CN106149733B - Tunnel immediately adjacent to bridge section deep foundation pit supporting structure and construction method - Google Patents

Tunnel immediately adjacent to bridge section deep foundation pit supporting structure and construction method Download PDF

Info

Publication number
CN106149733B
CN106149733B CN201610651303.9A CN201610651303A CN106149733B CN 106149733 B CN106149733 B CN 106149733B CN 201610651303 A CN201610651303 A CN 201610651303A CN 106149733 B CN106149733 B CN 106149733B
Authority
CN
China
Prior art keywords
tunnel
square pile
reinforcement cage
wall
steel reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610651303.9A
Other languages
Chinese (zh)
Other versions
CN106149733A (en
Inventor
王新泉
崔允亮
张世民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201610651303.9A priority Critical patent/CN106149733B/en
Publication of CN106149733A publication Critical patent/CN106149733A/en
Application granted granted Critical
Publication of CN106149733B publication Critical patent/CN106149733B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of tunnel immediately adjacent to bridge section deep foundation pit supporting structure, mainly including compositions such as tunnel, tunnel side buttress brace, cement soil wall, precast square pile, connection vertical tube, steel reinforcement cage, mould bag, support member, cast-in-place wallboard wall, side slope, horizontal bent cap, sizing leading truck, big cushion caps;The tunnel floor bottom is provided with tunnel side buttress brace, precast square pile and cast-in-place wallboard wall are provided with the outside of the big cushion cap, cast-in-place wallboard wall bottom is provided with cement soil wall, and construction leads wall and is provided with sizing leading truck, the side slope and faces upward slope and is provided with grouting rock bolt and in-network processing.The present invention has the characteristics of following and beneficial effect:The security and stability of tunnel immediately adjacent to bridge section deep foundation pit support are improved by tunnel side buttress brace, cement soil wall, cast-in-place wallboard wall etc., whole work progress is simple to operate, remarkable benefit.The tensile strength of cast-in-place wallboard wall can be improved by the mould bag on the outside of the stretch-draw anchor and steel reinforcement cage inside precast square pile.

Description

Tunnel immediately adjacent to bridge section deep foundation pit supporting structure and construction method
Technical field
The present invention relates to a kind of tunnel immediately adjacent to bridge section supporting construction and construction method, more particularly to a kind of tunnel immediately adjacent to bridge section depth base Pit supporting construction and construction method, belong to Highway Municipal engineering.
Background technology
With the high speed development of China's economic, mountain area is increasingly goed deep into building for highway, and bridge tunnel ratio significantly increases Add, tunnel immediately adjacent to bridge turns into one of new landscape of highway.Tunnel immediately adjacent to bridge section portal design section is small, and landform is more narrow, construction Place is narrow, and line position is higher, and abutment is close to tunnel portal, and portal construction and beam slab set up more difficult.Tunnel immediately adjacent to bridge section depth base During cheating excavation construction, the stabilization of face-upward slope and dark hole structure is affected greatly, it is necessary to take corresponding supporting to carry out Strengthen, to ensure the stabilization and safety of tunnel exit face-upward slope, dark hole structure and foundation pit side-wall.
Existing tunnel exit Bridge-wire fusing time structure deep foundation pit supporting construction, employ fender post+miniature steel pipe pile and face When anchor and spray net supporting scheme.Tunnel slope is used and gone along with sb. to guard him using general shotcrete reinforcing mode, tunnel immediately adjacent to bridge section with facing upward slope simultaneously Stake supporting and retaining system, tunnel bottom use the support technology of miniature steel pipe pile grouting and reinforcing, pass through the tunnel immediately adjacent to bridge section tunnel for completion of constructing Face-upward slope, the displacement of barrel and deformation monitoring, show that tunnel resistance to overturning and supporting effect are good.But such support pattern Construct complex, fender post quantity is more, and the construction period is longer.
In consideration of it, in order to improve the security and stability of tunnel immediately adjacent to bridge section foundation ditch, it would be highly desirable to which invention is a kind of simple and effective Tunnel immediately adjacent to bridge section deep foundation pit supporting structure and construction method, improve the construction quality and efficiency of construction of tunnel immediately adjacent to bridge section.
The content of the invention
It is an object of the invention to improve the security and stability of tunnel immediately adjacent to bridge section foundation ditch, there is preferable Technological Economy Benefit.
To achieve the above object, present invention employs following technical scheme:
Tunnel immediately adjacent to bridge section deep foundation pit supporting structure, it is characterised in that the structure mainly include tunnel, tunnel side buttress brace, Cement soil wall, precast square pile, connection vertical tube, steel reinforcement cage, mould bag, support member, cast-in-place wallboard wall, side slope, horizontal bent cap, sizing are led Formed to frame, big cushion cap etc.;The tunnel floor bottom is provided with tunnel side buttress brace, be provided with the outside of the big cushion cap precast square pile with Cast-in-place wallboard wall, cast-in-place wallboard wall bottom are provided with cement soil wall, and construction leads wall and is provided with sizing leading truck, the side slope and face upward slope Provided with grouting rock bolt and in-network processing.
Further, tunnel side buttress brace is followed by horizontal bar close to precast square pile side is pre-buried.
Precast square pile is provided with and shelves groove, and corner precast square pile is provided with three grooves, and remaining precast square pile is provided with two grooves, set in groove There is connection vertical tube, entirely shelve groove and be provided with grouting behind shaft or drift lining body, bottom is provided with vertical tube fixed plate, and bottom plate is provided with pre-buried connection end, in advance Square pile side processed is provided with horizontal connecting hole, and horizontal screw bolt is set in hole, steel pipe support, precast square pile top are provided between precast square pile Portion is provided with horizontal bent cap, and screw rod connection end is provided with being followed by horizontal bar correspondence position.
Anchor cable is provided with inside connection vertical tube, top is provided with top fixing element, is provided with anchor cable junction steel plate at the top of anchor cable, anyhow Key is fitted together to steel plate is provided between steel plate, connection vertical tube bottom is provided with injected hole, geotextiles are laid outside hole.
Portion sets steel reinforcement cage to cast-in-place wallboard within the walls, and steel reinforcement cage bottom is provided with steel reinforcement cage bottom plate, and bottom plate pre-embedded bolt, side is set There is mould bag, set support member to be fixed on steel reinforcement cage on the inside of mould bag, bottom coordinates nut to be fixed on steel reinforcement cage bottom plate with L-type pressing plate On.
Steel reinforcement cage is provided with horizontal stiffener, and horizontal stiffener end is provided with the bar connecting collar, in the bar connecting collar Connection vertical tube is set.
The present invention also provides the construction method of tunnel immediately adjacent to bridge section deep foundation pit supporting structure, it is characterised in that including following step Suddenly:
1) construction tunnel side buttress brace:Excavated in the tunnel floor bottom constructed, rear formwork is poured, and side is reserved to be followed by Horizontal bar, then set up sizing leading truck;
2) construction cement soil wall:Stirring or slot grooving cement soil wall after the completion of excavation of foundation pit.
3) banding steel cage:According to design requirement banding steel cage, then every 30~50cm colligation horizontal stiffeners, water The flat reinforcement end welded reinforcement connection collar, while every 50~100cm colligation support members;
4) mould bag is set:Mould bag, mould bag and support member colligation are inserted on the outside of steel reinforcement cage, bottom is inserted on steel reinforcement cage bottom plate Pre-embedded bolt in, and with L-type pressing plate coordinate nut tighten fixation.
5) it is implanted into precast square pile:The fixed connection vertical tube with anchor cable, then plays precast square pile on pre-buried connection end Implantation is hung, welded still pipe supports between two precast square piles after implantation;
6) tunnel side buttress brace is connected with precast square pile:Reserved on precast square pile reserved horizontal screw bolt and tunnel side buttress brace It is followed by horizontal bar welding;
7) cast-in-place wallboard wall is poured:Steel reinforcement cage is lifted by crane, makes reinforcing bar connected set ring control steel reinforcement cage to hang down in real time through connection vertical tube Straight degree and position, concrete is filled when inserting steel reinforcement cage;
8) fixed anchor cable:After anchorage cable stretching, mortar is injected into connection vertical tube, is connected as anchor cable with anchor cable junction steel plate It is overall, vertically and horizontally between key be fitted together to by steel plate interlocked;
9) construction level bent cap:Formwork pours horizontal bent cap at the top of precast square pile;
10) slope construction and slope is faced upward:Construction grouting rock bolt and in-network processing form bank protection.
The present invention has the characteristics of following and beneficial effect:
(1) present invention improves tunnel immediately adjacent to bridge section deep pit support by tunnel side buttress brace, cement soil wall, cast-in-place wallboard wall etc. The security and stability of shield, whole work progress is simple to operate, remarkable benefit.
(2) the anti-of cast-in-place wallboard wall can be improved by the mould bag on the outside of the stretch-draw anchor and steel reinforcement cage inside precast square pile Tensile strength.
(3) steel reinforcement cage side sets horizontal stiffener, the horizontal stiffener end set bar connecting collar, and the collar is inserted in company Vertical tube is connect, the globality of cast-in-place wallboard wall can be increased.
Brief description of the drawings
Fig. 1 is tunnel immediately adjacent to bridge section deep foundation pit supporting structure plan of the present invention;
Fig. 2 is tunnel immediately adjacent to bridge section profile of the present invention;
Fig. 3 is tunnel immediately adjacent to bridge section sectional side view of the present invention;
Fig. 4 is tunnel side buttress brace and precast square pile connection figure;
Fig. 5 is the slot structure figure of precast square pile two of the present invention;
Fig. 6 is the slot structure figure of precast square pile three of the present invention;
Fig. 7 is reinforcement cage structure schematic diagram of the present invention;
Fig. 8 is enlarged drawing in Fig. 7 circles;
Fig. 9 is steel reinforcement cage of the present invention with being connected vertical tube connection figure;
Figure 10 is Fig. 2 partial enlarged drawing;
Figure 11 is Fig. 3 partial enlarged drawing;
Wherein:1. the tunnel side buttress brace 3. of tunnel 2. is followed by the precast square pile 6. of 4. cement soil wall of horizontal bar 5. and shelves groove 7. connect 8. injected hole of vertical tube, 9. anchor cable, 10. vertical tube fixed plate, the 11. pre-buried reinforcing bar of 12. grouting behind shaft or drift lining body of connection end 13. to connect 16. mould bag of female connector ring 14. steel reinforcement cage, 15. top fixing element, 17. support member, the 18. cast-in-place anchor cable of wallboard wall 19. connection steel It is mixed that the horizontal bent cap 21. of plate 20. leads 23. nut, the 24. big grouting rock bolt 26. of the cushion cap 25. net sprays of the sizing of wall 22. leading truck The water of 27. screw rod connection end of solidifying soil, 28. connecting screw, 29. steel pipe support, 30. steel reinforcement cage bottom plate, 31. horizontal connecting hole 32. The flat pre-embedded bolt 35.L type pressing plates of 33. horizontal stiffener of screw rod 34..
Embodiment
Formwork erection technical requirements, concrete pouring construction technical requirements, Reinforcement binding technique requirement etc., the present invention is no longer Tired to state, emphasis illustrates that the present invention relates to the embodiment of structure.
As shown in Figures 1 to 3, tunnel immediately adjacent to bridge section deep foundation pit supporting structure, mainly by the tunnel of 6m internal diameters, 1.5m, high 8m is wide Tunnel side buttress brace, cement soil wall, external diameter 2m precast square pile, diameter 25mm connection vertical tube, steel reinforcement cage, thickness 5mm mould bag, The thick cast-in-place wallboard wall of 3mm steel plates support member, 1.8m, side slope, horizontal bent cap, diameter 48mm sizing leading truck, big cushion cap etc. Composition;Tunnel floor bottom is provided with tunnel side buttress brace, and precast square pile and cast-in-place wallboard wall are provided with the outside of 8m × 8m big cushion cap, existing Pour wallboard wall bottom and be provided with cement soil wall, construction leads wall and is provided with sizing leading truck, the side slope and faces upward the mortar that slope is provided with 4m The anchor pole in-network processing thick with 10cm.Portion sets steel reinforcement cage to cast-in-place wallboard within the walls, and it is thick that steel reinforcement cage bottom is provided with steel reinforcement cage bottom plate 3mm, the pre-buried 20mm bolts of bottom plate are spent, side is provided with mould bag, sets support member to be fixed on steel reinforcement cage on the inside of mould bag, bottom is thick Degree 3mm L-type pressing plate coordinates nut to be fixed on steel reinforcement cage bottom plate.
As shown in figure 4, tunnel side buttress brace is followed by horizontal bar close to the pre-buried diameter 20mm in precast square pile side.Precast square pile with It is followed by the screw rod connection end that horizontal bar correspondence position is provided with length 20cm, being connected with screw rod by being followed by horizontal bar when both connect Connection is completed in end welding.
As shown in Fig. 5~6, precast square pile be provided with 60cm it is wide shelve groove, corner precast square pile is provided with three grooves, and remaining is pre- Square pile processed is provided with two grooves, and connection vertical tube is provided with groove, groove is entirely shelved and is provided with grouting behind shaft or drift lining body, and grouting behind shaft or drift lining body is C30 cement mortar, Bottom is provided with vertical tube fixed plate, and bottom plate is 3mm steel plates, and bottom plate is provided with pre-buried connection end, and precast square pile side is provided with level Connecting hole, aperture 22mm set horizontal screw bolt in hole, screw diameter 20mm, and diameter 48mm steel pipe is provided between precast square pile Support, precast square pile top are provided with wide 2mm, thickness 1m horizontal bent cap, length 20cm are provided with being followed by horizontal bar correspondence position Screw rod connection end.
The anchor cable that diameter 2mm is provided with inside vertical tube is connected, top is provided with 3mm steel plate top fixing elements, is provided with the top of anchor cable Anchor cable junction steel plate, thickness 3mm, anyhow to the chimeric key of steel plate is provided between steel plate, connection vertical tube bottom is provided with injected hole, aperture 10mm, geotextiles are laid outside hole.
As shown in fig. 7, steel reinforcement cage is provided with diameter 18mm horizontal stiffener, reinforcement end is provided with reinforced bar jointing sleeve Ring, the collar are made up of diameter 10mm reinforcing bar, and connection vertical tube is set in the collar.

Claims (5)

1. tunnel immediately adjacent to bridge section deep foundation pit supporting structure, it is characterised in that mainly by tunnel (1), tunnel side buttress brace (2), soil cement Wall (4), precast square pile (5), connection vertical tube (7), steel reinforcement cage (14), mould bag (16), support member (17), cast-in-place wallboard wall (18), Side slope, horizontal bent cap (20), sizing leading truck (22) and big cushion cap (24) composition;Tunnel (1) the bottom plate bottom is provided with tunnel side Buttress brace (2), is provided with precast square pile (5) and cast-in-place wallboard wall (18) on the outside of the big cushion cap (24), under cast-in-place wallboard wall (18) Portion is provided with cement soil wall (4), and construction leads wall (21) and is provided with sizing leading truck (22), the side slope and faces upward slope and is provided with grouting rock bolt (25) with in-network processing (26);Described tunnel side buttress brace (2) is followed by horizontal bar (3) close to precast square pile (5) side is pre-buried;In advance Square pile (5) processed is provided with and shelves groove (6), and corner precast square pile (5) is provided with three grooves, and remaining precast square pile (5) is provided with two grooves, in groove Provided with connection vertical tube (7), entirely shelve groove (6) and be provided with grouting behind shaft or drift lining body (12), bottom is provided with vertical tube fixed plate (10), set on bottom plate There is pre-buried connection end (11), precast square pile (5) side is provided with horizontal connecting hole (31), and horizontal screw bolt (32) is set in hole, prefabricated Steel pipe support (29) is provided between square pile (5), horizontal bent cap (20) is provided with the top of precast square pile (5), it is right with being followed by horizontal bar (3) Position is answered to be provided with screw rod connection end (27).
2. tunnel immediately adjacent to bridge section deep foundation pit supporting structure according to claim 1, it is characterised in that described connection vertical tube (7) Inside is provided with anchor cable, and top is provided with top fixing element (15), and anchor cable top is provided with anchor cable junction steel plate (19), anyhow to steel plate it Between be provided with steel plate be fitted together to key, connection vertical tube (7) bottom be provided with injected hole (8), lay geotextiles outside hole.
3. tunnel immediately adjacent to bridge section deep foundation pit supporting structure according to claim 1, it is characterised in that described cast-in-place wallboard wall (18) internal to set steel reinforcement cage (14), steel reinforcement cage (14) bottom is provided with steel reinforcement cage bottom plate (30), and bottom plate is provided with pre-embedded bolt (34), Side is provided with mould bag (16), sets support member (17) to be fixed on steel reinforcement cage (14) on the inside of mould bag (16), bottom L-type pressing plate (35) nut (23) is coordinated to be fixed on steel reinforcement cage bottom plate (30).
4. tunnel immediately adjacent to bridge section deep foundation pit supporting structure according to claim 1, it is characterised in that on the steel reinforcement cage (14) Provided with horizontal stiffener (33), horizontal stiffener (33) end is provided with the bar connecting collar (13), and the bar connecting collar (13) is interior Connection vertical tube (7) is set.
5. the construction method of tunnel immediately adjacent to bridge section deep foundation pit supporting structure as claimed in claim 1, it is characterised in that including following Step:
1) construction tunnel side buttress brace (2):Excavated in the tunnel floor bottom constructed, rear formwork is poured, and side is reserved to be followed by Horizontal bar (3), then set up sizing leading truck (22);
2) construction cement soil wall (4):Stirring or slot grooving cement soil wall (4) after the completion of excavation of foundation pit;
3) banding steel cage (14):According to design requirement banding steel cage (14), then every the horizontal reinforcement of 30~50cm colligations Muscle (33), horizontal stiffener (33) end welded reinforcement connection collar (13), while every 50~100cm colligation support members (17);
4) mould bag (16) is set:Mould bag (16), mould bag (16) and support member (17) colligation, bottom are inserted on the outside of steel reinforcement cage (14) It is inserted in the pre-embedded bolt (34) on steel reinforcement cage (14) bottom plate, and coordinates nut (23) to tighten fixation with L-type pressing plate (35);
5) it is implanted into precast square pile (5):The fixed connection vertical tube (7) with anchor cable (9) on pre-buried connection end (11), then will be pre- Square pile (5) lifting implantation processed, welded still pipe support (29) between two precast square piles (5) after implantation;
6) tunnel side buttress brace (2) is connected with precast square pile (5):The reserved horizontal screw bolt (32) of precast square pile (5) is strengthened with tunnel side That is reserved on beam (2) is followed by horizontal bar (3) welding;
7) cast-in-place wallboard wall (18) is poured:Steel reinforcement cage (14) is lifted by crane, makes reinforcing bar connected set ring (13) through vertical tube (7) is connected, in real time Steel reinforcement cage (14) perpendicularity and position are controlled, concrete is filled when inserting steel reinforcement cage (14);
8) fixed anchor cable (9):After anchor cable (9) tensioning, the injection mortar into connection vertical tube (7) will with anchor cable junction steel plate (19) Anchor cable (9) is connected as entirety, vertically and horizontally between by steel plate be fitted together to key interlock;
9) construction level bent cap (20):Formwork pours horizontal bent cap (20) at the top of precast square pile (5);
10) slope construction and slope is faced upward:Construction grouting rock bolt (25) and in-network processing (26) form bank protection.
CN201610651303.9A 2016-08-10 2016-08-10 Tunnel immediately adjacent to bridge section deep foundation pit supporting structure and construction method Active CN106149733B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610651303.9A CN106149733B (en) 2016-08-10 2016-08-10 Tunnel immediately adjacent to bridge section deep foundation pit supporting structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610651303.9A CN106149733B (en) 2016-08-10 2016-08-10 Tunnel immediately adjacent to bridge section deep foundation pit supporting structure and construction method

Publications (2)

Publication Number Publication Date
CN106149733A CN106149733A (en) 2016-11-23
CN106149733B true CN106149733B (en) 2017-12-22

Family

ID=57329604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610651303.9A Active CN106149733B (en) 2016-08-10 2016-08-10 Tunnel immediately adjacent to bridge section deep foundation pit supporting structure and construction method

Country Status (1)

Country Link
CN (1) CN106149733B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951652B (en) * 2018-08-08 2020-08-14 黑龙江龙捷市政轨道交通工程有限公司 Bridge-tunnel connection section deep foundation pit supporting structure and construction method
CN109113069A (en) * 2018-08-08 2019-01-01 武岳 Precipitous section tunnel immediately adjacent to bridge foundation pit support device and construction method
CN108824451B (en) * 2018-08-29 2019-09-03 武岳 Tunnel immediately adjacent to bridge section deep foundation pit supporting structure and construction method
CN114197452B (en) * 2021-12-18 2023-03-03 杭州森竹建设工程有限公司 Post-grouting prestressed hollow square pile and manufacturing method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009174178A (en) * 2008-01-24 2009-08-06 Kajima Corp Method of constructing underground structure
CN105133664A (en) * 2015-08-26 2015-12-09 济南轨道交通集团有限公司 Combined frame type isolation protection system and construction method thereof
CN206052727U (en) * 2016-08-10 2017-03-29 浙江大学城市学院 Tunnel immediately adjacent to bridge section deep foundation pit supporting structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009174178A (en) * 2008-01-24 2009-08-06 Kajima Corp Method of constructing underground structure
CN105133664A (en) * 2015-08-26 2015-12-09 济南轨道交通集团有限公司 Combined frame type isolation protection system and construction method thereof
CN206052727U (en) * 2016-08-10 2017-03-29 浙江大学城市学院 Tunnel immediately adjacent to bridge section deep foundation pit supporting structure

Also Published As

Publication number Publication date
CN106149733A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN106149733B (en) Tunnel immediately adjacent to bridge section deep foundation pit supporting structure and construction method
CN205742213U (en) Foundation pit supporting construction
CN106498950B (en) Anchor head is placed in the implementation method of the Pile-Anchor Supporting for Deep Excavation system of pile body
CN106499413A (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN201148621Y (en) Miniature anti-slide pile composite structure
CN107268807A (en) A kind of Prefabricated concrete-filled steel tube superposed column
CN210163913U (en) Asymmetric double-row pile-anchor rod combined supporting structure
CN103510540B (en) Mortar flag stone retaining wall reinforcement construction method and structure thereof
CN110106896A (en) A kind of prefabricated card slot type anchor pier lattice girder construction and assembling constructing method of slope reinforcement
CN102605773B (en) Construction method of slip-casting expanded-base cast-in-situ bored pile and extruding-extending device thereof
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
CN104295003A (en) Structural column construction method
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN106436732A (en) Reinforcing method and reinforcing structure for replacing strip foundations by raft foundations
KR20090007826A (en) Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut
CN103452120A (en) Pile top crown beam structure of high-strength prestress pipe pile for supporting foundation pit and construction method thereof
CN108060789A (en) A kind of wall support and change method of existing masonry structure base isolation reinforcement
CN209260897U (en) Assembly concrete beam column sleeve combination connecting node
CN110439025A (en) Portal type building pile foundation underpinning structure in narrow space and construction method
CN103806451A (en) Anchorage-type foundation pit reinforcing structure and construction method thereof
CN210766861U (en) Portal formula building pile foundation underpins structure under narrow and small space
CN206800370U (en) It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground without fertile groove
CN108842790A (en) A kind of embankment side slope framework anchor holding frame lattice assembled retaining structure and construction method
CN108265733A (en) Build-in soil body restricted type pile slab supporting structure and construction method before stake
CN208718686U (en) A kind of precast assembly steel loop borehole wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant