber block, thickness 6cm.
4. a kind of historical relic's protection device for slowing down blasting vibration as described in claim 1, it is characterised in that:The steel structure Part(1-2)Bottom passes through bolt(6)It is fixed.
CN201610637711.9A 2016-08-08 2016-08-08 A kind of historical relic's protection device for slowing down blasting vibration Active CN106150114B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610637711.9A CN106150114B (en) 2016-08-08 2016-08-08 A kind of historical relic's protection device for slowing down blasting vibration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610637711.9A CN106150114B (en) 2016-08-08 2016-08-08 A kind of historical relic's protection device for slowing down blasting vibration

Publications (2)

Publication Number Publication Date
CN106150114A CN106150114A (en) 2016-11-23
CN106150114B true CN106150114B (en) 2018-09-04

Family

ID=57328160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610637711.9A Active CN106150114B (en) 2016-08-08 2016-08-08 A kind of historical relic's protection device for slowing down blasting vibration

Country Status (1)

Country Link
CN (1) CN106150114B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719150A (en) * 2021-08-27 2021-11-30 青岛新华友建工集团股份有限公司 Protection device for blasting construction vibration of tunnel under building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4224589B2 (en) * 2005-03-04 2009-02-18 国立大学法人 琉球大学 Seismic reinforcement method for buildings with piloti frames
CN201598846U (en) * 2010-03-10 2010-10-06 中国建筑一局(集团)有限公司 Antique building external wall prestressing steel band reinforcement device
CN201883704U (en) * 2010-12-20 2011-06-29 重庆中设工程设计有限公司 External prestressed tensile base
CN103388408A (en) * 2013-07-28 2013-11-13 桂林理工大学 External pre-stressed tendon reinforcing steering block for building structure
CN103993751A (en) * 2014-05-20 2014-08-20 东南大学 Wall reinforcing structure and method for improving integrality of historic buildings
CN205875763U (en) * 2016-08-08 2017-01-11 南京工业大学 A historical relic protection device for slowing down blasting vibration

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4224589B2 (en) * 2005-03-04 2009-02-18 国立大学法人 琉球大学 Seismic reinforcement method for buildings with piloti frames
CN201598846U (en) * 2010-03-10 2010-10-06 中国建筑一局(集团)有限公司 Antique building external wall prestressing steel band reinforcement device
CN201883704U (en) * 2010-12-20 2011-06-29 重庆中设工程设计有限公司 External prestressed tensile base
CN103388408A (en) * 2013-07-28 2013-11-13 桂林理工大学 External pre-stressed tendon reinforcing steering block for building structure
CN103993751A (en) * 2014-05-20 2014-08-20 东南大学 Wall reinforcing structure and method for improving integrality of historic buildings
CN205875763U (en) * 2016-08-08 2017-01-11 南京工业大学 A historical relic protection device for slowing down blasting vibration

Also Published As

Publication number Publication date
CN106150114A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN109339828B (en) Tunnel prestress inverted arch structure and construction method thereof
CN108677758A (en) The antidumping anti-fall girder apparatus and its construction method that existing bridge is added
CN106150114B (en) A kind of historical relic's protection device for slowing down blasting vibration
CN205875763U (en) A historical relic protection device for slowing down blasting vibration
CN203113229U (en) Reinforcing device for T-shaped beam and beam case
Sathiparan et al. Shear and flexural bending strength of masonry wall retrofitted using PP-band mesh
CN214459670U (en) Ultrahigh cast-in-situ box girder combined formwork
CN105113781B (en) Device is set up in a kind of overhanging complete pre-buried installation in side of setting a roof beam in place
Twigden et al. Dynamic testing of post-tensioned rocking walls
CN111335341A (en) Ecological concrete slope protection structure crossing rock mass cracks and construction method thereof
CN205474788U (en) Broad width box girder bridge girder roof reinforced structure
WO2011110749A1 (en) Method in connection with a foundation for tower-like structures and a foundation for tower-like structures
CN202705887U (en) Combined type pre-stressed concrete anti-shock check block
CN112182695B (en) Method for determining prestress in masonry guta cultural relic shockproof cable system
Zeng et al. Experimental study on bending behavior of corroded post-tensioned concrete beams
Manandhar et al. Experimental investigation of low cost steel wire mesh retrofit for stone masonry in mud mortar
Ismail et al. Out-of-plane testing of seismically retrofitted URM walls using posttensioning
CN201495662U (en) Curtain wall
Grębowski et al. Cable-stayed cantilever structures as an expat of unique application in the construction of a building located in seismic area–an author’s project of multifunctional building in Lisbon, Portugal
CN115559234A (en) Novel flexible protection system for preventing rock rolling impact and dangerous rock collapse
CN106869338B (en) A kind of antiseptic concrete method
Celik et al. Seismic evaluation and retrofit of a 16th century historic brick masonry dome in Istanbul using combined steel rings and CFRP sheets
CN210194557U (en) Full dam section overflow and anchor cable fixed type modular combined retaining dam
Wen et al. Shaking table investigation on the seismic failure mode of PHC pipe-piles considering liquefaction
Shama et al. The seismic performance of braced timber pile bents

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant